Sitework takeoff
Clearing, mass excavation, undercut and backfill for lake-plain sites, plus storm and sanitary runs to the Cuyahoga County connection.
CY · LF · TONWe prepare quantity takeoffs and construction estimates for Cleveland contractors, developers and owners. Plans come back organized by CSI MasterFormat division in Excel and PDF with marked-up plan sets, typically in 24–48 hours.
Cleveland pricing turns on lake-effect snow loads, freeze-thaw cycles on Cuyahoga County soils, heavy multifamily permit volume (563 of 706 new units in 2025), prevailing-wage exposure on public work, and ZIP-adjusted material and labor costs that differ from Columbus or Cincinnati rates.
Cleveland is the second-largest city in Ohio by our covered permit volume, and the 2025 mix shows where the estimating work sits: 706 new privately-owned residential units permitted, 563 of them multifamily, at an average value of $201,500 per unit. That is an 80% multifamily share, down 21% from 896 units in 2024. If you are bidding a mid-rise or a gut rehab in Tremont, Ohio City or the Warehouse District, your estimate lives or dies on concrete, framing and MEP quantities, not on a single-family checklist.
We build takeoffs from your plan set in Bluebeam Revu and PlanSwift, price them with ZIP-code-adjusted RSMeans data, and deliver Excel and PDF files organized by CSI MasterFormat division with marked-up drawings. That format lets a general contractor drop our quantities straight into a bid form and lets a subcontractor isolate their division. If you are comparing markets across the state, start with our Ohio construction estimating overview, or see how the numbers shift in Columbus and Cincinnati.
For bidders. You need quantities you can defend at a bid opening. We return division-by-division takeoffs with waste factors shown separately, so you can adjust before the number goes in.
For builders. You are buying out trades and need a check against subcontractor quotes. We price the same scope with ZIP-adjusted material and labor rates and flag the line items that look light.
For owners. You want a budget before design is complete. We estimate from schematic sets, state the assumptions, and mark which quantities will move once drawings firm up.
Select a bar to compare Cleveland with the largest Ohio markets we cover.
706 new housing units in 2025 (-21.2% vs 2024).
143 single-family · 563 multifamily (80%).
Of the 706 new privately-owned residential units permitted in Cleveland in 2025, 563 were multifamily — about 80% of the total — against 143 single-family units. Permitted value was $142M, an average of $201,500 per unit, and Cleveland ranked 2nd of 20 covered Ohio cities by units at 5.9% of the 11,913 statewide total. For a bidder, that means your competition is mostly on apartment and mixed-use work: podium decks, Type III and Type V wood over concrete, elevator and trash-chute scopes, and unit-turn finishes. A single-family takeoff template will miss the repetition math that drives multifamily pricing, so we count typical units once, apply the multiplier, and break out the typical-unit finishes separately. Our multi-family estimating services cover that structure.
Units fell 21% from 896 in 2024 to 706 in 2025. When permit volume drops, more contractors chase fewer jobs and bid margins compress, which puts pressure on every quantity in your estimate — an overstated concrete or framing line is the difference between winning and buying the job. Cleveland also sits on lake-plain soils with high frost depth, so foundations, slab subbase and dewatering are real line items here, not allowances. If you work across Northeast Ohio, our Akron construction estimating and Toledo construction estimating pages show how the same scope prices in adjacent markets.
We take off and price the divisions that drive Cleveland bids, from sitework through MEP, in the units your subcontractors actually buy.
Clearing, mass excavation, undercut and backfill for lake-plain sites, plus storm and sanitary runs to the Cuyahoga County connection.
CY · LF · TONFootings, frost walls, podium decks and slab-on-grade, with formwork area and reinforcement separated from placed concrete volume.
CY · SF · LBSpread footings, caissons and waterproofing for Cleveland's frost depth and high water table along the lakefront and river flats.
CY · SF · LFWood and light-gauge studs, joists, sheathing and trusses counted by typical unit, then multiplied across the multifamily floor plan.
LF · SF · EATPO and modified bitumen for flat multifamily roofs, with insulation, cover board, flashing and snow-guard line items called out.
SQ · LF · EAPlumbing, HVAC and electrical rough-in by fixture, diffuser and device count, coordinated against the unit plan and riser diagrams.
EA · LF · TONSingle-family and two-family takeoffs for Cleveland's 143 permitted single-family units, priced with ZIP-adjusted local rates.
SF · EA · LSTenant fit-out and adaptive reuse in the Warehouse District and University Circle, with demolition and MEP tie-in quantities broken out.
SF · LF · EAYou are bidding Cuyahoga County school, clinic and warehouse work against four or five local GCs. We return division-by-division quantities with waste shown separately so your bid form closes without a plug.
Your Cleveland pipeline is 80% multifamily, so unit-mix changes swing concrete, framing and MEP cost more than any finish allowance. We reprice the affected divisions when the unit mix moves.
You need to isolate your division from a general contractor's full takeoff before you sign a lump sum. We extract your scope, quantify it in your units, and flag the line items that look light.
Your schematic set is going to a Cleveland owner who wants a budget before design development. We estimate from what is drawn, list assumptions, and mark which quantities will move.
You are budgeting a roof replacement, boiler plant or tenant fit-out on an older building. We quantify existing conditions from your drawings and separate replacement scope from repair scope.
Lake-effect storms and freeze events drive water and roof claims across the east side. We quantify tear-out, drying and replacement by area so the scope is defensible.
We estimate from plan sets for projects anywhere in Cuyahoga County and the surrounding counties. The list below covers the neighborhoods and suburbs that appear most often in the sets we receive.
The 2025 permit mix in Cleveland is 706 new privately-owned residential units, 563 of them multifamily, at an average value of $201,500 per unit. That mix shapes the property types we see most, alongside the commercial and industrial work that does not appear in residential permit counts.
Wood-frame over podium or full concrete structures in Ohio City, Tremont and the Warehouse District. Unit counts drive plumbing fixture and branch wiring quantities more than square footage does.
Watch for: Podium transfer slabs, unit-mix changes, corridor MEP mains
Warehouse and school conversions where existing structure is reused and new MEP is threaded through old bays. You need existing-condition quantities before you can price the new work.
Watch for: Structural reinforcement, shaft openings, hazardous-materials abatement
143 single-family units were permitted in 2025, mostly narrow-lot infill and scattered rebuilds. Small footprints still carry full sitework, foundation and utility connection scope.
Watch for: Utility tap fees, tight-lot excavation, driveway and walk replacement
Clinic, office, retail and restaurant build-outs in University Circle, Downtown and the suburbs. Landlord shell conditions and tenant scope split determine what you actually price.
Watch for: Shell condition, sprinkler modifications, grease and hood work
Distribution and light manufacturing work along the I-77 and I-480 corridors. Slab flatness, clear height and dock equipment drive cost more than wall area.
Watch for: Slab thickness and flatness, dock packages, fire pump capacity
K-12 additions, higher-education renovations and healthcare work in and around University Circle. Phased occupancy and summer shutdowns compress the schedule and shift labor cost.
Watch for: Phasing, temporary partitions, owner-furnished equipment
Two Cleveland projects with the same square footage can price 15% apart once you account for code triggers, soil, weather and the labor market. These are the six factors we adjust for before we send a number.
Cleveland and its suburbs each adopt and amend the Ohio Building Code on their own schedule, so the same renovation can trigger different requirements on either side of a border. We read the adopted edition and local amendments before pricing life-safety, egress and energy scope, and you should confirm the current edition with the local building department. Permit review times vary by jurisdiction and affect your start date, not our quantity takeoff.
Ohio Building Code · local building department · Cuyahoga CountyMuch of Cleveland sits on glacial till and lake-plain clay, with filled ravines and old stream beds along the east side. Those conditions push foundation scope toward over-excavation, engineered fill, deeper footings or drilled piers. On adaptive reuse, existing footings may be undersized for the new loads, so we carry a structural allowance and flag it rather than burying it in the concrete division.
Glacial till · lake-plain clay · drilled piersLake-effect snow and freeze-thaw cycles drive roof snow-load design, footing depth below frost and exterior detailing. Winter construction adds temporary heat, enclosures and cold-weather concrete protection, and it slows masonry and exterior finishes. We price a winter sequence separately when your schedule crosses December through March, because the labor and equipment cost is not the same as a summer build.
Lake-effect snow · frost depth · freeze-thaw cyclesCleveland union trades cover most commercial and institutional work, while residential and light commercial contractors draw from a non-union market. Wage rates, overtime rules and apprenticeship ratios differ between the two, so the same scope prices differently depending on who is building it. We state which labor basis we used and can reprice on the other so your bid matches the crew you intend to use.
Union trades · open-shop labor · apprenticeship ratiosCombined sewers in older Cleveland neighborhoods mean storm connections and downspout disconnection can trigger separate permits or on-site detention requirements. Tight urban lots limit staging and spoil placement, which adds haul-off and material-handling cost. On larger sites, we quantify earthwork by cut and fill and check whether the balance can be kept on site before pricing trucking.
Combined sewers · on-site detention · cut and fill balanceCleveland is within a day's haul of Midwest steel, concrete and masonry suppliers, which keeps base material pricing competitive. The variables are delivery timing and storage: urban sites rarely have laydown room, so materials arrive sequenced to installation and that sequencing carries a cost. We price material by ZIP code and note where a longer haul or a crane-assisted delivery changes the number.
Midwest suppliers · ZIP-code pricing · sequenced deliveryCleveland's mix of lakefront multifamily, aging commercial stock, and heavy industrial work changes what you count and how you count it. These are the trades where local conditions move the numbers.
Cleveland sits on glaciated soils: silty clay tills, pockets of sand and gravel, and shallow shale in some areas. A takeoff has to separate topsoil strip from unsuitable fill removal, because over-excavation under footings is common on the near-west side and in the Flats. You also need rock excavation as a separate line item, not buried in the general excavation quantity, since the unit cost and equipment differ. Winter work adds frost-protection line items and temporary heat. For a full breakdown of cut, fill, haul-off, and undercut, see our sitework estimating services. Confirm geotechnical recommendations against the actual borings before you price the undercut depth.
Wood-frame multifamily over podium is common here, and the takeoff splits into: floor joists and rim board by linear foot, wall studs by count with plates and blocking, sheathing by sheet with waste, and trusses by piece. Cleveland's snow load and wind exposure govern header sizing and hold-down counts, so hardware is a real line item, not an allowance. Air barrier and continuous insulation are measured by wall area, with detailing at penetrations. Our framing estimating services and multi-family estimating services pages cover how we separate structure from envelope. Confirm the adopted edition of the residential and energy codes with the local building department, since the envelope requirements drive insulation thickness.
Cleveland's climate drives heating-dominated mechanical designs, so boiler and hydronic systems show up alongside rooftop units. Take off pipe by diameter and linear foot, fittings by count, and insulation by linear foot with a separate valve and fitting allowance. Ductwork is measured by weight or by square foot of sheet metal, with dampers and flex counted separately. Electrical takeoff runs conduit by size and foot, wire by foot per size, and devices by count. Domestic water, sanitary, and storm are separate systems. Our MEP estimating services page shows the format. Confirm the adopted plumbing and electrical code editions with the local building department, since amendments affect material listings.
Multifamily work around University Circle, Ohio City, and Detroit-Shoreway typically uses spread footings and slab-on-grade, with deep foundations only where fill is thick. Take off formwork by contact area, not by concrete volume, and count anchor bolts, embeds, and dowels separately. Basement walls need waterproofing and drainage board measured by wall area, plus footing drains by linear foot. Freeze-thaw cycles and road salt drive air-entrainment and higher PSI mixes for exterior flatwork. Our concrete estimating services and foundation estimating services pages show how we structure these divisions. Verify the local amendment to the adopted building code with Cleveland's Building and Housing department before finalizing mix designs.
Low-slope membrane roofs dominate commercial and larger multifamily in Cleveland, with steep-slope asphalt shingle on smaller residential. A takeoff needs roof area by slope, perimeter for edge metal and drip edge, penetration counts, and tapered insulation by area with a separate cricket and saddle count. Tear-off is measured separately from new membrane, and disposal is a line item. Snow guards and heat trace appear on some projects. Our roofing estimating services page lists the assemblies we price. Lake-effect snow and freeze-thaw mean flashing details at walls and curbs get extra scrutiny; count them rather than carrying a percentage.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Slab-on-grade concrete, 5 in. | 18,400 | SF |
| 03 30 00 | Spread footings, formed | 142 | CY |
| 05 12 00 | Structural steel, podium frame | 96 | TON |
| 06 10 00 | Wood framing, upper floors | 42,600 | SF |
| 07 21 00 | Continuous insulation, exterior | 21,800 | SF |
| 07 54 00 | TPO membrane roof, 60 mil | 14,200 | SF |
| 23 21 00 | Hydronic piping, 2 in. and under | 3,150 | LF |
| 26 05 19 | Conduit and wire, branch | 28,700 | LF |
This example sizes a wood-frame exterior wall for a three-story multifamily building. Dimensions are illustrative; substitute your own plan dimensions.
Assume a wall 180 ft long and 10 ft high, with 20 percent open area for windows and doors, studs at 16 in. on center, single bottom plate, double top plate, and one row of blocking at mid-height.
| Step | Calculation | Result |
|---|---|---|
| Gross wall area | 180 ft × 10 ft | 1,800 SF |
| Net wall area | 1,800 SF × 0.80 | 1,440 SF |
| Stud count | 1,440 SF ÷ 1.333 SF per stud (16 in. OC) | 1,080 studs |
| Stud length | 10 ft + 1 ft for plates and waste | 11 ft per stud |
| Stud linear feet | 1,080 × 11 ft | 11,880 LF |
| Bottom plate | 180 ft × 1 | 180 LF |
| Top plate | 180 ft × 2 | 360 LF |
| Blocking | 180 ft × 1 row | 180 LF |
| Sheathing | 1,440 SF × 1.10 waste | 1,584 SF |
Waste factors: use 5 percent on studs when buying precut lengths, 10 percent on sheathing for cuts and damage, and 5 percent on plates. Add hold-downs, anchor bolts, and straps by count from the structural sheets. Confirm the adopted residential code and local amendments with the Cleveland Building and Housing department before you finalize the wall assembly.
If you want this level of detail on your own plans, our residential estimating services and framing estimating services teams can turn it around in 24–48 hours.
Pricing depends on project type, size, and how complete the drawings are. A single-family takeoff is priced differently from a full multifamily or commercial package. We do not publish a flat rate because the scope varies. Send your plans through our get an estimate page and we will quote based on square footage, number of sheets, and trades involved. Turnaround is 24–48 hours for most projects, with rush available.
Most projects are delivered in 24–48 hours. Larger multifamily or industrial packages may take longer depending on sheet count and trade coverage. Rush service is available if you are pricing a bid due in a day or two. The clock starts when we have a complete plan set and your scope notes. Missing sheets or unresolved RFIs will extend the schedule, so send everything at once.
Yes. We adjust RSMeans data by ZIP code for the Cleveland area, so material and labor rates reflect local conditions. That matters for trades where Northeast Ohio pricing diverges from national averages, such as concrete, steel, and mechanical work. If you have recent local quotes or subcontractor pricing, send them and we will use them as the basis instead of the published data.
Send the full architectural, structural, civil, and MEP drawings as PDFs, plus any specifications and addenda. If you have a BIM model or CAD files, those help but are not required. We mark up the plan set and return an Excel workbook organized by CSI MasterFormat division along with a PDF. Incomplete sets are workable if you tell us what is missing and how you want gaps handled.
Yes. Multifamily and mixed-use are a large share of Cleveland's residential permit activity — 563 of 706 permitted units in 2025 were multifamily. We take off podium construction, wood-frame upper floors, envelope, and MEP systems. Our multi-family estimating services page covers the typical scope. For podium and structural work, see our commercial estimating services page.
Yes. Cleveland's industrial base and the broader Midwest logistics and reshoring investment drive demand for warehouse, manufacturing, and process work. We take off structural steel, slab-on-grade, process piping, and electrical distribution. Industrial packages often need heavier MEP and rigging scope, so send the process drawings and equipment schedules along with the building sheets. Our industrial estimating services page lists the divisions we cover.
We add line items for temporary heat, hoarding, and frost protection on schedules that run through winter. For sitework, we separate topsoil strip, unsuitable fill removal, and rock excavation so you can price each at the right unit rate. Under slab, we count vapor barrier and granular base separately. If your geotechnical report calls out over-excavation, we price it as its own line rather than burying it.
We use Bluebeam Revu for plan markup, PlanSwift for quantity takeoff, and RSMeans data for unit pricing. Deliverables come in Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets showing what we counted. That format is easy to hand to a subcontractor or drop into your own estimating template.
Yes. We cover the whole state through our Ohio construction estimating services page, including Columbus, Cincinnati, Toledo, and Akron. If your project is in a Cleveland suburb or elsewhere in Cuyahoga County, the same process applies. Send the address and we will confirm coverage and pricing.
The permit figures come from the U.S. Census Bureau's Building Permits Survey for 2025. The survey counts new privately-owned residential units permitted by the city itself. It does not include commercial, industrial, or renovation permits, and it does not capture unincorporated areas around Cleveland. Treat the numbers as a directional indicator of residential activity, not a full picture of construction volume in the region.
Send your plans and we will return a CSI-organized takeoff in 24–48 hours.