Sitework and earthwork
Caliche excavation, gravel base, trenching, and haul-off quantities for rural Lyon County parcels.
CY · LF · TONScope Precision Estimate produces quantity takeoffs and cost estimates for Yerington contractors, developers, and owners — from CMU block walls and metal ag buildings to septic, well, and rural sitework packages. We price ZIP-code-adjusted material and labor and return Excel and PDF takeoffs in 24–48 hours.
Yerington pricing is driven by Lyon County haul distances, caliche and expansive clay soils, well and septic in place of municipal utilities, high desert wind and freeze-thaw exposure, and a small local subcontractor pool that pushes mobilization costs higher on rural parcels.
Yerington sits in Lyon County in the Mason Valley, where most work is agricultural, residential, and light commercial rather than high-rise. That changes what a takeoff has to capture: septic systems and wells instead of sewer and water taps, gravel driveways instead of curb and gutter, and metal ag buildings on slab or pier foundations instead of tilt-up shells. If you are pricing a project here, see our Nevada construction estimating services for how we handle statewide labor and material adjustments.
We build takeoffs by CSI MasterFormat division so your bid package lines up with how general contractors and owners actually break scope. PlanSwift and Bluebeam Revu handle the digitizing and markup; RSMeans data with ZIP-code adjustment sets the unit costs. Everything ships as Excel and PDF with marked-up plan sets, usually within 24–48 hours. For rural parcels around Mason Valley, sitework estimating and foundation estimating are where most of the risk sits.
For bidders. You need quantities you can defend on bid day. We return division-organized takeoffs with marked-up plans so you can trace every CY, LF, and TON back to the sheet it came from.
For builders. You are scheduling crews across Lyon County. We break material and labor by division with ZIP-adjusted pricing so you can sequence block, framing, and MEP without re-keying our numbers.
For owners. You want a budget before you commit. We estimate ag buildings, shops, and residential from schematic plans so you can compare options against real Mason Valley costs.
Select a bar to compare Yerington with the largest Nevada markets we cover.
1 new housing units in 2025.
1 single-family · 0 multifamily (0%).
The U.S. Census Bureau Building Permits Survey for 2025 shows Yerington issued permits for 1 new privately-owned residential unit, all single-family, with 0 multifamily units and a permitted value of $125,000. The prior year recorded 0 units. That is a small, lumpy pipeline — one project can swing the year. Among covered Nevada cities the city ranks 14 of 14 by units, and its share of the covered state total is 0%, against 11,895 units statewide. For bidders this means fewer projects to chase locally and more competition on each one, so estimate accuracy matters more than volume. It also means most of your work likely comes from Lyon County parcels outside city limits or from nearby markets; our West Wendover and Ely pages cover similar rural pricing conditions.
With a single-family permitted value of $125,000, the average project here is modest — well below urban Nevada custom-home budgets. At that level, sitework and utilities are a large share of cost: excavation in caliche, septic leach fields, well drilling, power trenching, and gravel base. A $125,000 house budget can absorb a disproportionate amount in Division 31 and 33 work before framing starts, which is why we take off sitework separately rather than burying it in a general conditions line. On the building side, block stem walls, wood or metal framing, and standing-seam roofing dominate. If your scope includes utility coordination or mechanical systems, our MEP estimating team breaks those divisions out. Compare the statewide picture on the Nevada estimating page.
Division-organized takeoffs and cost estimates for the project types that actually get built in and around Yerington.
Caliche excavation, gravel base, trenching, and haul-off quantities for rural Lyon County parcels.
CY · LF · TONSlabs, stem walls, driveways, and shop aprons priced with local batch plant and pump access in mind.
CY · SFSpread footings, pier pads, and post-tension slabs detailed against expansive clay and frost depth.
CY · LF · EAWood and light-gauge framing for houses, shops, and ag buildings with waste factors by member type.
BF · LF · EAStanding-seam metal, shingle, and low-slope assemblies with flashing and trim counted at penetrations.
SQ · LFWell, septic, propane, and electrical service scope broken out where municipal utilities are absent.
LF · EA · TONFull-house takeoffs from plan sets, including the sitework and utility lines that dominate rural budgets.
SF · EAShops, barns, and light commercial shells with division-level material and labor breakdowns.
SF · TONYou are pricing Lyon County school, utility, and ag building packages. We return division-organized quantities with marked-up sheets so your bid form reconciles line by line.
Your lots are outside city sewer and water. We quantify septic, well, power trench, and gravel drive scope that urban takeoff templates usually miss entirely.
You are adding a shop, hay barn, or equipment shed. We take off metal building packages, slab or pier foundations, and the electrical service that feeds them.
You bid concrete, framing, or roofing only. We isolate your division from the full set so you are not carrying another trade's scope in your number.
You need a budget before you option land near Yerington. We estimate lot grading, utility extensions, and per-unit shell costs from schematic plans.
You want a third-party quantity check before a client meeting. We mark up your set and return a takeoff you can compare against your own cost model.
We take off projects across Lyon County and the surrounding rural counties, from in-town lots to parcels several miles out on gravel roads. Distance from Yerington changes mobilization and material haul, so tell us the parcel location up front.
The permit mix here is almost entirely single-family residential, with a small volume of ag and light commercial work alongside it. That shapes which divisions carry the money on a Yerington takeoff.
Custom and production homes on in-town lots and rural parcels. We take off slab or raised-floor foundations, wood framing, roofing, and full MEP rough-in, then separate well and septic from the house scope.
Watch for: Well pump, pressure tank, septic tank and leach field, power trench
Hay barns, equipment sheds, and shops, usually pre-engineered metal on slab or pier foundations. We quantify anchor bolts, column reactions, slab thickness, and the electrical service feeding welders and compressors.
Watch for: Slab thickness, anchor bolt templates, service amperage, door openings
Small retail, office, and service buildings along the main corridors. We break out storefront glazing, tenant demising walls, rooftop units, and the site work that ties into existing utilities or a new septic system.
Watch for: Storefront systems, rooftop unit curbs, ADA restroom counts, utility tie-in
Owner-built shops behind homes and on rural acreage. We measure slab square footage, insulation, overhead door sizes, and the subpanel and circuit count needed for the equipment you plan to run.
Watch for: Overhead door sizes, subpanel capacity, slab reinforcement, apron grading
Corrals, shade structures, pump houses, and small utility buildings. Quantities are small but mobilization is the driver, so we price them with the haul and equipment time separated from material.
Watch for: Mobilization distance, equipment hours, pipe and footing counts
Room additions, garage conversions, and interior remodels on older Yerington housing stock. We take off selective demolition, framing tie-ins, and the MEP modifications that existing systems usually require.
Watch for: Demolition, framing tie-ins, panel capacity, roof tie-in details
Two bids on the same Yerington plans can differ by a wide margin because of site conditions, haul distance, and how the jurisdiction reviews the permit. These are the drivers we adjust for.
Yerington and Lyon County review building permits under adopted editions of the IBC, IRC, and NEC, and rural parcels usually trigger septic and well approvals from the county health authority before a building permit issues. Review timelines and required submittals vary by project type, so confirm the adopted code edition and current submittal checklist with the local building department before you finalize your schedule and carry.
IBC · IRC · Lyon County building department · county health authorityMason Valley soils range from sandy alluvium near the river to expansive clays and caliche-cemented layers on surrounding benches. Expansive clay drives over-excavation, import, and deeper footings; caliche drives rock excavation and slower drilling for pier foundations. Without a geotechnical report, we carry an allowance and flag it as a bid risk rather than burying it in the concrete line.
Geotechnical report · expansive clay · caliche · over-excavationYerington runs high desert: hot summers, cold winters, wide daily temperature swings, and low annual rainfall concentrated in short storms. That affects roof underlayment and flashing details, freeze protection on exterior plumbing, insulation values, and HVAC sizing. Snow load and wind exposure matter on metal buildings, so we confirm the design criteria on the drawings instead of assuming a default.
IECC climate zone · snow load · wind exposure · freeze protectionThe local labor pool is small, and many specialty trades travel in from Carson City, Reno, or Fallon. Travel time and per diem show up in labor rates even when the work itself is straightforward. We adjust labor by ZIP code and call out trades where only one or two crews are realistically available, since that affects both price and schedule.
ZIP-code-adjusted labor · crew travel · specialty trades · per diemRural parcels need well and septic instead of municipal water and sewer, plus power trenching, gravel driveways, and culverts at the county road approach. Flat valley ground drains slowly, so lot grading and positive drainage away from foundations are real line items. Setbacks, parcel size, and ag exemptions vary by zoning, so verify land use with the county before pricing.
Septic system · well · power trench · lot grading · zoning setbackMost material comes from Reno or Carson City suppliers, so freight is a real cost on every truckload and full loads price better than partial ones. Concrete and aggregate haul distance from the nearest plant affects the yard price. Nevada sales tax applies to materials and is collected on the invoice, so we carry it as a separate line rather than folding it into unit prices.
Freight · aggregate haul · Nevada sales tax · supplier distanceYerington sits in Lyon County at roughly 4,400 feet, where high-desert temperature swings, caliche-bearing soils, and long hauls from Reno or Carson City change what a line item actually costs. Here is how that shows up division by division.
Yerington parcels commonly carry caliche and cemented gravel, so a takeoff that assumes free-ripping 12 inches will miss the breaker or rock trencher you actually need. We carry separate lines for unclassified excavation, rock excavation by the cubic yard, over-excavation and backfill, and import. Drainage matters because summer monsoon cells drop intense rain on ground that sheds slowly; we quantify swales, culverts, and riprap by the linear foot and ton. If your site is graded for a shop or equipment yard, see our sitework estimating services for how we structure cut, fill, and haul quantities before pricing.
Wood framing is the default here, and lumber priced at Reno-area yards carries a haul premium to Yerington. We measure wall plates, studs at 16 or 24 inches on center, headers, sheathing, and roof framing by length and sheet count, then apply waste factors by member type rather than one blanket percentage. Trusses are quoted as a supplier package with a separate line for crane setting and for the labor to sheet and brace. On a metal-building job, the framing takeoff shifts to purlins, girts, and anchor-bolt layout. Framing estimating services covers how we split material from erection labor.
At this elevation, roof assemblies see intense UV and wide daily swings, so underlayment, flashing, and ventilation details get priced as separate lines instead of a single square-foot number. We take off roofing by the square with ridge, hip, valley, and penetration lengths, plus drip edge and ice-and-water membrane where the design calls for it. Insulation is measured by net area with R-value noted per assembly, and drywall by sheet count with an allowance for texture and corner bead. Roofing estimating services shows how we break a steep-slope assembly down line by line.
Slab-on-grade and stem-wall foundations dominate Yerington residential and light commercial work. We take off concrete by the cubic yard with separate waste allowances for footings, walls, and flatwork, then add vapor barrier, welded wire or fiber mesh, and anchor bolts as their own lines. Freeze-thaw cycles here push air entrainment and joint spacing into the specification, and mix design changes price. Reinforcement is taken off by the pound rather than by the bar so rebar laps and chairs do not disappear. Our concrete estimating services page shows the format we return, with formwork measured by contact area.
Yerington has no municipal gas grid in much of its service area, so heating often lands on propane, electric resistance, or a heat pump, and that decision changes the mechanical takeoff before you price a single fitting. We count plumbing fixtures, water and drain runs by diameter and length, HVAC tonnage with ductwork by pound and linear foot, and electrical devices, feeders, and panel schedules by circuit. Nevada adopts the NEC with local amendments, so confirm the adopted edition and any Lyon County requirements with the building department before you lock the spec. MEP estimating services explains our fixture-and-device counts.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24 in x 12 in continuous | 18.5 | CY |
| 03 20 00 | Rebar, #4 footing and stem wall | 4,120 | LB |
| 03 30 00 | Slab concrete, 4 in with vapor barrier | 42.0 | CY |
| 06 10 00 | 2x6 wall framing, 9 ft plate, 16 in OC | 1,860 | LF |
| 06 10 00 | 7/16 OSB wall sheathing | 96 | SHT |
| 07 30 00 | Asphalt shingle roofing, 6:12 slope | 34 | SQ |
| 09 21 00 | 1/2 in drywall, walls and ceilings | 312 | SHT |
| 31 23 00 | Structural fill, on-site material, compacted | 210 | CY |
This walk-through uses illustrative dimensions for a 40 ft x 60 ft detached shop with a 6 in slab and a thickened 12 in x 12 in perimeter footing. Confirm your own dimensions and the adopted code edition with the Lyon County building department before ordering.
Step 1 — Slab area and volume.
| Step | Calculation | Result |
|---|---|---|
| Slab area | 40 ft x 60 ft | 2,400 SF |
| Slab volume at 6 in | 2,400 x 0.5 ft / 27 | 44.4 CY |
| Perimeter footing | 2 x (40 + 60) = 200 LF | 200 LF |
| Footing volume at 12 in x 12 in | 200 x 1.0 x 1.0 / 27 | 7.4 CY |
| Net concrete | 44.4 + 7.4 | 51.8 CY |
| Waste at 5 percent | 51.8 x 1.05 | 54.4 CY |
Step 2 — Reinforcement. Assume #4 bars at 16 in on center each way in the slab and four continuous bars in the footing. Slab bar count one way is 60 ft / 1.33 ft = 45 bars; the other way is 40 ft / 1.33 ft = 30 bars. Total length is (45 x 40) + (30 x 60) = 1,800 + 1,800 = 3,600 LF. Footing steel is 4 x 200 = 800 LF. Combined 4,400 LF at 0.668 lb per LF equals about 2,939 LB, and a 5 percent lap allowance brings it to roughly 3,086 LB.
Step 3 — Vapor barrier and base. Vapor barrier runs the slab area plus a 6 in lap at the perimeter: 2,400 SF plus about 100 SF of lap, so order 2,500 SF. Base gravel at 4 in compacted over the same area is 2,400 x 0.333 / 27 = 29.6 CY, and at 15 percent compaction loss you order about 34 CY.
Step 4 — What drives the price. Concrete in this part of Lyon County is priced with a haul component from Reno-area batch plants, so the yardage above is only half the story. Add pumping or a short chute, a hot-weather set retarder or cold-weather accelerator depending on the pour month, and finishers traveling in from outside the valley. Our residential estimating services team returns this same structure with material and labor split by line.
No. We work from your plan set, specifications, and site civil drawings, mark them up in Bluebeam Revu, and return Excel and PDF files organized by CSI MasterFormat division. If you have a geotechnical report or a survey with spot elevations, send it, because rock depth and grade change earthwork quantities more than anything else on a Yerington job. A site visit is useful when the drawings do not match existing conditions, but it is not required to start.
Most projects return in 24 to 48 hours, and rush turnaround is available when a bid date is close. A single-family residence or small shop typically fits the standard window. Larger commercial or multi-building packages take longer because we price MEP systems and sitework separately. Send the complete set, including addenda and any alternates, so we do not have to reissue the estimate when a revised sheet arrives.
They come from the U.S. Census Bureau Building Permits Survey, which counts permits issued by the city itself for new privately-owned residential units only. The 2025 figure for Yerington is 1 unit, all single-family, with a permitted value of $125,000. That survey does not capture commercial, industrial, agricultural, or owner-built permits, and it does not include unincorporated Lyon County work outside city limits, so treat it as one narrow indicator rather than a full picture of local construction volume.
It can. Caliche and cemented gravel are common in this part of Lyon County, and both can force over-excavation, import, or a thicker structural section than the drawings assume. Expansive clays in some areas drive post-tension or stiffened slab designs. We take off the foundation as drawn, then carry separate lines for over-excavation and backfill so the difference is visible. Ask your geotechnical engineer for a report before bidding, or budget a contingency line.
We use ZIP-code-adjusted material and labor pricing, which reflects that many trades travel in from the Reno and Carson City corridor. Travel time, per diem, and mobilization are not the same as a wage rate, so we keep them as separate lines where the scope supports it. If you are self-performing with a local crew, tell us and we will price the labor portion to your actual crew composition instead of a regional average.
Yes. Metal buildings are common on rural parcels around Yerington, and the takeoff is different from wood framing. We measure the foundation and anchor-bolt layout, the primary and secondary steel as a supplier package, purlins and girts by linear foot, wall and roof panels by square, and insulation by net area. Erection labor, crane time, and door and window openings are carried as their own lines so you can compare a supplier quote against our takeoff.
Rural parcels often sit on septic and private wells, and those scopes fall outside the building shell. We carry lines for septic tank, leach field, and perc testing, plus water service, power trenching, and propane if there is no gas main. Because requirements vary by parcel and by the county health authority, describe the system in your notes and confirm the design with the local jurisdiction before you price it.
We take off roofing by the square, then break out ridge, hip, valley, and penetration lengths, drip edge, underlayment, and any ice-and-water membrane the design requires. Pitch, number of planes, and access affect labor more than the shingle type, so those go into the labor line rather than a blanket square-foot rate. At this elevation, UV exposure and freeze-thaw cycling make flashing and ventilation details worth pricing separately instead of burying them in the square count.
Yes. We take off commercial and light industrial buildings, including tilt-up and masonry shells, tenant improvements, and equipment pads. Those packages lean harder on MEP, fire protection, and site utilities, and NFPA 13 sprinkler scope is easy to leave out of a shell bid. Send the architectural, structural, and MEP sets together, and confirm which code edition the local building department has adopted so the specification lines match what will actually be permitted.
Send the plan set, specifications, and any addenda, plus site civil drawings if earthwork is in scope. A geotechnical report, survey, and your bid date help us prioritize. We return Excel and PDF files organized by CSI MasterFormat division with marked-up plan sets, so you can see where every quantity came from. If a scope is still in design, send what you have and note the assumptions, and we will flag the lines that need a decision before bid.
Send your plan set and bid date, and we will return a division-by-division takeoff with marked-up drawings, usually within 24 to 48 hours.