Sitework takeoffs
Clearing, mass grading, red clay cut and fill, storm pipe and erosion control for Savannah River floodplain lots.
CY · LF · TONWe prepare quantity takeoffs and construction estimates for builders working in North Augusta, Aiken County and the CSRA. Send your plans and specs and we return an Excel and PDF estimate by CSI MasterFormat division in 24–48 hours.
Multifamily-heavy permitting, Piedmont red clay and shallow groundwater, Savannah River floodplain and seismic detailing, hot-humid IECC envelope requirements, and Georgia–South Carolina labor and material pricing that shifts across the river. Each one changes quantities, waste factors and unit costs on your takeoff.
North Augusta sits in Aiken County on the South Carolina bank of the Savannah River, across from Augusta, Georgia. The city's permit mix is unusual for a community its size: multifamily units made up 62% of the 517 new privately-owned residential units permitted in 2025, per the U.S. Census Bureau Building Permits Survey. That means a steady stream of apartment and townhome scopes — repeated unit plans, shared MEP risers, large site packages — alongside single-family infill and the commercial work that follows rooftops. If you bid here, your takeoff has to handle both a 194-unit-plan type and a 323-unit multifamily building without losing the repetition.
We build estimates the way a general contractor prices a bid: measure from the drawings, tag every assembly to a CSI MasterFormat division, apply ZIP-code-adjusted material and labor pricing, and show the math in a marked-up plan set. Whether you are pricing a slab-on-grade duplex near the river or a garden-style apartment building off a state route, the deliverable is the same: an Excel workbook and PDF organized by division, ready to plug into your bid form. Start with our South Carolina construction estimating overview, or send drawings straight to get an estimate.
For bidders. You need a defensible number before the bid date. We return division-level quantities and pricing so you can adjust labor, add your markup and submit without rebuilding the takeoff.
For builders. You are buying out trades and ordering material. Our takeoffs give you concrete yards, framing board feet and roofing squares with waste, so purchase orders match the plans.
For owners. You are comparing proposals or checking a budget. We show scope by division with assumptions called out, so you can see what each contractor included and what was left out.
Select a bar to compare North Augusta with the largest South Carolina markets we cover.
517 new housing units in 2025 (-0.2% vs 2024).
194 single-family · 323 multifamily (62%).
The 2025 permit data tells you where the estimating hours go. North Augusta issued permits for 517 new privately-owned residential units, essentially flat against 518 in 2024, but 323 of those units — 62% — were multifamily. Permitted value was $138M, an average of $266,700 per unit. For a bidder, that mix means the money is in repeated unit types: you measure one typical apartment plan, then multiply, but you must also carry corridor, stair, elevator, roof and site quantities that do not repeat. North Augusta ranked 8th of 23 covered state cities by units and accounted for 4.5% of the 11,527 units permitted across those cities. Multifamily estimating lives or dies on how cleanly you separate the typical unit from the one-off common areas.
North Augusta's labor and material market is tied to the Augusta, Georgia metro, not to Charleston or Greenville. Much of the state's permit volume sits in coastal tourism markets and Upstate manufacturing growth, so statewide averages can mislead you here. A subcontractor based in Augusta prices differently from one in Columbia, and delivery charges on ready-mix, structural steel and roofing follow the same split. We price with ZIP-code-adjusted material and labor data rather than a single state number, and we flag line items where the nearest supplier is across the river. If you also work toward the Upstate, our Greer estimating and Greenwood estimating pages cover those markets.
Division-level takeoffs for the scopes that show up most often in Aiken County — from riverfront sitework to apartment building envelopes.
Clearing, mass grading, red clay cut and fill, storm pipe and erosion control for Savannah River floodplain lots.
CY · LF · TONSlab-on-grade, elevated decks, footings and paving for multifamily and commercial pours in the CSRA.
CY · SF · LBSpread footings, stem walls, pier and grade beam, and waterproofing for Piedmont clay and high groundwater.
CY · SF · LFWood and cold-formed steel studs, trusses, sheathing and blocking for repeated apartment and townhome plans.
BF · LF · EAShingle, TPO and modified bitumen systems with slope, flashing and waste factors for hot-humid exposure.
SQ · LF · EAPlumbing risers, HVAC tonnage, ductwork and electrical feeders for multifamily buildings and tenant fit-outs.
LF · TON · EACustom and production homes priced by division, including IECC envelope details for South Carolina climate zone 3A.
SF · EA · LSRetail, office, medical and light industrial scopes along the river corridors and major state routes.
SF · EA · LSYou are bidding garden-style apartments and single-family infill in Aiken County, where multifamily was 62% of 2025 residential permits. We return division-level quantities so your bid form is complete before the deadline.
Your North Augusta projects repeat unit plans across three and four-story walk-ups. We count one typical unit, then multiply by building, tracking shared risers, corridors and amenity areas separately.
You buy lumber and ready-mix by the truckload. We measure board feet, plate counts and slab yards off the plans so your purchase orders and crew loading match the drawings.
Shared plumbing walls and stacked mechanical closets drive your labor in multifamily. We take off fixture counts, riser lengths and ductwork by system so you can price the repetition correctly.
You need a budget before design is final. We show assumptions and alternates by CSI division so you can compare contractor proposals and see what each one excluded.
You are checking cost during design development. We mark up the plan set with quantities and note scope gaps, giving you a documented basis for the next revision.
We take off projects across Aiken County and the surrounding CSRA, from the riverfront to the state routes heading north and east. If your plans are inside these areas, send them over.
The city's 2025 permit data shows 323 multifamily units against 194 single-family units, so your takeoff has to handle both repeated apartment plans and one-off houses. These are the property types we price most often here.
Three and four-story walk-ups with surface parking and shared stair cores. We take off one typical unit, then multiply by building, tracking corridors, risers and amenity spaces separately.
Watch for: Unit mix changes, corridor lengths, shared plumbing walls
Attached units with party walls and individual utilities. We measure each unit type, count firewalls and roof intersections, and apply waste factors to framing and roofing per building.
Watch for: Party wall assemblies, roof tie-ins, per-unit utility stubs
Custom and production homes on remaining lots inside the city and along the river corridors. We take off foundation, framing, roofing and finishes from the plan set and note allowances for owner selections.
Watch for: Slab versus crawl space, porch and garage scope
Small commercial buildings that follow residential growth, often one or two stories with storefront glazing. We separate landlord shell work from tenant fit-out so each side knows its scope.
Watch for: Storefront systems, MEP service size, demising walls
Flex buildings and storage near the state routes, typically pre-engineered metal with slab-on-grade. We take off slab thickness, column reactions and metal building scope, then price the civil and MEP packages.
Watch for: Slab flatness, PEMB versus conventional, site utilities
Ground-floor commercial under residential units, common near the riverfront districts. We split the estimate by use and by floor so vertical separation and fire-rated assemblies are priced correctly.
Watch for: Occupancy separation, rated floor assemblies, shared egress
Aiken County pricing is not the same as pricing in Columbia or Charleston. These are the local conditions that move quantities and labor on your North Augusta bid.
North Augusta enforces the South Carolina adopted building, residential, plumbing, mechanical, electrical and energy codes, and Aiken County reviews some work outside the city limits. Plan review comments can change wall assemblies, egress widths and energy details after you bid. Confirm the adopted code edition and local amendments with the city or county building department before you lock your number, and price any resubmittal time separately.
City of North Augusta Building Department · Aiken County · SC adopted codesMuch of the area sits on residual soils and weathered rock near the fall line, with sandy and clayey layers that vary between lots. Expansive clay can force deeper footings, reinforced slabs or pier systems, and rock may require hoe-ram or blasting. If you have a geotechnical report, send it; otherwise we price a typical bearing condition and flag the foundation scope for confirmation.
Geotechnical report · expansive clay · rock excavationNorth Augusta sees humid summers, occasional ice events and the outer bands of Atlantic hurricanes. Wind design and roof attachment matter on taller multifamily buildings, and drainage must handle intense rainfall. We check roof cover board, fastening schedules and site grading quantities against the drawings so stormwater and wind scope are not left as an allowance.
Wind uplift · stormwater management · roof attachmentThe CSRA draws trades from both sides of the Savannah River, and crews move between Augusta and North Augusta based on the next start. Multifamily repetition rewards a stable framing and MEP crew, but labor rates and availability shift with the commercial pipeline. Our pricing uses ZIP-code-adjusted labor, and you can adjust the burden to match your own crews.
CSRA labor pool · Augusta, GA · ZIP-code-adjusted laborThe riverfront and lower-lying parcels near the Savannah River floodplain require careful grading, retaining walls and storm drainage. Cut and fill balances, sediment control and utility crossings add scope that is easy to miss on a building-only takeoff. We measure sitework separately and flag areas where a civil plan or survey is needed to price the dirt correctly.
Floodplain · retaining walls · sediment controlReady-mix, lumber and roofing come from suppliers in the Augusta and Aiken area, so delivery is short but plant schedules tighten when several multifamily jobs pour at once. South Carolina sales and use tax treatment differs from Georgia, and jobs near the state line can mix both. We price material with ZIP-adjusted costs and note where tax or freight needs your confirmation.
Ready-mix suppliers · SC sales and use tax · Augusta, GA material yardsNorth Augusta sits in Aiken County on the Savannah River, and its takeoffs look different from a coastal or Upstate job. The city issued 517 new privately-owned residential units in 2025, 62% of them multifamily, so your quantities skew toward repeated unit types, shared foundations, and sitework that has to handle river-corridor grades and Piedmont clay.
Aiken County's residual clay soils and the grades along the Savannah River corridor drive the cut-fill balance on most North Augusta sites. We take off clearing by acre, stripping depth by square yard, and structural fill by compacted cubic yard, then separate unsuitable material that has to be undercut and replaced. For multifamily pads, trench excavation for utilities and storm runs is measured by linear foot with bedding stone by ton. If your project includes a retaining wall or a graded building pad, our sitework estimating services break the work into CSI Division 31 and 33 lines so your excavator can bid the same quantities you priced. Confirm the adopted erosion-control and stormwater requirements with the City of North Augusta building department before you finalize the dirt package.
Wood-frame multifamily and single-family work in North Augusta is priced off wall, floor, and roof assemblies, not a lump-sum board-foot guess. We count studs by length and spacing, plates by linear foot, headers by size and count, joists and trusses by piece, and sheathing by sheet with a waste factor applied per assembly. Floor and roof sheathing waste runs higher on hip and complex roof plans, so we apply it by area rather than one flat percentage across the whole frame. Hold-downs, anchor bolts, and hardware are counted from the plans and the shear schedule. See our framing estimating services page for the level of detail we return, and note that engineered lumber substitutions should be flagged before bid day because they change both piece counts and unit cost.
Multifamily work means repeated plumbing stacks, so we take off fixtures by count per unit type and multiply by the unit mix rather than counting every fixture on every floor plan. Domestic water and drain, waste, and vent piping are measured by linear foot and diameter, with fittings counted by size. Electrical is taken off by device count, fixture count, and linear foot of conduit and conductor, with separate lines for panelboards and service gear. HVAC is measured by tonnage, linear foot of duct by size, and count of terminal units. Our MEP estimating services division-level breakdown lets your mechanical, electrical, and plumbing subs bid the same scope, which matters when 62% of the city's 2025 residential permits were multifamily.
With 323 multifamily units permitted in 2025, slab-on-grade and elevated deck concrete dominate the foundation scope. We take off footings by linear foot and cubic yard, slab by square foot with thickened edges, and reinforcing by pound using bar schedules rather than a blanket allowance. Formwork is measured by contact area, and we carry separate lines for vapor barrier, granular base, and dowels at construction joints. Mix design matters here: sulfate exposure and freeze-thaw cycles push you toward a specified air content and minimum compressive strength, so the takeoff notes the design strength rather than assuming a default. Our foundation estimating services and concrete estimating services packages both show waste separately so your ready-mix supplier quote lines up with our quantities.
North Augusta roofs take summer heat, afternoon thunderstorms, and occasional hail, so underlayment and flashing details are not placeholders in our takeoffs. We measure roof area by square, add starter and ridge by linear foot, count boots and vents by piece, and separate valley and penetration flashing from field flashing. For multifamily buildings, we break roofing by building and by roof section so a low-slope membrane area is not mixed with steep-slope shingle area. Wall envelope lines cover housewrap or fluid-applied membrane by square foot, flashing tape by linear foot, and sealant by linear foot of joint. Our roofing estimating services team prices membrane, shingle, and metal systems separately so you can compare bids without reworking the whole roof scope.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 31 23 16 | Trench excavation, utility runs | 1,240 | LF |
| 31 23 23 | Structural fill, compacted | 860 | CY |
| 03 30 00 | Slab on grade, 4,000 psi | 9,450 | SF |
| 03 20 00 | Reinforcing steel, footings and slab | 38,200 | LB |
| 06 10 00 | Wall framing, studs and plates | 14,600 | LF |
| 06 16 00 | Roof sheathing, 7/16 in. OSB | 4,180 | SF |
| 07 30 00 | Asphalt shingles, steep slope | 42 | SQ |
| 22 11 16 | Domestic water piping, PEX | 3,050 | LF |
This example prices a slab-on-grade pour for one three-story wood-frame building. The dimensions are illustrative, not a project we have estimated. The method is the same one we use on every multifamily takeoff in North Augusta, where 323 of the 517 residential units permitted in 2025 were multifamily.
Step 1 — Establish the slab area. Building footprint is 90 ft by 35 ft. Area = 90 × 35 = 3,150 SF per floor. The ground-floor slab covers the footprint only, so slab area = 3,150 SF.
Step 2 — Add slab thickenings and edges. Perimeter edge thickening runs the full perimeter: 2 × (90 + 35) = 250 LF. Interior bearing lines add 120 LF. Total thickening = 370 LF, at 12 in. wide by 12 in. deep below the 4 in. slab.
Step 3 — Convert slab area to volume. Slab volume = 3,150 SF × (4 in. ÷ 12) = 1,050 CF. Thickening volume = 370 LF × (12 in. ÷ 12) × (12 in. ÷ 12) = 370 CF. But the thickening sits below the slab, so the slab volume over the thickening footprint is already counted — deduct 370 LF × 1 ft × 0.333 ft = 123 CF. Net = 1,050 + 370 − 123 = 1,297 CF.
Step 4 — Convert to cubic yards and add waste. 1,297 CF ÷ 27 = 48.0 CY. Apply a typical 5% waste and pump loss: 48.0 × 1.05 = 50.4 CY.
| Step | Calculation | Result | Unit |
|---|---|---|---|
| Slab area | 90 ft × 35 ft | 3,150 | SF |
| Perimeter + interior thickening | 2 × (90 + 35) + 120 | 370 | LF |
| Slab volume | 3,150 × 0.333 ft | 1,050 | CF |
| Thickening volume | 370 × 1 ft × 1 ft | 370 | CF |
| Deduct slab over thickening | 370 × 1 ft × 0.333 ft | −123 | CF |
| Net volume | 1,050 + 370 − 123 | 1,297 | CF |
| Convert to CY | 1,297 ÷ 27 | 48.0 | CY |
| With 5% waste | 48.0 × 1.05 | 50.4 | CY |
Step 5 — Reinforcing. Assume #4 bars at 16 in. on center each way for the slab and four continuous #5 bars in the thickenings. Slab bars: 3,150 SF × 2 directions × (12 ÷ 16) = 4,725 LF of #4. Thickening bars: 370 LF × 4 = 1,480 LF of #5. Convert to pounds using 0.668 lb/LF for #4 and 1.043 lb/LF for #5: 4,725 × 0.668 = 3,156 lb, and 1,480 × 1.043 = 1,544 lb. Total reinforcing = 4,700 lb, plus typical 5% lap and waste = 4,935 lb.
The takeoff then carries vapor barrier at 3,150 SF plus 10% lap, granular base at 3,150 SF, and dowels at construction joints counted by piece. If your building has an elevated podium deck, the same sequence applies but formwork and shoring become separate line items, and you should confirm the adopted code edition and inspection sequence with the local building department before you lock the concrete package.
In 2025, 323 of the 517 new privately-owned residential units permitted in North Augusta were multifamily, about 62%. That means repeated unit plans, shared foundations, and common-area MEP. We take off one typical unit type in full, then multiply by the unit mix and add the common areas separately, which is faster and less error-prone than counting every fixture on every floor plan. It also makes change orders easier to price, because the unit-type quantities are already isolated.
Aiken County soils commonly include residual clay and sandy clay, and the Savannah River corridor has areas of fill and variable bearing. We take off undercut and replacement as a separate line so it is not buried in the structural fill quantity, and we carry vapor barrier and granular base explicitly. Geotechnical recommendations govern footing bearing and depth, so send the soils report with the plans. Confirm footing inspection requirements and any special inspection thresholds with the local building department.
The figures come from the U.S. Census Bureau Building Permits Survey for 2025, and they count new privately-owned residential units permitted by the city itself. North Augusta permitted 517 units in 2025 against 518 in 2024, with $138M in permitted value and an average of $266,700 per unit. The survey covers residential only, so commercial and industrial permits are not included. Use the numbers as a demand signal, not as a cost benchmark for your specific project.
We use RSMeans data as the base and adjust material and labor pricing by ZIP code, so a North Augusta address does not get Charleston or Atlanta pricing. Where you have supplier or subcontractor quotes, we plug those in and show the variance against the database line. The output stays organized by CSI MasterFormat division in Excel and PDF, with marked-up plan sets, so your subs can see exactly which quantities came from where.
Most projects turn around in 24 to 48 hours, and rush service is available when your bid date is close. Turnaround depends on sheet count and how complete the drawings are. A single-family plan set moves faster than a three-building multifamily package with civil, structural, and MEP drawings. Send the full set, including the civil and geotechnical reports if you have them, and we will confirm the schedule before we start.
Yes. We routinely split Division 31 and 33 from the building trades so your excavator and your general contractor are not bidding overlapping scope. That split matters in North Augusta, where river-corridor grades and storm drainage can swing the dirt package significantly. Our sitework estimating services cover clearing, stripping, cut and fill, trenching, storm pipe, and erosion control as separate line items with their own units.
Send the architectural, structural, civil, and MEP drawings, the specification book, the geotechnical report, and any addenda. If you have a unit mix schedule or a bid form, include it so our divisions match yours. For renovations, existing conditions drawings or a site walk narrative help. We return Excel and PDF files organized by CSI MasterFormat division with marked-up plan sets, so your team can trace every quantity back to a sheet.
Yes. We work across South Carolina, including Greer, Mauldin, Greenwood, Easley, Simpsonville, and Hanahan. Each city has its own permitting office, adopted code edition, and inspection sequence, and the labor and material pricing shifts by ZIP code. If your project spans more than one jurisdiction, we keep the takeoff consistent and note where local requirements change the scope, such as different erosion-control or fire-protection thresholds.
We apply waste by assembly rather than one flat percentage. Framing lumber, sheathing, roofing, and drywall each carry a typical range, and we note the percentage used on each line so you can adjust it. Complex roof plans and cut-up floor plans justify the higher end of the range. Concrete gets a smaller allowance for pump loss and spillage. Showing waste separately keeps your material quote comparable to ours and makes it obvious when a supplier is padding quantity.
Yes. The permit figures on this page are residential only, but our commercial estimating services and industrial estimating services cover tenant fit-outs, retail, light industrial, and warehouse work. Commercial takeoffs lean on Division 23 and 26 quantities, equipment schedules, and structural steel by piece and pound. Send the drawings and specs, and we will confirm scope and turnaround before we begin.
Send your drawings, specs, and any unit mix or bid form, and we will return a division-level takeoff in 24 to 48 hours.