Sitework takeoff
Clearing, stripping, cut and fill, undercut and backfill measured by CY for clay-heavy Summit County sites.
CY · SF · LFWe prepare quantity takeoffs and cost estimates for Akron contractors, developers and owners — Excel and PDF deliverables organized by CSI MasterFormat division, with marked-up plan sets. Most projects return in 24–48 hours.
Akron pricing turns on four local drivers: Summit County clay soils that push footing and undercut quantities, freeze-thaw cycles that drive frost-depth and roof detailing, a heavy share of occupied-building rehab and demolition, and northeastern Ohio labor rates that sit below the national average but move with Midwest industrial demand.
Akron is the fifth-largest city in Ohio and one of the state's most active renovation markets. A large share of the work here is not new construction — it is rehabs, tenant build-outs and system replacements inside occupied buildings, plus institutional and light-industrial projects around Summit County. That mix changes what an estimate has to prove. Demolition, selective removal, temporary protection, phasing and utility tie-ins carry real money in an occupied-building job, and they are the lines most often left out of a bid.
We build estimates from the drawings, not from a square-foot average. Wall types get measured by LF and SF, footings by CY, structural steel by TON, and mechanical and electrical scopes by count and LF of run. Material and labor pricing is adjusted by ZIP code using RSMeans data, so an Akron estimate reflects this market rather than a national midpoint. If you are comparing our numbers against a Cleveland or Canton bid, the difference usually sits in labor, mobilization and site conditions. Start with our Ohio construction estimating overview, then send plans through get an estimate.
For bidders. You need a defensible number before the bid date. We return a division-by-division takeoff with quantities, waste factors and unit costs so you can see where the money is and where your competition likely missed scope.
For builders. You are buying out subs and ordering material. We give you LF, SF, CY and TON quantities you can hand straight to a supplier or a trade contractor, plus a marked-up plan set showing what was measured.
For owners. You need a budget before design is finished. We price what is drawn, flag what is missing, and separate hard cost from allowances so your contingency is based on identified risk rather than a percentage guess.
Census permit counts are not published at the city level here — permits for Akron are issued through a county or regional office, so no city-level new residential unit figure exists. Read the market qualitatively instead. Ohio's industrial pipeline, including Intel's Columbus-area chip plant and broader Midwest reshoring and logistics investment, pulls trades and material pricing across the state, and Akron sits inside that supply chain. For a bidder, the practical effect is that a renovation estimate must carry real money for selective demolition, temporary partitions, dust control and after-hours work. New-build scopes compete for the same crews. If your project straddles both, our commercial construction estimating and industrial estimating scopes are where that split gets priced.
Much of Summit County sits on glacial till and clay soils with a high water table in low areas, so footing over-excavation, undercut and backfill by CY are routine line items rather than contingencies. Frost depth governs footing bearing elevation, and freeze-thaw cycles drive air-entrained concrete, joint spacing and roof ice-dam detailing. On the building side, Akron's older housing and commercial stock means masonry bearing walls, undersized electrical services and original cast-iron or galvanized piping. Those conditions create change orders when they are not measured. Review our foundation estimating and MEP estimating scopes if your project touches them. Contractors working the wider region often compare numbers against our Cleveland and Canton pages.
Eight scopes we price most often for Akron and Summit County work, each delivered with quantities, units and a marked-up plan set.
Clearing, stripping, cut and fill, undercut and backfill measured by CY for clay-heavy Summit County sites.
CY · SF · LFFootings, walls, slabs and flatwork by CY and SF, with air-entrainment and joint spacing for freeze-thaw exposure.
CY · SFSpread footings, stem walls, waterproofing and drainage priced to frost depth and over-excavation quantities.
CY · LF · SFFloor, wall and roof framing by LF and piece count, including blocking, sheathing and hardware for rehab tie-ins.
LF · EA · BFTear-off, deck repair, insulation and membrane or shingle systems by square and SF of roof area.
SQ · SFService upgrades, distribution, plumbing rough and HVAC changeouts by count and LF of run in occupied buildings.
EA · LF · TONPartitions, ceilings, finishes and storefront scopes for tenant fit-out and adaptive reuse downtown.
SF · LFUnit-by-unit takeoffs for apartment rehab and new low-rise, with repeat-unit multipliers and common-area scope.
EA · SFAkron's aging commercial stock means phased work around tenants. We quantify temporary partitions, dust control, after-hours labor and utility shutdowns that a square-foot bid ignores.
Summit County build-outs turn on existing conditions. We measure LF of partition, SF of ceiling, and door and hardware counts from the plan set so your number holds after the walkthrough.
Converting a warehouse or office building means unknown structure and MEP. We price what is drawn, list the assumptions, and separate hard cost from allowances so your contingency tracks real risk.
Roof, boiler and service upgrades in Akron are often funded a year ahead. We give you division-level numbers you can carry into a capital plan without a full design set.
Early cost feedback keeps a design inside budget. We return quantities by assembly — wall type, footing size, roof area — so you can adjust scope before documents are complete.
Akron's plant and warehouse work runs on slab, racking, power and dock scope. We measure those items by CY, LF and count instead of applying a building-wide rate.
We estimate projects across Summit County and the surrounding Northeast Ohio corridor. If your site is in one of these areas, send the plans and we will price it against ZIP-adjusted material and labor for that location.
Akron's permit activity leans toward renovation, institutional work and light industrial rather than greenfield subdivision. These are the property types we price most often here.
Office, retail and mixed-use buildings where tenants stay in place during construction. We measure selective demolition, new partitions, ceiling and floor finishes, and the phasing and protection scope that occupied work requires.
Watch for: Temporary partitions, after-hours labor, utility shutdown coordination
Hospitals, clinics, schools and university buildings around Summit County. These jobs carry infection-control or occupied-facility requirements, so we price barriers, negative air, and off-hours work as separate line items.
Watch for: ICRA barriers, negative air machines, phased utility tie-ins
Plants, distribution buildings and shop space. Slab replacement, racking, dock equipment, process power and make-up air dominate the cost, and they are measured by CY, LF and count rather than by building area.
Watch for: Slab thickness and reinforcement, dock levelers, process power
Older apartment buildings and small multi-family properties in Akron need unit-by-unit takeoffs. We count kitchens, baths, doors and windows per unit type, then multiply, so a 40-unit building is priced from real unit mixes.
Watch for: Unit-type counts, existing plumbing stacks, window replacement
Single-family rehabs, additions and system replacements in Akron's older housing stock. Framing, roofing, siding and MEP are measured by LF, SF and count, with allowances flagged where existing conditions cannot be seen.
Watch for: Concealed framing damage, knob-and-tube wiring, sewer laterals
Warehouses, schools and office buildings being converted to housing or new commercial use. Structural reinforcement, new MEP distribution and code-driven egress work usually carry the budget, and all three need measured quantities.
Watch for: Structural reinforcement, egress paths, new MEP risers
Two bids for the same Akron building can differ by more than the trade scope. These are the local conditions that move the number, and each one should be visible as a line in the estimate.
Akron and Summit County review building, electrical, plumbing and fire permits, and the adopted code edition matters on renovation work. An interior build-out in an existing building can trigger egress, sprinkler and accessibility upgrades that were not in the original scope. We list permit and review costs as separate line items and tell you to confirm the adopted code edition and any local amendments with the Summit County building department before you finalize the bid.
IBC · NEC · NFPA 13 · Summit County building departmentMuch of Summit County sits on glacial till and clay soils with variable bearing capacity, and older Akron buildings often have shallow footings, unreinforced basement walls or partial crawl spaces. That drives footing size, undercut and backfill quantities, and waterproofing scope. We measure footings by CY and wall area by SF, and we carry an allowance for unforeseen subgrade work rather than assuming the geotech report covers every location on the site.
Glacial till · clay soils · footing CY · waterproofing SFNortheast Ohio winters bring freeze-thaw cycles, lake-effect snow and a short paving season. Concrete placed in cold weather needs heated enclosures, accelerators or blankets, and roofing adhesives have temperature limits. We price temporary heat, winter protection and snow removal as separate items, and we note which scopes will be resequenced if the schedule runs into January.
Freeze-thaw · lake-effect snow · temporary heat · cold-weather concreteAkron draws from the same labor pool as Cleveland and Canton, so trade rates move together across the region. Mechanical, electrical and sprinkler labor is the tightest, and prevailing-wage or union requirements on public and institutional work change the rate structure entirely. We use ZIP-code-adjusted labor from RSMeans data and state the wage basis used, so you can compare our number against a union or open-shop bid on equal terms.
RSMeans data · ZIP-adjusted labor · prevailing wage · union ratesDowntown Akron lots are tight, with alley access, shared walls and limited laydown area, so mobilization, crane placement and material handling cost more than on a suburban site. Stormwater rules and post-construction runoff requirements can add detention, bioretention or underdrain scope. We measure sitework by CY of cut and fill, LF of pipe and SF of pavement, and price erosion control and dewatering separately.
Stormwater detention · erosion control · dewatering · sitework CYAkron sits within a day's haul of Cleveland, Canton and Columbus suppliers, so most commodity materials price at regional levels, but specialty items and long-lead equipment still carry freight and lead-time risk. Ohio sales tax applies to materials unless a valid exemption certificate covers the project. We show material cost, freight and tax treatment as separate components so your buyout and your accounting both reconcile.
Ohio sales tax · exemption certificate · freight · long-lead equipmentAkron's mix of legacy industrial buildings, hillside residential, and institutional work means your takeoff has to account for the city's specific soils, weather, and existing conditions. Summit County issues permits through its building department, so confirm the adopted code edition with the local building department before you finalize quantities. Here is how that breaks down trade by trade.
Akron sits on glaciated terrain with silty clay tills and shale bedrock that often slopes. Cut and fill quantities are driven by the grade change, not the footprint. You'll see 02 32 00 rock excavation as a separate line when shale is shallow, plus 31 23 16 trenching and 31 23 23 backfill. Winter muck and frost depth (typically 30–36 inches) affect footing subgrade. Erosion control under 31 25 00 is a separate permit item. For a full division breakdown, see our sitework estimating services.
Akron's snow load (typically 25–30 psf ground) and wind exposure on ridges drive roof framing. You'll take off 06 10 00 rough carpentry for trusses, sheathing, and blocking, plus 05 12 00 structural steel for any open-web joists. Roofing assemblies include 07 30 00 shingles or membrane, 07 60 00 flashing, and 07 20 00 insulation. Ice dam protection at eaves is common. Steep pitches and dormers add labor. For a detailed breakdown, see roofing estimating services.
Akron's institutional and commercial work often includes 09 20 00 gypsum board, 09 30 00 tile, 09 50 00 ceilings, and 09 60 00 flooring. Historic renovations may require 09 90 00 painting with lead-safe practices if pre-1978. Casework (12 30 00) and specialties (10 00 00) are often owner-furnished, so clarify scope. For a residential finish schedule, see residential estimating services.
Hillside lots in Akron often require stepped footings and retaining walls. Takeoff items include 03 30 00 cast-in-place concrete for walls and footings, 03 20 00 reinforcing steel, and 03 10 00 formwork. Frost depth means footings bear below 36 inches in most areas. Existing fill or soft clay may trigger over-excavation and 31 23 23 backfill with granular material. Interior slabs on grade need vapor barrier under 03 30 00. For a line-item template, see concrete estimating services.
Akron's older housing stock often has undersized electrical services and galvanized piping. For new work, takeoff includes 22 00 00 plumbing (water, waste, vents), 23 00 00 HVAC (furnace, AC, ductwork), and 26 00 00 electrical (service, branch, devices). Commercial projects add 21 00 00 fire suppression and 28 00 00 low-voltage. Ohio's adoption of the IECC affects insulation and lighting. For a full MEP takeoff, see MEP estimating services.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footings and foundation walls | 12 | CY |
| 03 20 00 | Reinforcing steel | 1,200 | LB |
| 06 10 00 | Framing lumber | 2,400 | BF |
| 07 30 00 | Asphalt shingles | 18 | SQ |
| 09 20 00 | Gypsum board | 1,600 | SF |
| 22 00 00 | Plumbing rough-in | 1 | LS |
| 23 00 00 | HVAC | 1 | LS |
| 26 00 00 | Electrical | 1 | LS |
This example shows how we calculate concrete volume for a simple continuous footing. Dimensions are illustrative. Assume a 20 ft x 30 ft addition with a continuous footing 16 in wide x 8 in deep.
Step 1: Perimeter. 2 × (20 + 30) = 100 LF.
Step 2: Cross-section area. 16 in = 1.333 ft; 8 in = 0.667 ft. Area = 1.333 × 0.667 = 0.889 SF.
Step 3: Volume. 100 LF × 0.889 SF = 88.9 CF.
Step 4: Convert to cubic yards. 88.9 ÷ 27 = 3.29 CY.
Step 5: Add waste. Typical waste for footings is 5–10%. Use 10%: 3.29 × 1.10 = 3.62 CY. Round up to 4 CY.
Step 6: Rebar. Assume 4 #4 bars continuous. 4 bars × 100 LF = 400 LF. #4 bar weighs 0.668 lb/ft, so 400 × 0.668 = 267 lb. Add 10% for laps and waste: 294 lb.
Step 7: Formwork. Footing sides: 2 sides × 100 LF × 0.667 ft = 133 SF. Add 10% waste: 147 SF.
This method applies to any continuous footing. Adjust dimensions and waste factors based on soil conditions and local practice. For a full foundation takeoff, see our foundation estimating services.
We estimate all types: residential additions, custom homes, multi-family, commercial build-outs, industrial retrofits, and institutional work. Akron's mix includes hillside homes, legacy industrial buildings, and university projects. We use ZIP-code-adjusted pricing for Akron and surrounding areas.
We review geotechnical reports when available. If not, we assume typical local conditions: silty clay over shale. We include line items for rock excavation, over-excavation, and backfill. For hillside sites, we add retaining walls and drainage. We recommend a site visit or soil borings for accurate quantities.
Most projects are completed in 24–48 hours. Rush service is available. We deliver Excel and PDF files organized by CSI MasterFormat division, with marked-up plan sets. For large or complex projects, we'll confirm a schedule when you send plans.
Yes. We adjust labor rates based on project type and funding. Publicly funded projects in Ohio may require prevailing wage, which we factor into the estimate. For private work, we use local market rates from RSMeans data adjusted by ZIP code. Always confirm wage requirements with the awarding agency.
We include line items for temporary heat, winter protection, and cold-weather concrete practices when the schedule extends into winter. Frost depth affects footing elevations. We also note snow load requirements for structural framing. These factors are built into the estimate based on your project timeline.
Yes. We take off selective demolition, hazardous material abatement (lead, asbestos), and structural upgrades. Existing conditions are a major cost driver. We recommend a site assessment before finalizing quantities. Our estimates include allowances for unforeseen conditions.
We use Bluebeam Revu for plan markup, PlanSwift for quantity takeoff, and RSMeans data for pricing. This combination lets us produce detailed, accurate estimates with clear backup. Deliverables are in Excel and PDF, organized by CSI division.
Yes. We cover all of Ohio, including Cleveland, Cincinnati, Toledo, Dayton, Parma, and Canton. We also handle projects nationwide. If your project is in a nearby city, we can apply the appropriate local pricing adjustments.
We use the U.S. Census Bureau Building Permits Survey for residential permit data. This survey counts new privately-owned residential units only. For Akron, permits are issued by a county or regional office, so no city-level Census figure exists. We describe demand qualitatively rather than citing permit numbers.
Send your plans and specifications through our get an estimate page. We'll review the scope and provide a quote and turnaround time. Most estimates are delivered within 24–48 hours. Rush service is available.
Upload your drawings and we'll return a detailed, CSI-organized estimate within 24–48 hours.