Sitework takeoff
Clearing, over-excavation, backfill and utility trenching quantities for Lake County clay and till sites.
CY · LF · TONWe prepare quantity takeoffs and construction estimates for contractors, developers and owners building in Mentor, Lake County and the eastern Cleveland suburbs. Send your plans and we return an Excel and PDF estimate by CSI MasterFormat division, with marked-up drawings, in 24–48 hours for most projects.
Mentor pricing turns on Lake County labor rates, lake-effect snow loads and frost depth, heavy clay and glacial till soils, older housing stock near the lakefront, and the city's single-family permit mix — 61 new private residential units permitted in 2025, all single-family, averaging $323,700 in permitted value.
Mentor sits in Lake County, about 25 miles east of Cleveland along the I-90 corridor, and the work we price here is mostly single-family residential, light commercial and industrial infill. The 2025 permit data reflects that: 61 new privately-owned residential units, all single-family, at an average permitted value of $323,700 per unit. That mix means our takeoffs lean on residential assemblies — footing and foundation walls, wood framing, roof trusses, MEP rough-in — while commercial bids still need Division 3 concrete and Division 8 glazing priced to local labor.
Because the city's housing stock ranges from newer subdivisions to older lakefront homes, renovation and addition estimates need careful demolition and temporary protection line items, not just new-work quantities. If you bid across the region, our Ohio construction estimating coverage handles the same CSI format for projects in Euclid and Strongsville. Send plans through our get an estimate page and we return marked-up drawings with the numbers.
For bidders. You need quantities that survive a scope review. We break out concrete, framing, roofing and MEP by division, flag missing scope, and show waste factors so your bid holds up against the other three bidders.
For builders. You are buying material and scheduling crews. We price to ZIP-code-adjusted material and labor, so your lumber, concrete and mechanical numbers reflect what suppliers and subs actually charge in Lake County.
For owners. You are comparing budgets before design is final. We quantify what the drawings show, list assumptions, and give you a division-level estimate you can hand to a lender or a design team.
Select a bar to compare Mentor with the largest Ohio markets we cover.
61 new housing units in 2025 (-18.7% vs 2024).
61 single-family · 0 multifamily (0%).
Mentor issued permits for 61 new privately-owned residential units in 2025, down from 75 in 2024 — a 19% decline. All 61 units were single-family; there were no multifamily permits, so the multifamily share was 0%. Permitted value totaled about $20M, or $323,700 per unit. Mentor ranked 11th of 20 covered Ohio cities by units and accounted for 0.5% of the 11,913 units permitted across those cities. For you as a bidder, the practical read is a smaller but steadier pipeline of detached homes, additions and teardown rebuilds rather than apartment towers. Price your framing, foundation and roofing packages for that scale, and check the Ohio construction estimating page for how the rest of the state compares.
Lake-effect snow drives ground snow load and roof framing requirements, and frost depth governs footing elevations — both are code-driven quantities you cannot guess from a square-foot ratio. Soils across much of Lake County include clay and glacial till, which affects over-excavation, backfill and drainage line items. East of the city, the corridor toward Painesville and the Grand River adds sites with variable bearing conditions. On the commercial side, the reshoring and logistics investment across Ohio, alongside Intel's Columbus-area chip plant, keeps industrial and warehouse bids active. Confirm the adopted code edition and local amendments with the Mentor building department before you finalize any structural or energy scope.
We take off the trades that drive cost on Mentor residential, commercial and industrial projects, and deliver quantities in Excel and PDF by CSI MasterFormat division.
Clearing, over-excavation, backfill and utility trenching quantities for Lake County clay and till sites.
CY · LF · TONFootings, foundation walls, slab-on-grade and flatwork priced with formwork and reinforcement by area.
CY · SF · LBFrost-depth footings, damp proofing, drainage board and backfill for detached homes and additions.
LF · SF · CYFloor, wall and roof framing with truss and sheathing counts for snow-load-governed roofs.
LF · EA · BFUnderlayment, ice barrier at eaves, shingles and flashing, with waste factors typical for cut-up roofs.
SQ · LF · EAPlumbing, HVAC and electrical rough-in counts for residential and light commercial scopes.
EA · LF · TONFull-house takeoffs for new builds, teardown rebuilds and additions across Mentor's neighborhoods.
SF · EA · LSDivision-level estimates for retail, office and light industrial projects along the I-90 corridor.
SF · CY · TONYou are bidding single-family subdivisions and light commercial infill along Mentor Avenue and Route 20, and you need a division-by-division takeoff you can defend line by line in a scope review.
You price concrete flatwork, framing or mechanical packages in Lake County and need quantities pulled from the same sheets the GC is using, with waste factors stated so your number holds.
You are evaluating lot-by-lot costs for residential infill or a small commercial pad and need a budget that separates sitework, foundations and vertical construction before you commit to a pro forma.
You need a third-party quantity check on your drawings before issuing a permit set, so omissions in wall types, roof plan or MEP routing get caught while they are still cheap to fix.
You are planning a renovation or addition to an older Mentor building and need demolition, temporary protection and selective structural work quantified, not just new finishes.
You are scoping storm, water or fire damage in Lake County housing stock and need replacement quantities by assembly, with code-upgrade items called out separately from like-for-like repair.
We price work across Lake County and the eastern Cleveland suburbs, from the Route 2 corridor to the older lakefront blocks. If your project sits in one of these areas, the labor and material pricing is adjusted for its ZIP code.
The 2025 permit data shows 61 new privately-owned residential units, all single-family, at an average permitted value of $323,700. That is the core of the work here, with light commercial and industrial filling out the rest.
New houses in Mentor and Concord Township subdivisions, priced from footing to final grade. We take off foundation walls, floor and roof framing, siding, roofing, insulation and MEP rough-in by division.
Watch for: Confirm truss profiles, wall heights and whether the garage is conditioned.
Older homes near Mentor Headlands and the lake often get additions, kitchen and bath rebuilds, and structural repairs. We quantify demolition, temporary shoring and new work separately so the owner sees the true cost.
Watch for: Watch for hidden rot, undersized framing and asbestos in older assemblies.
Retail, office and restaurant buildings along Mentor Avenue and Route 20. Takeoffs cover Division 3 concrete, Division 5 structural steel, Division 8 storefront glazing and Division 15 mechanical.
Watch for: Verify tenant fit-out scope versus landlord base building work.
Small plants, distribution and service buildings near the Route 2 industrial corridor. We price slab-on-grade, pre-engineered metal buildings, dock equipment and process utilities.
Watch for: Check slab thickness, joint layout and equipment anchorage requirements.
Low-rise apartment and senior living projects in Lake County. We break out unit-by-unit finishes, common-area MEP, elevators and sitework so the per-unit cost is clear.
Watch for: Confirm unit mix, sound ratings and sprinkler scope early.
Garages, pole barns, sunrooms and second-story additions. We quantify the tie-in to existing structure, roof transitions and matching finishes, which are the line items that usually get missed.
Watch for: Measure existing conditions; do not trust as-built dimensions.
Mentor sits in a lake-effect climate zone with clay soils and a mix of older and newer housing stock. Those conditions move quantities and labor more than most bidders expect.
Mentor enforces the Ohio Building Code, which adopts the IBC with state amendments, and residential work follows the Ohio Residential Code. Plan review and inspection sequencing affect your schedule, and schedule affects general conditions. Confirm the adopted code edition and any local amendments with the Mentor building department before you price. Sprinkler and energy requirements can add scope that is not shown on the drawings.
Ohio Building Code · Ohio Residential Code · Mentor building departmentMuch of Lake County is underlain by glacial till and lake-plain clay, which drains slowly and can require over-excavation or engineered fill under footings. Near the lake, high groundwater means waterproofing, sump and drainage board are real line items, not allowances. We price footing drains, granular base and damp-proofing from the drawings, and flag where a geotechnical report is needed to confirm bearing capacity.
glacial till · lake-plain clay · geotechnical reportMentor sits in a primary lake-effect snow belt, so roof snow loads and ice-dam protection drive both structure and detailing. We take off ice-and-water shield, drip edge and snow guards, and check that roof framing matches the ground snow load for the site. Wind exposure near the lake can also push uplift requirements on roof sheathing and cladding fasteners.
ground snow load · ice-and-water shield · wind upliftCleveland-area union and open-shop rates apply here, and trades like concrete, framing and mechanical are shared with larger projects in Cuyahoga County. That competition for crews shows up in labor pricing and in how far out you have to schedule. We price to ZIP-code-adjusted labor so your estimate reflects what subs in the 44060 and 44077 areas actually charge, not a national average.
Cleveland labor market · ZIP-code-adjusted labor · 44060 · 44077Flat lots with clay soils need positive drainage, and many Mentor sites require detention or retention because of local stormwater rules. We quantify clearing, stripping, structural fill, storm sewer, catch basins and riprap from the civil drawings. If the site plan shows a bioretention or underground detention system, we price it as a separate Division 2 package so the owner can see the cost apart from the building.
stormwater detention · structural fill · Division 2Mentor is served by Cleveland-area suppliers and yards, so delivery is straightforward, but specialty items like long-span trusses, precast and custom storefront still carry lead times. We price material to the ZIP code and note long-lead items so you can lock them in early. Ohio sales tax applies to materials unless you have a valid exemption, and that should be shown as a separate line in the estimate.
long-lead items · Ohio sales tax · Cleveland suppliersMentor sits in Lake County, where the building stock runs from 1950s ranches near the lake to newer subdivisions and light industrial along the Route 2 and Route 20 corridors. Each trade carries its own local adjustment, and here is where they land in the quantities.
Lake County soils range from sandy lake-plain deposits near the shoreline to heavier clay till farther south, so a sitework takeoff has to separate topsoil strip from unsuitable subgrade rather than assume one stripping depth. We measure cut and fill by station, not by acre, because a lot that looks flat on the plan often carries a foot of fall across the building pad. Underdrain, footing drain tile and storm laterals get counted by linear foot with fittings and bedding stone broken out separately. In Mentor, roof leader discharge and sump pump lines frequently need to reach a storm system or daylight point, and that run length is a common omission.
A framing takeoff for a Mentor house or small commercial building starts with plate heights and stud spacing, then converts to piece counts for plates, studs, headers, joists and sheathing. Roof geometry matters here because lake-effect snow loads push truss and rafter design, and the plan set may show a deeper heel or tighter spacing than the same plan would carry farther south. We list engineered lumber separately from dimensional lumber, note hangers and connectors by type and count, and flag any beam shown on the structural sheet without a corresponding schedule. Blocking, backing and stair framing are counted as line items rather than absorbed into a general carpentry allowance.
An MEP takeoff is where most of the risk sits on a remodel or tenant fit-out. We count plumbing fixtures with their supply and drain runs, water heater and shutoffs, then HVAC equipment, duct by size and linear foot, and registers by count. Electrical is taken off by device, fixture, panel, circuit and home run, with the service entrance sized from the load calculation rather than assumed. In older Mentor buildings, the existing panel capacity and the route for new mechanical runs often control the cost more than the equipment itself, so we note those conditions instead of pricing a clean-slate installation.
Frost depth in northeast Ohio drives footing elevations, and a foundation takeoff here should carry continuous footings, spread footings, stem walls and slab-on-grade as separate assemblies. We count formwork by contact area, not by wall length, because stepped footings and interior bearing pads change the number. Reinforcement is taken off by bar mark with lap and waste, and vapor retarder, granular base and control joints are listed individually. Garage slabs, aprons and driveway approaches are frequently shown on the civil sheet only, so we cross-check architectural and civil drawings before the concrete quantities are finalized.
A roofing takeoff in this market means measuring slope areas rather than footprint, adding for hips, valleys and ridge, and pricing underlayment, ice barrier and ventilation as distinct items. Ice dam protection at eaves is standard practice in northeast Ohio, and the linear footage of eave and valley is what drives that number. Wall assemblies get taken off by area with house wrap, flashing, sealant and insulation separated, because the thermal envelope requirements follow the adopted energy code edition. Confirm which edition your local building department has adopted before you lock insulation R-values and window U-factors into the estimate.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24x12 continuous | 48 | CY |
| 03 30 00 | Slab-on-grade, 4 in. w/ vapor retarder | 1,850 | SF |
| 05 12 00 | Structural steel beam, W8x18 | 34 | LF |
| 06 10 00 | 2x6 stud wall framing, 16 in. O.C. | 2,140 | LF |
| 06 10 00 | Roof trusses, 24 in. O.C. | 38 | EA |
| 07 30 00 | Asphalt shingles w/ ice barrier at eaves | 32 | SQ |
| 09 29 00 | Gypsum board, 1/2 in., walls and ceilings | 5,600 | SF |
| 15 00 00 | PEX domestic water, 1/2 in. and 3/4 in. | 410 | LF |
This example uses illustrative dimensions, not a specific project. Say the plan shows a continuous footing 24 inches wide by 12 inches deep, running beneath the perimeter and the interior bearing line. We measure the footing centerline length from the foundation plan rather than the building outline, because corners overlap if you simply add the four sides.
Take a rectangular footprint 40 ft by 28 ft with one interior bearing line running the 28 ft direction. Centerline perimeter is 40 + 40 + 28 + 28 = 136 LF. Add the interior bearing line at 28 LF, minus nothing because it ties into the perimeter footings. Total centerline length is 164 LF.
| Step | Calculation | Result |
|---|---|---|
| Footing cross-section area | 2.00 ft x 1.00 ft | 2.00 SF |
| Net volume | 164 LF x 2.00 SF | 328 CF |
| Convert to cubic yards | 328 ÷ 27 | 12.15 CY |
| Add waste and over-excavation, 8% | 12.15 x 1.08 | 13.12 CY |
| Order quantity | round up to whole yard | 14 CY |
The 8% allowance covers form deflection, minor over-excavation and spillage. It is not a substitute for a geotechnical recommendation; if the soils report calls for a wider footing or a deeper bearing elevation, the cross-section changes and the volume moves with it. Dowels, keyway, formwork contact area and anchor bolts are separate line items, and a concrete takeoff should show them rather than bury them in the yardage. If you are pricing a residential project in Lake County, have the foundation plan and the structural sheets side by side before you start, because the footing schedule and the plan view do not always agree.
We price by the scope and drawing set, not by a flat city rate, so the number depends on sheet count, disciplines involved and whether you need a full estimate or a single-trade quantity. Most projects turn around in 24 to 48 hours, and rush delivery is available when a bid date is close. Send the plans and we will confirm scope, format and timing before any work starts. Deliverables come as Excel and PDF organized by CSI MasterFormat division with marked-up plan sets.
We read the geotechnical report if one is provided and carry the recommended bearing elevation, footing width and any over-excavation or backfill requirement as separate line items. Without a report, we take off what the drawings show and flag the assumption in the notes, because lake-plain sands and heavier clay till behave differently under the same footing design. Rock, unsuitable subgrade and dewatering are noted as allowances rather than guessed at, so you can see exactly where the risk sits before you bid.
Yes. The city's recent permit activity is almost entirely single-family, but the Route 2 and Route 20 corridors carry light industrial, warehouse and retail work, and we handle those scopes as well. A commercial estimate usually means more divisions in play, more coordination between architectural, structural and MEP sheets, and a longer list of allowances. Residential work tends to be tighter on quantity but heavier on code-driven details. We organize both the same way, by MasterFormat division, so your bid form lines up.
The figures come from the U.S. Census Bureau Building Permits Survey, which counts permits issued by the city itself. The survey covers new privately-owned residential units only, so commercial, industrial and renovation permits are not included in the totals. In 2025 Mentor issued 61 residential units, all single-family, down from 75 the previous year. That is useful context for workload and pricing trends, but it is not a measure of total construction volume in the city. Confirm current activity with the local building department.
We list temporary heat, enclosure, cold-weather concrete protection and snow removal as general conditions line items rather than absorbing them into trade pricing. Concrete placed below the temperature thresholds in the specification needs heated water, blankets or accelerators, and that cost is real. Roofing and exterior work in this climate also carries more weather-day risk, which affects scheduling but not quantity. If your bid form separates general conditions from trade work, we will format the estimate to match.
Yes. Many subcontractors send us one discipline, and we take off only that scope with the limits stated clearly at the top of the estimate. A framing takeoff will show plates, studs, headers, joists, sheathing and connectors, but it will not include drywall, insulation or finishes unless you ask. Stating the limits matters because a partial takeoff that looks complete causes more problems than no takeoff at all. Tell us where your scope starts and stops.
We work from PDF, and we can also use CAD files, scanned drawings and, for renovation work, a measured drawing set you provide. If you only have a partial set, tell us which sheets are missing so we can note the assumptions in the estimate instead of pricing around a gap. We use Bluebeam Revu and PlanSwift for takeoff and RSMeans data with ZIP-code-adjusted material and labor pricing, so quantities and unit costs reflect this market rather than a national average.
We apply the code families that govern the work, such as IBC or IRC for building, IECC for energy, NEC for electrical and IPC or UPC for plumbing, and we note the edition assumed in the estimate. Code editions are adopted locally, so confirm the current edition with the Mentor building department before you finalize. Where a requirement is triggered by occupancy, height or construction type, we show it as a line item so you can see the cost rather than discovering it during plan review.
Yes. We cover the surrounding region, including Euclid, Strongsville and Dublin, and the rest of the state through our Ohio construction estimating services. Pricing is adjusted by ZIP code, so material and labor rates follow the project location rather than a single statewide figure. If your project is in a neighboring community, send the address with the plans and we will price it for that location.
Send the complete drawing set, the specification if one exists, the bid form or scope sheet you are pricing against, and the project address. If there is a geotechnical report, a structural schedule or a finish schedule, include those too, because they change quantities. Tell us the deadline and the format you need. We will confirm scope and turnaround, then deliver Excel and PDF files organized by CSI MasterFormat division with the plan sheets marked up.
Send your drawings and bid date, and we will confirm scope and turnaround, then return a MasterFormat-organized Excel and PDF takeoff with marked-up plan sets.