Sitework takeoffs
Clearing, mass excavation, and export for plateau lots and Pacific Highway frontage, with trucking and disposal separated.
CY · LF · TONScope Precision Estimate prepares quantity takeoffs and cost estimates for Federal Way contractors, developers, and owners. We use ZIP-code-adjusted material and labor pricing, deliver in 24–48 hours, and organize every estimate by CSI MasterFormat division, with marked-up plan sets included.
Federal Way pricing turns on King County labor rates, wet-season excavation and dewatering, steep glacial soils on the west side, and long truck hauls to regional pits. Residential permits jumped 339% in 2025, so bid competition for crews and materials is tighter than the unit count alone suggests.
Federal Way sits between Seattle and Tacoma in King County, and its bid market reflects both. You see single-family infill on the plateau, commercial tenant improvements and ground-up work along Pacific Highway South, and sitework tied to the Port of Tacoma logistics corridor. Every estimate we produce is priced with ZIP-code-adjusted material and labor costs, not a national average.
We deliver Excel and PDF takeoffs organized by CSI MasterFormat division, with marked-up plan sets so you can trace each quantity back to the sheet. Most projects turn in 24–48 hours, and rush service is available when a bid date moves. If you are pricing work in Federal Way's broader state market, we cover the surrounding cities as well, including Renton and Kirkland.
For bidders. You need a defensible number before the bid date. We return division-level quantities with waste factors, unit costs, and marked-up plans so you can adjust scope without rebuilding the takeoff.
For builders. You need purchasing quantities, not a lump sum. We break out concrete, framing, roofing, and MEP by area and system so your foreman can order to the sheet and reconcile deliveries.
For owners. You need a budget you can carry through design. We flag scope gaps, alternates, and escalation-sensitive line items early, then reprice as drawings develop.
Select a bar to compare Federal Way with the largest Washington markets we cover.
136 new housing units in 2025 (+338.7% vs 2024).
136 single-family · 0 multifamily (0%).
Federal Way issued 136 new privately-owned residential units in 2025, up from 31 in 2024, a 339% increase, according to the U.S. Census Bureau Building Permits Survey. All 136 were single-family; multifamily share was zero. Permitted value was $49M, or about $360,700 per unit. That mix matters: single-family infill means many small, repetitive takeoffs, not one large multifamily package. If you bid several of these, your estimating labor per unit has to stay low, which favors template-driven takeoffs and consistent waste factors. For a wider view of how Federal Way compares with other covered cities, see our Washington construction estimating page.
Federal Way's 136 units rank 19 of 25 among the covered state cities and account for 0.8% of the 16,004 state total. That is a small share, so local suppliers and crews are not the only bidders; you compete with Seattle and Tacoma pricing. Cost drivers here include King County labor rates, wet-season excavation and dewatering on glacial till, and haul distances to aggregate pits south and east of the city. Residential work near Dash Point and the plateau tends toward slab-on-grade and crawlspace foundations, while steeper west-side lots push retaining wall and shoring quantities. If your project is closer to the port corridor, see how we price Renton and Everett work for comparison.
We price the divisions that drive Federal Way residential, commercial, and sitework bids. Each takeoff comes with marked-up plans and a division-level summary.
Clearing, mass excavation, and export for plateau lots and Pacific Highway frontage, with trucking and disposal separated.
CY · LF · TONSlab-on-grade, footings, and retaining walls priced with King County formwork and pump rates, plus waste factors.
CY · SF · LFCrawlspace and slab foundations with perimeter drains and waterproofing, sized to local glacial soils and wet-season schedules.
CY · LF · SFWall, floor, and roof framing by area, with stud, plate, and sheathing counts for single-family infill plans.
LF · EA · BFRoof areas, underlayment, and flashing quantities for the steep and low-slope roofs common on Federal Way infill.
SF · SQ · LFMechanical, electrical, and plumbing rough and finish counts by fixture and device, priced for local labor.
EA · LF · TONFull-house takeoffs for the single-family permits driving Federal Way volume, from footing to final trim.
SF · EA · LSTenant improvements and ground-up commercial along Pacific Highway South, organized by CSI division for bid review.
SF · EA · LSYou are pricing King County school, transit, and municipal packages against three or four other bidders, and you need division-level quantities you can defend in a post-bid review.
Federal Way issued 136 new privately-owned residential units in 2025, all single-family. You need takeoffs that survive a value-engineering pass before the model sells.
Pacific Highway South and the Gateway corridor generate shell-and-core plus TI work. You need demolition, partition, ceiling, and MEP counts split so the landlord and tenant scopes stay separate.
Grading, storm, and sanitary packages here run against tight winter windows. You need cut-fill quantities, pipe lengths by size, and structure counts before you commit equipment.
You bid from a general contractor's plan set with limited time. We return counts by sheet and area so your crew can order to the drawing rather than to a lump sum.
You need a budget that holds through design changes on infill parcels. We flag escalation-sensitive line items and alternates early so your numbers stay usable.
We take off plans for projects across Federal Way and the surrounding South King County and Pierce County markets. If your site is near a city line, tell us the jurisdiction so the right code and permit assumptions go into the estimate.
The 2025 permit mix in Federal Way was entirely single-family, 136 new privately-owned residential units with no multifamily units permitted. Commercial and sitework volume comes from the highway corridor and the Port of Tacoma logistics market, so our takeoffs split cleanly between residential and commercial scopes.
New houses on subdivided plateau lots, typically two-story with attached garages. We take off footing and stemwall concrete, framing by floor, roof by pitch and covering, and MEP rough-in by fixture count.
Watch for: Lot-specific foundation depth and retaining walls on sloped plateau parcels.
Kitchen and bath rebuilds, additions, and second-story conversions in older Lakota and Twin Lakes neighborhoods. Demolition, framing, and finish counts are separated so you can price owner allowances separately.
Watch for: Hidden rot, asbestos, and undersized existing framing discovered after demo.
Retail, restaurant, medical, and office buildouts along Pacific Highway South and Gateway. We count partitions by type, ceiling by grid and tile, storefront glazing, and MEP by fixture and diffuser.
Watch for: Landlord shell conditions, ADA upgrades, and separate TI permit scope.
Small retail pads, self-storage, and light industrial buildings. Structural concrete, tilt-up or masonry, joist and deck, and site utilities are taken off by drawing sheet and detail.
Watch for: Site utility tie-in distances and jurisdictional frontage improvements.
Distribution and yard space serving the Port of Tacoma corridor. Slab-on-grade, racking loads, dock equipment, and fire protection are priced by area and system rather than a square-foot allowance.
Watch for: Slab flatness, dock levelers, and NFPA 13 sprinkler density.
Grading, storm drainage, sanitary sewer, and frontage work on infill and commercial parcels. We quantify cut and fill, pipe by diameter and material, structures, and paving by section.
Watch for: Wet-weather excavation, shoring, and export or import haul distance.
Two bids on the same Federal Way drawings can differ by more than the plans explain. These are the variables that move our numbers, and the ones we ask about before we start.
Federal Way enforces the Washington State Building Code, which adopts the IBC and IRC with state amendments, plus the Washington State Energy Code and the state plumbing and mechanical codes. The adopted edition and local amendments drive insulation values, ventilation, glazing, and seismic detailing. Confirm the current edition and any city-specific amendments with the Federal Way building department before you finalize. We price to the edition stated in your permit documents.
Washington State Building Code · Washington State Energy Code · Federal Way building departmentGlacial till and outwash soils are common on the plateau, and some parcels carry fill or organics that require over-excavation. A geotechnical report governs footing size, reinforcement, and whether you need a structural fill or a deep foundation system. We take off footings, stemwalls, slab thickness, and rebar from the foundation plan and note where the geotech report changes the quantities.
geotechnical report · footing and stemwall concrete · rebarWestern Washington's wet winters and seismic design category shape roofing underlayment, flashing, exterior envelope, and hold-down hardware. Federal Way also has stormwater requirements tied to the parcel and the receiving system, which can add detention, treatment, or flow-control structures. Those items appear in the site civil sheets, and we count them as separate line items rather than burying them in a site allowance.
seismic design category · stormwater detention · roofing underlaymentFederal Way sits between the Seattle and Tacoma labor markets, so crew availability and wage rates reflect both. Publicly funded work may carry prevailing wage requirements that change the labor component of every division. We price labor from ZIP-code-adjusted rates and flag the divisions where wage determinations or shift work would change the number.
prevailing wage · ZIP-code-adjusted labor rates · King County labor marketInfill parcels on the plateau and along the highway corridor often have limited staging, steep driveways, or shared access. Critical areas, buffer requirements, and frontage improvements can add scope that is not in the building drawings. We ask for the site plan and any geotechnical or critical areas report so those costs land in the estimate instead of in a change order.
critical areas · frontage improvements · site planMost concrete, lumber, and finishes reach Federal Way through the Seattle-Tacoma distribution network, so freight is shorter than for outlying Washington markets but still moves with fuel and mill pricing. Washington sales tax applies to materials and some services, and it is not uniform across every line item. We keep material pricing current and identify taxable versus non-taxable items so your bid total is not off by a tax line.
Washington sales tax · Seattle-Tacoma distribution · material pricingFederal Way sits on glacial till and outwash, with steep slopes toward Puget Sound and a wet marine climate. Those conditions change quantities, not just notes, in five trades.
Most Federal Way lots on the plateau need cut and fill balanced on paper before you bid. We take off stripping depth, unsuitable till removal, and structural fill by cubic yard, then add compaction testing and shoring for the slopes that drop toward the Sound. Winter work means erosion control blankets, silt fence, and a construction stormwater permit — the line items that show up when you start in October. Haul distance to an approved disposal site drives the truck-hour rate more than the excavation itself. Send the geotech and the site plan together; one without the other undercounts import or export. See our sitework estimating services for the full division 31 takeoff.
Federal Way's single-family permits are almost all wood-frame, and the framing takeoff is where a bid is won or lost. We count studs by wall length and height, plates by linear feet, joists and rafters by piece with a typical 5% waste, and sheathing by sheet. Engineered lumber — LVL beams, PSL posts, TJI joists — is listed separately so you can carry a supplier quote. Roof pitch and any vaulted ceilings change rafter length and birdsmouth cuts. Our framing estimating services include a wall-by-wall count and a separate hardware and hanger list. If the plans show a daylight basement, we take off the taller stem walls and the extra floor system.
Federal Way's residential permits are mostly single-family, so MEP takeoffs are fixture-and-circuit counts, not loop drawings. We count receptacles, switches, smoke/CO alarms, exhaust fans, and light fixtures by room, then add panel schedule and service size. Plumbing is fixture units, water heater, and the number of hose bibs; HVAC is tonnage, duct linear feet, and register count. For commercial tenant improvements, we break out the same items by zone and add fire sprinkler head count. Our MEP estimating services deliver a room-by-room count you can hand to each trade. If the project is a duplex or townhome, we separate each unit's riser and meter.
Footings on Federal Way's till often bear on native soil, but the wet side of town sees more over-excavation and crushed-rock base. We quantify formwork by contact area, rebar by ton with lap and waste, and concrete by cubic yard with a typical 5–10% waste factor. Slab-on-grade thickness, vapor barrier, and control joints are separate lines because they are separate scopes. For residential work, garage slabs and driveway aprons are frequently missed on the first pass. Our foundation estimating services break out footings, stem walls, and slab separately so your concrete sub can price what they actually place.
The marine climate means underlayment and flashing details matter more than shingle brand. We measure roof area by slope, add a typical 10% waste for hips and valleys, and count drip edge, valley metal, pipe boots, and ridge vent by piece. Ice-and-water membrane at eaves and valleys is a separate line because code and manufacturer requirements differ. On Federal Way's steeper roofs, we add fall protection and staging to the labor, not just the material. Our roofing estimating services produce a plan-marked takeoff showing each roof plane. Confirm the adopted code edition and any local amendments with the city building department before you finalize.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24" x 12" | 18.5 | CY |
| 03 20 00 | Rebar, #4 and #5, incl. lap | 3.2 | ton |
| 06 10 00 | Wall framing, 2x6 studs @ 16" | 412 | pcs |
| 06 10 00 | TJI floor joists, 11-7/8" | 58 | pcs |
| 07 30 00 | Asphalt shingles, incl. 10% waste | 34.2 | SQ |
| 07 30 00 | Ice-and-water membrane, eaves | 186 | LF |
| 31 10 00 | Structural fill, on-site | 240 | CY |
| 31 25 00 | Silt fence and inlet protection | 310 | LF |
A typical Federal Way plateau lot uses continuous footings under exterior and interior bearing walls. The dimensions below are illustrative, not a plan takeoff. You have a 40 ft x 30 ft rectangle with a 24 ft interior bearing wall and a 12 ft garage separation wall. Footing width is 24 in and thickness is 12 in.
Step 1 — Linear feet of footing. Perimeter = 2 x (40 + 30) = 140 LF. Interior bearing = 24 LF. Garage separation = 12 LF. Total = 176 LF.
Step 2 — Volume without waste. Cross-section = 2.0 ft x 1.0 ft = 2.0 SF. Volume = 176 LF x 2.0 SF = 352 CF. Convert: 352 / 27 = 13.04 CY.
Step 3 — Add waste and over-excavation. Typical waste for footings is 5–10%. At 8%: 13.04 x 1.08 = 14.08 CY. If the geotech requires 6 in of over-excavation under the footing, add 176 LF x 2.0 ft x 0.5 ft = 176 CF = 6.52 CY, which is often backfilled with crushed rock instead of concrete. Confirm with the geotechnical report before you carry it as concrete.
Step 4 — Rebar. Two #4 continuous bars: 176 LF x 2 = 352 LF. Add 10% for lap and waste = 387 LF. #4 weighs 0.668 lb/LF, so 387 x 0.668 = 259 lb. Vertical dowels into the stem wall: assume 176 dowels at 2.0 lb each = 352 lb. Total rebar = 611 lb, or about 0.31 ton.
| Step | Calculation | Result | Unit |
|---|---|---|---|
| Footing length | 2 x (40 + 30) + 24 + 12 | 176 | LF |
| Cross-section | 2.0 ft x 1.0 ft | 2.0 | SF |
| Volume, no waste | 176 x 2.0 / 27 | 13.04 | CY |
| Volume, 8% waste | 13.04 x 1.08 | 14.08 | CY |
| Rebar, continuous | 352 x 1.10 x 0.668 | 259 | lb |
| Rebar, dowels | 176 x 2.0 | 352 | lb |
That is the arithmetic your concrete sub will check. On the wet side of Federal Way, add dewatering and a gravel working mat if the excavation holds water. For a full division 03 takeoff, see our concrete estimating services.
In 2025, Federal Way issued permits for 136 new privately-owned residential units, all single-family, with a total permitted value of $49M. That is up from 31 units in 2024 and works out to an average of $360,700 per unit. The city ranked 19th of 25 covered Washington cities by unit count and accounted for 0.8% of the state total of 16,004 units. If your project is a custom home or small infill, you are bidding into the same pool as those permits.
The numbers come from the U.S. Census Bureau's Building Permits Survey for 2025, as reported by the city itself. The survey counts new privately-owned residential units only, so it excludes commercial, industrial, and public projects, as well as remodels and additions. That is why a city with a lot of commercial work can show a low residential unit count. Use the figure as a demand signal, not a full picture of construction activity.
Much of Federal Way sits on glacial till and outwash, which can be dense and hard to excavate but generally offers good bearing. The wetter, lower areas near the Sound may have softer soils or fill that require over-excavation and crushed-rock replacement. Your geotechnical report will specify bearing capacity and whether you need to remove unsuitable material. We take off both the concrete and the structural fill separately so you can see which scope carries the risk. Always confirm the geotech recommendations with the city building department before finalizing.
If your schedule runs from October through April, yes. Federal Way's marine climate brings frequent rain and occasional freezing nights. That means temporary heat, covered work areas, and concrete curing blankets can be required. Erosion control and construction stormwater best management practices are typically required during the wet season, and they are separate line items from permanent sitework. We include them when the schedule shows a wet-season start. Confirm the specific requirements with the city's public works or building department.
Washington State adopts the International Building Code, International Residential Code, and related codes with state amendments, and local jurisdictions may adopt their own amendments and effective dates. Federal Way enforces the edition adopted by the city at the time of permit application. Because the adopted edition and any local amendments change on a cycle, we do not assume a year in the takeoff. Check with the Federal Way building department for the current edition and any local amendments that affect your scope.
Washington has a state prevailing wage law that applies to public works projects, and federal projects may fall under Davis-Bacon. For private residential work, prevailing wage generally does not apply, but some publicly funded affordable housing does. We ask about funding source at the start of the takeoff. If prevailing wage applies, we use the applicable wage determination for King County and list labor rates separately from material. That way you can see the impact before you bid.
Yes. We break out each unit's plumbing riser, electrical meter, and HVAC system separately, then add the shared walls, common areas, and site work. Federal Way's residential permits in 2025 were all single-family, but the city allows multifamily in some zones. If your project is a duplex or townhome, send the full set including the site plan and unit plans. We will produce a takeoff that separates per-unit costs from shared costs.
Send the architectural, structural, civil, and MEP plan sets in PDF, plus any specifications, geotechnical report, and addenda. If you have a preferred CSI division breakdown or a bid form, include that. We work in Bluebeam Revu, PlanSwift, and RSMeans data, and we return Excel and PDF takeoffs organized by CSI MasterFormat division with marked-up plan sets. Most projects are returned in 24–48 hours, and rush turnaround is available.
Yes. We cover the Seattle metro and much of Washington, including Everett, Renton, Spokane Valley, Yakima, Kirkland, and Bellingham. If your project is in Federal Way but your office is in one of those cities, or the reverse, we can handle it. The takeoff is based on ZIP-code-adjusted material and labor pricing, so the location of the work drives the cost, not where you are based. See our Washington construction estimating page for the full coverage area.
We use ZIP-code-adjusted material and labor pricing, typically drawing on RSMeans data for the Federal Way area. That means the labor rates reflect the local market, including King County wage pressure. We do not publish a single wage number because it changes by trade and by project type. Instead, we show labor hours and rates by line item so you can adjust them if your crew is more or less productive. For public work, we swap in the applicable prevailing wage determination.
Send your plans and specs and we will return a CSI-organized takeoff in Excel and PDF, typically within 24–48 hours.