Sitework and excavation
Cut and fill volumes, retaining wall footings and undercut for hillside parcels in Hyde Park, Mount Adams and the river valley.
CY · SF · LFWe prepare quantity takeoffs and cost estimates for Cincinnati contractors, developers and owners. Plans come back in Excel and PDF by CSI MasterFormat division, with marked-up plan sets, typically within 24–48 hours.
Cincinnati pricing turns on hillside sitework and retaining walls, river-valley soils and bedrock depths, a 72% multifamily share of permitted units, prevailing wage on public work, and ZIP-adjusted material and labor rates that vary across Hamilton County and the surrounding suburbs.
Cincinnati sits on the Ohio River in Hamilton County, where the terrain changes block by block. A takeoff for a building on a flat West Side parcel and one on a hillside in Hyde Park or Mount Adams are not the same estimate, because excavation, shoring and retaining quantities move with the slope. We price both against ZIP-code-adjusted material and labor rates rather than a national average, so your numbers reflect what Cincinnati subcontractors actually charge.
Our work covers the project types that drive this market: multifamily buildings, tenant fit-outs, light industrial and warehouse work, and residential renovation. If your project sits outside the city, we also handle Columbus, Cleveland and Dayton work, and you can see the full scope of what we cover on our Ohio construction estimating page. Every estimate is organized by CSI MasterFormat division so your bid form, your buyout and your schedule of values all line up.
For bidders. You get a division-by-division takeoff with quantities you can check line by line, plus marked-up plan sets, so you can adjust scope and markup before the bid date rather than after.
For builders. We break out concrete, framing, roofing and MEP quantities separately, which lets you convert the estimate into a buyout package and a schedule of values without re-keying anything.
For owners. You see where the money sits across divisions and which scopes carry the most risk on hillside sites, so you can compare bids on the same basis instead of guessing at omissions.
Select a bar to compare Cincinnati with the largest Ohio markets we cover.
600 new housing units in 2025 (+167.9% vs 2024).
168 single-family · 432 multifamily (72%).
Cincinnati issued permits for 600 new privately-owned residential units in 2025, up from 224 in 2024 — a 168% increase, according to the U.S. Census Bureau Building Permits Survey. Multifamily accounted for 432 of those units, or 72% of the total, while single-family accounted for 168. Permitted value came to $118M, an average of $197,000 per unit. That mix tells you where estimating effort should go: a multifamily takeoff is driven by repeated unit types, corridor and common-area finishes, elevator and stair cores, and the MEP riser counts that a single-family estimate never touches. If your pipeline looks like this, our multi-family estimating services are built around unit-type repetition rather than one-off assemblies.
Cincinnati ranked 3rd of 20 covered Ohio cities by permitted units and accounted for about 5% of the 11,913 units permitted across those cities. Statewide demand is being pulled by Intel's Columbus-area chip plant and broader Midwest reshoring and logistics investment, which shows up in Cincinnati as warehouse, distribution and light industrial work along the I-75 and I-71 corridors. That matters to your bid: industrial scopes price differently from residential ones, with slab areas, structural steel tonnage and process utilities replacing drywall and trim. Bidders working both ends of that market should keep separate assemblies and separate waste factors, and can compare regional patterns on our Ohio construction estimating page.
We produce quantity takeoffs and cost estimates for the scopes that dominate Cincinnati work, from hillside excavation to multifamily MEP rough-in.
Cut and fill volumes, retaining wall footings and undercut for hillside parcels in Hyde Park, Mount Adams and the river valley.
CY · SF · LFFootings, foundation walls, slab-on-grade and elevated decks, with forming costs separated from placement on tight urban sites.
CY · SF · TONWood and light-gauge stud counts, joists, sheathing and blocking for multifamily buildings and residential additions.
LF · SF · EASlope and low-slope areas, membrane, insulation and flashing linear footage, plus tear-off and disposal volumes.
SQ · LF · TONFixture counts, pipe and duct runs, panel schedules and riser diagrams for multifamily and commercial fit-outs.
LF · EA · TONPartition types, ceiling areas, doors and hardware sets for Downtown and Over-the-Rhine tenant fit-outs.
SF · LF · EASlab areas, structural steel tonnage, dock equipment and process utilities for I-75 and I-71 corridor projects.
SF · TON · EANew builds, additions and gut renovations priced with ZIP-adjusted labor for Hamilton County and nearby suburbs.
SF · LF · EAYou need division-by-division quantities before bid day, especially on hillside sites in Hyde Park or Mount Adams where excavation and shoring can swing the number. We deliver Excel and PDF takeoffs in 24–48 hours.
Cincinnati permitted 432 multifamily units in 2025, 72% of the city total. Your pro forma needs unit-level costs for Type III and Type V over podium, plus sitework for tight urban lots and river-adjacent parcels.
You want quantities you can check against your own production rates, not a lump sum. We break out formwork, rebar, joist and sheathing counts, and squares by pitch so you can adjust labor before you commit.
You need a common scope baseline to see which bid omitted site utilities, retaining walls or MEP rough-in. Our marked-up plan sets show exactly what we measured and where the gaps sit.
Midwest reshoring and logistics investment is adding distribution and light industrial work along the I-75 and I-71 corridors. We take off slab thickness, tilt-up panels, racking loads and site paving separately.
Older housing stock in neighborhoods like Clifton, Northside and Oakley means selective demolition, structural repair and MEP upgrades. We estimate renovation scope by room and by system, not by square-foot average.
We estimate projects across Hamilton County and the surrounding counties, from urban infill to suburban subdivisions. If your site is outside the city, send the address and we will confirm coverage.
The 2025 permit mix was 72% multifamily, with the remainder single-family and renovation work. We estimate both new construction and existing-building scopes.
Podium and wrap construction, garden-style apartments and adaptive reuse of older buildings. We take off unit-by-unit finishes, corridor MEP, elevator and trash room scopes separately.
Watch for: Unit mix changes, Type III vs. Type V, sprinkler and standpipe risers.
Office, retail and restaurant build-outs in Downtown, Over-the-Rhine and Kenwood. We measure demising walls, storefront, kitchen hood and grease duct, and separate landlord from tenant scope.
Watch for: Landlord work letter, hood and make-up air, ADA restroom upgrades.
Distribution and flex buildings along I-75 and I-71. We take off slab thickness and reinforcement, tilt-up or PEMB panels, dock equipment, and site paving by section.
Watch for: Slab flatness, dock levelers, fire pump and ESFR demand.
Single-family homes on hillside and infill lots, plus production subdivisions in the northern suburbs. We price foundation type, framing, roofing and MEP rough-in by plan.
Watch for: Retaining walls, walkout basements, steep-drive drainage.
Whole-house remodels and additions in older neighborhoods where structural repair and MEP replacement are common. We estimate by system and by room rather than a square-foot average.
Watch for: Selective demolition, knob-and-tube, lead paint and asbestos.
Schools, clinics and ground-floor retail with residential above. We separate core and shell from interior fit-out and track long-lead equipment and specialty systems.
Watch for: Phasing, occupied-building work, acoustical and vibration criteria.
Cincinnati pricing is not one number. Hillside topography, river-adjacent soils, older building stock and Ohio code adoption all move quantities, and we adjust for each.
Ohio adopts the IBC, IRC, IECC and NEC at the state level, but the City of Cincinnati and Hamilton County administer permits and inspections locally. Review timelines, fire separation requirements and stormwater review can add cost and schedule. Confirm the adopted code edition and any local amendments with the city or county building department before you finalize your bid.
IBC · IRC · IECC · NEC · City of Cincinnati building departmentHillside parcels in Hyde Park, Mount Adams and Price Hill often need stepped footings, caissons or retaining walls, while river-adjacent ground may require deeper foundations or dewatering. We take off excavation, backfill, shoring and concrete separately so you can see how much of the cost is below grade. A geotechnical report changes these quantities more than any other document.
geotechnical report · caissons · retaining walls · dewateringCincinnati sees freeze-thaw cycles, summer humidity and occasional river flooding. Roof snow load, frost depth, exterior envelope and drainage design all respond to those conditions. We check roof pitch and underlayment, wall insulation and air barrier, and site drainage quantities against the drawings rather than assuming a regional default.
frost depth · snow load · IECC envelope · storm drainageCincinnati is a union-heavy market for commercial work, and wage rates and shift rules differ from open-shop regions. Prevailing wage applies on public projects. We price labor against ZIP-code-adjusted rates and flag scopes where crew size or overtime assumptions drive the total more than material cost.
prevailing wage · union labor · ZIP-code-adjusted rates · shift differentialNarrow streets in Over-the-Rhine and Clifton limit crane and concrete truck access, which adds handling and pump time. Steep drives and small lots also change earthwork balance and stormwater detention requirements. We measure access constraints and note where a crane or pump is assumed in the estimate.
crane access · concrete pump · earthwork balance · stormwater detentionCincinnati sits within a day's drive of Midwest steel, concrete and lumber suppliers, but long-lead electrical gear and mechanical equipment still set the schedule. We list lead times and alternates so you can carry the right escalation and avoid a bid that assumes next-week delivery on items quoted at twelve weeks.
long-lead equipment · escalation · alternates · Midwest suppliersCincinnati's hillside topography, river-valley soils, and 72% multifamily share of new residential permits drive specific quantity decisions in each trade. Here is what changes when you take off a project in Hamilton County versus a flat, single-family market.
Cincinnati sits on Ordovician limestone and shale with steep grades in neighborhoods like Mount Adams, Clifton, and Hyde Park. Cut-fill balances rarely close, so you need separate line items for rock excavation (often by cubic yard, measured from test borings), over-excavation and backfill, and retaining walls. On hillside lots, temporary shoring and erosion control (silt fence by linear foot, inlet protection by each) add cost that flat-site templates miss. We build our sitework takeoffs from the grading plan and a geotech report when one is available; if not, we flag rock as an allowance and show the quantity range. For a full scope review, see our sitework estimating services.
Cincinnati's older housing stock and new multifamily infill both lean on wood framing, but the detailing differs. For a three-story wood-frame apartment building in a neighborhood like Oakley or Walnut Hills, you need to count studs by wall type (2x4 vs. 2x6, 16-inch vs. 24-inch on center), plates by linear foot, and headers by size and span. Floor joists are often I-joists with specific depths for spans over garages or commercial space below. We take off framing from the architectural and structural sheets together, because a missing beam or double top plate at a shear wall shows up later as a change order. Our framing estimating services break this out by floor and wall type.
Cincinnati's mixed building stock means MEP takeoffs vary widely. A downtown office renovation may need new VAV boxes and ductwork routed around existing structure, while a new multifamily building in the West End uses split systems or PTACs with individual metering. For plumbing, count fixtures by type, measure domestic water and DWV piping by diameter and linear foot, and note backflow preventers and grease interceptors for commercial kitchens. Electrical takeoffs need panel schedules, device counts by type, and feeder lengths from the service entrance. We take off MEP from the mechanical, electrical, and plumbing drawings together so equipment schedules and circuiting match. Our MEP estimating services cover all three trades.
River-valley sites near the Mill Creek and Ohio River corridors often hit expansive clays and fill, which pushes foundation design toward drilled piers or over-excavated footings rather than simple spread footings. In a takeoff, that means counting pier diameters and depths separately, measuring grade beams by linear foot, and adding a waste factor for concrete (typical 5–10% for footings, less for walls). Slab-on-grade thickness varies by use — 4-inch for residential, 5- to 6-inch for commercial — and you need to note vapor barrier and reinforcement separately. We organize concrete quantities by mix design and placement method so your supplier quotes match the takeoff. See our concrete estimating services for the full division.
The freeze-thaw cycles in southwest Ohio are hard on roofs, and steep-slope residential roofs in older neighborhoods often need tear-off and decking replacement, not just shingles. In a takeoff, you measure roof area by slope (not footprint), add starter course by linear foot, ridge and hip by linear foot, and valley flashing by linear foot. For low-slope commercial and multifamily roofs, you need to separate insulation thickness, cover board, and membrane attachment method. Ice-and-water shield is required at eaves and valleys under the adopted residential code; confirm the exact extent with the local building department. We include roof plan markups so your roofer can verify the squares. See our roofing estimating services.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footings, 24x24x12 spread | 48 | EA |
| 03 30 00 | Slab-on-grade, 5-inch reinforced | 6,800 | SF |
| 05 12 00 | Structural steel beams and columns | 3.2 | TON |
| 06 10 00 | 2x6 exterior wall framing, 16 in. OC | 4,200 | LF |
| 06 10 00 | I-joist floor framing, 16 in. OC | 6,800 | SF |
| 07 30 00 | Asphalt shingle roofing, tear-off included | 2,400 | SF |
| 22 11 00 | Domestic water piping, PEX | 3,600 | LF |
| 26 05 19 | Branch circuit wiring, 12 AWG | 8,500 | LF |
This example uses illustrative dimensions for a three-story wood-frame building with 2x6 exterior walls at 16 inches on center. We are calculating studs, plates, and sheathing for one 40-foot wall section, then applying waste factors typical for framing.
Step 1 — Wall area and stud count. Wall length = 40 ft, height = 10 ft. Area = 400 SF. Studs at 16 in. OC: 40 ft ÷ 1.333 ft = 30 spaces, plus one for the end = 31 studs. Add 2 studs per opening for a typical window and door (assume 3 openings = 6 studs). Total studs = 37 per wall section. For three stories, multiply by 3 = 111 studs. Add 5% waste = 117 studs.
Step 2 — Plates. Top and bottom plates: 3 plates per wall (double top, single bottom). Linear feet = 40 ft × 3 = 120 LF per story. Three stories = 360 LF. Add 5% waste = 378 LF.
Step 3 — Sheathing. Wall area = 400 SF per story. Three stories = 1,200 SF. Add 10% waste for cuts and openings = 1,320 SF.
| Step | Calculation | Quantity | Unit |
|---|---|---|---|
| Studs | (40 ft ÷ 1.333) + 1 + 6 openings = 37 per story; × 3 stories × 1.05 | 117 | EA |
| Plates | 40 ft × 3 plates × 3 stories × 1.05 | 378 | LF |
| Sheathing | 400 SF × 3 stories × 1.10 | 1,320 | SF |
These quantities feed into our framing estimating services, where we break them out by wall type and floor. For a full building takeoff, we would repeat this for each unique wall segment and add connectors, headers, and shear panels. The waste factors shown are typical; confirm with your lumber supplier and the project specifications. If you are bidding a Cincinnati project, send us the plans and we will return a marked-up takeoff organized by CSI division.
Yes. For sites with steep grades, we take off rock excavation, retaining walls, and temporary shoring as separate line items, using the grading plan and geotech report. If no geotech is available, we flag rock as an allowance and show the quantity range so you can price the risk. We also include erosion control measures by linear foot and each, which are often required on hillside permits in Hamilton County.
We cover all divisions from 01 General Requirements through 33 Utilities, with detailed takeoffs in 03 Concrete, 05 Metals, 06 Wood, 07 Thermal and Moisture, 08 Openings, 09 Finishes, and 22/23/26 MEP. For multifamily, we pay special attention to fire-rated assemblies in Division 07 and 09, and to the MEP coordination between units. The takeoff is organized by division so your subcontractors can bid directly from it.
We use ZIP-code-adjusted material and labor pricing from RSMeans data, which reflects local prevailing wages and union agreements where applicable. For projects with specific union requirements, we can adjust the labor rates based on the trade and the project's labor agreement. We note the basis of our labor rates in the estimate so you can see where they came from and adjust if your situation differs.
Yes. Renovations in neighborhoods like Over-the-Rhine or Northside often require selective demolition takeoffs, which we measure by area or volume, and separate line items for structural repairs, new MEP rough-in, and finishes. We also flag hazardous material abatement as an allowance if the scope is not clear. The key is to take off what is drawn and list assumptions for anything that must be field-verified.
Most projects are returned in 24–48 hours. Rush service is available for shorter deadlines. The turnaround depends on the completeness of the drawings and the size of the project; a full multifamily building with MEP takes longer than a single-trade takeoff. We confirm the schedule when you send the plans.
Yes. Every takeoff includes a marked-up plan set in PDF showing what we measured and where. This helps you verify quantities and catch any scope we may have interpreted differently. The takeoff itself is delivered in Excel and PDF, organized by CSI MasterFormat division, so you can sort, filter, and add your own pricing.
The permit numbers on this page come from the U.S. Census Bureau's Building Permits Survey for 2025, which counts new privately-owned residential units permitted by the city itself. It does not include commercial permits or renovations. The survey showed 600 total units in Cincinnati, up from 224 the previous year, with 72% multifamily. We use this data to understand local construction volume, not to estimate individual projects.
River-valley sites often have deep fill and expansive clays, which can require over-excavation, engineered fill, or deep foundations. In a takeoff, we separate unsuitable material excavation from structural fill and note where a geotech report is needed. If the report is not available, we provide an allowance for rock and unsuitable soils so your bid is not exposed to a large unknown. Confirm foundation design with a local geotechnical engineer.
Yes. We cover Cincinnati and the surrounding region, including Columbus, Cleveland, Toledo, Akron, and Dayton. Each market has different labor rates and material logistics, so we adjust pricing by ZIP code. If your project is in one of these cities, send the plans and we will apply the correct local factors. See our Ohio construction estimating page for more on how we handle the state.
We need the complete set of drawings (architectural, structural, civil, MEP), specifications, and any addenda. A geotech report and survey are helpful for sitework. If you have a preferred format or a bid date, let us know. Send the files through our get an estimate page and we will confirm scope and turnaround.
Email your drawings and we will return a CSI-organized takeoff in 24–48 hours, with marked-up plans and ZIP-code-adjusted pricing for Cincinnati.