Sitework takeoff
Cut and fill volumes, stripping, grading and utility trenching for infill lots with tight access off La Grange Road.
CY · LF · TONOrland Park sits in Cook County, where new residential permits rose about 26% from 2024 to 2025 — 29 single-family units and $11M in permitted value. We produce CSI-organized takeoffs in Excel and PDF so your bid is complete before you submit it.
Four local cost drivers shape every Orland Park takeoff: Cook County prevailing-wage thresholds on public work, clay-heavy glacial soils that drive foundation over-excavation, IECC thermal envelope requirements on new single-family homes, and ZIP-code-adjusted material pricing for the 60462/60467 area. Each one changes your quantities, not just your unit rates.
Orland Park is a built-out Cook County suburb where most work is infill: teardown-and-rebuild single-family homes, additions, and small commercial tenant fit-outs along the La Grange Road and 159th Street corridors. That mix means your takeoffs are quantity-sensitive rather than volume-sensitive — a 2,800 SF custom home has more line items than a 20,000 SF warehouse, and the waste factors are less forgiving. We build estimates the same way you bid them: division by division, with quantities you can check against the plans.
We work from your architectural, structural and MEP sets in Bluebeam Revu and PlanSwift, price with RSMeans data adjusted to the project ZIP code, and return Excel and PDF deliverables organized by CSI MasterFormat division with marked-up plan sets. Most projects come back in 24–48 hours, with rush turnaround available. If you are comparing bids across the southwest suburbs, our Tinley Park and Oak Lawn pages cover the same labor market, and the Illinois construction estimating hub explains how we handle statewide code and wage differences.
For bidders. You need a complete scope before the bid date, not a square-foot guess. We return division-level quantities with waste factors stated, so you can adjust your markup instead of rebuilding the takeoff.
For builders. You are pricing a teardown-and-rebuild or an addition in Orland Park. We break out demolition, foundation over-excavation, framing and envelope separately, so change orders do not eat your margin.
For owners. You want a budget before you buy the lot or sign the lease. We give you a line-item estimate with alternates, so you can see what a different window package or HVAC system actually costs.
Select a bar to compare Orland Park with the largest Illinois markets we cover.
29 new housing units in 2025 (+26.1% vs 2024).
29 single-family · 0 multifamily (0%).
Orland Park issued 29 new privately-owned residential units in 2025, up from 23 in 2024 — about a 26% increase. All 29 were single-family; multifamily was zero. Permitted value was $11M, or roughly $390,200 per unit, and the city ranked 16th of 25 covered Illinois cities by unit count, about 0.4% of the 6,710 covered statewide units. For bidders, that reads as a steady custom-home and teardown market rather than a production-volume market. Your competition is other local builders, not national tract builders, so your estimate has to win on completeness and unit-rate accuracy. A missed foundation or envelope line is harder to absorb on a 29-unit annual market than it would be on a 300-unit one. The Illinois construction estimating page shows how the same figures compare across the state.
The Chicago area remains a major commercial and industrial hub with a strong logistics and data-center pipeline, and that pipeline pulls union labor and material supply away from small residential and fit-out work across Cook, Will and DuPage counties. In practice, your Orland Park estimate needs current local labor rates, not a national average — carpenters, electricians and operating engineers all price differently here than they do downstate. Material pricing is also ZIP-sensitive: concrete, lumber and drywall delivered to 60462 does not price the same as to a rural ZIP. We adjust both. If your project is industrial or logistics-adjacent, our industrial estimating services and commercial estimating services pages cover the divisions that matter most. Nearby Tinley Park and Palatine share the same labor pool.
We cover the divisions that show up on Orland Park plans: sitework, concrete, framing, roofing, MEP and full residential or commercial packages.
Cut and fill volumes, stripping, grading and utility trenching for infill lots with tight access off La Grange Road.
CY · LF · TONFootings, foundation walls, garage slabs and driveways, with rebar and formwork broken out by pour.
CY · SF · LBOver-excavation and granular backfill quantities for clay-heavy Cook County soils, plus waterproofing and drain tile.
CY · SF · LFDimension lumber, engineered joists, LVL beams and sheathing counted from the framing plans, with typical waste factors stated.
BF · LF · EAArchitectural shingle, underlayment, ice-and-water membrane at eaves, ridge vent and flashing for steep-slope residential roofs.
SQ · LF · EARough and finish plumbing, HVAC equipment and ductwork, and electrical devices counted from the MEP set.
LF · EA · TONFull division-by-division packages for custom homes, teardown rebuilds and additions in the 60462 and 60467 ZIPs.
SF · EA · LSTenant fit-outs and small commercial buildings along 159th Street, priced with CSI-organized quantities and alternates.
SF · EA · LSYou are pricing teardown-and-rebuild homes and additions on tight Orland Park lots, where demolition, over-excavation and sheathing quantities decide the bid. We return division-level takeoffs with stated waste factors.
Your plans change between pricing and permit. We re-price framing, envelope and MEP scopes from the current set so your Orland Park budget tracks the drawings instead of an old square-foot number.
You bid concrete, framing or roofing across the southwest suburbs and need quantities you can defend. We break out the scope by CSI division with units you can check against the plans.
You are converting or upfitting space along La Grange Road and 159th Street. We separate demolition, partitions, ceiling, storefront and MEP so the landlord allowance and your scope do not overlap.
You need a budget before buying a lot or signing a lease in Orland Park. We give line-item estimates with alternates so you can see what a different window or HVAC package costs.
You need a cost check during design. We take off your schematic set, flag scope gaps and return Excel and PDF deliverables organized by MasterFormat division with marked-up plans.
We estimate from plans for projects throughout Orland Park and the surrounding Cook and Will County suburbs. If your project is in one of these areas, send the set and we will price it to the correct ZIP code.
Orland Park permits are almost entirely new privately-owned residential units, and most of that is single-family infill. The table below shows the 2025 permit mix we price against.
Teardown-and-rebuild and infill homes on existing lots, typically 2,500 to 4,000 SF. We take off demolition, foundation, framing, envelope and MEP by division so you can compare your bid to the plan set.
Watch for: Demolition debris, over-excavation, sheathing and window schedules
Second-story additions, kitchen and bath gut renovations, and rear extensions. Existing conditions drive the scope, so we price new work separately from patching, tie-ins and temporary protection.
Watch for: Tie-ins to existing framing, MEP relocation, temporary weather protection
Retail, restaurant and office upfits along La Grange Road and 159th Street. We separate landlord shell work from tenant scope, including storefront, partitions, ceiling, HVAC distribution and electrical.
Watch for: Landlord versus tenant scope, grease duct, ADA restroom upgrades
Small distribution and contractor-shop buildings near the I-80 and La Grange Road corridors. Slab-on-grade, tilt or masonry walls, and racking-ready electrical are the main quantities we price.
Watch for: Slab thickness and reinforcement, dock equipment, fire protection
Park district buildings, church additions and school-district projects in and around Orland Park. Prevailing wage and public bid requirements change the labor component, so we price them against the correct wage basis.
Watch for: Prevailing wage, bid alternates, phasing around occupied buildings
Townhome and small apartment projects in the southwest suburbs. Repetitive units reward accurate per-unit takeoffs, but we still break out the first unit, typical unit and common areas separately.
Watch for: Unit mix, common-area scope, fire separation and rated assemblies
Two estimates for the same square footage can differ by 20 percent or more once you account for the items below. We price each one explicitly rather than burying it in a unit rate.
Orland Park reviews residential and commercial permits through its own building department, and Cook County stormwater and drainage requirements can add review time and sitework scope. We list permit-related line items separately so you can see what the jurisdiction is driving. Confirm the adopted code edition and any local amendments with the Orland Park building department before you finalize your bid, because the edition in force changes egress, energy and fire-protection requirements.
Orland Park building department · Cook County stormwater · IBC · IRCMuch of the Orland Park area sits on glacial till and clay soils with pockets of sand and gravel, and some lots have a high water table. That affects over-excavation, backfill, footing design and waterproofing. We take off foundation work from the geotechnical report and structural drawings, and we carry a separate line for unsuitable-soil removal and engineered fill, because those quantities are the ones that blow up a residential foundation budget.
Glacial till · clay soils · geotechnical report · waterproofingNortheast Illinois design temperatures and frost depth drive footing depth, slab insulation, pipe burial and HVAC sizing. We price envelope and mechanical scopes to the energy code edition the project is permitted under, and we carry freeze protection for exterior water lines and fire-protection piping. Winter construction also adds temporary heat, hoarding and cold-weather concrete measures, which we list as separate line items rather than absorbing into the concrete rate.
IECC · frost depth · temporary heat · fire-protection pipingOrland Park bids against the same union and open-shop labor pool as Tinley Park, Oak Lawn and the rest of the southwest Cook County market. Framing, drywall and mechanical trades are the ones most likely to be booked out, and that shows up as premium labor or longer schedules. We price labor from RSMeans data adjusted to the project ZIP code, so your estimate reflects the local market rather than a national average.
RSMeans data · ZIP-code adjustment · union labor · open shopInfill lots in Orland Park are often narrow and already graded, so drainage, retaining walls and utility relocations become the expensive items. Cook County and local stormwater rules can require detention or infiltration on redevelopment, and that is a sitework scope many bidders miss. We take off grading, storm sewer, detention and erosion control from the civil set and flag anything that depends on a variance or a revised grading plan.
Detention · infiltration · erosion control · utility relocationOrland Park is inside the Chicago material delivery radius, so concrete, masonry and steel are readily available, but supplier pricing moves and fuel surcharges apply. Illinois sales tax treatment differs between materials purchased by a contractor and materials purchased by an owner, and municipal taxes can apply. We state the material pricing basis and sales-tax assumption on the estimate so you can adjust it to how you actually buy.
Chicago delivery radius · fuel surcharge · Illinois sales tax · material pricing basisOrland Park sits in Cook County, where clay soils, a real freeze depth, and a steady stream of tear-down rebuilds and infill subdivisions change how you count quantities. Here is where those conditions land in the divisions.
Cook County clay holds water, so a takeoff that assumes a clean cut and fill will not survive a wet spring. We carry stripping of topsoil in cubic yards, then over-excavation below footings where the geotech report calls for it, plus granular backfill by the ton. Frost depth drives water service and sanitary lateral cover, and the Village of Orland Park requires its own plan review before a permit is issued, so site plan sheet counts matter. Storm structures, trench backfill, and pavement restoration along 159th Street or La Grange Road corridors are separate line items, never lumped into a general conditions number. For dirt, utilities, and paving, see our sitework estimating services.
Orland Park's residential permits are almost entirely single-family, which means stick-framed houses with engineered floor systems, not panelized multi-family. We take off wall plates in linear feet, studs by height and spacing, headers by size, and sheathing in sheets with a typical waste factor applied per area. Roof trusses are counted by piece from the supplier layout, and blocking, nailers, and stair framing are itemized rather than carried as an allowance. Engineered lumber is priced by the piece with hangers and connectors listed individually. Framing estimating services has the full breakdown of how we present that.
Mechanical, electrical, and plumbing takeoffs in Orland Park follow the Illinois plumbing code family and the adopted edition of the NEC, which you should confirm with the local building department before pricing. We count fixtures by type, branch wiring by device and home run, and ductwork by pound and linear foot of each size. On the finish side, drywall is square feet of board with a waste factor, paint is by area and coat, and flooring, trim, and cabinetry are each their own line. MEP estimating services and residential estimating services cover the trade-level detail.
Foundations here are typically spread footings and frost walls on engineered fill, with slab-on-grade in garages and basements in the newer subdivisions. We count formwork in square feet of contact area, not slab area, and separate footing, stem wall, and slab mixes by compressive strength. Rebar is taken off by bar size and length with lap and waste, and vapor barrier and rigid insulation under slab are their own line items. Driveway and apron flatwork is measured separately from structural concrete because finish and thickness differ. Our concrete estimating services and foundation estimating services cover both sides of that split.
The Chicago-area climate brings hail and freeze-thaw cycling, so roof assemblies get underlayment, ice barrier at eaves, and ventilation calculated by net free area. We measure roof area from the plan and add for hips, valleys, and ridge, then convert to squares with a typical waste factor. Siding, house wrap, flashing, and window and door openings are taken off by elevation so nothing is double-counted. Gutters and downspouts are linear feet, not allowances. Roofing estimating services explains how we handle steep-slope and low-slope assemblies on the same bid.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24 in x 12 in | 18.6 | CY |
| 03 20 00 | Rebar, #4 footing bars with lap | 2,140 | LF |
| 03 11 00 | Foundation wall formwork, contact area | 1,860 | SF |
| 06 10 00 | 2x6 wall studs, 9 ft, 16 in o.c. | 1,540 | EA |
| 06 10 00 | OSB wall sheathing, 7/16 in | 86 | SHT |
| 07 30 00 | Architectural shingles, incl. waste | 34 | SQ |
| 09 29 00 | 1/2 in drywall, walls and ceilings | 9,240 | SF |
| 22 11 00 | PEX domestic water, 1/2 in and 3/4 in | 1,275 | LF |
This walk-through uses illustrative dimensions for a rectangular footing under a house of the size common in Orland Park's newer subdivisions. Confirm the actual footing width, depth, and layout with the structural drawings and the geotech report before you price anything.
Step 1 — Perimeter. A 40 ft by 30 ft footprint gives a perimeter of 2 x (40 + 30) = 140 LF. Add a 20 ft interior bearing wall footing and a 16 ft garage separation footing: 140 + 20 + 16 = 176 LF of footing.
Step 2 — Cross-section. The footing is 24 in wide by 12 in deep, so the cross-section is 2.0 ft x 1.0 ft = 2.0 SF.
Step 3 — Net volume. 176 LF x 2.0 SF = 352 CF. Divide by 27 to convert to cubic yards: 352 / 27 = 13.0 CY.
Step 4 — Waste and overpour. Footings are trenched and formed, so a typical waste factor of 5 percent is reasonable. 13.0 x 1.05 = 13.7 CY. Round to 14 CY for ordering.
Step 5 — Rebar. Four continuous #4 bars give 4 x 176 = 704 LF. Vertical dowels into the stem wall at 4 ft o.c. add 176 / 4 = 44 dowels at 3 ft each = 132 LF. Total 704 + 132 = 836 LF. With a typical 10 percent lap and waste allowance: 836 x 1.10 = 920 LF.
Step 6 — Formwork. Foundation wall formwork is measured on contact area, not footing volume. For a 9 ft wall on 176 LF, two faces: 176 x 9 x 2 = 3,168 SF, minus openings for the garage door and windows, which you deduct by elevation.
| Step | Calculation | Result | Unit |
|---|---|---|---|
| Footing length | 2 x (40 + 30) + 20 + 16 | 176 | LF |
| Cross-section | 2.0 ft x 1.0 ft | 2.0 | SF |
| Net volume | 176 x 2.0 / 27 | 13.0 | CY |
| With 5% waste | 13.0 x 1.05 | 13.7 | CY |
| Rebar with laps | (704 + 132) x 1.10 | 920 | LF |
| Wall formwork | 176 x 9 x 2 | 3,168 | SF |
Every one of those numbers changes if the footing steps, if the garage is detached, or if the geotech report requires over-excavation. That is why we price from the drawings and the soils report, not from a square-foot rule of thumb.
Most single-family projects are returned in 24 to 48 hours, with rush turnaround available if your bid date is close. Larger custom homes with detached garages, pools, or extensive sitework take longer because the sheet count and the number of trades go up. Send the full plan set, including the structural and civil sheets, and we will confirm the delivery date before we start.
Yes. We use ZIP-code-adjusted material and labor pricing, so the rates reflect the Orland Park market rather than a national average. That matters for concrete, carpentry, and roofing, where local labor availability moves the number more than material does. If you have current supplier quotes or a subcontractor bid you want us to match, send them and we will reconcile the takeoff against them.
Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets showing what was measured. The Excel file is built so you can adjust quantities, waste factors, and unit costs without rebuilding the sheet. Marked-up drawings let your superintendent and subs see exactly which walls, footings, and roof planes were counted, which cuts down on arguments during buyout.
The permit figures come from the U.S. Census Bureau Building Permits Survey for 2025. That survey counts new privately-owned residential units only, so it excludes commercial, industrial, and renovation permits. Orland Park issued 29 such units in 2025, up from 23 in 2024, and all 29 were single-family. Use those numbers as a demand signal, not as a count of total construction activity in the village.
Yes. The village has commercial corridors along La Grange Road and 159th Street, plus light industrial and warehouse space near the I-80 interchange. Those projects involve different divisions than a house: structural steel, metal stud and drywall systems, rooftop units, fire protection, and site utilities. Our commercial estimating services and industrial estimating services cover that scope.
We do not assume a clean cut and fill. If the geotech report calls for over-excavation, we carry the removal, the granular backfill by the ton, and the compaction testing as separate line items. We also check that footing depths clear the local frost depth and that the water and sanitary laterals are buried below it. If you do not have a soils report yet, we will flag that as an open item on the estimate.
Yes. We work across the southwest suburbs, including Tinley Park, Oak Lawn, and Berwyn, as well as the north side suburbs like Skokie, Des Plaines, and Palatine. Rates adjust by ZIP code, so a takeoff for a Tinley Park address will not carry the same labor and material pricing as one for Skokie. See the Illinois construction estimating page for the full coverage list.
A complete plan set, including architectural, structural, civil, and MEP sheets, plus any specifications and the geotech report if one exists. If you only have architectural drawings, we can still produce a takeoff but we will list the structural and MEP quantities as assumptions to be confirmed. Tell us your bid date and whether you want alternates priced separately.
Yes, though Orland Park's 2025 residential permits were all single-family, so most local work we see is custom and production housing. Multi-family takeoffs add unit-mix matrices, repeated floor plans by level, and separate counts for common areas, elevators, and fire protection. Our multi-family estimating services page shows how we structure those quantities so you can compare buildings on a per-unit basis.
Yes, and those bids need extra care. A tear-down adds demolition, disposal, utility disconnects, and often a new water and sanitary service, none of which appear on a plan for a vacant lot. We carry those as separate line items so they do not get buried in general conditions. Send the demolition plan if you have one, and confirm with the village what permits and inspections apply.
Send your plan set and bid date, and we will return a MasterFormat-organized takeoff in 24 to 48 hours.