Sitework takeoff
Clearing, stripping, cut and fill, and base stone for Strongsville lots, where frost depth drives deeper footings and thicker aggregate base.
CY · SF · TONScope Precision Estimate builds quantity takeoffs and cost estimates for Strongsville contractors, developers and owners. We price Cuyahoga County work from your plans, with ZIP-code-adjusted material and labor costs, delivered in Excel and PDF in 24–48 hours.
Four local cost drivers set the number here: Cuyahoga County's freeze-thaw cycles driving frost-depth footings and thicker base stone, high-wind roof tie-down detailing, a residential market that fell to 28 permitted units in 2025 from 95 in 2024, and suburban commercial and industrial fit-out work along the I-71 and Route 82 corridors.
Strongsville sits in Cuyahoga County, where most of the work we price is residential replacement and remodel, suburban commercial fit-out, and light industrial. The city issued permits for 28 new privately-owned residential units in 2025, down from 95 in 2024 — a 71% drop — with an average permitted value of $414,100 per unit. That mix means fewer tract packages and more one-off estimates where every line item has to be right the first time.
We build takeoffs from your plan set in Bluebeam Revu and PlanSwift, price them with RSMeans data adjusted to the local ZIP code, and hand back an Excel workbook and PDF organized by CSI MasterFormat division, plus a marked-up plan set showing what we measured. Most projects turn in 24–48 hours, with rush available. If you are bidding work across the region, start with our Ohio construction estimating coverage, or send plans straight through Get an estimate.
For bidders. You need a defensible number before the bid date. We measure your set, flag scope gaps, and separate base bid from alternates so you can adjust without rebuilding the estimate.
For builders. You are buying out subs and ordering material. We give you quantities by trade — concrete, framing, roofing, MEP — tied to CSI divisions so your purchase orders match your estimate.
For owners. You are comparing proposals or checking a budget. We price the scope you actually have and show the assumptions, so you can see where a low bid is leaving work out.
Select a bar to compare Strongsville with the largest Ohio markets we cover.
28 new housing units in 2025 (-70.5% vs 2024).
28 single-family · 0 multifamily (0%).
Strongsville permitted 28 new privately-owned residential units in 2025, all single-family, down from 95 in 2024 — a 71% decline. Statewide, covered cities recorded 11,913 units, and Strongsville's 28 units are 0.2% of that total, ranking 15th of 20 covered state cities by units. For bidders, that means less volume but no less competition: fewer jobs are chasing the same crews, so estimates need to be tight on labor hours rather than padded. The average permitted value per unit was $414,100, which points to custom and infill work rather than production housing. If you are pricing that kind of work, our residential estimating services and framing estimating services cover the divisions that carry the cost.
With residential permits at 28 units and $12M in permitted value, the steadier estimating demand in Strongsville comes from commercial fit-out, retail and light industrial work along the I-71 and Route 82 corridors, plus institutional and medical office projects serving the surrounding suburbs. Statewide demand is being pulled by Intel's Columbus-area chip plant and broader Midwest reshoring and logistics investment, which shows up in Northeast Ohio as warehouse and plant upgrades. Those projects price differently from houses: more MEP estimating services and commercial estimating services, heavier sitework estimating services for parking and utilities, and concrete estimating services for slabs and foundations. Compare regional pricing against our Mansfield construction estimating and Mentor construction estimating coverage.
We take off and price the divisions below from your Strongsville plan sets, with quantities by unit and costs adjusted to the local ZIP code.
Clearing, stripping, cut and fill, and base stone for Strongsville lots, where frost depth drives deeper footings and thicker aggregate base.
CY · SF · TONFootings, foundation walls, garage slabs, driveways and flatwork, measured with formwork and reinforcement by area and volume.
CY · SF · LBFrost-depth footings, damp proofing, drainage board and backfill for Cuyahoga County soil and freeze-thaw conditions.
CY · LF · SFFloor, wall and roof framing with studs, plates, headers, joists, sheathing and hardware counted by piece and length.
LF · EA · BFShingle, underlayment, ice barrier, flashing and ventilation, with high-wind tie-down detailing common on Northeast Ohio roofs.
SQ · LF · EAPlumbing, HVAC and electrical rough and finish counts for residential and commercial fit-out, priced by fixture, run and device.
EA · LF · TONCustom and infill homes like the single-family work permitted in Strongsville, taken off division by division from the plan set.
SF · EA · LSRetail, office and light industrial fit-out along the Route 82 and I-71 corridors, including site, shell and interior packages.
SF · EA · LSStrongsville's retail and office corridors along Royalton Road and Pearl Road generate tenant improvement packages where you need division-by-division quantities before the bid date, not after.
With 28 single-family units permitted in 2025 at an average value of $414,100, most of the residential work here is one-off custom builds where a missed line item cannot be absorbed across a tract.
Cuyahoga County's aging housing stock drives roof, window, and kitchen replacements. You need measured quantities for material orders, not square-foot guesses that leave money on the table.
Strongsville's industrial parks near Foltz Parkway and the Ohio Turnpike support distribution and light manufacturing builds where slab, steel, and MEP quantities drive the budget.
If you bid concrete, framing, or roofing packages here, you need quantities separated by CSI division so your purchase orders and labor hours match the scope you priced.
Whether you are comparing contractor proposals or validating a pro forma, an independent takeoff shows what the scope actually contains and where a low number is leaving work out.
We price work across Cuyahoga, Medina, and Lorain county suburbs, from the city's own neighborhoods out to the surrounding communities where our clients bid.
The 2025 permit mix was all single-family, no multifamily, so the work here skews toward custom homes, replacements, and the commercial and industrial buildings that serve them.
With 28 new single-family units permitted in 2025 at an average value of $414,100, these are higher-spec builds. We measure foundation, framing, roofing, and MEP from the full set and price finishes by room.
Watch for: Verify wall heights, window schedules, and structural steel allowances.
Kitchen, bath, and whole-house renovations in Strongsville's older subdivisions require selective demolition quantities and new work priced separately so you can see the true cost of each phase.
Watch for: Watch for hidden framing repairs and outdated wiring.
Hail and wind claims across Cuyahoga County keep roofing contractors busy. We take off squares, underlayment, flashing, and ventilation from the plan or from field dimensions you provide.
Watch for: Confirm decking replacement allowance and ice-and-water shield coverage.
Tenant improvements along Royalton Road and Pearl Road involve demising walls, storefront, HVAC distribution, and electrical. We price base building versus tenant scope so the split is clear.
Watch for: Check sprinkler relocation and ADA restroom upgrades.
Distribution and light manufacturing buildings near the Turnpike need slab-on-grade, pre-engineered metal building, and dock equipment quantities priced by division for a clean buyout.
Watch for: Verify slab thickness, reinforcement, and dock leveler counts.
Driveways, walks, pads, and foundations are common standalone scopes here. We measure formwork, reinforcement, and flatwork by area and thickness so your material order is right.
Watch for: Confirm subgrade prep, joint spacing, and finish requirements.
Strongsville's numbers move with the same variables that affect the rest of northeast Ohio, but a few local conditions matter more than most.
Strongsville enforces the Ohio Building Code, which adopts the IBC with state amendments, and residential work falls under the Ohio Residential Code. Permit review runs through the city's building department, and plan review comments can add scope before a permit is issued. Confirm the adopted code edition, local amendments, and inspection sequencing with the building department before you finalize your estimate, because the edition in force changes fire separation, egress, and energy requirements.
Ohio Building Code · Ohio Residential Code · Strongsville Building DepartmentMuch of Cuyahoga County sits on glacial till and lake-plain clays that expand and contract with moisture. That drives deeper footing depths, granular backfill, and sometimes underdrains or piering on additions and new builds. If your geotechnical report calls for over-excavation or engineered fill, those quantities belong in the estimate as separate line items, not buried in a lump-sum earthwork allowance.
Glacial till · Expansive clay · Geotechnical report · UnderdrainNortheast Ohio's freeze-thaw cycles set frost depth around 36 inches for footing design, and lake-effect snow loads affect roof framing and drainage. Ice-and-water shield, drip edge, and snow guards are common line items on roofing estimates here. Winter concrete work adds heating, blankets, and accelerators, so schedule assumptions change the number. Confirm local frost depth and ground snow load with the building department.
Frost depth · Lake-effect snow · Ice-and-water shield · Winter concreteCuyahoga County's union and open-shop trades both work Strongsville, and prevailing wage applies on public projects. Labor rates move with demand from the Intel Columbus-area chip plant and Midwest reshoring work, which pulls electricians and mechanical trades toward larger projects. Your estimate should reflect the crew you can actually staff, not a statewide average that assumes full availability.
Prevailing wage · Union labor · Intel Columbus plant · Midwest reshoringFlat to gently rolling lots in Strongsville often need grading, storm sewer, and detention to meet local stormwater rules. Clay soils drain slowly, so bioswales, dry wells, or oversized basins may be required. We take off cut and fill, pipe runs, structures, and erosion control separately so you can see which part of the site package is driving cost.
Storm sewer · Detention basin · Erosion control · Clay soilsStrongsville sits between Cleveland and Akron, with ready access to I-71, I-80, and the Ohio Turnpike, so material delivery is rarely the constraint. What changes the estimate is supplier pricing on lumber, steel, and asphalt, which shifts with regional demand. We price with RSMeans data adjusted to the local ZIP code and separate material from labor so you can see where a supplier quote beats the database.
I-71 · Ohio Turnpike · RSMeans data · ZIP-code adjustmentStrongsville sits in Cuyahoga County, where glacial till soils, a 42-inch nominal frost depth, and a mature suburban housing stock shape what you actually measure. Here is how that plays out division by division.
Strongsville's glaciated soils typically carry silt and clay with scattered cobbles, so a takeoff that prices only topsoil strip and bulk cut will miss the rock excavation allowance and the undercut backfill that show up on about half the basements we measure. Measure stripping by square foot of disturbed area, then cut and fill by cubic yard from cross sections, not from a single average depth. Add a separate line for unsuitable material haul-off; on tight suburban lots off Pearl Road and Royalton Road the export distance drives the number. Detention and drainage scope belongs in the same takeoff — see our sitework estimating services for how we structure it.
Most Strongsville residential framing is platform-framed dimensional lumber with engineered floor joists and roof trusses. Take off wall studs by linear foot of wall, converted to pieces at the specified spacing, then add plates, headers, and blocking as separate counts. Sheathing is measured by square foot of wall and roof area with openings deducted above a threshold you set in the takeoff notes. Trusses are priced per piece from the supplier layout, not per square foot. Wind and snow loading on roof sheathing and connections should follow the adopted residential code — confirm the edition with the Strongsville building department. Framing estimating services has our full lumber and sheathing sequence.
For residential work, plumbing is counted by fixture and by linear foot of DWV and supply piping, with the water service and sewer lateral measured separately from the building to the right-of-way. HVAC is priced by tonnage and by linear foot of duct and flex, with register and return counts. Electrical is counted by device, by fixture, and by linear foot of branch circuit; the service entrance and panel schedule drive the largest single line. On commercial fit-outs in Strongsville, verify the adopted plumbing and electrical code editions with the local building department before you finalize counts. MEP estimating services covers the full division breakdown.
Footings and foundation walls in Strongsville are usually cast-in-place on continuous footings set below the local frost depth, with a drained granular base and dampproofing. Take off footing concrete by linear foot of wall times width times depth, convert to cubic yards, then add waste — typical for formed footings is 5 to 8 percent. Wall forms are measured by contact area, square foot, not by wall length. Add anchor bolt counts, keyway, and the vapor retarder under slab by square foot. Flatwork, driveways, and garage aprons are separate line items with their own waste. Our concrete estimating services page covers the formwork and reinforcing breakdown we use.
Steep-slope asphalt shingle roofs dominate here, with ice dam protection required at eaves because of freeze-thaw cycling. Take off roof area by slope, then add the eave and valley underlayment membrane by linear foot, not by square. Ridge, hip, and valley flashing are linear-foot items; step flashing at sidewalls is a count per course. Ventilation — ridge vent by linear foot, soffit vent by square foot of soffit — is frequently missed on bids. On commercial and light industrial buildings in the industrial corridor, take off membrane roofing by square foot with a separate allowance for tapered insulation crickets at drains. Roofing estimating services shows the format we deliver.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 31 23 16 | Bulk excavation, basement | 410 | CY |
| 31 23 23 | Granular backfill, footings | 95 | CY |
| 03 30 00 | Footing concrete, 24x12 | 18 | CY |
| 03 30 00 | Foundation wall concrete, 8 in | 34 | CY |
| 03 11 00 | Wall formwork, contact area | 2,240 | SF |
| 06 10 00 | Wall framing, 2x6 studs | 1,860 | LF |
| 06 10 00 | Roof sheathing, 7/16 OSB | 3,150 | SF |
| 07 31 13 | Asphalt shingles, steep slope | 31.5 | SQ |
This example prices the footing and foundation wall concrete for a typical Strongsville single-family house. All dimensions are illustrative; substitute your own plan dimensions before you use any of these numbers.
Assume a rectangular foundation 40 ft by 28 ft on centerline, an 8-inch-thick wall, and a continuous footing 24 in wide by 12 in deep.
Step 1 — Footing perimeter. Perimeter = 2 x (40 + 28) = 136 LF.
Step 2 — Footing concrete. 136 LF x 2.0 ft x 1.0 ft = 272 CF. Divide by 27 = 10.07 CY. Add 5 percent waste (typical for formed footings) = 10.57 CY, round to 11 CY.
Step 3 — Wall height. Assume 8 ft wall from top of footing to top of wall.
Step 4 — Wall concrete. 136 LF x 8.0 ft x 0.667 ft = 725.7 CF. Divide by 27 = 26.88 CY. Add 5 percent waste = 28.22 CY, round to 29 CY.
Step 5 — Formwork. Both faces of the wall: 136 LF x 8.0 ft x 2 = 2,176 SF of contact area. Add 10 percent for bulkheads, corners, and waste = 2,394 SF.
Step 6 — Footing formwork. Two sides of the footing: 136 LF x 1.0 ft x 2 = 272 SF, plus 10 percent = 299 SF.
| Step | Item | Calculation | Quantity | Unit |
|---|---|---|---|---|
| 1 | Footing perimeter | 2 x (40 + 28) | 136 | LF |
| 2 | Footing concrete | 136 x 2.0 x 1.0 / 27 x 1.05 | 11 | CY |
| 4 | Wall concrete | 136 x 8.0 x 0.667 / 27 x 1.05 | 29 | CY |
| 5 | Wall formwork | 136 x 8.0 x 2 x 1.10 | 2,394 | SF |
| 6 | Footing formwork | 136 x 1.0 x 2 x 1.10 | 299 | SF |
Two things to watch in Strongsville. First, footing depth must reach below the local frost depth, so confirm the required bearing elevation on your plan before you set the wall height. Second, reinforcing steel — rebar in the wall and dowels at the footing — is a separate line item and is not included above. If you want this level of detail on your own plans, send them through our foundation estimating services page.
We measure every CSI division shown on your plans: sitework, concrete and foundations, framing, roofing, envelope, insulation and drywall, and MEP rough-in. Each line carries a quantity, a unit of measure, and a CSI section number so your estimator can drop it straight into a bid. We also mark up the plan set so you can see where each quantity came from. If your plans are incomplete, we list the assumptions we made so you can price the missing scope deliberately rather than by guess.
Cuyahoga County soils are largely glacial till, which means silt and clay with scattered cobbles and occasional soft pockets. That drives two extra line items most bids miss: rock excavation allowance and undercut backfill where the bearing soil is unsuitable. We do not guess at quantities for those; we flag them as allowances tied to the geotechnical report and let you decide the risk. Confirm bearing requirements with the Strongsville building department and your geotech before you finalize footing depths.
Yes. We apply ZIP-code-adjusted material and labor pricing, so the numbers reflect the Cleveland-area market rather than a national average. That matters for concrete, lumber, and mechanical trades, where local availability and union status move the unit cost. We use RSMeans data as the base and adjust from there. If you have recent supplier quotes or subcontractor bids from your own projects, send them and we will benchmark our units against yours.
Yes. Strongsville has a substantial industrial and commercial corridor along the I-71 and Route 82 area, and we take off tenant fit-outs, warehouse shells, and light industrial buildings. Those plans usually need Division 22, 23, and 26 measured in detail, plus a separate allowance for fire protection if the building requires it. Confirm the adopted code edition and any local amendments with the building department before you lock your MEP counts.
Most projects come back in 24 to 48 hours. Rush turnaround is available when your bid date is close. The clock starts when we have a complete plan set and your scope notes. If drawings are missing a sheet or a specification section, we will tell you before we start rather than guess and hand you a number you cannot defend.
We deliver Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets so you can trace every quantity back to the drawing. The Excel file is structured so you can adjust waste factors, unit costs, or labor rates yourself without rebuilding the takeoff. If your estimating software needs a specific import layout, tell us and we will match it.
The permit figures come from the U.S. Census Bureau Building Permits Survey, and they count new privately-owned residential units only. That means additions, alterations, and commercial permits are not included in the totals. For 2025 the survey recorded 28 new residential units in Strongsville, down from 95 in 2024, with a permitted value of $12M. Use those numbers as a demand signal, not as a count of all construction activity in the city.
Yes. We cover the surrounding region, including Mansfield, Mentor, Beavercreek, Dublin, and Westerville, along with the rest of Ohio. Soil, frost depth, and code editions shift as you move across the state, so we adjust the takeoff assumptions rather than reusing a Strongsville template. If your project is in a jurisdiction we have not listed, send the address and we will confirm coverage before we start.
Send the architectural, structural, and MEP drawings, the specification book if one exists, and any geotechnical report. Tell us the bid date and whether you want a full takeoff or a specific division. If you have a scope sheet or a subcontractor bid form you want us to match, include it. The more context you give us up front, the fewer assumptions end up in the final number.
We list them explicitly. On a Strongsville bid the common ones are footing drains, ice dam membrane, attic ventilation, and temporary power. Rather than bury those in a lump sum, we call them out so you can decide whether to carry them, exclude them in writing, or ask for a clarification. That is the difference between a takeoff you can defend and one that gets you into an argument after award.
Send your plans and bid date through our get an estimate page and we will return a division-organized takeoff within 24 to 48 hours.