Sitework takeoff
Clearing, mass excavation, undercut, backfill, and utility trenching for Dublin sites with glacial till.
CY · LF · TONWe produce quantity takeoffs and construction estimates for builders working in Dublin, Ohio and across Franklin and Delaware counties. Deliverables arrive in Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets, usually within 24 to 48 hours.
Dublin pricing turns on four things: Franklin and Delaware county plan review, glacial till soils that push footing and undercut quantities, frost-depth foundations, and a residential mix that is 38 percent multifamily. Roughly $55M in permitted value across 100 new privately-owned units keeps bidders competing on tight scopes.
Dublin sits across Franklin and Delaware counties, and most of the work we estimate here is a mix of infill residential, multifamily, and commercial fit-out along the Bridge Street and Perimeter Drive corridors. Because the city issues its own permits, plan review comments come back with local amendments layered on the Ohio Building Code, so your takeoff has to reflect the adopted edition, not a generic model. Confirm the current edition with the city building department before you price.
We build estimates from the drawings outward: sitework and utility quantities first, then foundations, framing, envelope, and MEP, each line tied to a CSI MasterFormat division and a unit of measure you can audit. Material and labor pricing is ZIP-code adjusted, so Dublin lines do not carry the same cost basis as a rural Ohio county. For statewide context, see our Ohio construction estimating services page, and if your bid package crosses into adjacent suburbs, we also cover Westerville and Strongsville.
For bidders. You need a bid that survives scope review. We return division-coded quantities with marked-up plans so you can defend every line, and rush turnaround is available when the bid date moves.
For builders. You are buying out trades and tracking overruns. We break framing, concrete, and MEP into installable quantities with waste factors stated, so your purchase orders match what the field actually installs.
For owners. You are comparing proposals or checking a budget before design is complete. We give you a cost basis by division and flag the allowances that carry the most risk in Dublin.
Select a bar to compare Dublin with the largest Ohio markets we cover.
100 new housing units in 2025 (-2% vs 2024).
62 single-family · 38 multifamily (38%).
Dublin issued 100 new privately-owned residential units in 2025, down about 2 percent from 102 in 2024, according to the U.S. Census Bureau Building Permits Survey. Single-family accounted for 62 units and multifamily 38, so multifamily is 38 percent of the residential pie. Permitted value was $55M, an average of $552,700 per unit. That average is high, which tells you the residential work here is not starter product: expect deeper foundations, larger footprints, and more MEP per unit than a typical Ohio subdivision. For bidders, the practical effect is fewer but larger packages, and general contractors who expect unit-price backup on concrete, framing, and rough-in. Dublin ranks 8th of 20 covered Ohio cities by units and holds 0.8 percent of the 11,913 units permitted statewide, so it is a steady but not high-volume market. Compare it against the wider Ohio market when you set overhead.
Franklin and Delaware county soil conditions include glacial till and pockets of soft clay, so footing over-excavation and backfill quantities are a common swing item; price them from the geotechnical report, not from a standard detail. Foundations must reach local frost depth, which adds concrete and rebar versus southern Ohio. On the commercial side, tenant fit-out along the Perimeter Drive and Emerald Parkway office corridors drives interior demolition, studs, drywall, and above-ceiling MEP more than shell construction. If your package includes a parking field or drives, our sitework estimating services cover clearing, excavation, and utility trenching by the cubic yard and linear foot. Builders working the western suburbs also send us packages alongside Beavercreek and Mentor work.
Every package below is delivered in Excel and PDF, organized by CSI MasterFormat division with marked-up plan sets, usually within 24 to 48 hours.
Clearing, mass excavation, undercut, backfill, and utility trenching for Dublin sites with glacial till.
CY · LF · TONFootings, frost-depth walls, slab-on-grade, and flatwork quantities with formwork and rebar separated.
CY · SF · LBSpread footings, pier and grade beam, waterproofing, and drainage priced from the geotechnical report.
CY · LF · SFFloor joists, studs, headers, sheathing, and trusses counted by member and length with waste stated.
LF · EA · BFSlope, underlayment, ice barrier at eaves, and flashing for central Ohio freeze-thaw cycles.
SQ · LFRough-in and trim for plumbing, HVAC, and electrical, including above-ceiling work in fit-outs.
LF · EA · TONCustom and production homes priced division by division, from permit set through finishes.
SF · EAOffice, retail, and tenant improvement packages along Dublin's commercial corridors.
SF · LF · EAYou bid Dublin infill and fit-out work against a short list. We return division-coded quantities with marked-up plans so your number holds up in scope review, and rush turnaround is available when the bid date moves.
You need installable quantities, not a lump sum. We break concrete, framing, and MEP into line items with stated waste factors so your labor hours and purchase orders match what crews install on Dublin sites.
You are testing multifamily and mixed-use feasibility before design is complete. We give you a cost basis by CSI division and flag the allowances — sitework, foundations, MEP — that carry the most risk in Franklin and Delaware county dirt.
You need a check on your own cost model. We take your drawings and return quantities tied to sheet references and detail callouts, so you can see where your basis differs from ZIP-code-adjusted Dublin pricing.
You are comparing proposals or checking a budget before you commit. We give you a division-level cost basis and identify the line items most likely to move, so you can ask better questions of your bidders.
You handle capital repairs and tenant fit-outs on occupied buildings. We estimate selective demolition, roofing, and MEP replacement in phases, with quantities organized so your contractor's invoice can be checked line by line.
We estimate projects across Dublin and the surrounding Franklin and Delaware county communities. If your bid package crosses a city line, the permit authority and local amendments change, so tell us the jurisdiction up front.
Dublin's 2025 permit mix ran about 62 single-family and 38 multifamily units, with an average permitted value near $552,700 per unit. That mix drives what we price most: custom infill homes, multifamily buildings, and commercial fit-out along the Bridge Street and Perimeter Drive corridors.
Infill and lot-split homes on the west side and near Historic Dublin. We take off full basements, walkout foundations, engineered floor systems, and steep-slope roofing, with framing quantities by member size and sheet count.
Watch for: Wall heights and stepped footings on sloped lots; window and door schedules that lag the plans.
Three- and four-story wood-frame and podium buildings. We break units into typical and corner types, then extend quantities by count, so your per-unit cost is auditable and your buyout packages are complete.
Watch for: Podium waterproofing, unit-mix changes, and balcony and corridor finishes that repeat per floor.
Office, medical, and retail tenant improvements along Bridge Street and Perimeter Drive. We estimate partitions, ceilings, storefront, and MEP distribution from the reflected ceiling and single-line drawings, with fixture counts by circuit.
Watch for: Existing conditions, sprinkler relocation, and landlord scope splits that change who pays for what.
Flex and distribution space tied to the region's logistics investment. We take off slab thickness and reinforcement, tilt or pre-engineered wall panels, dock equipment, and racking-ready electrical, with quantities by bay and by square foot.
Watch for: Slab flatness tolerances, dock count changes, and fire-protection demand driven by storage height.
Schools, municipal buildings, and places of assembly. We estimate masonry, structural steel, and MEP systems from the specification sections, with allowances for owner-furnished equipment and specialty systems called out separately.
Watch for: Spec-driven systems, phasing around occupied buildings, and prevailing-wage triggers on public work.
Second-story additions, kitchen and bath remodels, and whole-house updates in established Dublin neighborhoods. We estimate selective demolition, structural tie-ins, and finish upgrades, with allowances for concealed conditions found after opening walls.
Watch for: Load paths at tie-ins, temporary weather protection, and disposal of demolition debris.
Two Dublin projects with the same square footage can price 15 to 25 percent apart once jurisdiction, soils, and site logistics are accounted for. These are the drivers we adjust for before we send a number.
Dublin issues its own permits and reviews plans against the adopted Ohio Building Code with local amendments, so the edition in force drives insulation, egress, and fire-protection quantities. A takeoff built from a model code can miss amendments that add scope. Confirm the adopted edition and any local amendments with the city building department before you price, and note that the energy code in force will set envelope values.
Ohio Building Code · city building department · IECCMuch of Dublin sits on glacial till with pockets of clay, and some areas carry a history of shale and limestone at depth. That drives footing size, undercut, and backfill quantities. A geotechnical report changes the foundation line more than any other single document. Without one, we carry an allowance and state it clearly, then reprice when the report is issued.
glacial till · geotechnical report · footing and undercut quantitiesCentral Ohio freeze-thaw cycles set frost depth, footing elevation, and the amount of granular base under slabs and pavement. Winter concrete work carries heating and curing costs. Site drainage matters on the west side, where grades fall toward the Scioto River and its tributaries, so we quantify storm structures, swales, and retention volume from the grading plan rather than a rule of thumb.
frost depth · granular base · storm structures · retention volumeDublin sits in a metro where Intel's Columbus-area chip plant and reshoring investment pull on the same trades you need. Framing, mechanical, and electrical crews are the tightest, and their rates move faster than material prices. We price labor at ZIP-code-adjusted rates and flag the divisions where a bid date more than 30 days out should carry an escalation note.
Intel Columbus-area plant · framing crews · mechanical and electrical tradesInfill lots and tight commercial sites limit staging, so we price crane picks, material handling, and temporary protection that a greenfield site would not need. Local land-use rules — setbacks, lot coverage, tree preservation, and parking ratios — change how much buildable area your drawings actually yield. We check the site plan against the takeoff before we finalize quantities.
staging limits · tree preservation · lot coverage · parking ratiosDublin is a short haul from Columbus-area suppliers, so delivery is rarely the cost driver. What moves the number is specification: engineered lumber versus dimensional, storefront versus curtain wall, and the mechanical system selected. Sales tax treatment and any exemption certificates on a project also change the bottom line. We state the basis for each major material line so you can swap specifications and see the delta.
engineered lumber · storefront glazing · sales tax treatment · supplier deliveryDublin's mix of single-family infill and mid-rise multifamily, combined with central Ohio soils and freeze-thaw cycles, drives specific line items in every trade. The sections below show what we adjust in each division when we price work here.
Dublin sits on glaciated soils with pockets of expansive clay, so a takeoff that stops at 'strip topsoil' will miss the real cost. We measure stripping depth by area, then add undercut allowance where the geotech report shows unsuitable material. For a typical lot, that means separate lines for topsoil strip, haul-off, structural fill import, and compaction testing. We also carry sediment control and temporary stabilization as measured items, not lump sums. If your project includes paving, curbs, or storm structures, our sitework estimating services break those out by CSI division so you can see what is base bid and what is alternate. Confirm the local adopted code edition with the city building department for any right-of-way work.
Dublin's residential framing runs from simple stick-built to engineered floor systems, and the takeoff changes accordingly. We measure wall plates by linear feet, studs by count with 16-inch or 24-inch spacing, headers by size and length, and sheathing by sheet count with a typical 5–10% waste factor. For multifamily, floor trusses and I-joists are counted by piece and span, with rim board and blocking as separate items. Roof framing is taken off by rafter or truss count, not just squares. Framing estimating services here also include hardware, hangers, and shear panels. If the structural drawings show a different spacing than the architectural set, we flag it before the bid goes out.
Mechanical, electrical, and plumbing takeoffs in Dublin follow the same CSI divisions as the rest of Ohio, but fixture counts and distribution lengths change with unit mix. We count plumbing fixtures by type, water and waste lines by linear feet and diameter, and HVAC equipment by tonnage and CFM. Electrical is taken off by device count, home runs, and panel schedules. For multifamily, we separate common-area and unit-level scope so you can price each. MEP estimating services include coordination notes where a ceiling plenum is tight. Interior finishes, drywall, and doors are counted by room or by type, with waste factors applied to sheet goods. Always cross-check the mechanical schedules against the architectural room names.
Freeze-thaw cycles in central Ohio push air-entrainment and mix-design requirements into every exterior slab and foundation wall. For Dublin projects, we take off footings by linear feet and width, stem walls by height and thickness, and slab-on-grade by square feet with a typical 5–10% waste factor. We also add vapor barrier, gravel base, and dowels as separate lines. On multi-family podiums or retaining walls, the reinforcing schedule drives the quantity, so we count bar size and lap separately. Our concrete estimating services and foundation estimating services teams both work from the same marked-up plan set, so footing and wall quantities reconcile. Always verify the geotech recommendations against the permit set before you lock the number.
Roofing in Dublin has to handle ice damming, wind uplift, and summer hail, so the assembly matters as much as the square count. We take off field shingles or membrane by square, underlayment by roll, ice-and-water shield by linear feet at eaves and valleys, and flashing by type and length. For commercial or multifamily, TPO or EPDM is measured by square with insulation thickness and fastening pattern as separate lines. We also count vents, pipe boots, and drip edge. Roofing estimating services include a waste factor that varies by roof complexity, typically 10–15% on cut-up roofs. Confirm local wind and snow load requirements with the building department before finalizing the assembly.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24"x12" | 48 | CY |
| 03 30 00 | Slab-on-grade, 4" thick | 1,850 | SF |
| 04 20 00 | CMU stem wall, 8" | 210 | LF |
| 06 10 00 | 2x6 wall framing, 16" o.c. | 3,200 | LF |
| 06 10 00 | Floor trusses, 24" deep | 42 | EA |
| 07 30 00 | Asphalt shingles, architectural | 32 | SQ |
| 09 29 00 | Drywall, 1/2" on walls | 6,400 | SF |
| 22 11 00 | PEX water lines, 1/2" | 380 | LF |
This example uses illustrative dimensions for a typical two-story home on a crawl-space-free, slab-on-grade foundation. The slab is 50 feet by 37 feet, with a 4-inch thickness. We calculate volume, add a waste factor, and convert to cubic yards. Your actual dimensions and thickness will come from the structural drawings.
| Step | Calculation | Result |
|---|---|---|
| Area | 50 ft × 37 ft | 1,850 SF |
| Volume (ft³) | 1,850 SF × (4 in ÷ 12) | 616.7 ft³ |
| Volume (yd³) | 616.7 ft³ ÷ 27 | 22.8 CY |
| Waste factor | 22.8 CY × 1.10 | 25.1 CY |
| Vapor barrier | 1,850 SF × 1.10 | 2,035 SF |
| Gravel base | 1,850 SF × 0.33 ft | 610 ft³ |
The waste factor of 10% is typical for slab-on-grade with a pump truck and minor overpour. If the slab includes thickened edges or interior footings, those are taken off separately by linear feet and added to the total. Vapor barrier is measured by square feet with a 10% lap and waste allowance. Gravel base is measured by cubic feet or cubic yards, depending on how your supplier prices it. We also carry expansion joint, cure-and-seal, and dowels as separate line items. For Dublin, the mix design must account for freeze-thaw exposure, so the concrete supplier will need air-entrainment and a low water-cement ratio. Those requirements do not change the quantity but they do change the unit price. Always confirm the slab thickness and reinforcement with the structural drawings and the local building department before you finalize the order.
We price per project based on square footage, number of sheets, and trade complexity. Most single-family estimates are returned within 24–48 hours, and rush service is available. You send plans and we send an Excel and PDF takeoff organized by CSI MasterFormat division with marked-up plan sets. There is no starting price published because a 1,200 SF ranch and a 40-unit multifamily building require very different levels of detail. Send your plans through the get an estimate page and we will quote the fee before we start.
We read the geotech report and structural notes before we measure. If the report calls for undercut and replacement, we add separate lines for excavation, haul-off, and structural fill. If the report is not available, we note the assumption and exclude undercut so you can price it as a contingency. We also check footing depths and stem wall heights against the architectural set. The city building department has the final say on what is required, so confirm the adopted code edition and any local amendments before you rely on the number.
Yes. We take off commercial and multi-family projects using the same CSI MasterFormat divisions, with separate scopes for common areas and unit interiors. For multifamily, we count fixtures, doors, and windows by unit type so you can price a typical unit and multiply. For commercial, we follow the tenant improvement drawings and separate base-building work from tenant scope. Our commercial estimating services and multi-family estimating services teams both work from marked-up plan sets and return Excel and PDF deliverables. Turnaround is typically 24–48 hours for most projects.
We use Bluebeam Revu for plan markup, PlanSwift for quantity takeoff, and RSMeans data for unit pricing. Material and labor pricing is adjusted by ZIP code, so Dublin quantities carry central Ohio pricing rather than a national average. We deliver Excel workbooks with formulas visible so you can adjust waste factors or unit costs yourself, plus a PDF with the marked-up plan set. If you use a different estimating platform, we can export to a format your team can import. Tell us your preferred format when you send the plans.
Freeze-thaw affects concrete mix design, footing depth, and exterior finishes. In takeoff terms, we add air-entrained concrete notes, check frost depth against the structural drawings, and carry drainage board or waterproofing on foundation walls where the drawings show it. For sitework, we measure swales, storm structures, and temporary stabilization separately. We do not guess at local frost depth; we use the value shown on the plans or note that it must be confirmed. The city building department and the geotech report are the final references for these requirements.
Yes. We cover Dublin and the surrounding central Ohio market, including Westerville, and we also work in other Ohio cities such as Beavercreek, Strongsville, and Mentor. The takeoff method is the same, but pricing is adjusted by ZIP code and local labor conditions. If your project is in a different jurisdiction, tell us the address so we can apply the right pricing. You can see our state coverage on the Ohio construction estimating services page. Send the plans and we will confirm the location before we start.
Waste factors vary by material and installation method. For concrete, we typically use 5–10% on slabs and footings. For framing lumber, 5–10% depending on complexity. For roofing shingles, 10–15% on cut-up roofs and 5–10% on simple gable roofs. For drywall, 10–15% including breakage and cutouts. We show the waste factor as a separate line in the Excel workbook so you can see exactly what we applied. If your supplier or installer uses a different factor, you can change it in the spreadsheet without rebuilding the takeoff.
We mark up the plan set to show what we measured and what we excluded. If a scope item is not shown on the drawings, we list it as an assumption or exclusion so you can decide whether to carry it. Common gaps in Dublin include undercut, vapor barrier, firestopping, and temporary facilities. We do not fill gaps with a lump sum; we either measure the item or flag it. That way your bid is transparent and you can compare subcontractor quotes against a known baseline. Review the exclusions page before you submit.
The permit figures on this page come from the U.S. Census Bureau, Building Permits Survey for 2025. The survey counts permits issued by the city itself for new privately-owned residential units only. It does not include commercial permits, additions, or alterations. In 2025, Dublin issued permits for 100 total residential units, down from 102 in 2024, with 62 single-family and 38 multifamily units. The permitted value was $55 million, averaging $552,700 per unit. These numbers describe residential permitting activity, not the total construction market. Use them as context, not as a projection for your specific project.
Send the complete plan set, including architectural, structural, mechanical, electrical, and plumbing drawings, plus the geotech report if available. If you have a specification book or finish schedule, include those too. We also need the project address so we can apply ZIP-code-adjusted pricing. If the plans are not final, tell us what is still in design so we can note assumptions. You can upload files through our get an estimate page. We confirm the scope and fee before we begin, and most estimates are returned within 24–48 hours.
Upload your plans and we will return a CSI-organized takeoff in Excel and PDF within 24–48 hours.