Sitework takeoff
Clearing, stripping, cut and fill, and erosion control measured per lot for subdivision grading in Upstate clay.
CY · SF · LFScope Precision Estimate builds line-item takeoffs and estimates for builders working in Simpsonville and the surrounding Upstate. You send the plan set; we return Excel and PDF quantities organized by CSI MasterFormat division, with marked-up drawings, typically in 24–48 hours.
Simpsonville's 2025 permit run is all single-family, 197 units at a $277,500 average, so pricing turns on subdivision sitework, slab-on-grade foundations, wood framing and shingle roofing. Upstate clay soils, Piedmont frost depths and Greenville County inspections drive earthwork, footing and drainage quantities more than coastal wind or flood rules would.
Simpsonville sits in Greenville County along the I-385 corridor between Greenville and Fountain Inn, and the permit record tells you what is being built here: 197 new privately-owned residential units in 2025, up from 142 in 2024, with zero multifamily. That is a subdivision market. Most of the work we price is production single-family — sitework packages, slab and stem-wall foundations, wood frame, architectural shingle roofs, and the MEP rough-in that follows.
The Upstate's manufacturing growth feeds this corridor, and the same crews that build houses here also chase commercial and industrial work around Mauldin and Greer. If you bid both, we can price both: residential estimating services for production plans, commercial estimating services for tenant fit-out and light industrial. We also cover nearby markets such as Easley and Greenwood when your bid list crosses county lines. Everything is priced with ZIP-code-adjusted material and labor rates, not a statewide average.
For bidders. You have a hard bid date. Send plans and specs; we return a division-by-division takeoff with marked-up sheets so you can see where every quantity came from before you sharpen your number.
For builders. You build the same plan across multiple lots. We price the sitework and foundation separately per lot, then hold the vertical takeoff constant, which is how production budgets actually get managed.
For owners. You need a budget before design is finished. We estimate from preliminary drawings, flag the allowances that carry the most risk, and update the numbers as the set develops.
Select a bar to compare Simpsonville with the largest South Carolina markets we cover.
197 new housing units in 2025 (+38.7% vs 2024).
197 single-family · 0 multifamily (0%).
Simpsonville issued 197 new privately-owned residential units in 2025, up 39% from 142 in 2024, all single-family, at a permitted value of $55M and an average of $277,500 per unit. That average tells you the product type: mid-market production homes, not custom estate work. For bidders, a 39% jump means more plans chasing the same framers, concrete crews and HVAC subs, so labor pricing moves faster than material pricing. Build the escalation into your bid rather than absorbing it. Simpsonville ranks 18th of 23 covered state cities by units and accounts for 1.7% of the 11,527 units permitted across those cities, so it is a steady secondary market next to Greenville, not a volume driver. See the statewide picture on our South Carolina construction estimating page.
Two failure modes show up repeatedly on Simpsonville bids. First, sitework: Piedmont red clay does not compact like coastal sand, and undercutting or over-excavation for footings is routinely carried as a lump sum instead of a measured quantity. Price it by cubic yard with a stated depth assumption. Second, wall assemblies: plans drawn for one jurisdiction get reused across Greenville, Laurens and Anderson counties, and the adopted code edition and inspection sequence can differ. Confirm the adopted edition with the local building department before you lock your scope. If your bid list reaches toward North Augusta or Lexington, expect different soil and drainage assumptions again.
We price the scopes that dominate Simpsonville's residential and light commercial work, plus the sitework and MEP packages that carry the most risk.
Clearing, stripping, cut and fill, and erosion control measured per lot for subdivision grading in Upstate clay.
CY · SF · LFSlab-on-grade, stem wall and footing concrete, rebar and vapor barrier priced from the structural sheets.
CY · TON · SFFloor, wall and roof members counted by size and length, with typical waste factors stated separately.
LF · EA · BFArchitectural shingle squares, underlayment, flashing and ridge vent for steep-slope production roofs.
SQ · LFPlumbing, HVAC and electrical rough-in priced by fixture, ton and device count from the plan set.
EA · TON · LFDriveways, walks, patios and flatwork measured with jointing and finish called out per square foot.
CY · SFFull-house budgets for production plans, broken out by CSI division so you can buy out each trade.
LS · SFTenant fit-out and light industrial shells along the I-385 corridor, including site and MEP packages.
SF · LSYou run the same plan across multiple lots off I-385. We price sitework and foundation per lot and hold the vertical takeoff constant, so your per-unit budget stays comparable.
Your plans change between design development and permit set. We re-price the affected divisions only, keeping the rest of the estimate stable while the owner makes selections.
You need a defensible number for a hard bid date. We return a division-by-division takeoff with marked-up sheets you can keep in the bid file.
You buy lumber and ready-mix weekly. We break out plates, studs, headers, sheathing and anchor bolts by floor so your material order matches the takeoff.
You rough in the same tract plans repeatedly. We count fixtures, devices, home runs and fittings by division so your labor hours track the actual layout.
You need a budget before the full set is drawn. We estimate from preliminary plans, flag the allowances carrying the most risk, and update as drawings develop.
We price plans for lots in Greenville County and the surrounding Upstate corridor. If your project sits outside these areas, send the address and we will confirm coverage.
The 2025 permit record for Simpsonville shows 197 new privately-owned residential units and no multifamily, so the bulk of our local work is single-family and the sitework that supports it.
Tract homes on subdivision lots, priced per plan with sitework and foundation separated by lot. We hold the vertical takeoff constant so your per-unit cost stays comparable across phases.
Watch for: Per-lot sitework quantities, slab thickness, and lumber package counts.
One-off homes with architectural details, taller plates, and mixed exterior finishes. We price from the permit set and flag allowances for items still in selection, such as cabinetry and lighting.
Watch for: Allowances, specialty finishes, and structural steel connections.
Attached units share party walls and often a single foundation pour. We count fire separation assemblies, shared utility runs, and the roof area over the full building rather than per unit.
Watch for: Party-wall fire ratings, shared MEP runs, and roof tie-ins.
Tenant fit-outs, small retail, and office buildings along the Woodruff Road and I-385 corridors. We price demising walls, storefront, ceiling and MEP distribution from the architectural and MEP sets.
Watch for: Storefront glazing, sprinkler coverage, and HVAC zoning.
Metal building shells and tilt-up warehouses serving the Upstate manufacturing base. We take off slab thickness, column reactions, and dock equipment from the structural and civil drawings.
Watch for: Slab flatness, column anchorage, and dock package scope.
Room additions, kitchen and bath remodels, and small commercial upfits. We price selective demolition separately from new work so you can see the cost of each portion clearly.
Watch for: Demo quantities, tie-in details, and temporary protection.
Simpsonville sits in Greenville County, where the adopted code edition and local amendments drive requirements. The items below are the ones that move numbers most often on our takeoffs here.
Simpsonville and Greenville County enforce the adopted South Carolina codes, including the IRC for one- and two-family dwellings and the IBC for commercial work. The edition in force changes wind and seismic detailing, egress, and energy requirements. Confirm the adopted edition and any local amendments with the Simpsonville building department before you finalize your bid.
IRC · IBC · IECC · Simpsonville building departmentUpstate South Carolina soils include residual clays and weathered rock, and bearing capacity varies across a subdivision. We price stem-wall and slab-on-grade foundations from the geotechnical report where one is provided, and flag footing sizes and reinforcement as allowances when it is not. On sloped lots, retaining walls and extra backfill can add cost quickly.
Geotechnical report · stem wall · slab-on-grade · retaining wallSimpsonville sees hot, humid summers and occasional winter freezes. That drives higher roof underlayment and flashing standards, condensation control in attics and crawlspaces, and freeze protection on exterior piping. Wind-borne debris requirements apply closer to the coast, so confirm whether your jurisdiction has adopted them before pricing windows and doors.
IECC climate zone · freeze protection · roof underlayment · wind-borne debrisThe Upstate manufacturing boom pulls electricians, plumbers and equipment operators toward industrial projects, which tightens residential trade availability. We price labor from ZIP-code-adjusted rates for the Simpsonville area rather than a statewide average, and we flag trades where the local spread between union and open-shop rates is wide.
RSMeans data · ZIP-code-adjusted labor · open-shop rates · trade availabilitySubdivision lots here often need clearing, grubbing, and cut-fill to reach pad grade. We take off mass excavation, erosion control, and storm drainage from the civil set, then price utility trenching separately. Post-construction drainage requirements and stream buffers can limit where you can place fill or discharge stormwater, so confirm local land-development rules early.
Mass excavation · erosion control · storm drainage · utility trenchingLumber, ready-mix and shingles are sourced regionally, but delivery distance and plant availability affect pricing. We use current material pricing adjusted for the Simpsonville ZIP code and note when a specified product has a long lead time. Sales tax treatment on materials varies by contract type, so confirm how your purchase orders are written.
Ready-mix · lumber package · lead times · sales taxSimpsonville sits in Greenville County, where the Piedmont's red clay, humid summers, and steady single-family infill shape what you count and how you count it.
Piedmont red clay does not drain like coastal sand, so your cut-fill balance drives the whole site package. We take off mass excavation by cut depth and area, then separate unsuitable-material undercut, because clay that stays wet often has to be removed and replaced with structural fill. You will also see temporary silt fence, construction entrance stone, and a sediment basin on most Greenville County subdivisions. Verify the approved grading plan against the civil set before you price haul-off; we have seen 15% swings in export volume when the geotech report recommends undercutting. Our sitework estimating services break these items into separate CSI divisions so you can see what is truly site versus what is building pad.
Wood-frame construction dominates Simpsonville's residential permits, and framing takeoffs here are driven by wall height, roof pitch, and whether the plan uses engineered lumber or dimensional lumber. We count studs by spacing and wall length, plates in linear feet, headers by size and span, and sheathing in sheets with a typical waste factor. Roof trusses are usually a vendor package, so we carry the truss count and let you plug the supplier quote. Floor joists, rim board, and subfloor adhesive are separate line items. If you are pricing a two-story plan, do not forget the stair framing and temporary bracing. Framing estimating services should always reconcile the architectural wall types against the structural sheets.
Mechanical, electrical, and plumbing rough-in is where Simpsonville plans often hide the most scope gaps. We count plumbing fixtures by type, water and drain lines by linear foot and diameter, and gas piping if the home has a gas range or water heater. Electrical takeoff includes device boxes, receptacles, switches, lighting outlets, smoke and CO detectors, and panel schedules. HVAC is usually a load-calculated package, but we still count supply and return registers, flex duct runs, and condensate lines. Because South Carolina adopts the IRC and IECC with local amendments, confirm the energy code edition with the Greenville County building department before you finalize insulation and glazing values. MEP estimating services keep these divisions separate so you can bid them to the right subcontractors.
Most Simpsonville single-family homes sit on slab-on-grade or crawlspace foundations with continuous footings, and the takeoff turns on footing width, stemwall height, and slab thickness. We count linear feet of footing, cubic yards of ready-mix by mix design, vapor barrier square footage, and anchor bolt quantity. In clay, a post-tensioned slab may be specified instead of a conventional reinforced slab, which changes your tendon and stressing takeoff. Weather also matters: summer pours in the Upstate often need retarders, and winter pours need blankets. Foundation estimating services should include the underslab plumbing rough and termite treatment so those costs do not land in another trade.
Architectural asphalt shingles are the default roof covering on Simpsonville homes, with some metal roofing on porches and accents. The takeoff is roof area by slope, plus starter course, ridge cap, valley flashing, drip edge, underlayment, and ice-and-water shield at valleys and eaves. Pitch affects both labor and waste: a 6:12 roof wastes less than a 12:12, and cut-up hip roofs waste more than simple gables. We measure from the elevation and plan dimensions and apply a typical waste factor, then list ventilation items like ridge vent and soffit vent by linear foot. Roofing estimating services should show underlayment and flashing separately, because those are common omissions when a bid is rushed.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Slab-on-grade concrete, 4 in. | 38 | CY |
| 03 30 00 | Continuous footings, 12 in. x 24 in. | 168 | LF |
| 06 10 00 | 2x4 studs, 8 ft, 16 in. O.C. | 412 | EA |
| 06 10 00 | Bottom and top plates | 1,240 | LF |
| 06 10 00 | 7/16 in. OSB wall sheathing | 96 | SHT |
| 07 30 00 | Architectural shingles | 32 | SQ |
| 22 00 00 | PEX water lines, 1/2 in. | 310 | LF |
| 26 00 00 | Romex 12/2 and 14/2 | 1,850 | LF |
This example uses illustrative dimensions for a 2,400 sq ft one-story home with a simple gable roof. The plan shows a 60 ft ridge and 30 ft rafter run per side. The roof surface area is not the same as the footprint, so we calculate slope first.
Step 1 — Roof area from plan dimensions
| Item | Calculation | Result |
|---|---|---|
| Ridge length | given | 60 LF |
| Rafter run per side | given | 30 LF |
| Slope factor (6:12 pitch) | sqrt(6² + 12²) / 12 | 1.118 |
| Roof surface area | 2 sides × 60 LF × 30 LF × 1.118 | 4,025 SF |
Step 2 — Convert to squares
One roofing square equals 100 SF. 4,025 SF ÷ 100 = 40.25 squares.
Step 3 — Apply waste
A typical waste factor for a simple gable roof is 10%. 40.25 squares × 1.10 = 44.28 squares. Round up to 45 squares for ordering.
Step 4 — Accessories
Starter course runs the eaves and rakes. Eave length is 60 LF × 2 = 120 LF. Rake length is the rafter length per side: 30 LF × 1.118 = 33.5 LF, times 4 rakes = 134 LF. Total starter and drip edge = 254 LF. Ridge cap is 60 LF. Valley flashing is zero on this simple gable, but if the plan had a valley, you would add it here.
Step 5 — Underlayment
Synthetic underlayment covers the full roof area: 40.25 squares, rounded to 41 squares. Ice-and-water shield is required at eaves in many jurisdictions; confirm the adopted code edition with the Greenville County building department. For this example, we carry 120 LF at the eaves.
Step 6 — Ventilation
Ridge vent equals ridge length: 60 LF. Soffit vent is taken from the eave length: 120 LF. These are separate line items so the roofer can price them.
This is the level of detail we put in every roofing takeoff. Your actual quantities will differ with pitch, hips, valleys, and dormers, but the sequence is the same.
We cite the U.S. Census Bureau Building Permits Survey. The 2025 data for Simpsonville shows 197 new privately-owned residential units, all single-family, with a total permitted value of $55 million. That survey counts residential units only, so it does not include commercial or industrial permits. We use it to understand the volume and typical project size in the market, not to price your specific job.
Piedmont red clay holds water and expands when wet, so foundations often require over-excavation and structural fill. We take off undercut volume separately from mass excavation and price haul-off by the cubic yard. If the geotech report recommends a post-tensioned slab, we count tendons and stressing hardware instead of conventional rebar. These items can swing a foundation bid by thousands of dollars, so we never bury them in a lump sum.
Yes. The 2025 permit data shows all 197 new residential units were single-family, which tells you the market is driven by homebuilding. We also estimate small commercial buildings, tenant fit-outs, and light industrial work in the Greenville County area. The takeoff format is the same: CSI MasterFormat divisions, marked-up plan sets, and quantities you can hand to a subcontractor or supplier.
Send the complete plan set, including architectural, structural, civil, and MEP sheets, plus any specifications and the geotech report if available. If you have a preferred waste factor or a supplier quote for trusses or windows, include that. We return an Excel workbook and a PDF with the plan set marked up, organized by CSI division. Missing sheets are the main cause of delays, so send everything you have at once.
Most projects are returned in 24 to 48 hours. Rush service is available if you have a bid due sooner. The timeline depends on the completeness of the documents and the size of the project. A single-family home is usually faster than a multi-building commercial package. We confirm the schedule when we receive your plans so you know exactly when to expect the deliverable.
We use ZIP-code-adjusted material and labor pricing, so the rates reflect the Simpsonville area rather than a national average. That matters for ready-mix concrete, lumber, and subcontractor labor, which vary across the Upstate. We base the adjustment on RSMeans data and local market conditions. If you have recent supplier quotes, we can plug those in for a more precise number.
Yes. Complex roofs with hips, valleys, dormers, and multiple pitches take longer because every plane has to be measured and the waste factor is higher. We break the roof into sections, calculate each area with its slope factor, and add flashing and underlayment line items by type. The result is a shingle order you can trust rather than a guess based on footprint square footage.
We use Bluebeam Revu for plan markup and quantity measurement, PlanSwift for digital takeoff, and RSMeans data for pricing. The deliverable is an Excel workbook and a PDF with the marked-up plan set, organized by CSI MasterFormat division. That format lets you sort, filter, and compare bids without retyping quantities into your own spreadsheet.
Yes. We cover Simpsonville and the surrounding Upstate, including Easley, Greenwood, and other nearby cities. If your project is in Greenville County or a neighboring county, the same clay soils, humidity, and code environment apply. You can see our coverage for Easley construction estimating and Greenwood construction estimating on their respective pages.
The most common mistake is leaving erosion control and final stabilization out of the sitework package. Greenville County requires these measures, and they can add thousands of dollars. The second is forgetting underlayment and flashing in the roofing bid. Both are easy to fix when the takeoff is organized by CSI division and every line item is visible. We flag these gaps in the estimate so you can decide how to carry them.
Email your plan set and we will return a division-by-division takeoff in 24 to 48 hours.