Sitework takeoffs
Clearing, mass excavation, undercut and structural fill in Piedmont clay, plus storm drainage and erosion control quantities.
CY · LF · TONGreenwood sits in the Piedmont of upstate South Carolina, where clay soils, high summer humidity and a steady mix of mill-building renovations and new industrial work drive the numbers. We produce CSI-formatted takeoffs and estimates from your plan sets, usually inside 24–48 hours.
Greenwood pricing turns on four things: Piedmont red clay requiring undercut and structural fill, high water tables in the bottomlands near the Saluda River, humidity-driven moisture detailing on roofing and envelopes, and a project mix weighted toward textile-mill adaptive reuse, light industrial, healthcare and institutional work rather than coastal resort construction.
Greenwood is a Piedmont market, not a coastal one. The work here runs through mill rehabs, light industrial shells, medical and institutional buildings, and single-family infill on the ridges around town. That mix means your estimate has to handle two very different conditions on the same job: heavy sitework in expansive clay on one side, and interior fit-out inside a century-old masonry shell on the other. We build both into one CSI-organized estimate so your bid reflects what the plans actually show.
We work from your drawings, specifications and addenda in Bluebeam Revu and PlanSwift, price material and labor with ZIP-code-adjusted RSMeans data, and return Excel and PDF deliverables organized by CSI MasterFormat division with marked-up plan sets. Most projects come back in 24–48 hours, with rush turnaround available. If you are bidding a package in Greenwood or anywhere across the South Carolina construction estimating market, start with a set of plans and a scope letter and we will take it from there.
For bidders. You need a number you can defend in a bid opening. We return division-level quantities, unit costs and clarifications you can attach to your proposal, with alternates and addenda priced separately so nothing gets buried in a lump sum.
For builders. You are buying out subs and ordering material. Our takeoffs give you quantity by trade and by floor, so you can issue scopes, compare quotes and catch a supplier or subcontractor who is short on square footage, tonnage or linear feet.
For owners. You are testing a budget before design is finished. We price what is drawn, flag what is not, and give you a cost basis you can carry into value engineering without re-pricing the whole building from scratch.
Greenwood is the 18th-largest city in South Carolina by the state's own ranking, and its construction demand does not follow the coastal tourism pattern that drives Charleston or Myrtle Beach. The Upstate manufacturing corridor that runs through Greenville and Spartanburg reaches into Greenwood County, and the city's project mix reflects that: industrial shells, warehouse and distribution space, hospital and clinic work, school and church projects, and mill-building conversions. Permit activity for the city is handled through a county or regional office rather than a city permits desk, so there is no clean city-level Census count to quote. Instead, read demand from what you see on the street: active industrial parks, ongoing institutional renovation, and steady residential infill. If you are pricing a package in this corridor, our Anderson construction estimating page covers the adjacent market with the same cost structure.
Three local conditions move Greenwood numbers more than most bidders expect. First, Piedmont red clay: expansive soils mean undercut, backfill and sometimes lime stabilization, and that cost lands in Division 31 before anything is built. Second, water. The Saluda River and its bottomlands, plus the area's ponds and creeks, push groundwater and storm drainage scope higher than a ridge-top site. Third, humidity and heat. Roofing assemblies, wall weather barriers and HVAC latent load all carry a premium in upstate South Carolina, and mechanical equipment sizing that ignores it will be wrong. Labor availability in a market this size also matters: crews travel in from Greenville, Spartanburg and Greer, and mobilization shows up in your unit prices whether you itemize it or not.
We price the full scope of a Greenwood project, from clearing and grading through MEP rough-in and finishes, organized by CSI MasterFormat division.
Clearing, mass excavation, undercut and structural fill in Piedmont clay, plus storm drainage and erosion control quantities.
CY · LF · TONFoundations, slab-on-grade, mill-building floor slabs and tilt panels priced with formwork, reinforcement and finish by area.
CY · SF · LBSpread footings, pier and grade beam, and slab systems sized to the geotechnical report, with soil correction priced separately.
CY · LF · EAWood and light-gauge framing for residential and commercial shells, counted by member, plate height and floor level.
LF · EA · BFLow-slope membrane and steep-slope assemblies detailed for upstate humidity, including insulation, flashing and edge metal.
SF · LF · SQPlumbing, HVAC and electrical priced from fixture counts, equipment schedules and panel schedules, with latent load accounted for.
EA · LF · TONProcess buildings, warehouses and plant expansions, including equipment pads, utilities, and specialty structural and rigging scope.
SF · CY · TONGarden-style and low-rise apartment buildings priced by building type, with unit mix, common areas and site work broken out.
SF · EA · LFDowntown masonry shells hide unknown structural and MEP scope. You need measured brick, joist and header quantities plus demolition and shoring lines priced separately before you commit to a lump sum.
Greenwood County's manufacturing base keeps tilt-wall, pre-engineered metal and slab-on-grade packages moving. We quantify slab thickness, reinforcing, anchor bolts, and PEMB erection separately so your steel and concrete bids compare cleanly.
Self Regional and the college corridor generate clinic, lab and classroom fit-outs. These jobs carry med-gas, isolated power and above-ceiling coordination that a shell estimate will miss entirely.
Infill lots on the ridges and around the bypass need foundation and framing takeoffs that account for Piedmont clay and sloping pads. We price footing, stemwall, and floor system quantities by plan type.
You bid framing, roofing, concrete or MEP only. We return quantities in your units — board feet, squares, cubic yards, linear feet of pipe — so you can mark up your own labor without buying a full-building estimate.
Before you buy a parcel or sign a design contract, you want a defensible order-of-magnitude number. We price what is drawn, list what is excluded, and flag the sitework and utility items that drive Greenwood pro formas.
We estimate from plans for projects anywhere in Greenwood County and the surrounding Piedmont, from uptown blocks to outlying tracts. If your site is outside the city limits, the county or a nearby municipality issues the permit, and we price to the drawings either way.
Greenwood's permit activity is not one market. It is a mix of mill reuse, institutional work, light industrial shells and scattered residential, and each type carries a different takeoff method and a different set of scope gaps.
Brick bearing walls, heavy timber or steel joists, and large open floor plates. We measure demolition, masonry repair, new floor and roof framing, and the full MEP distribution that has to be threaded through a shell never designed for it.
Watch for: Structural unknowns, hazmat abatement, wall thickness at openings.
Tilt-wall and PEMB buildings with slab-on-grade, dock equipment and sparse office fit-out. We take off slab area and thickness, reinforcing, anchor bolts, embeds, and the site concrete that usually gets left out of the building package.
Watch for: Slab thickness, dowels, dock levelers, fire access lanes.
Clinics, labs, classrooms and offices inside existing or new shells. Above-ceiling coordination, med-gas, isolated power, and casework drive cost more than the partitions themselves, so we quantify each system separately.
Watch for: Med-gas, isolation panels, ceiling plenum depth, casework.
Ridge and lakeside lots with walk-out basements, retaining walls and long driveways. We price footing and stemwall quantities, floor systems, roof geometry, and the sitework that often exceeds the house foundation cost.
Watch for: Cut and fill balance, retaining walls, driveway length.
Duplexes, triplexes and short townhome runs. Repetition helps, but shared walls, common utilities and fire separation assemblies have to be priced per building, not per unit, or the estimate comes up short.
Watch for: Fire-rated assemblies, party walls, shared utility trenches.
Uptown storefronts and bypass commercial pads. Tenant fit-out inside a landlord shell means the base-building scope and the tenant scope must be split cleanly, with grease, hood, and ADA items priced where they belong.
Watch for: Landlord versus tenant split, hood and grease, ADA upgrades.
Two Greenwood jobs of the same square footage can price 30 percent apart. These are the variables that move the number here, and the ones we ask about before we open the plans.
Greenwood County and the City of Greenwood issue permits depending on where the site sits, and the adopted IBC, IRC, IECC and NEC editions drive egress, energy and electrical scope. We price to the drawings as permitted, not to an assumed code year. Confirm the adopted edition and any local amendments with the building department before you bid, because a missed sprinkler or energy requirement is a real cost.
IBC · IRC · IECC · NECThe residual clay across Greenwood County shrinks and swells with moisture, and rock is shallow on many ridge sites. Footing depth, undercut, backfill, and occasionally rock excavation can swing the foundation line hard. We take off footing and stemwall quantities from the structural sheets, then carry a separate allowance for unsuitable bearing and rock so the number is not buried in a contingency.
Expansive clay · Rock excavation · Footing depth · UndercutUpstate South Carolina gets heavy summer thunderstorms and occasional ice, and the design wind speed is higher than coastal readers expect for an inland county. Roof drainage, flashing, vapor control and exterior envelope detailing all carry cost. We quantify downspouts, gutters, drainage and WRB by area so weather detailing is priced, not assumed.
IECC climate zone · Design wind speed · Roof drainage · WRBGreenwood draws trades from Greenville, Anderson and the surrounding counties, so crew travel and mobilization show up in subcontractor pricing. We use ZIP-code-adjusted material and labor rates rather than a statewide average, which keeps the labor line honest for a market this size. Overtime, shift work and phased occupancy are priced as separate line items.
ZIP-code-adjusted RSMeans · Mobilization · Overtime · PhasingLong driveways, detention ponds, and utility extensions to outlying tracts are common here, and they are frequently under-scoped. We quantify clearing, grading, erosion control, storm pipe and structures by length and count, and separate them from the building package so you can see what the dirt actually costs. Confirm local stormwater and buffer requirements with the county or city.
Clearing and grading · Erosion control · Storm pipe · DetentionMasonry, structural steel and mechanical equipment move into Greenwood from regional suppliers, so freight and lead time affect the buyout. South Carolina sales tax treatment on materials and the contractor's exemption process can also change the bottom line. We price material at delivered cost and note where tax treatment or a long lead item needs to be confirmed before you lock a number.
Delivered material cost · Freight · Lead time · SC sales taxGreenwood sits in the Piedmont, where red clay subgrades, shallow rock, and a humid subtropical climate shape what you actually count. Here is how those conditions land in the divisions we price most often.
Piedmont red clay does not drain, so a Greenwood site plan usually means over-excavation under building pads and structural fill placed in lifts, not a simple cut-and-fill balance. Count clearing by acre, stripping by square yard at 6 to 8 inches typical, and unsuitable spoil haul-off separately from topsoil. Rock is shallow enough in parts of Greenwood County that you should carry a rock allowance or a unit rate per cubic yard of excavation rather than assume ripping. Detention ponds, riprap outfalls, and silt fence perimeter go in linear feet. Our sitework estimating services break these out by CSI division so you can see what the civil drawings leave to the contractor.
Wood framing is standard in Greenwood housing, so count wall plates in linear feet, studs by piece at 16 inches on center, and headers by size and span. Floor joists and rim board run linear feet; subfloor and roof sheathing run square feet with a waste factor. Roof pitch drives sheathing and underlayment quantities more than plan area does, so take the slope length, not the footprint. Trusses are usually a supplier package, so list them as an allowance or a per-piece count and keep the bearing and bracing in your own scope. Our framing estimating services quantify all of this from the elevations and framing plans.
MEP is where Greenwood bids go soft, because fixture and equipment counts drive the number more than floor area does. Count plumbing fixtures by piece, water and drain lines in linear feet by material, and gas piping separately if the project has it. Electrical runs by device count, fixture count, panel count, and linear feet of conduit and wire by size. HVAC is tonnage and equipment count, with ductwork by pound or linear foot and registers by piece. You need the mechanical schedules and the electrical panel schedules, not just the floor plan, or the takeoff is guesswork. Our MEP estimating services price from the schedules.
Slab-on-grade is the default for Greenwood commercial and residential work, so your takeoff runs formwork by square foot of contact area, not slab area. Count vapor barrier at 10 to 15 percent overlap, welded wire or fiber mesh by square foot, and anchor bolts by piece. Continuous footings are measured in linear feet with a stated width and depth, and grade beams get their own line. Where fill is deep or clay is expansive, thickened edges and pier systems show up, which is where a separate foundation takeoff keeps the concrete scope honest. Add control joints, dowels, and curing compound as separate lines instead of burying them in a square-foot price.
Greenwood gets summer humidity, afternoon thunderstorms, and occasional wind events, so underlayment, flashing, and fastening schedules matter as much as shingle count. Measure roofing by square (100 square feet) using slope length, then add starter course in linear feet, ridge and hip in linear feet, and valley flashing in linear feet. Count pipe boots, vents, and step flashing by piece. Wall envelope is measured by square foot of net wall area after deducting openings, with housewrap, flashing tape, and sealant called out separately. Check the current adopted code edition with the local building department before you lock wind and uplift details into the estimate.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 31 23 16 | Structural excavation, clay, incl. over-excavation | 1,850 | CY |
| 31 23 23 | Rock excavation allowance, shallow Piedmont rock | 120 | CY |
| 03 30 00 | Slab-on-grade, 5 in., incl. vapor barrier and mesh | 14,200 | SF |
| 03 10 00 | Continuous footings, 24 in. x 12 in. | 640 | LF |
| 06 10 00 | Wall framing, 2x6 studs at 16 in. O.C. | 3,900 | SF |
| 07 30 00 | Asphalt shingles, incl. underlayment, 6:12 pitch | 18,400 | SF |
| 22 11 00 | Domestic water piping, PEX, 1/2 in. to 1 in. | 1,150 | LF |
| 26 05 19 | Branch circuit conduit and wire, EMT | 2,400 | LF |
This walk-through uses illustrative dimensions, not a real project. The method is what transfers.
Start with the building footprint and confirm it against the foundation plan. Assume a 120 ft by 80 ft rectangle with a 4 ft perimeter apron on two sides.
| Step | Calculation | Result |
|---|---|---|
| Building slab area | 120 ft × 80 ft | 9,600 SF |
| Apron area | (120 ft × 4 ft) × 2 sides | 960 SF |
| Total slab area | 9,600 + 960 | 10,560 SF |
| Waste factor | 10,560 × 1.05 | 11,088 SF |
| Concrete volume at 5 in. | 11,088 × (5 ÷ 12) ÷ 27 | 171 CY |
Now the edges. Perimeter formwork runs the building perimeter plus the apron edges: 2 × (120 + 80) = 400 LF, plus 2 × 120 = 240 LF of apron edge, for 640 LF. Vapor barrier goes down at 10 percent overlap, so 10,560 × 1.10 = 11,616 SF. Welded wire mesh matches slab area at 11,088 SF, and you should add chairs or fiber as a separate line rather than assume the mesh stays in place.
Reinforcing steel in footings is measured by linear feet of bar, not by footing length. A continuous footing 640 LF long with four #5 bars continuous gives 640 × 4 = 2,560 LF of #5, plus dowels and lap splices. #5 bar weighs 1.043 lb per LF, so 2,560 × 1.043 = 2,670 lb, or about 1.34 tons before laps. Add 5 percent for laps and waste: about 1.4 tons.
Two Greenwood-specific adjustments. First, if the geotech report calls for undercutting unsuitable clay, add the over-excavation and structural fill as separate cubic-yard lines; do not absorb them into the slab price. Second, confirm the adopted code edition and any local amendment on slab thickness and vapor retarder with the local building department before you finalize. Send the plan set and we will return the takeoff organized by CSI division in Excel and PDF within 24 to 48 hours for most projects.
We do not publish a city-level permit count for Greenwood. Residential permit figures in the U.S. Census Bureau Building Permits Survey cover new privately-owned residential units only, and where permits are issued by a county or regional office, no separate city figure exists. That means any Greenwood permit number you see quoted is likely a county or regional total, not the city itself. Treat permit data as a demand indicator, not a scope document, and price from the plans.
Send the architectural, structural, civil, and MEP drawings, plus any specifications, schedules, and addenda. Geotechnical reports and civil grading plans matter more here than in most markets because of Piedmont clay and shallow rock. If you have a bid form or a scope narrative, include it so we can match your line structure. We return Excel and PDF files organized by CSI MasterFormat division with marked-up plan sets.
Most projects come back in 24 to 48 hours. Larger or multi-building packages take longer, and we will tell you the date before we start. Rush turnaround is available when a bid deadline is tight. The clock starts when we have a complete set of drawings, not when the first file arrives, so send everything at once if you can.
We use ZIP-code-adjusted material and labor pricing, so Greenwood County rates differ from Charleston or Greenville rates. We work from RSMeans data as the cost basis and adjust for the specific ZIP code, then apply your project's wage requirements where they exist. If you have recent local quotes for concrete, framing lumber, or sitework, send them and we will reconcile the estimate against them.
Yes. Civil-heavy packages are common here because of grading, drainage, and detention requirements. We break out clearing, stripping, unclassified excavation, rock, structural fill, storm pipe by size and material, structures, riprap, and erosion control as separate lines so you can see where the risk sits. If the geotech report identifies unsuitable material, we carry the spoil haul as its own line rather than hiding it.
Greenwood has steady single-family and small multi-family construction, and we price both. For housing, the takeoff typically runs framing by piece and linear foot, roofing by square, and MEP by fixture and device count. Multi-family adds unit-mix repetition, so we build a typical-unit takeoff and multiply, then add the common areas, sitework, and building envelope separately.
Yes. Every takeoff ships with marked-up drawings so you can trace each quantity back to the sheet it came from. That matters on a bid review, because a reviewer can check a wall length or a footing run without re-measuring the whole set. The markup uses color-coded overlays in Bluebeam Revu, and the Excel file is organized by CSI MasterFormat division.
We do not guess at rock. If the geotech report gives rippability or depth-to-rock information, we use it. If it does not, we carry a rock allowance as a separate cubic-yard line with a stated assumption, so the bid shows the exposure instead of burying it. On Piedmont sites, shallow rock is common enough that a bid without a rock line is a bid with an unpriced risk.
We can. If your bid form or your internal cost structure uses specific divisions, line items, or units, send a sample and we will build the takeoff to match it. Otherwise we deliver the standard CSI MasterFormat organization with quantities, units, and notes. Matching your format saves you a reformatting step on bid day.
Yes. We work across the Upstate and the Savannah River corridor, including Anderson, Greer, Mauldin, Easley, Simpsonville, and North Augusta. Pricing is ZIP-code adjusted, so each location carries its own material and labor basis. The scope logic does not change much between them, but freight, wage rates, and local amendment details do.
Upload your drawings and specifications and we will return a CSI-organized takeoff in Excel and PDF, usually within 24 to 48 hours.