Sitework takeoff
Clearing, mass cut and fill, red-clay haul-off and erosion control quantities for hilly Greenville County sites where balance rarely works.
CY · SF · LFWe produce CSI MasterFormat takeoffs and estimates for Greenville contractors, developers and owners. Residential permits here jumped 90% in 2025, so bid volume is high and accuracy on quantity, waste and ZIP-adjusted pricing decides who wins work.
Upstate manufacturing growth, a 90% jump in permitted residential units, 57% multifamily share, Piedmont red-clay and weathered-granite subsurface conditions, and Greenville County's hilly terrain all drive sitework, foundation and MEP quantities. ZIP-code-adjusted material and labor pricing keeps your numbers tied to this market.
Greenville sits in the Piedmont of upstate South Carolina, where the ground is red clay over weathered granite and the terrain rolls enough that cut and fill never balances the way it does on the coast. That matters to your estimate: footing depths, retaining walls, and haul-off quantities swing more here than a flat-site template would suggest. We build takeoffs for these conditions, not for a generic Southeast average.
Our work covers the full South Carolina construction estimating market, and we handle Greenville residential, commercial and industrial scopes in the same CSI MasterFormat structure. Deliverables come as Excel and PDF, organized by division, with marked-up plan sets so your team can trace every quantity back to the sheet it came from. Pricing runs on ZIP-code-adjusted material and labor data, which keeps line items tied to what suppliers and subs actually charge around Greenville County. Typical turnaround is 24–48 hours, with rush available. If your next bid is a multifamily podium, a spec warehouse off I-85, or a hillside custom home, start with Get an estimate.
For bidders. You need quantities you can defend in a bid review. We return division-coded takeoffs with waste factors stated, so you can see where the concrete, rebar and framing counts came from before you set your number.
For builders. You need buyout numbers that match what your subs will actually charge. ZIP-adjusted pricing and clear scope splits by trade let you compare quotes line by line instead of guessing at gaps.
For owners. You need a budget before design is finished. We estimate from schematic sets and flag the assumptions, so your pro forma reflects Greenville County site conditions rather than a national average.
Select a bar to compare Greenville with the largest South Carolina markets we cover.
766 new housing units in 2025 (+89.6% vs 2024).
329 single-family · 437 multifamily (57%).
Greenville issued 766 new privately-owned residential units in 2025, up from 404 in 2024 — a 90% increase, per the U.S. Census Bureau Building Permits Survey. Multifamily accounted for 437 of those units, 57% of the total, with 329 single-family. Permitted value reached $219M, averaging $285,300 per unit. For bidders, that mix means more podium and wrap construction, more type III and type V wood framing over concrete podiums, and more competition for the same framing and MEP subs. Multifamily bids turn on unit-count repetition, so a small error in per-unit framing or rough-in quantities multiplies fast. We build unit-type matrices so your takeoff scales correctly across a 200-unit building. If you also work the coast, see our North Charleston construction estimating page for how coastal scopes differ.
Greenville ranks 5th of 23 covered South Carolina cities by permitted residential units, with 6.6% of the covered state total of 11,527 units. That places it behind the Charleston-area cities but ahead of most of the Upstate, and it reflects the manufacturing growth driving the region. Upstate industrial and commercial work — distribution, advanced manufacturing, office and medical — pulls the same subcontractor pool that residential builders rely on, which tightens pricing on concrete, steel erection and electrical. We see this in bids where the same crew is priced on three projects in the same week. Compare notes with nearby markets on our Rock Hill construction estimating and Sumter construction estimating pages, or the state overview for the full picture.
We cover the divisions that drive cost on Greenville County projects, from mass grading on rolling Piedmont sites to multifamily rough-in.
Clearing, mass cut and fill, red-clay haul-off and erosion control quantities for hilly Greenville County sites where balance rarely works.
CY · SF · LFSpread footings, stem walls and slab-on-grade quantities priced against weathered-granite bearing conditions common in the Upstate.
CY · SF · LFFormwork, rebar, embeds and finish schedules for podiums, retaining walls and tilt panels, with waste factors stated per element.
CY · TON · SFDimensional lumber, engineered joists, trusses and sheathing counted by unit type so multifamily repetition stays accurate.
BF · LF · EAPlumbing, HVAC and electrical rough-in by fixture and device count, matched to unit plans and Greenville County permit sets.
LF · EA · TONShingle, standing-seam and TPO areas with pitch, valley and penetration allowances for Upstate wind and hail exposure.
SQ · LF · EACustom and production home takeoffs from plan sets, including site-specific foundation and retaining wall scope.
SF · EA · LFDivisions 2 through 16 for office, retail and medical builds, with bid-level alternates and unit-price schedules.
SF · EA · LSYou bid podium multifamily and tilt-up warehouse work around I-85 and need division-coded quantities with stated waste factors before you set a number and sign a lump-sum contract.
Concrete, framing and MEP subs chasing Greenville County work need takeoffs split by CSI division so you can price your scope without carrying another trade's risk in your bid.
Upstate infill and greenfield sites sit on red clay with rolling grade, so you need a budget that reflects real cut, fill and haul quantities before you commit to land.
You issue schematic and design-development sets and want a third-party quantity check that flags scope gaps early, while changes are still cheap to make on paper.
Manufacturing and institutional owners in the Upstate need hard budgets for expansions and renovations, priced on ZIP-adjusted labor and material data rather than a national average.
When you scope a roof replacement, repaint or unit turnover across a Greenville portfolio, you need unit-rate quantities to compare contractor proposals line by line.
We estimate projects across Greenville County and the surrounding Upstate, from downtown infill to greenfield sites along the I-85 corridor. If your project is in one of these areas, the takeoff is priced to that location.
Greenville issued 766 new privately-owned residential units in 2025, with 437 of those multifamily and 329 single-family, according to the U.S. Census Bureau Building Permits Survey. That mix drives what we estimate most in this market.
Four- and five-story wood-frame over podium, plus surface-parked wrap buildings, are the dominant multifamily type in Greenville County. We take off unit-by-unit framing, sheathing and MEP rough-in so your per-unit cost holds across the building.
Watch for: Podium waterproofing, fire-rated assemblies, unit turnover
Greenville's 329 single-family permits in 2025 were mostly subdivision production homes on rolling Piedmont lots. We estimate per-plan quantities for slabs, framing, roofing and finishes, then adjust for lot-specific foundation and sitework.
Watch for: Lot grading, stem wall depth, roof pitch changes
Custom homes on steep lots near Paris Mountain and the northern Greenville County foothills carry retaining walls, stepped footings and long driveways. We take off those site elements separately so they do not get buried in the house square-foot number.
Watch for: Retaining walls, stepped footings, driveway cut
Tilt-up and pre-engineered metal buildings along I-85 and near the Greenville-Spartanburg corridor are a steady Upstate type. We estimate slab thickness, panel quantities, structural steel and dock equipment from the civil and structural sets.
Watch for: Slab flatness, tilt panel reinforcing, dock packages
Small commercial shells, tenant fit-outs and restaurant builds follow Greenville's retail growth along Woodruff Road and the Haywood Road corridor. We separate shell scope from tenant improvements so each budget stands on its own.
Watch for: Grease interceptor, hood, utility capacity
Greenville has a deep stock of 1980s and 1990s office and medical space being renovated rather than replaced. We measure selective demolition, new partitions, ceiling and MEP scope against existing conditions shown on the survey.
Watch for: Asbestos, existing MEP, ceiling height
Greenville pricing is not Charleston pricing or Atlanta pricing. These are the variables that move a number here, and each one appears as a line item or an assumption in our takeoffs.
Greenville County and the City of Greenville each run their own plan review, and the adopted editions of the IBC, IRC, IECC and NEC can differ by jurisdiction. Review timelines affect your carry cost, and inspection sequencing affects when trades can start. We flag the code items that carry cost — fire separation, egress, energy envelope — and you confirm the adopted edition with the local building department before bidding.
City of Greenville · Greenville County · IBC · IECCPiedmont residual soils hold water, shrink and swell with moisture, and often sit over partially weathered rock. Footings may need to bear deeper than a coastal template assumes, and rock excavation is a real line item on many hillside lots. We carry rock excavation and unsuitable soil undercut as separate bid items rather than burying them in the earthwork allowance.
Residual clay · Weathered rock · Under-cut · BackfillGreenville's grade means stormwater moves fast, and local land-development rules require detention or retention and sediment control on most new sites. Those structures, plus riprap, pipe and grading, are frequently understated in early budgets. We take them off from the civil set and list them as a distinct site package.
Detention pond · Sediment control · Riprap · Storm pipeGreenville competes for trade labor with the broader I-85 manufacturing corridor, and concrete, drywall and MEP crews stay busy when industrial work is strong. Labor rates and crew availability shift with that cycle. Our pricing uses ZIP-code-adjusted wage data for the Greenville area, so the labor line reflects the local market rather than a state average.
Concrete crews · Drywall · MEP trades · ZIP-adjusted wagesRolling terrain and subdivision build-out mean long driveways, temporary roads and tight lots where a concrete truck cannot reach the pour. Haul-off of unsuitable clay and rock adds trucking cost that a flat-site estimate misses. We price access, temporary construction entrance and haul distance as their own items.
Haul distance · Temporary road · Concrete access · TruckingGreenville sits between Atlanta and Charlotte, so most material comes by truck with lead times that move with regional demand. Lumber, structural steel, switchgear and rooftop units are the long-lead items that most often break a schedule. We note long-lead categories in the estimate so you can buy them out early.
Structural steel · Switchgear · Rooftop units · LumberGreenville's mix of infill multifamily, Upstate industrial work and hillside residential puts specific demands on a takeoff. Below is how local ground, climate and code drive quantities in five trades.
Greenville sits in the Piedmont, so you are cutting red clay and weathered granite, not clean sand. A takeoff here has to carry unclassified vs. rock excavation separately, plus a rock allowance line, because a bid that lumps them will lose money on a hillside lot. Clearing and grubbing is measured by acre, but haul-off is measured by cubic yard of swell, and the swell factor on Piedmont clay runs higher than the textbook number. Silt fence, inlet protection and a construction entrance are per linear foot and per each, and the city's stormwater requirements mean those quantities are not optional. See our sitework estimating services for how we break these out.
Upstate humidity and summer thunderstorms drive roof detailing, and a takeoff that ignores valley and ridge flashing will come up short. Framing is taken off by linear foot of wall, plate and header, then converted to board feet with a waste factor that runs higher on complex roof plans. Sheathing is by sheet, with cuts and waste added. Roofing is by square (100 square feet), and on steep pitches you add for ice and water shield at valleys and eaves. If the project is in a wooded area, you also carry gutter and downspout quantities. Our framing estimating services and roofing estimating services break these down by assembly.
Greenville infill sites are tight, so general conditions carry more than a typical suburban job. You need line items for temporary fencing, dumpster pulls, crane or pump truck days, and a staging area if the lot is small. On hillside projects, you also carry temporary erosion control and possibly a construction entrance with stone. Permitting fees and inspections are separate line items, and you should verify them with the city. If the project is in a historic district, add for design review and potential material matching. Our commercial estimating services and residential estimating services both include these general conditions.
Footings, stem walls, slab-on-grade and piers all price differently when the subgrade is expansive clay. A proper takeoff separates 03 30 00 cast-in-place concrete by element, not by a single cubic-yard number, because the ready-mix supplier quotes different mixes for footings and slabs. Rebar is taken off by bar size and total weight, including lap and waste, and vapor barrier is measured by square foot of slab area plus 10 percent for laps. On hillside lots, retaining walls and pier foundations push concrete quantities up, and you should confirm footing depth requirements with the local building department before you finalize. Our concrete estimating services cover this scope.
Greenville follows the South Carolina adopted codes, so MEP takeoffs have to reflect the current energy code and any local amendments. Ductwork is measured by linear foot and by pound of sheet metal, and fittings are counted each. Electrical is taken off by device, fixture, and home run, with conduit and wire by the foot. Plumbing is by fixture and by linear foot of pipe, separated by material. On multifamily projects, you also need to count riser diagrams and meter stacks. We confirm the adopted code edition with the local building department before finalizing quantities. Our MEP estimating services handle this trade coordination.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Cast-in-place concrete, footings | 185 | CY |
| 03 30 00 | Cast-in-place concrete, slab-on-grade | 420 | CY |
| 04 20 00 | Unit masonry, CMU backup | 12,400 | SF |
| 06 10 00 | Wood framing, walls and plates | 38,500 | BF |
| 07 30 00 | Asphalt shingles, steep slope | 62 | SQ |
| 08 11 00 | Hollow metal doors and frames | 84 | EA |
| 09 29 00 | Gypsum board, interior partitions | 42,000 | SF |
| 22 11 00 | Domestic water piping, PEX | 6,800 | LF |
This example shows how we take off continuous footings for a three-story wood-framed building on a Piedmont clay site. Dimensions are illustrative. We start with the footing plan: a continuous 24-inch-wide by 12-inch-deep footing runs 420 linear feet around the perimeter and under interior bearing walls.
Step 1 — Volume per linear foot Width × depth = 2.0 ft × 1.0 ft = 2.0 CF per LF.
Step 2 — Total volume 2.0 CF/LF × 420 LF = 840 CF.
Step 3 — Convert to cubic yards 840 CF ÷ 27 = 31.1 CY.
Step 4 — Add waste and spillage Typical waste for footings is 5%. 31.1 CY × 1.05 = 32.7 CY.
Step 5 — Add pier pads 12 pier pads at 3 ft × 3 ft × 1 ft = 108 CF = 4.0 CY. With 5% waste = 4.2 CY.
Step 6 — Total concrete 32.7 + 4.2 = 36.9 CY. Round to 37 CY for ordering.
| Step | Calculation | Result |
|---|---|---|
| 1 | 2.0 ft × 1.0 ft | 2.0 CF/LF |
| 2 | 2.0 CF/LF × 420 LF | 840 CF |
| 3 | 840 CF ÷ 27 | 31.1 CY |
| 4 | 31.1 CY × 1.05 | 32.7 CY |
| 5 | 12 × (3×3×1) = 108 CF ÷ 27 = 4.0 CY × 1.05 | 4.2 CY |
| 6 | 32.7 + 4.2 | 36.9 CY |
For rebar, we take off #4 bars at 12 inches on center each way. For 420 LF, that is 420 LF longitudinal plus 420 LF transverse (assuming a 2-ft width, one bar each way). Total 840 LF. Add 10% for laps and waste = 924 LF. Convert to weight: #4 bar weighs 0.668 lb/ft, so 924 × 0.668 = 617 lb. Round to 620 lb.
This is the level of detail we provide in every takeoff, with quantities organized by CSI division and ready for pricing. For a project like this, you would also need formwork, vapor barrier, and gravel base, which we take off separately. Send us your plans for a complete takeoff.
Greenville follows the South Carolina adopted building codes, which include the IBC, IRC, IECC, NEC, and IPC/UPC. The city may have local amendments, so you should confirm the exact edition and any amendments with the Greenville building department before you finalize your takeoff. We do not assume a code year in our estimates; we ask you to provide the applicable code edition or we note it as an assumption.
The Piedmont region has expansive red clay and weathered granite. This means footings may need to be deeper or wider, and you may need rock excavation allowances. In a takeoff, we separate unclassified excavation from rock excavation and add a rock allowance line. We also account for increased concrete and rebar quantities if the geotechnical report calls for deeper footings. Always provide the geotechnical report if available.
Typical waste for framing lumber ranges from 5% to 10% depending on the complexity of the roof and wall layout. On hillside homes with many corners and valleys, we use the higher end. We also add waste for sheathing and trim. These factors are applied in the takeoff and shown separately so you can adjust them based on your crew's practices.
We take off silt fence by linear foot, inlet protection by each, and construction entrances by each. We also include temporary seeding and mulching by square foot if required. The City of Greenville has stormwater requirements, so we include these items in the sitework package. You should verify the specific requirements with the city's stormwater department, as they can vary by site.
Most projects are returned within 24 to 48 hours. Rush service is available if you have a bid deadline. We deliver Excel and PDF files organized by CSI MasterFormat division, with marked-up plan sets so you can see exactly what we measured. The turnaround starts when we receive complete plans and specifications.
Yes, we cover all of South Carolina. We have pages for North Charleston construction estimating, Rock Hill, Mount Pleasant, Summerville, Goose Creek, and Sumter. Pricing is adjusted by ZIP code for material and labor, so a takeoff for Greenville uses local costs. If your project is in another part of the state, we can still help.
For multifamily, we take off MEP by building and by unit type. We count fixtures, devices, and equipment, and measure pipe and duct by linear foot. We also include riser diagrams and meter stacks. Coordination between trades is critical, so we note any conflicts we see in the plans. Our MEP estimating services are set up for this kind of repetitive layout.
We need the complete set of architectural, structural, civil, and MEP drawings, plus specifications and any addenda. If you have a geotechnical report, provide that as well. For renovations, existing conditions drawings help. We also ask for the project address so we can apply the correct ZIP code for pricing. You can upload plans through our get an estimate page.
The permit data comes from the U.S. Census Bureau's Building Permits Survey for 2025. It counts new privately-owned residential units permitted by the city itself. In 2025, Greenville permitted 766 total units, up from 404 in 2024, with 329 single-family and 437 multifamily units. The total permitted value was $219 million. This data helps you understand the local market volume, but it does not include commercial or industrial permits.
Yes, we estimate industrial projects including manufacturing and warehouse facilities. For industrial work, we take off foundations, structural steel, process piping, and electrical distribution. We use RSMeans data adjusted for the Greenville ZIP code. Industrial takeoffs often require coordination with equipment vendors, so we note any vendor-supplied items as exclusions. Our industrial estimating services cover this scope.
Upload your drawings and specifications and we will return a CSI-organized takeoff within 24 to 48 hours.