Quantity Surveyor Services

Send your drawings and specifications. We return measured quantities and pricing organized by CSI MasterFormat division, with marked-up plan sets, in Excel and PDF.

24–48 hours for most projectsTypical turnaround
Excel + marked-up PDFsOrganized by CSI section
ZIP-code pricingLocal material and labor
Price confirmed firstBefore any work starts
Sample estimate sheet
Division 03 — ConcreteSample format
Line itemQtyUnitConcrete
Continuous footing 24" × 12"412LF30.5 CY
Slab-on-grade 5" thick18,400SF283.9 CY
Elevated slab 8" thick9,200SF227.2 CY
Column 16" × 16" × 10'24EA18.9 CY
Formwork, slab edges1,240LF—
Total concrete560.5 CY
Illustrative quantities. Waste factor applied as a separate line.
Formwork separated from volume

What are quantity surveyor services?

Quantity surveyor services produce a measured bill of quantities: line items organized by CSI MasterFormat division, measured in U.S. customary units, and priced with ZIP-code-adjusted material and labor rates. You send PDFs or native files; we return Excel workbooks, PDF summaries, and marked-up plan sets in 24–48 hours for most projects.

  • Quantities are measured in LF, SF, CY, EA, and MBF, then converted to pricing units.
  • Typical waste factors range from 5% for concrete to 10% for masonry and drywall.
  • The most common costly miss is formwork and shoring separated from concrete volume.

If you search for quantity surveyor services, you likely work with UK, Australian, or Canadian QS terminology and need measured quantities and pricing for a U.S. project. We provide that service in the format U.S. contractors, developers, architects, and owners expect: line items organized by CSI MasterFormat division, measured in U.S. customary units, priced with ZIP-code-adjusted material and labor rates. You send PDFs or native files; we return Excel workbooks, PDF summaries, and marked-up plan sets in 24–48 hours for most projects.

Deliverable
Excel estimate + marked-up PDF plans
Organized by
CSI MasterFormat section
Turnaround
24–48 hours for most projects
Pricing
ZIP-code-adjusted material and labor pricing
Software
Bluebeam Revu, PlanSwift, RSMeans data

Our takeoff is not a black-box number. Each line shows the drawing sheet it came from, the spec section that governs it, the measured quantity, and the unit. For example, concrete footings are measured in LF and converted to cubic yards using the dimensions on the foundation plan, while formwork is measured separately in square feet so you can see the labor and material split. We use Bluebeam Revu for markup, PlanSwift for on-screen takeoff, and RSMeans data for unit cost pricing. If you have Cubit files, we can work from those exports as well.

This service overlaps with our quantity takeoff services and construction cost estimating services, but it is built for clients who need a QS-style measured bill of quantities rather than a bid-ready estimate. If you need a second opinion on an existing estimate, see our estimate review and second-opinion audit. For early-stage budgets, start with cost planning and feasibility studies.

As a quantity surveying company, we support bid preparation and scope of work reviews across CSI divisions, including Division 03 concrete, Division 05 metals, Division 09 finishes, Division 22 plumbing, and Division 26 electrical. We also provide construction estimator services and quantity takeoff and estimating for subcontractor takeoff services, with parametric estimating available when drawings are incomplete. We track addendum and AIA G702 schedule of values requirements, and our takeoff software supports MasterFormat 2020. For safety and site logistics, we reference OSHA guidance where it affects quantities.

Services

What our outsourced quantity surveying includes

We measure and price the work shown in your drawings and specifications. The output is a bill of quantities by CSI MasterFormat division, with quantities traceable to sheet references. We do not design, specify, or approve substitutions. If a detail is unclear, we flag it as an RFI item rather than assume.

Concrete & Formwork

Footings, walls, slabs, and elevated decks measured in CY, with formwork and rebar separated in SF and LF.

CY · SF · LF

Masonry & Stone

CMU and brick veneer wall area, mortar, grout, reinforcement, and flashing measured by wall type.

SF · LF · EA

Structural Steel

Columns, beams, joists, and decking measured by member size and tonnage, with connections counted.

TON · EA · SF

Rough Carpentry

Framing lumber in MBF, sheathing in SF, blocking in LF, and trusses by count and span.

MBF · SF · LF

Thermal & Moisture

Insulation, air barrier, roofing membrane, flashing, and sealants measured by area and linear feet.

SF · LF · EA

Openings & Glazing

Doors, frames, hardware sets, and glazing measured by type, size, and count, with fire ratings noted.

EA · SF

Finishes

Drywall, flooring, base, paint, and ceilings measured by room and finish schedule, with waste factors applied.

SF · LF · EA

MEP Rough-In

Plumbing, HVAC, and electrical quantities measured by fixture, linear feet of pipe, and device count.

EA · LF · TON

What every quantity surveyor takeoff includes

  • Measured quantities by CSI MasterFormat division (Divisions 01–49 as applicable)
  • Unit rates for material and labor, ZIP-code adjusted
  • Formwork, shoring, and rebar separated from concrete volume
  • Masonry wall area, brick veneer, mortar, and grout quantities
  • Structural steel tonnage by member size, including decking
  • Rough carpentry framing (MBF), sheathing (SF), and blocking (LF)
  • Thermal and moisture: insulation, air barrier, roofing, flashing
  • Openings: doors, frames, hardware sets, and glazing
  • Finishes: drywall, flooring, base, paint, and ceilings
  • Plumbing, HVAC, and electrical rough-in quantities
  • Sitework: cut/fill, paving, curb, and storm drainage
  • Marked-up plan sets and Excel/PDF deliverables
How we work

How we take off your project

  1. Document review and setupWe log the drawing set, note the latest revision date, and confirm the spec sections you want priced. We set up a PlanSwift file with the architectural, structural, and MEP sheets aligned. If you provide a BIM model, we link it to our [BIM estimating services](/bim-estimating-services/) workflow. We also verify that the drawings are at a consistent scale and that all sheets listed on the cover sheet are present. Missing sheets are noted as RFI items before we proceed.
  2. Quantity extraction by tradeWe measure concrete footings in LF and convert to CY using the dimensions on S-101, then measure formwork in SF separately. For masonry, we measure wall area in SF and deduct openings larger than 10 SF. Rebar is taken off by bar size and lap length from the structural notes. We follow a standard sequence: foundations, vertical structure, horizontal structure, envelope, interiors, and MEP. Each quantity is tagged with the sheet number and grid line for traceability.
  3. Pricing and waste factorsWe apply ZIP-code-adjusted material and labor rates from RSMeans data. Waste factors are added as separate lines: typically 5–10% for rebar, 5% for concrete, 10% for drywall, and 7–10% for roofing. You can see and adjust each factor. We also include sales tax where applicable and note any prevailing wage requirements. If you have your own productivity rates or supplier quotes, we can incorporate them into the pricing.
  4. Quality check and RFI logA second estimator cross-checks quantities against the drawings, focusing on common misses like wall openings, roof penetrations, and fire-rated assemblies. We produce an RFI log listing unclear details so you can resolve them before pricing. The check includes a comparison of our quantities to any provided by the design team, and a review of the spec sections for items that are specified but not shown on the drawings. Discrepancies are flagged with a recommended action.
  5. Deliverable assemblyWe organize the bill of quantities by CSI MasterFormat division in Excel, with a PDF summary and marked-up plan sets. Each line includes the quantity, unit, unit rate, and total. The workbook is structured so you can sort by division or trade. We also include a basis of estimate document that states the pricing date, RSMeans data version, and any assumptions. Marked-up plans are color-coded by trade for easy review.
  6. Review and supportAfter delivery, we schedule a review call to walk through the bill of quantities and answer your questions. We can adjust quantities or pricing based on your feedback, and we provide a revised deliverable within one business day. If you need ongoing support, we offer a [dedicated construction estimator](/dedicated-construction-estimator/) who can attend project meetings and update the estimate as the design evolves. We also provide a [change order estimating](/change-order-estimating/) service for scope changes after the initial takeoff.

What we need from you

  • Drawing setPDF or native files of architectural, structural, civil, and MEP sheets. Include the latest revision and any addenda.
  • SpecificationsProject manual or spec sections, especially Divisions 03–09, 22, 23, and 26. We need to know material types and installation requirements.
  • Schedule of finishesRoom finish schedule and door/window schedules. These drive quantities for flooring, paint, and openings.
  • Site plan and surveyGrading plan, utility plan, and survey with spot elevations. Needed for cut/fill, paving, and site utilities.
  • Project locationZIP code or city and state for material and labor pricing adjustments.
  • Bid date or deadlineLet us know your deadline so we can schedule turnaround. Rush service is available.
Sample output

Sample bill of quantities

Below is an excerpt from a mid-size commercial project. Quantities are illustrative and show the level of detail you receive.

Sample format — illustrative quantities
SectionLine itemQtyUnitRef.
03 30 00Concrete, slab-on-grade, 5" thick, 4000 psi18,400SFS-101
03 30 00Concrete, elevated slab, 8" thick, 4000 psi9,200SFS-102
04 20 00CMU wall, 8" normal weight, reinforced12,500SFA-201
05 12 00Structural steel, W12×26 beams18.5TONS-301
06 10 00Wood framing, 2×6 studs at 16" o.c.8.2MBFA-202
07 21 00Batt insulation, R-19, walls12,500SFA-501
08 11 13Hollow metal door, 3'-0" × 7'-0"24EAA-601
09 29 00Gypsum board, 5/8" type X, walls22,000SFA-401
09 30 13Ceramic tile, floors3,200SFA-402
22 11 16Domestic water piping, type L copper1,850LFP-101
23 31 00Ductwork, galvanized steel, rectangular4,200LBM-101
26 05 19Conduit, EMT, 3/4"6,500LFE-101

Units of measure we use

We measure in U.S. customary units and state the drawing reference for each quantity. The table below shows the units you will see in our bill of quantities.

ItemUnitHow it's measured
Concrete, earthwork, fillCYVolume from plan dimensions; footing length × width × depth ÷ 27
Formwork, drywall, flooring, roofing, paintSFArea from plan or elevation; openings deducted above a threshold
Piping, conduit, base, joint sealantsLFLinear run measured along centerline on plan or riser diagram
Fixtures, doors, windows, equipmentEACounted from schedules, plans, and details
Structural steel, rebarTONWeight calculated from member sizes and lengths; laps included
LumberMBFBoard feet from framing plans; nominal sizes used
Roofing membraneSQ100 SF per square; waste factor applied separately
CoatingsGALCoverage rate from manufacturer data; number of coats specified
LaborHRLabor hours from RSMeans data or your productivity rates

Worked example: takeoff of a concrete footing and stem wall

This example shows how we measure a continuous footing and stem wall from a foundation plan. The dimensions are illustrative and do not represent a specific project. We use Bluebeam Revu for markup, PlanSwift for quantity extraction, and RSMeans data for pricing. All quantities are organized by CSI MasterFormat division.

Given:

  • Footing: 24" wide × 12" deep, total length 180 LF (measured along grid line A–1 to A–7)
  • Stem wall: 8" thick × 4' high, same length
  • Waste factor: 5% for concrete
  • Rebar: #4 bars, 10% waste

Step 1 — Footing volume

  • Convert dimensions to feet: 24" = 2.0', 12" = 1.0'
  • Cross-sectional area = 2.0' × 1.0' = 2.0 SF
  • Volume = 2.0 SF × 180 LF = 360 CF
  • Convert to CY: 360 CF ÷ 27 = 13.33 CY

Step 2 — Stem wall volume

  • Thickness = 8" = 0.667'
  • Cross-sectional area = 0.667' × 4.0' = 2.668 SF
  • Volume = 2.668 SF × 180 LF = 480.2 CF
  • Convert to CY: 480.2 CF ÷ 27 = 17.79 CY

Step 3 — Total concrete volume

  • Footing + stem wall = 13.33 + 17.79 = 31.12 CY

Step 4 — Formwork area

  • Footing sides: 2 sides × 1.0' high × 180 LF = 360 SF
  • Stem wall sides: 2 sides × 4.0' high × 180 LF = 1,440 SF
  • Total formwork = 1,800 SF

Step 5 — Rebar

  • Footing: 4 #4 bars continuous, plus #4 stirrups at 12" o.c.
  • Longitudinal: 4 bars × 180 LF = 720 LF
  • Stirrups: (180 LF ÷ 1 LF) + 1 = 181 EA; each stirrup length ≈ 2' (perimeter) → 362 LF
  • Total #4 rebar = 720 + 362 = 1,082 LF
  • Weight: #4 bar = 0.668 lb/LF → 1,082 × 0.668 = 723 lb = 0.36 TON
  • Add 10% waste: 0.36 × 1.10 = 0.40 TON

Step 6 — Apply waste to concrete

  • Concrete with 5% waste: 31.12 CY × 1.05 = 32.68 CY

Step 7 — Summary

  • Concrete: 32.68 CY
  • Formwork: 1,800 SF
  • Rebar: 0.40 TON

This level of detail lets you see exactly how each quantity was derived and adjust waste factors or dimensions as needed. For a complete bill of quantities with ZIP-adjusted pricing, send us your drawings. If you need to track changes after the initial takeoff, our change order estimating service can update quantities as the design evolves. For projects requiring ongoing cost control, we also offer project cost control and reporting.

Cost drivers

What drives cost in a quantity surveying company estimate

Relative impact on a typical estimate for this trade, based on estimator judgment. Select a bar for details.

Scale: 1 = minor, 5 = major relative impact. Estimator judgment, not measured data.
Relative impact 5 / 5

Material selection

Structural system choice (steel vs. concrete vs. wood) changes both material and labor. For example, a steel frame may reduce foundation cost but adds fireproofing. We price the specified system and note alternatives. Material grades, finishes, and manufacturer selections also affect unit rates. We use RSMeans data and local supplier quotes to refine pricing for specific products.

Material selection

Structural system choice (steel vs. concrete vs. wood) changes both material and labor. For example, a steel frame may reduce foundation cost but adds fireproofing. We price the specified system and note alternatives. Material grades, finishes, and manufacturer selections also affect unit rates. We use RSMeans data and local supplier quotes to refine pricing for specific products.

Site conditions

Soil bearing capacity, water table, and access affect earthwork, dewatering, and foundation design. A geotechnical report is essential for accurate CY of cut/fill and backfill. We also consider laydown areas, temporary roads, and utility relocations. If the site is tight, we add allowances for hand excavation and shoring. These factors can increase sitework cost by 15–25%.

Labor market

Union vs. open shop, prevailing wage, and local productivity affect labor hours. We adjust RSMeans data with ZIP-code factors and your input on labor rates. For prevailing wage projects, we apply Davis-Bacon rates or state equivalents. Overtime and shift work are priced separately. Labor availability can also affect crew sizes and durations, which we reflect in the estimate.

Code requirements

Fire ratings, seismic zones, and energy code affect material quantities (e.g., fire-rated drywall, insulation R-values). Confirm the adopted code edition with the local building department. For example, IECC climate zone determines insulation thickness, and seismic design category affects rebar detailing and hold-downs. We review the code summary on the drawings and adjust quantities accordingly.

Schedule and phasing

Accelerated schedules may require overtime or shift work, increasing labor cost. Long-lead items may need expedited freight. We can include these as separate allowances. Phased occupancy may require temporary partitions and separate utility connections. We also consider seasonal restrictions, such as winter heating and temporary enclosures. These factors are priced as general conditions or separate line items.

Waste factors

Typical waste ranges: 5–10% for rebar, 5% for concrete, 10% for drywall, 7–10% for roofing. We apply them as visible lines so you can adjust based on your crew's experience. Waste factors vary by material and installation method; for example, tile waste can be 10–15% for complex layouts. We also account for packaging and breakage.

Market volatility

Material prices for steel, lumber, and copper can fluctuate significantly. We use the latest RSMeans data and note the pricing date. For long-duration projects, we can include escalation allowances or commodity index adjustments. We also monitor tariffs and supply chain disruptions that may affect lead times and costs. You can request a sensitivity analysis for key materials.

Scope gaps

Common scope gaps we catch

These items are frequently missed in takeoffs and estimates. We flag them so you can include them in your bid or budget.

  • Formwork and shoring are often lumped into concrete volume. We separate them because formwork can be 40–60% of the concrete cost. We measure formwork area in SF and price it separately.
  • Rebar lap lengths and waste are sometimes ignored. We calculate laps from the structural notes and add a typical 5–10% waste factor. This can add 1–2 tons on a mid-size project.
  • Wall openings affect drywall, insulation, and paint quantities. We deduct openings larger than 10 SF and add for corner bead and trim. Missing this overstates finishes by 5–8%.
  • Fire-rated assemblies require firestopping and fire dampers. These are often in Division 07 or 23 but missed in takeoff. We cross-check the life safety plan and spec sections.
  • Roof penetrations, curbs, and flashing are not just roofing. They require coordination with mechanical and electrical. We measure flashing in LF and include curb details from the roof plan.
  • HVAC duct insulation and vibration isolation are often omitted. We include them based on the mechanical spec and detail drawings. They can add 10–15% to the mechanical cost.
  • Electrical conduit fill and wire derating affect wire size and quantity. We review the panel schedules and feeder schedules to ensure conduit and wire quantities match the design.
  • Site utility connections and tap fees are sometimes excluded. We include them as allowances if the utility company has not provided a quote. Confirm fees with the local utility.
  • Temporary facilities and general conditions are not always in the scope. We can include them as a separate division if you provide the requirements.
  • Sales tax on materials and prevailing wage impacts vary by state. We apply the appropriate rate based on the project location. For state-specific pages, see [Texas](/texas-construction-estimating-services/), [California](/california-construction-estimating-services/), [Florida](/florida-construction-estimating-services/), [New York](/new-york-construction-estimating-services/), or [North Carolina](/north-carolina-construction-estimating-services/).
  • Freight and delivery for long-lead items can be significant. We add allowances for items like switchgear, elevators, and custom millwork.
  • Testing and inspection allowances are often overlooked. We include a line item for special inspections, concrete testing, and commissioning if required by spec.

Material options and cost drivers

Material selection significantly impacts cost. This table compares common options for structural and envelope systems, showing typical units and key cost drivers.

Material / systemCommon unitTypical waste factorKey cost drivers
Cast-in-place concreteCY5%Formwork complexity, reinforcement density, pump vs. crane, finish requirements
Structural steelTON3–5%Connection details, fireproofing, erection labor, galvanizing
Wood framingMBF5–10%Lumber species and grade, spans, sheathing type, labor productivity
CMU masonrySF5–8%Wall height, reinforcement, grout fill, scaffolding, finish
Brick veneerSF7–10%Pattern, mortar color, ties, flashing, shelf angles
Metal stud framingSF10%Gauge, spacing, height, bracing, openings
Gypsum boardSF10%Thickness, type (X, moisture-resistant), layers, finish level
TPO roofingSQ7–10%Membrane thickness, attachment method, insulation, flashing details
Copper pipingLF5%Diameter, wall thickness, fittings, joining method, insulation
Codes and standards

Codes and standards that affect quantities

Model codes

Model codes set minimum requirements that directly change material quantities. The IBC and IRC govern structural, fire, and life safety provisions. For concrete, ACI 318 is referenced for reinforcement details, which affects rebar tonnage. The IECC sets insulation R-values and air barrier requirements by climate zone, changing insulation and sealant quantities. The NEC dictates conduit fill and wire sizing, impacting electrical counts. The IPC and UPC set pipe sizing and fixture counts. NFPA 13 governs sprinkler layout, affecting pipe and head quantities. Confirm the adopted code edition with the local building department, as editions vary by jurisdiction.

Industry standards

Industry standards provide measurement and installation rules that estimators must follow. ACI 318 and ACI 301 detail concrete construction and formwork. ASTM standards cover material specifications (e.g., ASTM A615 for rebar, ASTM C90 for CMU). SMACNA standards govern ductwork fabrication and installation, affecting sheet metal quantities. GA-216 provides drywall installation requirements, including fastener spacing and joint treatment. NRCA guidelines cover roofing installation, including flashing and membrane attachment. These standards influence waste factors, overlap, and accessory quantities.

Specification sections

Specification sections define the scope and quality of work. For concrete, Section 03 30 00 states mix designs, reinforcement, and finish requirements. Section 04 20 00 covers CMU, including reinforcement and grout. Section 05 12 00 defines structural steel, including connections and fireproofing. Section 06 10 00 covers rough carpentry, including framing and sheathing. Section 07 21 00 specifies insulation, including R-values and installation. Section 08 11 13 details hollow metal doors and frames. Section 09 29 00 covers gypsum board, including types and finishes. Section 22 11 16 specifies plumbing piping materials. Section 23 31 00 defines ductwork, including insulation. Section 26 05 19 covers conduit and wire. Estimators must read these sections to capture all specified components, as omissions lead to scope gaps.

Local amendments

Local jurisdictions often amend model codes, changing requirements that affect quantities. For example, some areas require stricter energy codes, increasing insulation thickness. Seismic zones may require additional rebar and hold-downs. Fire codes may mandate sprinklers in more building types. Wind-borne debris regions require impact-resistant glazing. These amendments vary by state, county, and city. Always confirm the adopted code edition and local amendments with the local building department before finalizing quantities. We review the code summary on your drawings and adjust the takeoff accordingly. For a detailed review of your estimate against code requirements, consider our estimate review and second-opinion audit service. If you need ongoing cost control, see our project cost control and reporting.

Who we provide estimates for

Who uses our quantity takeoff for contractors

General contractors

You need accurate quantities to price a hard bid or negotiate a contract. Our bill of quantities gives you a defensible basis for your number and helps you identify scope gaps before you commit.

Subcontractors

You want to verify quantities in your trade before submitting a bid. We provide trade-specific takeoffs with marked-up plans so you can see exactly what we measured and where.

Developers

You need a reliable cost baseline for pro formas and construction loans. Our estimate helps you compare bids and track changes. For ongoing cost control, see [project cost control and reporting](/construction-cost-control/).

Architects

You want to check that your design is within the owner's budget. We provide elemental cost breakdowns and can review your design against cost targets. For early-stage budgets, see [cost planning and feasibility studies](/feasibility-study-estimating/).

Owners

You need an independent estimate to validate contractor pricing. Our second-opinion audit can review an existing estimate and identify missing scope. See [estimate review and second-opinion audit](/estimate-review-services/).

Where we provide estimates

Quantity Surveyor in 20 states

Pricing is adjusted to the project ZIP code. Select a highlighted state to see the cities we cover there.

States we coverSelected
TX

Quantity Surveyor in Texas

Nation's largest construction market; Sun Belt population growth, data centers, semiconductor plants, and single-family home building.

Texas estimating services
Property types

Project types and what changes in the takeoff

The takeoff approach varies by project type. Below are common project types we handle and the key differences you should expect.

Commercial office building

Core and shell takeoff with separate tenant improvement allowances; MEP systems measured by riser diagrams and schedules.

Watch for: Watch for future tenant loads and separate metering; coordinate with landlord scope.

Multifamily residential

Repetitive unit takeoff with typical floor plans; quantity multipliers per unit type; exterior envelope measured by elevation.

Watch for: Watch for unit mix changes and balcony/ corridor details; sound insulation requirements add cost.

Industrial warehouse

Large open floor slabs, tilt-up or pre-engineered metal buildings; sitework often dominates.

Watch for: Watch for slab flatness requirements, column spacing, and fire protection for high-piled storage.

Healthcare facility

Complex MEP and medical gas systems; specialized finishes and equipment; strict code compliance.

Watch for: Watch for infection control during construction, shielding, and redundant systems.

K-12 school

Multiple buildings with similar classroom modules; extensive sitework and playgrounds; prevailing wage often applies.

Watch for: Watch for summer break scheduling, durable finishes, and security systems.

Retail shell

Simple structural and envelope; MEP often minimal for shell; tenant fit-out separate.

Watch for: Watch for storefront glazing, signage, and landlord work letter requirements.

Hotel

Guest room modules repeated; back-of-house and public areas; extensive MEP and finishes.

Watch for: Watch for FF&E coordination, sound insulation, and sprinkler layout in guest rooms.

Deliverables

What you receive

  • Excel workbook with quantities and pricing organized by CSI MasterFormat division, including unit rates and totals.
  • PDF summary report with a division-level roll-up and a list of assumptions and exclusions.
  • Marked-up plan sets showing measured areas, lengths, and counts with color-coded annotations by trade.
  • RFI log listing unclear details and missing information that could affect quantities or pricing.
  • Waste factor summary showing the percentage applied to each material and the resulting quantity.
  • Basis of estimate document stating the pricing date, RSMeans data version, and ZIP-code adjustments.
  • Optional: [schedule of values preparation](/schedule-of-values-preparation/) for progress billing, if requested.
Checklist

Pre-bid checklist for quantity surveyor services

  • Verify drawing set is complete and latest revision.
  • Check that all spec sections are included.
  • Confirm project ZIP code for pricing adjustments.
  • Review finish schedules for room-by-room quantities.
  • Check structural notes for rebar lap and waste requirements.
  • Verify roof plan for penetrations and flashing details.
  • Review mechanical schedules for equipment and duct sizes.
  • Check electrical panel schedules for feeder and conduit sizes.
  • Confirm site utility connection fees with local utility.
  • Note any prevailing wage or union requirements.
  • Identify long-lead items for freight allowances.
  • Confirm bid date to schedule turnaround.
Client reviews

What clients say about Scope Precision Estimate

10 client reviews
AW
Andrew WilsonGeneral Contractor

Highly recommended for construction cost estimating. The quantities were accurate, the pricing was well organized, and the final report was easy to review.

MD
Matthew DavisConstruction Manager

Their construction estimate was thorough and professionally prepared. It made our budgeting process much easier and helped us identify potential cost issues early.

CM
Christopher MillerResidential Builder

We needed a quick and accurate construction cost estimate, and they delivered exactly what we needed. Great attention to detail and a very responsive team.

BT
Brian TaylorProject Estimator

Fast, accurate, and dependable estimating service. They understood the project requirements quickly and provided a detailed estimate without unnecessary delays.

RW
Robert WilliamsEstimating Manager

Professional and reliable estimating service. The detailed quantity takeoff helped us reduce pricing errors and submit our proposal on time.

JR
James RichardsonConstruction Project Manager

Excellent construction estimating service. The team provided a comprehensive takeoff and cost breakdown that saved us hours of manual work.

FAQ

Quantity Surveyor questions

What is the difference between a quantity surveyor and a construction estimator?

In U.S. practice, a quantity surveyor focuses on measuring and quantifying materials and labor from drawings, often producing a bill of quantities. A construction estimator uses those quantities to build a full bid, including indirect costs, overhead, and profit. Our service provides the measured quantities and unit rates, which you can use as the basis for your estimate. We also offer full estimating services if you need a complete bid package. For a detailed comparison, see our construction estimating services page.

Do you provide unit rates for materials and labor?

Yes. We apply ZIP-code-adjusted material and labor rates from RSMeans data. Each line item includes a unit rate and total. You can see how the rate was derived and adjust it if you have specific supplier quotes or productivity rates. We also note the pricing date and data version so you can assess currency. For specialized trades, we may supplement with our own historical data. If you need a full bid with indirect costs, consider our bid estimating services.

How do you handle waste factors?

We apply waste factors as separate lines so you can see the percentage and resulting quantity. Typical waste ranges: 5–10% for rebar, 5% for concrete, 10% for drywall, and 7–10% for roofing. You can adjust these based on your crew's experience or project conditions. We also account for packaging and breakage where relevant. For example, tile waste may increase for diagonal layouts. Waste factors are applied per material and noted in the basis of estimate. See our material takeoff services for more details.

Can you take off from BIM models?

Yes. If you provide a BIM model, we can extract quantities directly from it using our BIM estimating workflow. This can be faster and more accurate for complex projects. We link the model to our estimating software and verify quantities against the drawings. We also check for model completeness and note any discrepancies. See our BIM estimating services for more details. For projects without a model, we use traditional takeoff from PDFs.

What is your turnaround time?

Most projects are delivered within 24–48 hours. Rush service is available for an additional fee. The actual turnaround depends on the project size and complexity. We will confirm the schedule when you send the documents. For large projects, we may provide a phased delivery. We also offer dedicated estimator support for ongoing projects. Contact us to discuss your schedule.

How do you handle missing information?

We flag unclear details as RFI items in a log. This allows you to resolve them before finalizing your bid. We do not make assumptions that could affect quantities without noting them. The RFI log is included with the deliverable. We also cross-check drawings and specifications for inconsistencies. For example, if a wall type is shown on the plan but not detailed, we will note it. This helps you avoid scope gaps.

Do you provide marked-up plans?

Yes. We provide marked-up plan sets showing measured areas, lengths, and counts with color-coded annotations by trade. This helps you trace each quantity back to the drawing. The markups are in PDF format and can be overlaid on your original drawings. We use Bluebeam Revu for markup. Each markup includes a label with the quantity and unit. This is especially useful for verifying complex areas.

Can you review an existing estimate?

Yes. Our estimate review and second-opinion audit service can check an existing estimate for missing scope, quantity errors, and pricing inconsistencies. We provide a report with findings and recommendations. This is useful for validating contractor bids or internal estimates. We compare your estimate to our independent takeoff. We also check for compliance with specifications. The review is typically completed within 3–5 business days.

What software do you use?

We use Bluebeam Revu for markup, PlanSwift for quantity extraction, and RSMeans data for pricing. For BIM projects, we use appropriate model-checking tools. The deliverables are provided in Excel and PDF formats, organized by CSI MasterFormat division. We can also provide quantities in a format compatible with your estimating software. Our team is proficient in a range of industry-standard tools. Let us know if you have specific software requirements.

Do you offer ongoing support?

Yes. We offer a dedicated construction estimator who can attend project meetings and update the estimate as the design evolves. We also provide change order estimating for scope changes after the initial takeoff. This ensures your estimate stays current throughout the project. For long-term projects, we can set up a regular update schedule. See our dedicated estimator service for more details.

How do you handle sales tax and prevailing wage?

We apply sales tax based on the project location and material type. For prevailing wage projects, we use Davis-Bacon rates or state equivalents. We note any assumptions in the basis of estimate. You should confirm specific tax rates and wage determinations with your local authorities. We can also adjust for union labor rates if required. For projects in multiple jurisdictions, we apply rates by location.

What if I need a schedule of values?

We can prepare a schedule of values for progress billing as an optional add-on. This organizes the estimate into billing line items that align with your contract. See our schedule of values preparation service for more details. We can also link the schedule of values to your project cost control system. This helps you track billing and costs throughout construction. The schedule of values is typically provided in Excel format.

How do construction takeoff services differ from full estimating?

Construction takeoff services measure quantities from drawings and specs, while full estimating adds labor, material, equipment, and markup to produce a bid price. Our takeoff delivers line items by CSI MasterFormat division with units such as square feet, cubic yards, and each. You get the measured scope of work, and we can extend it with unit cost pricing if you need a complete estimate. This is useful when you have your own pricing but need accurate quantities for bid preparation.

Can you provide quantity takeoff for contractors who self-perform?

Yes. Quantity takeoff for contractors is our core service. We measure from your PDFs or native files using PlanSwift and Bluebeam Revu, then organize results by CSI divisions such as Division 03 concrete, Division 05 metals, and Division 26 electrical. You receive Excel and PDF deliverables with marked-up plans. This helps self-performing contractors verify scope of work, reduce waste, and prepare accurate bids without hiring a full-time estimator.

What does a quantity surveyor for developers provide?

A quantity surveyor for developers provides cost planning, parametric estimating, and detailed takeoffs to support feasibility studies and budget approvals. We measure quantities in square feet, cubic yards, and other units, then apply ZIP-code-adjusted pricing. Deliverables include Excel workbooks and PDF summaries organized by MasterFormat 2020. We also assist with AIA G702 schedule of values and change order estimating. This gives developers reliable numbers for pro formas and lender packages.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning. is a Senior Estimator with more than 15 years of professional experience in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Guides on this topic

Get your quantity surveyor estimate

Send your drawings and specifications to receive a bill of quantities with ZIP-adjusted pricing in 24–48 hours.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote