Scope Precision EstimateContact Us

Construction Estimating Consultant

Send your plans, specs and current estimate. We return a line-by-line review with corrected quantities, pricing notes and a written opinion on scope and risk.

24–48 hours for most projectsTypical turnaround
Excel + marked-up PDFsOrganized by CSI section
ZIP-code pricingLocal material and labor
Price confirmed firstBefore any work starts
Sample estimate sheet
Division 03 — ConcreteSample format
Line itemQtyUnitConcrete
Continuous footing 24" × 12"412LF30.5 CY
Spread footing 6' × 6' × 18"24EA48.0 CY
Foundation wall 8" × 8'286LF56.6 CY
Slab-on-grade 5" thick12,400SF191.4 CY
Elevated slab 8" thick8,200SF202.5 CY
Total concrete529.0 CY
Illustrative quantities. Waste factor applied as a separate line.
Formwork and rebar separate

A construction estimating consultant reviews the numbers you already have. You send the plan set, specifications, bid form and your current estimate or budget. We audit quantities against the drawings, check pricing against ZIP-code-adjusted RSMeans data and recent quotes, and flag scope gaps before you commit to a number. This is advisory work, not a production takeoff. It fits when a bid is due, when a budget has to be defended to a lender, when a change order needs a second opinion, or when an owner wants an independent read on a contractor's proposal. We organize every review by CSI MasterFormat division and return it in Excel and PDF with a marked-up plan set. The same discipline we apply to Construction Estimating Services is turned on your existing estimate, so you see exactly which line items move. If you are deciding between a full takeoff and a review, start with Quantity Takeoff Services or send the estimate for an Estimate Review & Second-Opinion Audit.

Deliverable
Excel estimate + marked-up PDF plans
Organized by
CSI MasterFormat section
Turnaround
24–48 hours for most projects
Pricing
ZIP-code-adjusted material and labor pricing
Software
Bluebeam Revu, PlanSwift, RSMeans data

Our review is built for construction estimator teams and for construction estimate for contractors who need a second set of eyes before bid day. We check material takeoff lines across division 03 concrete, division 05 metals, division 09 finishes, division 22 plumbing and division 26 electrical, and we verify labor and material pricing against current market data. Every bid package is checked for missing scope, unit errors and duplicate lines. We work in Bluebeam Revu, PlanSwift and RSMeans data, and we can review an on-screen takeoff or a spreadsheet model. If your team needs outsourced construction estimating for overflow, we can scale to that through Outsource Estimating Services.

We also support subcontractor estimating services and general contractor estimating workflows, including Uniformat-level rollups when a lender or owner asks for them. For change orders and schedule of values, we tie review comments back to Change Order Estimating and Schedule of Values Preparation. If your project needs a quantity surveyor's view, see Quantity Surveyor Services, and for 5D model-based checks, BIM Estimating Services (5D) covers model quantity extraction. Turnaround is 24–48 hours for most projects, with rush available.

Services

What our construction cost consultant review covers

We work from the documents you provide and test the estimate against them. The review covers quantity verification, pricing basis, scope completeness and risk exposure. You get comments on each division, a list of missing items, and a revised summary you can use for a bid, a budget or a negotiation.

Quantity verification against architectural

Quantity verification against architectural, structural and MEP sheets

Pricing check against ZIP-adjusted RSMeans data and your quotes

Pricing check against ZIP-adjusted RSMeans data and your quotes

Division-by-division scope review from 01 00 00 through 33 00 00

Division-by-division scope review from 01 00 00 through 33 00 00

General conditions build-up from supervision days and temporary facilities

General conditions build-up from supervision days and temporary facilities

Escalation review on long-lead items such as switchgear and steel

Escalation review on long-lead items such as switchgear and steel

Sales tax and freight check at the project ZIP combined rate

Sales tax and freight check at the project ZIP combined rate

Allowance review with stated quantity and unit price basis

Allowance review with stated quantity and unit price basis

Bond and insurance rate check against contract amount

Bond and insurance rate check against contract amount

What every construction estimating consultant takeoff includes

  • Quantity verification against architectural, structural and MEP sheets
  • Pricing check against ZIP-adjusted RSMeans data and your quotes
  • Division-by-division scope review from 01 00 00 through 33 00 00
  • General conditions build-up from supervision days and temporary facilities
  • Escalation review on long-lead items such as switchgear and steel
  • Sales tax and freight check at the project ZIP combined rate
  • Allowance review with stated quantity and unit price basis
  • Bond and insurance rate check against contract amount
  • Marked-up plan set showing where quantities were measured
  • Written opinion on bid risk and recommended contingency
  • Comparison of your number to historical cost on similar projects
How we work

How we run outsourced construction estimating review

  1. Document intake and indexingWe log the plan set by sheet number and date, note the specification sections and confirm the bid form. Missing sheets — often the structural general notes, the mechanical schedules or the civil utility plan — are requested before we start. This step prevents reviewing against a superseded set. We also check addenda dates against the sheet index to ensure we are working from the latest issue.
  2. Quantity spot-check by divisionWe measure representative line items in Bluebeam Revu and PlanSwift: footing and slab volumes in CY, formwork contact area in SF, gypsum board by wall type, duct weight from schedules, conduit and conductor in LF, and cut/fill in CY. The goal is not a full takeoff but enough measurement to test your quantities. We compare our measured quantities to yours and flag variances greater than 5% for review.
  3. Pricing basis auditEach unit price is compared to ZIP-code-adjusted RSMeans data, your subcontractor quotes and historical cost from comparable projects. We flag lines where the price is a percentage, a round number or an allowance without a stated quantity. Sales tax and freight are checked at the project ZIP combined rate. We also note where a quote should replace a database price to reduce risk.
  4. Scope gap and risk reviewWe walk the drawings for items that commonly fall between divisions: cut and patch for MEP rough-in, roof flashing and counterflashing in LF, site utilities from the property line, testing and special inspections, and temporary protection in renovations. Each gap is listed with the sheet or spec section where it appears. We also check for items like firestopping, seismic bracing and roof drains that are often missed.
  5. Marked-up set and written commentsQuantities we measured are marked on the plan set and tied to the Excel line items. Comments explain what changed, why, and what the number should be. You get a revised summary, a list of missing items, and a short opinion on contingency and bid risk. The marked-up set uses cloud annotations and dimension lines so you can trace each quantity.
  6. Review call and revisionWe walk through the findings on a call, answer questions on specific divisions, and issue a revised file if you send updated quotes or a revised sheet. Most reviews are returned in 24–48 hours, with rush available when a bid date is close. The call is typically 30–60 minutes and can include your team members.

What we need from you

  • Plan setArchitectural, structural, civil, mechanical, electrical and plumbing sheets, with the issue date and any addenda.
  • SpecificationsProject manual with CSI sections, so we can check scopes like 07 92 00 joint sealants and 09 29 00 gypsum board.
  • Current estimateYour Excel or PDF estimate with quantities, units and unit prices, including any allowances and general conditions.
  • Bid form and scheduleThe bid form, alternates, unit price schedule and the construction schedule, so escalation and overtime can be reviewed.
  • Quotes and buyoutSubcontractor and supplier quotes you have received, so we can compare your pricing basis to the market.
  • Project ZIP and tax rateThe project ZIP code for material and labor pricing, and the combined sales tax rate that applies.
Sample output

Sample construction bid preparation comments by division

A short extract from a review showing how comments are tied to a CSI section, a quantity and a drawing reference.

Sample format — illustrative quantities
SectionLine itemQtyUnitRef.
03 30 00Slab-on-grade 5" thick, 12,400 SF — quantity matches S-101191.4CYS-101
05 12 00Structural steel tonnage 84 TON — connection material not carried84TONS-301
07 92 00Joint sealants 2,850 LF — backer rod and sealant quantity omitted2,850LFA-501
09 29 00Gypsum board 42,600 SF — corner bead and fire-rated assembly not broken out42,600SFA-601
23 31 00Ductwork 18,400 LB — insulation in SF and diffuser count missing18,400LBM-401
26 05 00Conduit 14,200 LF — conductor LF and panelboard count not shown14,200LFE-201
31 23 00Excavation 3,150 CY — haul-off and topsoil strip omitted3,150CYC-101
03 30 00Concrete waste factor 5% not applied to 529 CY total26.5CYS-101
05 50 00Metal fabrications 1,200 LB — miscellaneous angles and embeds missing1,200LBS-401
08 11 00Hollow metal doors 24 EA — frames and hardware sets not counted24EAA-701
22 11 00Plumbing piping 3,800 LF — insulation and hangers omitted3,800LFP-201

Units we verify: square footage, linear feet, each count

Each line item in your estimate should carry a unit that matches how the work is bought and installed. These are the units we check most often.

ItemUnitHow it's measured
Cast-in-place concreteCYVolume from footing, wall and slab dimensions divided by 27, with waste shown separately
Concrete formworkSFCASquare feet of contact area from wall, column and deck formwork, keyed to structural sheets
Structural steelTONMember weight by shape from the steel drawings, plus connection material and shop primer
Rough carpentryBFBoard feet from wall, floor and roof framing, or LF for repetitive members
Gypsum boardSFBoard area by wall type and layer, with corner bead in LF and fire-rated assembly noted
DuctworkLBDuct weight or SF of duct surface from mechanical schedules and routing plans
Electrical conduitLFFeeder and branch circuit conduit by size and material, with conductor in LF
Excavation and fillCYCut and fill volumes from civil sheets, with topsoil strip in SY and haul-off in CY

Worked example: reviewing a Division 03 concrete slab takeoff

This example shows how we verify a slab-on-grade quantity in a review. The dimensions are illustrative. We start with the slab area from the architectural and structural drawings, then convert to volume, apply waste as a separate line, and check reinforcing and formwork.

Step 1 — Confirm slab area. From the foundation plan, the building footprint is 120 ft × 80 ft. Subtract a 10 ft × 12 ft mechanical room that is slab-on-grade but already counted in a separate line. Net slab area = (120 × 80) − (10 × 12) = 9,600 − 120 = 9,480 SF.

Step 2 — Convert to volume. Slab thickness is 5 in. Volume = 9,480 SF × (5/12) ft = 9,480 × 0.4167 = 3,950 CF. Convert to cubic yards: 3,950 ÷ 27 = 146.3 CY.

Step 3 — Apply waste. Typical waste for slab-on-grade is 5–10%. Using 8%: waste = 146.3 × 0.08 = 11.7 CY. Total concrete = 146.3 + 11.7 = 158.0 CY. The waste is shown as a separate line, not buried in the unit price.

Step 4 — Check reinforcing. From the structural notes, reinforcing is #4 bars at 18 in. on center each way. Number of bars in the long direction: (80 ft × 12 in./ft) ÷ 18 = 53.3, round to 54 bars. Each bar length = 120 ft. Total length = 54 × 120 = 6,480 LF. In the short direction: (120 × 12) ÷ 18 = 80 bars, each 80 ft long. Total = 80 × 80 = 6,400 LF. Total reinforcing = 6,480 + 6,400 = 12,880 LF. Convert to tons: #4 bar weighs 0.668 lb/ft. 12,880 × 0.668 = 8,604 lb = 4.3 tons. Add 5% for laps and waste: 4.3 × 1.05 = 4.5 tons.

Step 5 — Check formwork and edge. Slab edge formwork is the perimeter of the slab: 2 × (120 + 80) = 400 LF. If a thickened edge is required, the formwork area may be greater. We note that edge insulation, if specified, is measured in LF.

Step 6 — Check vapor barrier and base. Vapor barrier under slab = 9,480 SF, plus 10% lap = 10,428 SF. Base course of compacted gravel at 4 in. thick: 9,480 SF × (4/12) = 3,160 CF = 117 CY.

Review comments. We compare these quantities to the estimate. If the estimate shows 146 CY without waste, we flag the missing 11.7 CY. If reinforcing is shown as a lump sum, we ask for the tonnage. If vapor barrier is omitted, we add it. Each comment is tied to the drawing sheet and the CSI section (03 30 00).

Cost drivers

What moves the reviewed construction estimate

Relative impact on a typical estimate for this trade, based on estimator judgment. Select a bar for details.

Scale: 1 = minor, 5 = major relative impact. Estimator judgment, not measured data.
Relative impact 5 / 5

Pricing basis

The same line item can be priced from RSMeans data, a completed project, a subcontractor quote or an allowance. Each basis carries different risk, and the review states which basis your number uses and where a quote should replace a database price. For example, a database price for structural steel may not reflect current mill pricing, so we flag it for a quote.

Pricing basis

The same line item can be priced from RSMeans data, a completed project, a subcontractor quote or an allowance. Each basis carries different risk, and the review states which basis your number uses and where a quote should replace a database price. For example, a database price for structural steel may not reflect current mill pricing, so we flag it for a quote.

General conditions

When general conditions are carried as a percentage, the review rebuilds them from supervision days, temporary facilities, dumpsters, site office and final cleaning. A percentage that looks reasonable on a small project can underprice a long schedule. For instance, a 5% general conditions on a $1M project may be adequate, but on a $10M project with 18 months, it may not cover a full-time superintendent and temporary power.

Escalation

Long-lead items such as switchgear, elevators and structural steel can be quoted months before installation. The review checks whether escalation is carried, at what date, and whether the bid form allows a price adjustment. If escalation is not carried, we recommend adding a line based on published indices or a stated percentage for the period from bid to installation.

Labor conditions

Overtime, shift work, winter conditions and restricted site access change labor hours. The review checks whether the schedule requires them and whether the estimate prices them, rather than assuming straight-time day work. For example, a project in a cold climate may need temporary heat and winter protection, which adds cost to concrete and masonry divisions.

Tax and freight

Material pricing is checked at the project ZIP combined rate, not a state average. Freight on items like structural steel, ductwork and switchgear is reviewed against the quote or a stated allowance. If freight is not quoted, we flag it for a line item based on weight and distance from the supplier.

Waste factors

Waste factors vary by material and installation method. Typical ranges are 5–10% for concrete, 10% for gypsum board, and 2–5% for structural steel. The review checks that waste is applied consistently and shown as a separate line, not buried in the unit price. We also check that waste is not double-counted in both quantity and price.

Contingency

Contingency should reflect the level of design completion and the risk profile of the project. The review recommends a percentage based on the number of unresolved items and the stage of design. For a project at 90% construction documents, a 3–5% contingency may be appropriate, while at 50% design, 10% or more may be needed.

Scope gaps

Scope gaps we catch in a bid package

Most estimate errors are not arithmetic. They are items that were never carried, or were carried in the wrong division. These are the gaps we find most often.

  • Cut and patch for MEP rough-in appears only in the plumbing and electrical divisions, with no allowance in finishes or general conditions. We catch it by tracing wall and ceiling penetrations on the architectural sheets against the MEP routing. This gap can add thousands in patching and painting costs.
  • Roofing and waterproofing terminations, flashing and counterflashing are measured in LF but dropped from the summary. We catch it by checking the roof plan and wall sections against the 07 60 00 and 07 92 00 lines. Missing flashing can lead to water infiltration and costly repairs.
  • Site utilities from the property line to the building show on the civil sheets but not in the estimate. We catch it by comparing the utility plan to the sitework division and the plumbing general notes. This includes water, sewer, gas, and electrical conduits, which are often overlooked.
  • Testing, special inspections and third-party commissioning are not listed as line items. We catch it by reading the structural general notes and the commissioning specification, then adding a line with a stated basis. These services are required by code and can be a significant cost.
  • Bond and insurance are quoted at a flat rate rather than the rate the surety will apply to the contract amount. We catch it by checking the contract value against the rate schedule and the bid form. Underestimating bond premiums can erode profit margins.
  • Allowances for fixtures, specialties and landscaping are carried without a quantity or unit price. We catch it by listing each allowance and asking for the fixture count or area it is meant to cover. Without a basis, allowances are a wild card in the bid.
  • Firestopping and fire-rated assembly components are often omitted from Division 07 and Division 09. We catch it by reviewing the UL designs on the architectural sheets and checking that each penetration is accounted for in the estimate. This is a common gap in commercial projects.
  • Temporary heating, cooling, and ventilation during construction are not carried in general conditions. We catch it by checking the schedule for winter or summer months and the specification for indoor air quality requirements. These costs can be substantial in extreme climates.
  • Seismic bracing and anchorage for MEP systems are not included in the mechanical and electrical divisions. We catch it by reviewing the structural drawings for seismic requirements and the MEP sheets for bracing details. This is often missed in areas with seismic codes.
  • Roof drains, scuppers, and overflow systems are not counted in the plumbing or roofing divisions. We catch it by examining the roof plan and plumbing riser diagrams for drainage components. Missing these items can lead to roof ponding and structural issues.

Labor and material pricing basis for a concrete slab line item

The same line item can be priced from different bases. This table shows how each basis changes the number and what a consultant checks.

Pricing basisSourceTypical riskWhat we verify
Unit cost (database)RSMeans data, ZIP-adjustedMay not reflect current market or project conditionsZIP adjustment, waste factor, and whether a quote is available
Historical costCompleted project of similar typePast productivity and material prices may differProject date, location, and scope match; adjust for escalation
Subcontractor quoteWritten bid from a subcontractorQuote may exclude scope or carry qualificationsScope inclusions, exclusions, and validity period
AllowanceOwner or estimator allowanceNo quantity or unit price basisStated quantity, unit price, and who carries overruns
Parametric estimateCost per SF or per unitLoses detail and may miss specific scopeApplicability to project type and size; check with detailed takeoff
Codes and standards

Codes and standards that affect the reviewed estimate

Model codes

Model codes set the minimum requirements that drive quantities. The International Building Code (IBC) and International Residential Code (IRC) govern structural, fire, and life safety provisions. The International Energy Conservation Code (IECC) affects insulation, glazing, and lighting quantities. The National Electrical Code (NEC) and International Plumbing Code (IPC) or Uniform Plumbing Code (UPC) dictate conduit, conductor, and pipe sizing. NFPA 13 covers sprinkler systems. Each code edition adopted by the jurisdiction changes specific requirements, such as fire-resistance ratings, seismic design categories, and energy performance. Confirm the adopted edition with the local building department before finalizing the estimate.

Industry standards

Industry standards provide the test methods and installation requirements that estimators use to verify quantities. ACI 318 for concrete, ACI 301 for specifications, and ASTM C94 for ready-mixed concrete affect mix design and waste. ASTM A615 for reinforcing steel and A992 for structural steel determine material weights. SMACNA standards for ductwork influence sheet metal quantities. GA-216 for gypsum board installation and NRCA guidelines for roofing affect waste factors and fastening. These standards are referenced in specifications and change the unit prices and quantities.

Specification sections

CSI MasterFormat sections tell the estimator what is included. Division 03 30 00 Cast-in-Place Concrete specifies thickness, reinforcing, and finish, which directly changes volume and labor. 05 12 00 Structural Steel gives tonnage and connection requirements. 07 21 00 Building Insulation states R-values and areas. 09 29 00 Gypsum Board defines board types, layers, and fire ratings. 22 11 00 Plumbing and 23 31 00 HVAC detail pipe and duct sizes. 26 05 00 Electrical covers conduit and wire. Reading these sections prevents scope gaps and ensures quantities match the specified materials.

Local amendments

Local jurisdictions adopt model codes with amendments that change cost. For example, some cities require stricter energy codes, additional fire sprinkler coverage, or seismic bracing beyond the model code. These amendments affect quantities and unit prices. The adopted edition year also matters; a project permitting under the 2018 IBC may differ from one under the 2021 IBC. Always confirm the adopted code edition and local amendments with the local building department. Our review flags where the estimate may not reflect local requirements.

Who we provide estimates for

Who hires a construction estimating company

General contractors

You have a bid due and want a second set of eyes on quantities and scope before the number goes in. The review tells you where your estimate is thin and what contingency to carry.

Subcontractors

You are pricing a division and need to confirm your takeoff against the drawings. The review checks your quantities, your unit prices and the scope you are being asked to carry.

Developers and owners

You have a contractor's proposal or a budget and need an independent read before you sign. The review compares the number to the drawings and to market pricing, and lists what is missing.

Architects

You are advising a client on a budget or a contractor's estimate. The review gives you a division-by-division comment set you can forward without endorsing the number yourself.

Lenders and reviewers

You need a third-party opinion on whether a construction budget is complete. The review lists scope gaps, pricing basis and recommended contingency with drawing references.

Where we provide estimates

Construction Estimating Consultant in 20 states

Pricing is adjusted to the project ZIP code. Select a highlighted state to see the cities we cover there.

States we coverSelected
TX

Construction Estimating Consultant in Texas

Nation's largest construction market; Sun Belt population growth, data centers, semiconductor plants, and single-family home building.

Texas estimating services
Property types

Project types and what changes in the review

The review approach adjusts to the project type. These are common categories we see and the specific items we focus on.

Commercial office renovation

Demolition, temporary protection, and cut-and-patch for MEP rough-in drive the review; quantities come from existing conditions and phased drawings.

Watch for: Watch for missing hazardous material abatement, fire-rated assembly continuity, and after-hours work premiums.

K-12 school addition

Review focuses on structural steel, masonry, and MEP tie-ins to existing systems; quantities from new sheets plus tie-in details.

Watch for: Watch for summer shutdown schedule, security and communications scope, and playground or site work not in base bid.

Multifamily wood-frame

Review checks framing lumber in board feet, sheathing, and fire-rated assemblies between units and corridors.

Watch for: Watch for missing firestopping, sound isolation details, and sprinkler coverage in attics and balconies.

Light industrial warehouse

Slab-on-grade, tilt-up or metal building panels, and site utilities are the main quantities; review checks thickness and reinforcing.

Watch for: Watch for missing dock equipment, bollards, and utility coordination with the local jurisdiction.

Healthcare clinic fit-out

Review focuses on medical gas, specialized HVAC, and electrical systems; quantities from equipment schedules and riser diagrams.

Watch for: Watch for missing certification testing, infection control during construction, and owner-furnished equipment scope.

Restaurant build-out

Review checks grease duct, hood, and grease interceptor; quantities from plumbing and mechanical plans.

Watch for: Watch for missing health department requirements, make-up air, and grease trap sizing.

Retail shell and core

Review verifies base building MEP stub-outs and structural capacity for tenant loads.

Watch for: Watch for missing tenant improvement allowances, signage, and exterior lighting.

Municipal utility project

Review focuses on excavation, pipe, and pavement restoration; quantities from civil plans and profiles.

Watch for: Watch for missing traffic control, dewatering, and testing requirements.

Deliverables

What you receive

  • A written review organized by CSI MasterFormat division, with comments on quantities, pricing and scope for each section.
  • An Excel workbook with your line items, our verified quantities, unit prices and a revised summary you can use for the bid or budget.
  • A marked-up plan set in Bluebeam Revu showing where quantities were measured and where scope gaps were found.
  • A list of missing items with the sheet or specification section where each one appears.
  • A short written opinion on bid risk, recommended contingency and items that should be quoted rather than carried as an allowance.
  • A review call to walk through the findings and answer questions on specific divisions.
Checklist

Pre-bid checklist for general contractor estimating

  • Confirm latest drawing issue date and addenda incorporated.
  • Verify all disciplines present: architectural, structural, civil, MEP.
  • Check that general conditions are built from schedule and site needs.
  • Review unit prices against ZIP-adjusted RSMeans data or quotes.
  • Apply waste factors as separate lines, not buried in unit prices.
  • Confirm sales tax and freight at project ZIP combined rate.
  • Check escalation on long-lead items like switchgear and steel.
  • List all allowances with quantity and unit price basis.
  • Verify bond and insurance rates against contract amount.
  • Check for missing testing, special inspections, and commissioning.
  • Review cut-and-patch and temporary protection for renovations.
  • Confirm permit fees and utility connection charges with jurisdiction.
Client reviews

What clients say about Scope Precision Estimate

10 client reviews
JR
James RichardsonConstruction Project Manager

Excellent construction estimating service. The team provided a comprehensive takeoff and cost breakdown that saved us hours of manual work.

KM
Kevin MartinezCivil Contractor

Great experience from start to finish. The detailed material takeoff and cost estimate helped us prepare a much more accurate project budget.

DT
Daniel ThompsonCommercial Contractor

Very impressed with the accuracy and turnaround time. Their estimate gave us a clear picture of material and labor costs before starting the project.

SH
Steven HarrisCommercial Builder

The quality of the estimate exceeded our expectations. Their detailed breakdown of labor, materials, and project costs gave us confidence in our bid.

MA
Michael AndersonGeneral Contractor

The cost estimate was detailed, accurate, and easy to understand. It helped us prepare our bid confidently and stay competitive without overlooking important costs.

AW
Andrew WilsonGeneral Contractor

Highly recommended for construction cost estimating. The quantities were accurate, the pricing was well organized, and the final report was easy to review.

FAQ

Construction Estimating Consultant questions

What is the difference between an estimating consultant and a takeoff service?

A takeoff service produces quantities from drawings. An estimating consultant reviews the quantities and pricing you already have, tests them against the documents, and advises on scope and risk. We do not replace your estimate; we audit it and provide a written opinion. If you need a full takeoff, we offer that separately. Our review includes a line-by-line comparison to the drawings and specifications, with comments tied to specific CSI sections and drawing sheets. We also check for missing scope, such as temporary protection or testing, that a pure takeoff might not capture.

How do you handle confidential or proprietary estimates?

We treat all documents as confidential. We sign a non-disclosure agreement if you require one. Files are stored securely and shared only with the assigned reviewer. We do not reuse your data for other clients. Upon request, we delete files after the review is complete. Our team uses encrypted transfer methods and restricts access to project-specific folders. If your estimate contains proprietary unit prices or subcontractor quotes, we keep those segregated and do not reference them in any other engagement. You retain full ownership of all documents you provide.

Can you review an estimate prepared by another consultant?

Yes. We routinely review estimates from other consultants, contractors, or in-house teams. We focus on the numbers and scope, not on the preparer. The review is objective and tied to the drawings and specifications. We provide comments you can use to improve the estimate or negotiate. Our comments include specific references to CSI sections, such as 03 30 00 for concrete or 05 12 00 for structural steel, and note any missing quantities or pricing basis. We also flag assumptions that may not hold, like productivity rates or waste factors.

What if my estimate is in a format other than Excel?

We can work from PDF, Excel, or even a printed estimate. If it is in a proprietary format, we may ask for an export. We return our comments in Excel and PDF, organized by CSI division, so you can merge them with your file. We also provide a marked-up plan set. For PDFs, we use Bluebeam Revu to add comments directly on the drawings and link them to the estimate lines. If you provide a printed estimate, we will digitize it or work from a scan, but this may add time to the turnaround. We confirm the format and deliverables before starting.

Do you verify subcontractor quotes as part of the review?

Yes. If you provide quotes, we check them against the scope and the drawings. We look for missing items, qualifications, and exclusions. We compare quote totals to your estimate and flag variances. We do not contact subcontractors on your behalf unless you ask us to. For example, a mechanical quote might exclude controls or testing, which we would flag as a gap. We also check that the quote's scope matches the specification sections, such as 23 31 00 for HVAC ductwork, and that any allowances are clearly stated. Our comments help you level bids and avoid change orders.

How do you handle unit price discrepancies?

We compare your unit prices to ZIP-adjusted RSMeans data, recent quotes, and historical costs. If a price is significantly higher or lower, we note it and ask for backup. We do not arbitrarily change prices; we provide a range and recommend a basis. You decide the final number. For instance, if your concrete unit price is $150 per CY but RSMeans adjusted for your ZIP code shows $130, we will ask if you have a recent quote or if the mix design includes special admixtures. We document our reasoning so you can justify the price to your team or client.

What is the turnaround time for a review?

Most reviews are returned in 24–48 hours after we receive complete documents. Rush service is available for a premium. The time depends on the project size and the completeness of your estimate. We confirm the schedule when we start. For a typical commercial project with 50 to 100 sheets and a detailed estimate, we can provide a full review within two business days. If documents are incomplete or the estimate is in a non-standard format, we will notify you of any impact on the schedule. We also offer phased reviews for large projects.

Can you help with a bid protest or claim?

We provide an independent review of the estimate and scope. Our comments can support a bid protest or claim, but we are not attorneys and do not provide legal advice. We can provide a written opinion and marked-up documents that you can use with your legal counsel. Our review focuses on the factual basis of the estimate, such as quantities, unit prices, and scope inclusions. We can identify where the estimate deviates from the drawings or specifications, which may be relevant to your case. We can also provide a sworn statement if needed.

Do you offer consulting on an hourly basis?

For small reviews or specific questions, we can work on an hourly basis. Most clients prefer a fixed fee based on project size and scope. We provide a quote after reviewing the documents. Contact us for a proposal. Hourly consulting is best for targeted questions, such as verifying a single trade's quantities or reviewing a change order. For a comprehensive estimate review, a fixed fee gives you cost certainty. We will recommend the best approach after understanding your needs and the project complexity.

What if I disagree with your review comments?

We welcome discussion. If you have information we do not, such as a quote or a clarification, we will revise our comments. The goal is an accurate estimate. We document our reasoning so you can see how we arrived at each comment. For example, if you have a subcontractor quote that justifies a higher unit price, we will update our comment to reflect that. We do not insist on our initial findings; we adjust based on evidence. This collaborative approach ensures the final estimate is as accurate as possible.

Do you review estimates for projects outside the U.S.?

We focus on U.S. projects and pricing. For international projects, we can review quantities and scope, but pricing may require local data. We will tell you upfront if we can provide a meaningful review. Our cost databases, such as RSMeans, are U.S.-based, so we cannot provide accurate pricing for other countries without local input. However, we can still check quantity takeoffs, scope gaps, and specification compliance. If you have local pricing, we can incorporate it. Contact us to discuss your project location and needs.

How do you ensure accuracy in your review?

We use a systematic process: document intake, quantity spot-checks, pricing audit, scope gap review, and a written report. We cross-check quantities against drawings and specifications. We also use software like Bluebeam Revu and PlanSwift for measurement. Our comments are tied to drawing sheets and CSI sections. For example, we might verify concrete volumes by recalculating from dimensions and comparing to the estimate. We also check that waste factors and unit conversions are correct. Our goal is to provide you with a reliable second opinion.

What are construction takeoff services and how do they differ from a review?

Construction takeoff services produce quantities from drawings, usually as a material takeoff organized by CSI division. A review audits quantities and pricing you already have. In a takeoff, we measure square foot, linear foot and pounds per square foot from the plan set, then price labor and material. In a review, we compare your numbers to the drawings and flag differences. If you need production quantities, start with takeoff; if you need a second opinion, send the estimate.

How does construction cost estimating handle labor and material pricing?

Construction cost estimating combines quantity takeoff with labor and material pricing. We use ZIP-code-adjusted RSMeans data and recent quotes, then apply productivity factors by trade. For division 03 concrete, we check formwork, reinforcement and finish rates. For division 26 electrical, we verify fixture counts and conduit runs. The output is a bid package with line items you can defend. We do not invent numbers; we show the basis for each rate.

What does a construction estimating company need to start an outsourced construction estimating review?

A construction estimating company needs the plan set, specifications, bid form and your current estimate in Excel or PDF. We also ask for the project address, bid date and any subcontractor quotes. We work in Bluebeam Revu, PlanSwift and RSMeans data, and we can review an on-screen takeoff. Turnaround is 24–48 hours for most projects, with rush available. If you need ongoing support, we can act as your outsourced construction estimating team.

What are material takeoff services and how do they differ from a construction cost consultant review?

Material takeoff services produce quantities from the drawings: square footage of slab, linear feet of pipe, each count of fixtures. A construction cost consultant review starts from quantities you already have and tests them against the plan set, addenda and RFIs. We check unit errors, duplicate lines and missing scope, then price the corrected quantities with ZIP-code-adjusted RSMeans data. The deliverable is a marked-up plan set with division-by-division comments, not a new takeoff.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning. is a Senior Estimator with more than 15 years of professional experience in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Guides on this topic

Send your estimate for review

Send your plans, specs and current estimate for a line-by-line consulting review and get comments on quantities, pricing and risk.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote
Call Us