Sitework takeoff
Clearing, grading and red-clay cut/fill quantities for Piedmont lots, with haul and erosion-control line items.
CY · LF · TONWe prepare CSI MasterFormat takeoffs and estimates for builders working in Greer and the surrounding Upstate. Send your plans and get an Excel and PDF estimate with marked-up drawings, usually within 24–48 hours.
Greer pricing turns on four local drivers: Upstate manufacturing labor competition, Piedmont red-clay sitework, Greenville–Spartanburg corridor material freight, and a residential market that swung from 1,488 permitted units in 2024 to 409 in 2025. Bidders must price labor and dirt realistically, not with coastal or national averages.
Greer sits in the Greenville–Spartanburg manufacturing corridor, where plant expansions and warehouse work keep subcontractor crews busy and labor rates firm. Residential permitting here is volatile: the city issued 409 new privately-owned units in 2025, down from 1,488 in 2024, so bid volume and crew availability can shift sharply between quarters. We build estimates around that reality, using ZIP-code-adjusted material and labor pricing rather than a statewide average.
That volatility changes how you bid. With fewer active subdivisions than 2024, more contractors are chasing each plan set, so padding overhead is a fast way to lose the job. The estimates we return break out sitework, foundation, framing, roofing and MEP scopes by area, with waste factors and unit costs you can adjust without rebuilding the takeoff. Every takeoff is organized by CSI MasterFormat division and delivered in Excel and PDF with marked-up plan sets, so your superintendent and your purchasing desk can both use the same numbers. If you are comparing this market with the rest of the state, start with our South Carolina construction estimating page, and see how we handle adjacent markets like Mauldin and Greenwood.
For bidders. You need a defensible number before the bid date. We return division-level quantities, waste factors and unit costs so you can adjust markup without rebuilding the takeoff.
For builders. You need purchasing and schedule support. We break out concrete, framing, roofing and MEP scopes by area so your crews and suppliers get quantities they can order from.
For owners. You need a budget before design is final. We price assemblies from schematic drawings and flag the line items most likely to move as documents develop.
Select a bar to compare Greer with the largest South Carolina markets we cover.
409 new housing units in 2025 (-72.5% vs 2024).
409 single-family · 0 multifamily (0%).
Greer issued 409 new privately-owned residential units in 2025, all single-family, with zero multifamily units permitted and a permitted value of $101M — an average of $247,500 per unit. That is a 73% drop from 1,488 units in 2024. For bidders, the practical effect is fewer active subdivisions and more competition per plan set, which pushes estimators to sharpen sitework, foundation and framing quantities instead of padding overhead. The average value per unit also tells you the product type: detached homes in the mid-$200Ks, not entry-level infill or apartment work. Compare that pattern with other Upstate markets on our South Carolina construction estimating page.
Greer ranked 13th of 23 covered South Carolina cities by permitted units in 2025 and accounted for 3.5% of the 11,527 units permitted across those cities. That places it firmly in the second tier: steady enough to keep a residential estimating pipeline running, small enough that a single large subdivision can move the local numbers. Because coastal tourism markets like Myrtle Beach and Upstate manufacturing markets like Greenville pull labor in different directions, we price Greer work with its own ZIP-adjusted labor and material rates. If your projects span the corridor, our Mauldin construction estimating and Anderson construction estimating pages show how we handle neighboring markets.
We cover the scopes that drive Greer residential and light commercial bids, from dirt to trim.
Clearing, grading and red-clay cut/fill quantities for Piedmont lots, with haul and erosion-control line items.
CY · LF · TONStem walls, footings, slab-on-grade and rebar schedules priced for Upstate clay and typical frost-depth details.
CY · SF · LBFormwork, reinforcement and flatwork quantities for driveways, walks, garage slabs and structural concrete.
CY · SF · LFStuds, plates, headers, joists and sheathing counted by floor and wall type from the architectural set.
LF · SF · EAShingle, underlayment, flashing and ventilation quantities with typical waste factors for gable and hip roofs.
SQ · LF · EARough and finish counts for plumbing, electrical and HVAC fixtures, devices and distribution runs.
EA · LF · TONFull division-level takeoffs for single-family plans, including allowances and marked-up plan sets.
SF · LSShell, interior fit-out and site packages for Greer's warehouse, retail and light-industrial projects.
SF · CY · TONYou bid plant expansions, warehouses and subdivision packages in the Greenville–Spartanburg corridor. We return division-level quantities fast enough to price multiple bid dates, with waste factors you can adjust for your own crews.
Concrete, framing and MEP trades in Greer chase the same plan sets. We give you measured quantities and unit costs so you can set markup against firm labor rates instead of guessing at a lump sum.
With residential permitting down from 2024, you need early budgets that survive design changes. We price assemblies from schematic drawings and flag the line items most likely to move as documents develop.
You need a second set of eyes on quantities before a bid goes out. Our marked-up plan sets and MasterFormat breakdown make it easy to check scope and confirm nothing was missed.
You are budgeting a plant addition, office fit-out or repair package. We price from your drawings and clarify what is included, so you can compare contractor bids on the same scope.
You handle tenant improvements and capital repairs across Greer properties. We measure each scope by area and unit, so your maintenance budget and contractor invoices line up.
We estimate projects throughout Greer and the surrounding Upstate, from downtown to the industrial corridors along Highway 101 and Interstate 85. If your project is in one of these areas, send the plans and we will price it.
Greer's 2025 residential permits were all single-family, and the surrounding area adds industrial and commercial work. We price the property types that match that mix.
Production and custom homes on infill lots and in subdivisions. We take off foundation, framing, roofing and MEP by area, with waste factors for each trade.
Watch for: Verify lot grading and utility tap fees before finalizing sitework.
Plant expansions, distribution buildings and manufacturing support space. We measure slab area, structural steel, siding and process utilities from permit sets.
Watch for: Confirm racking, fire protection and dock equipment are in scope.
Office, retail and restaurant build-outs in existing shells. We break out partitions, ceilings, HVAC and electrical by room or zone for accurate pricing.
Watch for: Check existing sprinkler and HVAC capacity before demolition.
Townhome rows and apartment buildings. We take off repetitive units once and multiply, tracking shared walls, stairs and sitework separately.
Watch for: Watch fire-rated assemblies and unit-to-unit utility separation.
Schools, churches and municipal buildings. We price from architectural and structural sets, with separate allowances for specialty systems and finishes.
Watch for: Confirm code occupancy and egress requirements with the local building department.
Grading, storm drainage, water and sewer for new construction. We measure cut and fill, pipe runs and structures from civil drawings.
Watch for: Verify rock excavation and dewatering allowances against soil report.
Greer sits in the Piedmont, where red clay soils, summer storms and a busy manufacturing corridor all affect what your project costs. These are the drivers we price into every estimate.
Greer enforces the South Carolina adopted building codes, but the edition and local amendments can change. Permit fees, plan review times and inspection schedules vary by project type. We include allowances for code-required items like fire separation, egress and energy compliance, and we tell you to confirm the adopted edition with the city or county building department before you lock your bid.
City of Greer building department · Greenville County · Spartanburg CountyUpstate red clay expands and contracts with moisture, so foundation design often calls for reinforced footings, pier and beam or engineered fill. We price from the geotechnical report when you have one, and we carry allowances for undercut and backfill when you do not. On sloped lots, retaining walls and stepped footings add concrete and labor that a flat-lot estimate will miss.
Geotechnical report · Reinforced footings · Engineered fillGreer sees hot, humid summers and occasional winter ice, which affects roofing schedules, concrete cure times and exterior painting. We build in seasonal productivity factors for trades that lose days to rain or heat. Wind and hail exposure can also drive roofing material and fastening requirements, so we check the specified assembly against local practice.
Summer humidity · Winter ice · Wind and hail exposureThe Greenville–Spartanburg manufacturing corridor keeps skilled trades in demand, and labor rates reflect that. When residential permitting slows, crews shift toward industrial and commercial work, which can tighten availability for residential scopes. We use ZIP-code-adjusted labor rates and note where trade rates are firm versus volatile, so you can carry the right contingency.
Greenville–Spartanburg corridor · Skilled trades · ZIP-code-adjusted laborPiedmont sites often need storm drainage, detention and erosion control to meet local land development rules. We measure pipe, structures, riprap and silt fence from civil drawings, and we flag where a grading plan is missing. On tight infill lots, limited laydown and access can add handling and crane time that a large-site estimate would not show.
Storm drainage · Detention · Erosion controlMost materials reach Greer by truck from regional suppliers, so freight and lead times move with fuel and demand. We price common assemblies from current RSMeans data and note long-lead items like switchgear, joists and rooftop units. Sales tax and local fees are not uniform across every purchase, so we list them as separate line items for you to confirm with your suppliers.
RSMeans data · Freight · Long-lead itemsGreer sits in Greenville County, where the Upstate manufacturing base and residential growth push both commercial and subdivision work through the same plan review and inspection pipeline. The five trades below are where local conditions change quantities, not just unit prices.
Upstate South Carolina sits in the Piedmont, so you are cutting red clay and weathered saprolite, not clean sand. A grading takeoff here needs rock excavation as a separate bid item because weathered rock and partial weathering profiles show up in footing cuts, and unclassified excavation allowances get burned through fast. Mass grading quantities should be computed from the site plan's existing and proposed contours, with topsoil strip measured separately at 6 to 8 inches. Erosion control is a line-item category of its own: silt fence, inlet protection, construction entrances and temporary seeding all carry monthly maintenance. For subdivisions, run the sitework scope through our sitework estimating services before you price the lots.
Wood-framed construction dominates Greer's single-family permits, with engineered floor systems and pre-engineered roof trusses on most plans. A framing takeoff counts studs by wall length, plate height and spacing, then adds corners, openings and blocking; headers are sized from the structural sheets, not assumed. Truss packages come from the truss manufacturer's sealed drawings, so the framing estimate should carry a place-holder until those drawings land. Sheathing is measured in sheets by thickness and rating, with waste around 5 to 10 percent depending on wall complexity. Our framing estimating services break this into wall, floor and roof systems so a framer can bid labor against the same quantities.
MEP is where Greer bids go wrong most often, because the drawings are usually design-build or performance-specified and the estimate gets built from fixture counts and rules of thumb instead of a real takeoff. Count plumbing fixtures from the plans, then price rough-in by fixture plus the water, waste and vent runs measured in linear feet. Electrical is counted by device, fixture, panel and circuit home run, with the service sized from the load calculation. HVAC is measured by tonnage and by linear feet of duct, with the equipment schedule driving the cost. Send MEP sets to our MEP estimating services when the mechanical drawings are still schematic.
Residential work in Greer is predominantly slab-on-grade and crawl space, with stem walls on continuous footings. Take off concrete by cubic yard from footing and slab dimensions, then add waste — typical waste factors run 5 to 10 percent for formed foundations and 5 percent for slab-on-grade placed from a pump truck. Rebar is measured in pounds or linear feet by bar size, not by area, and you need the lap and dowel schedule to get it right. Vapor barrier, gravel base and termite treatment are separate CSI lines that get left off foundation bids more often than any others. Run foundations through our foundation estimating services and concrete through our concrete estimating services.
Roofs in the Upstate take hail and summer heat, so shingle selection and underlayment spec matter to the takeoff. Measure roofing by the square (100 square feet) from the roof plan, including hips, ridges and valleys, then add starter course, ridge cap, valley metal and underlayment as separate lines. Typical waste factors run 10 to 15 percent on cut-up roofs and closer to 5 to 10 percent on simple gables. Ventilation — ridge vent, soffit vent, or both — is measured in linear feet and must match the attic square footage the mechanical drawings assume. Our roofing estimating services handle steep-slope and low-slope assemblies separately.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 31 23 16 | Bulk excavation, footing and slab area | 310 | CY |
| 31 23 23 | Rock excavation, unclassified allowance | 40 | CY |
| 03 30 00 | Continuous footing concrete, 24x12 | 18 | CY |
| 03 30 00 | Slab-on-grade concrete, 4 in. with vapor barrier | 46 | CY |
| 03 20 00 | Rebar, #4 and #5, footings and slab | 4,850 | LB |
| 31 23 16 | Gravel base, 4 in. compacted under slab | 62 | CY |
| 06 10 00 | Wall framing, 2x4 and 2x6 studs, plates, headers | 9,400 | LF |
| 07 30 00 | Asphalt shingles, underlayment, ridge and starter | 34 | SQ |
This example prices the slab and footing concrete for a one-story house on a level lot in Greer. All dimensions are illustrative — substitute your own plan dimensions before you use any of these numbers.
Assume a rectangular footprint 60 ft by 40 ft, with a 24 in. wide by 12 in. thick continuous footing under the perimeter, and a 4 in. thick slab with a 12 in. by 12 in. thickened edge already counted in the footing. Concrete is ordered in cubic yards, and 1 cubic yard equals 27 cubic feet.
| Step | Calculation | Quantity | Unit |
|---|---|---|---|
| Footing volume | 200 LF x 2.0 ft x 1.0 ft = 400 CF | 400 | CF |
| Footing, cubic yards | 400 CF / 27 | 14.8 | CY |
| Slab area | 60 ft x 40 ft = 2,400 SF, less footing overlap | 2,300 | SF |
| Slab volume | 2,300 SF x 0.333 ft = 766 CF | 766 | CF |
| Slab, cubic yards | 766 CF / 27 | 28.4 | CY |
| Subtotal | 14.8 + 28.4 | 43.2 | CY |
| Waste at 7 percent | 43.2 x 1.07 | 46.2 | CY |
Order 46 cubic yards, rounded up to the nearest full truck. The 7 percent waste factor covers spillage, over-excavation at the footing, and minor thickness variation in the slab; typical waste for formed foundations runs 5 to 10 percent, and you should pick the high end when the subgrade is uneven or the footing has many jogs.
Two things change this number on a real Greer job. First, if the footing has interior bearing lines or a garage stem wall, add those linear feet before you divide by 27. Second, if the slab is placed on a vapor barrier over gravel, the concrete thickness stays the same but the base course and barrier become separate line items — do not let them disappear into the concrete price. Rebar is not in this table; measure it by bar size from the foundation plan and add lap.
A quick cross-check: 46 cubic yards over roughly 2,300 square feet of slab and 200 linear feet of footing works out to about 0.02 cubic yards per square foot of floor area, which is in the normal range for this assembly. If your number is far off that, recheck the footing width and slab thickness before you send the bid.
They come from the U.S. Census Bureau Building Permits Survey for 2025, and they count new privately-owned residential units permitted by the city itself — not the whole county, and not commercial or industrial permits. Greer issued 409 such units in 2025, down from 1,488 in 2024, a change of about -73 percent. All 409 were single-family; multifamily was zero. Permitted value was $101M, or $247,500 per unit on average. Treat these as a demand signal, not a construction cost index.
A drop from 1,488 units to 409 in one year means fewer active subdivisions competing for the same crews, which usually loosens framing, concrete and MEP labor availability. That can work in your favor on labor rates, but it also means some subs are bidding work outside their normal trade to stay busy. Price the scope, not the market. If you are bidding multifamily in Greer, note that the 2025 data shows zero multifamily units permitted, so there is no recent local comparables base to lean on.
Greer is in the Piedmont, so expect red clay, micaceous saprolite and weathered rock rather than clean sand or coastal soils. That means shrink and swell factors matter for cut and fill balance, and rock excavation should be a separate unit-price item instead of an allowance. Have the geotechnical report in hand before you finalize the takeoff. If the report is not available, carry an unclassified excavation line and state the assumption in your proposal so the number is defensible.
For a complete takeoff, yes — architectural, structural, civil, and the MEP drawings. If MEP is still schematic, we can price the architectural and structural scope and flag the MEP quantities as allowances. Send PDFs and we mark them up in Bluebeam Revu, then deliver an Excel workbook and PDF organized by CSI MasterFormat division. Most projects turn around in 24 to 48 hours, and rush delivery is available when a bid date is close.
Division 31 for earthwork and erosion control, Division 03 for concrete and reinforcement, Division 06 for framing and sheathing, Division 07 for roofing and waterproofing, and Divisions 22, 23 and 26 for plumbing, HVAC and electrical. On a slab-on-grade house, Division 03 and Division 06 usually carry the largest share of cost, so small errors in footing dimensions or stud counts move the total more than anything else in the estimate.
Yes, and we label it as such. We price what is on the sheets, list the assumptions in a basis-of-estimate note, and mark every quantity that depends on a drawing that is still in progress. Truss packages, mechanical equipment schedules and site retaining walls are the usual items that move between revisions. That way you can bid with a documented number and update only the flagged lines when the final drawings arrive.
We price material and labor using ZIP-code-adjusted RSMeans data, so a Greer ZIP does not carry the same labor rate as Charleston or Myrtle Beach. The Upstate manufacturing base keeps some trades — electrical, mechanical, steel — tighter than the coastal markets, while residential framing and concrete labor tend to be more available. The adjustment is applied inside the estimate, not as a flat percentage on the bottom line.
An Excel workbook and a PDF, both organized by CSI MasterFormat division, plus a marked-up plan set showing what was measured and where. Quantities are broken out by line item with units — cubic yards, square feet, linear feet, each, tons — so you can drop them into your own pricing sheet. We do not bundle everything into a single square-foot number, because that hides the scope gaps that lose bids.
Yes. We cover Greer and the surrounding Upstate markets, and we also work across the state, including Myrtle Beach, Aiken, Anderson, Mauldin, Greenwood and North Augusta. Pricing is adjusted by ZIP code, so a Mauldin or Anderson job gets its own labor and material basis rather than a Greer number with a markup. Start with our South Carolina construction estimating page if you want the statewide picture.
As a separate unit-price line, never as a lump-sum allowance. Piedmont profiles often show partially weathered rock that a track hoe can rip but a dozer cannot push, and the volume only becomes clear after the cut is opened. Carry a quantity from the geotechnical borings, price it per cubic yard, and state in your proposal that the quantity is estimated from borings and will be reconciled against actual measurement. That protects both you and the owner.
Send your plan set and we will return a CSI-organized takeoff in Excel and PDF, typically within 24 to 48 hours.