Sitework takeoff
Clearing, structural fill, retaining walls, and utility trenching for steep Chuckanut-area lots and infill sites.
CY · LF · TONWe prepare CSI-formatted quantity takeoffs and estimates for Bellingham contractors and developers, priced with ZIP-code-adjusted material and labor data. Send plans and specs and we return Excel and PDF deliverables with marked-up plan sets in 24–48 hours for most projects.
Bellingham's marine climate and glacial soils drive footing depth, drainage, and roofing details. Multifamily infill downtown and near Western Washington University adds Type III and V wood-frame costs. Whatcom County permitting, ferry and border logistics, and steep infill sites raise sitework and concrete quantities beyond typical Puget Sound baselines.
Bellingham sits between Bellingham Bay and the Chuckanut foothills, and that geography shows up in every takeoff. Glacial till and marine clay push footing depths past the typical 24 inches, and wet winters mean footing drains, crushed-stone capillary breaks, and damp-proofing are not optional line items. If you are bidding a Fairhaven or Sehome remodel, the demo and shoring quantities often exceed the new work. Our Washington construction estimating practice is built around those conditions, and we price with RSMeans data adjusted to Bellingham ZIP codes rather than a statewide average.
On the vertical side, the city's permit mix skews multifamily — 506 of 737 new privately-owned residential units permitted in 2025 were in buildings with two or more units. That means repeated unit types, corridor and stair framing, and MEP rough-in counts that reward a disciplined takeoff. We deliver Excel and PDF organized by CSI MasterFormat division with marked-up plan sets, so your estimator can audit every quantity. Contractors working Federal Way or Yakima get the same format.
For bidders. You need quantities you can defend at bid review. We return division-level takeoffs with waste factors, unit costs, and marked-up plans so you can see where the concrete, framing, and roofing numbers came from before you sign a lump sum.
For builders. You are buying out trades and tracking change orders. Our estimates break framing, MEP, and finishes into CSI divisions with quantities you can hand to a subcontractor for a scope check, plus alternates for the items most likely to move.
For owners. You are comparing pro formas or lender draws. We give you a cost basis tied to Bellingham ZIP-code pricing, separated into hard costs by division, so you can test a multifamily or mixed-use budget before design is frozen.
Select a bar to compare Bellingham with the largest Washington markets we cover.
737 new housing units in 2025 (+37.8% vs 2024).
231 single-family · 506 multifamily (69%).
Bellingham issued permits for 737 new privately-owned residential units in 2025, up 38% from 535 in 2024. Multifamily accounted for 506 units, or 69% of the total, while single-family accounted for 231. Permitted value was $134M, an average of $181,400 per unit. For bidders, that mix means your competition is pricing repeated unit plans, not one-off custom homes, and your edge is in the shared scope: corridor framing, stair and elevator cores, common-area MEP, and site retaining walls. The city ranks 7th of 25 covered state cities by units and represents 4.6% of the 16,004 units permitted across those cities. See how we handle multi-family estimating services for that building type.
At $181,400 per permitted unit, Bellingham projects sit in a range where sitework, foundations, and framing dominate the budget. Steep lots near the Chuckanut foothills and along the bay require shoring, structural fill, and deeper footings, and those quantities are easy to undercount at bid time. We build sitework estimating services and foundation estimating services into the same takeoff as the vertical scope so the dirt and the structure reconcile. If you also work south of King County, our Auburn construction estimating page covers a similar multifamily-heavy permit profile.
We cover the divisions that carry the most cost on Bellingham residential and commercial work, from dirt to finishes.
Clearing, structural fill, retaining walls, and utility trenching for steep Chuckanut-area lots and infill sites.
CY · LF · TONFootings, stem walls, slab-on-grade, and rebar schedules sized for glacial till and marine clay conditions.
CY · SF · LBFloor, wall, and roof framing with stud, plate, joist, and sheathing counts for Type III and V buildings.
LF · EA · SFUnderlayment, flashing, and venting quantities for wind-driven rain exposure common along Bellingham Bay.
SF · LF · EAPlumbing, HVAC, and electrical rough-in counts by fixture and device for repeated multifamily unit plans.
EA · LF · TONCustom and production homes, including remodels in Fairhaven, Sehome, and the Lettered Streets.
SF · EA · LSTenant improvements, retail, and light industrial shell work priced to Whatcom County labor rates.
SF · EA · LSWaterfront and port-adjacent warehouse and process work, including foundations and utility tie-ins.
CY · LF · TONWith 506 of 737 permitted units in 2+ unit buildings, you are pricing repeated unit types, corridor framing, and stair cores. We give you division-level quantities with waste factors so your bid review holds up.
You need to know whether the GC's concrete or framing scope includes footing drains, capillary breaks, and shoring. Our marked-up plans show exactly what we counted, so you can compare before you sign.
Bellingham's permit mix is 69% multifamily, so your budget turns on unit-count efficiency and parking. We separate hard costs by CSI division and adjust material and labor to local ZIP codes.
You need early cost feedback while drawings are still moving. We flag missing scope like damp-proofing or footing depth changes from glacial till, so your client sees the cost impact before bid.
You are planning a remodel or addition in Fairhaven, Sehome, or the waterfront. We estimate demo, shoring, and new work separately so you can phase the project and control cash flow.
You are bidding Bellingham work from Seattle or farther. We apply Bellingham ZIP-code pricing and note local conditions like marine clay and wet winters, so your number reflects what crews actually face.
We estimate projects across Bellingham and Whatcom County, from downtown infill to hillside lots near the Chuckanuts. If your project is in one of these areas, the takeoff notes the access, soils, and staging conditions that affect cost.
The city's 2025 permit data shows 737 new privately-owned residential units, with 506 in multifamily buildings. That mix drives our takeoff priorities: repeated unit types, shared MEP, and site work that handles wet winters.
These are the majority of Bellingham's permitted units. We count each unit type separately, then add shared corridor, stair, and mechanical room quantities. Waste factors are applied by material, not a blanket percentage.
Watch for: Shared wall framing, fire separation, and unit-turn MEP counts.
Larger buildings bring elevator, sprinkler, and common-area scope. We break out NFPA 13 sprinkler mains, standpipes, and electrical house loads, then separate unit fit-out from core and shell so your buyout is clean.
Watch for: Sprinkler coverage, elevator pit, and common-area finishes.
Hillside lots near Chuckanut and Edgemoor often need stepped foundations and shoring. We estimate excavation, retaining walls, and footing drains as separate line items rather than burying them in a general condition.
Watch for: Slope shoring, footing depth, and driveway retaining.
Tight lots downtown and in Fairhaven limit staging and machine access. We add line items for hand excavation, short haul, and crane or pump placement, because those costs show up when a lot is under 5,000 square feet.
Watch for: Staging limits, haul distance, and utility relocations.
Ground-floor commercial under residential is common on corridors like Meridian and in the waterfront district. We separate tenant improvement allowances from base building and note where grease, venting, or ADA scope may fall to the owner.
Watch for: Tenant allowances, venting, and ADA path of travel.
Older Bellingham housing stock often has knob-and-tube wiring, undersized framing, and no footing drains. We carry demo, hazardous-material allowances, and structural upgrades as separate divisions so you can price alternates.
Watch for: Demo quantities, hazardous allowances, and structural upgrades.
Bellingham's cost profile is set by its soils, wet winters, and a permit mix that leans multifamily. These are the six factors we adjust for on every takeoff.
Bellingham and Whatcom County review residential and commercial permits under the Washington State Building Code, which adopts the IBC and IRC with state amendments. Energy code requirements under the Washington State Energy Code affect insulation, glazing, and ventilation quantities. Plan review timelines vary with project type and completeness, so we build a allowance for review cycles into the schedule. Confirm the adopted code edition and any local amendments with the city or county building department before you finalize your bid.
Washington State Building Code · Whatcom County · city building departmentGlacial till and marine clay are common in Bellingham, and both can push footing depths past the typical 24 inches. We carry over-excavation, crushed-stone capillary breaks, and footing drains as separate line items. On hillside lots near Chuckanut, stepped footings and retaining walls add concrete and rebar quantities. A geotechnical report is the input we ask for first, because it sets the depth and the drainage detail.
glacial till · marine clay · geotechnical reportBellingham's wet winters mean damp-proofing, drainage boards, and roof underlayment are not optional. We count weather-resistive barriers, flashing, and gutter quantities by linear foot, and we note where siding details need extra sealant or rain-screen. Roofing underlayment and ice-dam protection at eaves are standard allowances. If your project is on an exposed site near the bay, wind-driven rain details add labor to the envelope.
damp-proofing · weather-resistive barrier · ice-dam protectionWhatcom County labor rates differ from Seattle and from eastern Washington, and we price with RSMeans data adjusted to Bellingham ZIP codes. Multifamily projects with repeated unit types can absorb labor more efficiently, but tight downtown sites and hillside access reduce productivity. We note crew size and access assumptions in the estimate so you can see where labor hours are concentrated.
RSMeans data · ZIP-code adjustment · Whatcom County laborWet winters and clay soils make stormwater management a real cost. We count catch basins, trench drains, and detention or infiltration facilities as separate divisions. On infill lots, utility trenching and connection fees can rival the foundation cost. We ask for the civil plan and any geotechnical drainage recommendations before we finalize site quantities.
stormwater management · catch basins · utility trenchingBellingham is about 90 miles from Seattle, so material haul distance affects concrete, steel, and specialty finishes. We check whether suppliers are local or require a delivery surcharge, and we note when a product's lead time could affect the schedule. Sales tax applies to materials in Washington, and we carry it as a separate line so your bid total is transparent.
material haul distance · lead time · Washington sales taxBellingham's mix of steep sites, wet winters, and a 69% multifamily share of new residential units changes what you count and how you count it. Here are the trades where local conditions move the numbers most.
Whatcom County's glacial till and marine clay hold water, so a Bellingham site takeoff rarely stops at cut and fill. You need to count underdrain runs, footing drains, and sometimes a full perimeter French drain with washed rock and filter fabric. On sloped lots, add retaining wall footings and geogrid by square foot of wall face. Winter work means counting erosion control blanket, silt fence, and inlet protection by linear foot, plus temporary stabilization if you're moving dirt between October and April. For a full sitework takeoff, see our sitework estimating services. Confirm the city's adopted stormwater manual with the local building department before you finalize quantities.
Bellingham's wet season makes framing waste and protection costs real. Your takeoff should separate wall, floor, and roof framing by species and grade, then add sheathing by sheet with a waste factor typical for the layout. Count house wrap or a drained weather-resistive barrier by square foot, plus flashing tape at openings and seams. On multifamily, count fire-rated assemblies and blocking for fixtures separately from general framing. Truss and I-joist packages need a layout drawing check against the structural sheets. See our framing estimating services for wall, floor, and roof takeoffs organized by assembly.
Washington's energy code drives heat pump systems, tighter envelopes, and often HRV or ERV ventilation in new Bellingham homes. Your MEP takeoff should count line sets, condensate routing, and exterior pad or wall brackets, not just the indoor unit. Plumbing counts include freeze protection on any run in an unconditioned space. Electrical counts grow with panel capacity for heat pump, EV-ready circuits, and solar-ready conduit. On multifamily, count separate metering and riser diagrams per unit. Our MEP estimating services cover mechanical, electrical, and plumbing takeoffs by system and by floor.
Foundations here fight both frost and groundwater. Expect continuous footings with rebar, a capillary break, and damp-proofing or membrane waterproofing on below-grade walls. On hillside lots, stepped footings mean more formwork and more rebar splices than a flat-lot takeoff shows. Garage slabs and driveway aprons need air-entrained mix and a proper base course. Count anchor bolts, hold-downs, and embeds by piece, not by allowance. Our foundation estimating services cover footing, stemwall, slab-on-grade, and retaining wall takeoffs line by line. Verify the current adopted code edition and any local amendments with the Bellingham building department.
Steep pitches and heavy winter rain push Bellingham roofs toward standing-seam metal or high-grade asphalt with enhanced underlayment. Count ice-and-water shield at eaves and valleys by square foot, not by roll allowance. On low-slope multifamily, count TPO or EPDM membrane, insulation board, cover board, and tapered crickets around drains. Don't forget roof-to-wall flashing, drip edge, and pipe boots by piece. Ventilation — ridge, soffit, or mechanical — is a separate line. Our roofing estimating services break out membrane, flashing, and accessories so your bid doesn't bury them in a square-foot price.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Podium slab concrete, 8 in. | 1,240 | SF |
| 03 30 00 | Elevated slab on deck, 6 in. | 3,860 | SF |
| 05 12 00 | Structural steel columns and beams | 18,400 | LB |
| 06 10 00 | Wall framing, 2x6, 16 in. o.c. | 5,120 | LF |
| 06 16 00 | Roof sheathing, 5/8 in. OSB | 4,240 | SF |
| 07 25 00 | Weather-resistive barrier, drained | 6,850 | SF |
| 07 54 00 | TPO membrane, 60 mil | 4,240 | SF |
| 23 81 00 | Heat pump outdoor units | 24 | EA |
Dimensions below are illustrative. We are taking off 2x6 exterior wall framing at 16 in. on center for one duplex building with a simple rectangular footprint. The building is 48 ft long by 28 ft deep, single story, 9 ft wall height, with one interior bearing wall running the long direction.
Step 1 — Perimeter and wall area. Perimeter = 2 × (48 + 28) = 152 LF. Gross wall area = 152 LF × 9 ft = 1,368 SF.
Step 2 — Subtract openings. Two entry doors at 21 SF each, eight windows at 15 SF each. Openings = (2 × 21) + (8 × 15) = 42 + 120 = 162 SF. Net wall area = 1,368 − 162 = 1,206 SF.
Step 3 — Studs. At 16 in. o.c., studs per LF of wall = 12 ÷ 16 = 0.75, plus one for the end. For 152 LF: (152 × 0.75) + 1 = 115 studs. Add 2 studs per opening for cripples and trimmers: 10 openings × 2 = 20. Add corners and intersections: 4 corners × 2 = 8. Total studs = 115 + 20 + 8 = 143. With a typical 5% waste factor: 143 × 1.05 = 150 studs.
Step 4 — Plates. Three plates (two top, one bottom) at 152 LF each = 456 LF. Add 5% waste: 456 × 1.05 = 479 LF. In 16 ft sticks: 479 ÷ 16 = 30 sticks.
Step 5 — Sheathing. Net wall area 1,206 SF. Sheathing at 32 SF per 4x8 sheet = 1,206 ÷ 32 = 37.7 sheets. With a typical 10% waste factor for cutting: 37.7 × 1.10 = 41.5, round to 42 sheets.
| Step | Calculation | Result | Unit |
|---|---|---|---|
| Perimeter | 2 × (48 + 28) | 152 | LF |
| Gross wall area | 152 × 9 | 1,368 | SF |
| Openings | (2 × 21) + (8 × 15) | 162 | SF |
| Net wall area | 1,368 − 162 | 1,206 | SF |
| Studs before waste | (152 × 0.75) + 1 + 20 + 8 | 143 | EA |
| Studs with 5% waste | 143 × 1.05 | 150 | EA |
| Plates | 152 × 3 × 1.05 | 479 | LF |
| Sheathing with 10% waste | (1,206 ÷ 32) × 1.10 | 42 | SH |
This is the level of detail we deliver for Bellingham projects. For a full residential takeoff, see our residential estimating services.
Send the full plan set — architectural, structural, civil, and MEP — plus any specifications, addenda, and the bid form. If you have a site survey or geotechnical report, include it. We work in Bluebeam Revu and PlanSwift and return Excel and PDF takeoffs organized by CSI MasterFormat division with marked-up plan sets. Most projects turn around in 24–48 hours, and rush is available.
We separate work that is weather-sensitive — sitework, foundations, roofing, exterior finishes — and flag quantities that carry a seasonal premium. Erosion control, temporary stabilization, and dewatering are counted as line items, not allowances. If your schedule pushes dirt work into the wet months, your takeoff should show those costs explicitly so you can decide whether to bid them or exclude them with a note.
No. Permit and impact fees are jurisdiction-specific and change by ordinance. We take off the construction scope. You should confirm current fee schedules with the city or county building department. We do flag scope items that commonly trigger additional review, such as steep-slope grading, shoreline proximity, or critical areas, so you can budget time for those reviews separately.
Waste factors are typical and project-specific. Framing lumber often runs 5–10%, sheathing 10%, roofing 10–15% depending on pitch and cuts, and tile or siding 10–15%. We state the factor on each line so you can adjust it. On remodel work, we raise waste because existing conditions rarely match the drawings, and we note where field measurement should replace plan dimensions.
Yes. Multifamily is a large share of Bellingham's new residential units, and we take off those projects by building, by floor, and by unit type. We separate fire-rated assemblies, unit-turn scope, common area finishes, and sitework. Our multi-family estimating services cover podium, wrap, and garden-style buildings. Send the unit plans and a typical floor plan so we can set up a unit matrix.
We cover Bellingham and the surrounding Whatcom County area, including nearby cities such as Federal Way, Yakima, Kirkland, Kennewick, Auburn, and Pasco. If your project is farther out, send the address and we will confirm coverage. Pricing is ZIP-code-adjusted for material and labor, so outlying areas get the right local rates rather than a generic state average.
We use Bluebeam Revu, PlanSwift, and RSMeans data. Deliverables are Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets showing what we counted. Excel files include formulas so you can adjust quantities, waste factors, and unit costs. If your estimating team uses a different structure, tell us and we will match your template.
We use ZIP-code-adjusted material and labor pricing rather than a single state average. That matters in Bellingham because labor availability and material freight differ from the Seattle metro. We do not publish a starting price because scope varies too much. Send your plans and we will quote the takeoff based on the divisions and level of detail you need.
Our permit figures come from the U.S. Census Bureau Building Permits Survey for 2025. The data counts new privately-owned residential units permitted by the city itself, not total construction value or commercial permits. In 2025 Bellingham permitted 737 residential units, up 38% from 535 in 2024, with 506 multifamily units and 231 single-family units. Use these numbers as market context, not as a bid basis.
Most projects turn around in 24–48 hours. Larger multifamily or commercial projects with many sheets may take longer, and we will tell you upfront. Rush service is available if your bid date is close. Send plans through our get an estimate page and include your bid date, the divisions you need, and any specific format requirements so we can start without a back-and-forth.
Send your plans, specifications, and bid date, and we will return a takeoff organized by CSI MasterFormat division in 24–48 hours.