Sitework takeoff
Clearing, demolition, cut and fill, and storm drainage for Peninsula lots with high water tables and tidal influence.
CY · LF · TONWe produce CSI MasterFormat takeoffs and estimates for Hampton contractors, developers and owners. Send your plans and we return Excel and PDF quantities with marked-up plan sets, typically in 24–48 hours.
Hampton pricing turns on tidal flood-zone elevation and pile or helical foundation work, coastal wind and roof uplift details, older downtown and Phoebus building stock, and military and port-driven scopes. ZIP-code-adjusted material and labor pricing plus RSMeans data keep your numbers tied to the Peninsula market rather than a statewide average.
Hampton sits on the Virginia Peninsula between the Chesapeake Bay and Hampton Roads harbor, so nearly every takeoff here carries coastal risk: flood-zone elevation, wind-borne debris requirements, and foundations that often need piles or helical piers instead of spread footings. We build those items into the estimate as line items, not allowances. If you bid across the water, our Newport News construction estimating and Portsmouth construction estimating pages cover the same labor market.
We work from your PDF plan sets in Bluebeam Revu and PlanSwift, price with RSMeans data adjusted by ZIP code, and deliver Excel and PDF quantities organized by CSI MasterFormat division with marked-up plan sets. Most projects return in 24–48 hours; rush turnaround is available. Typical work includes single-family infill, multifamily and mixed-use, and the industrial and federal-adjacent scopes that follow the port and Langley. For statewide context, see our Virginia construction estimating page.
For bidders. You need division-level quantities fast enough to price a hard bid. We return takeoffs with waste factors and unit costs you can drop into your own spreadsheet, plus marked-up plans showing what we measured.
For builders. You are buying out trades and want to check sub quotes against a second set of quantities. We break out concrete, framing, roofing, MEP and sitework so you can see where a number is thin.
For owners. You need a budget before design is finished. We estimate from schematic drawings, flag scope gaps, and give you a basis-of-estimate you can hand to a lender or a design team.
Select a bar to compare Hampton with the largest Virginia markets we cover.
100 new housing units in 2025 (+47.1% vs 2024).
100 single-family · 0 multifamily (0%).
Hampton issued permits for 100 new privately-owned residential units in 2025, up from 68 in 2024 — about a 47% increase, per the U.S. Census Bureau Building Permits Survey. All 100 units were single-family; multifamily was zero. Permitted value was $19M, averaging $185,500 per unit. That mix tells you the current pipeline is detached and small-scale infill rather than apartment towers, so your estimating effort goes into repeated single-family takeoffs, lot-specific sitework, and per-unit utility connections. Hampton ranked 17 of 25 among the covered Virginia cities by units, at 1% of the 10,138 statewide units. For a broader read on where the volume sits, see our Virginia construction estimating page.
Zero multifamily permits in 2025 does not mean no multifamily work is coming. Peninsula demand tied to the port, Langley and the shipyard keeps pressure on rental housing, and projects often surface through rezoning and site plan review before they appear as permits. If you are pricing a multifamily or mixed-use job, the cost drivers are different: elevated first floors, pile caps, parking structures, and longer MEP runs. Our multi-family estimating services and commercial estimating services pages cover those scopes. Compare labor assumptions against Suffolk construction estimating and Richmond construction estimating if you bid outside the Peninsula.
We measure, price and document the scopes Hampton contractors actually build, from lot clearing to final connections.
Clearing, demolition, cut and fill, and storm drainage for Peninsula lots with high water tables and tidal influence.
CY · LF · TONPile, helical pier and grade beam quantities for coastal soils, plus slab-on-grade and crawlspace alternates.
EA · CY · LFFootings, stem walls, slabs, driveways and sidewalks, with formwork and reinforcement broken out separately.
CY · SF · LBWall, floor and roof framing with coastal wind and uplift hardware counted as separate line items.
LF · EA · BFShingle, metal and low-slope systems with underlayment, flashing and wind-rated fastening schedules.
SQ · LFPlumbing, HVAC and electrical rough-in quantities for single-family infill and light commercial fit-outs.
LF · EA · TONFull-house takeoffs from permit sets, with waste factors and ZIP-adjusted material and labor pricing.
SF · EAWarehouse, yard and port-adjacent scopes: paving, structural steel, process utilities and equipment pads.
SF · TON · LFHard bids on Peninsula projects turn on pile counts and flood-zone details. We return division-level quantities with marked-up plans so you can verify your own takeoff before the bid date.
Concrete, framing, roofing and MEP subs working Hampton jobs need quantities scoped to their trade only. We break out your division so you can price labor and material separately from the GC's package.
Infill and small multifamily sites near the water carry elevation and utility-extension costs that kill pro formas late. We estimate from schematic sets so those numbers land in your budget early.
Design teams need a cost check before construction documents are finished. We price your drawings by CSI division and flag scope gaps so revisions happen on paper, not in the field.
Federal-adjacent and port-related owners in Hampton often need a basis-of-estimate for funding. We deliver Excel and PDF quantities you can hand to a lender or review board.
Older housing stock in Hampton means selective demolition, structural repairs and code upgrades. We measure what is there and what has to be replaced, not just what is visible.
We estimate projects across the Virginia Peninsula and the wider Hampton Roads region, from downtown Hampton to the surrounding cities and counties.
Hampton's 2025 permit data shows 100 new privately-owned residential units, all single-family, up from 68 the year before. That mix — plus the port and military work — shapes what we estimate most.
Most new residential permits in Hampton are single-family homes on infill lots. We take off foundation, framing, roofing, and MEP from your plans and price with ZIP-adjusted RSMeans data.
Watch for: Pile or helical pier counts, flood elevation certificates, wind-borne debris glazing.
Small apartment and mixed-use buildings near Coliseum Central and the waterfront need unit-by-unit takeoffs. We break out drywall, doors, fixtures and MEP by typical unit type.
Watch for: Unit mix repetition, corridor lengths, elevator and trash room scope.
Buckroe Beach and Fox Hill properties often require elevated foundations and breakaway walls. We measure piling lengths, grade beams and flood vents as separate line items.
Watch for: Pile depth, breakaway wall panels, flood vent counts, stairs and decks.
Work tied to Langley and the Port of Virginia follows federal or heavy-industrial specs. We estimate from those drawings with the same CSI division structure you use.
Watch for: Prevailing wage rates, security clearances, special inspection requirements.
Retail, office and restaurant fit-outs along Mercury Boulevard and in downtown Hampton need demolition and new partition takeoffs. We measure existing conditions from your survey and plans.
Watch for: Existing wall types, ceiling heights, sprinkler relocation, ADA upgrades.
Warehouse and light-industrial projects near the port need slab, racking and utility takeoffs. We price slab thickness, column spacing and dock equipment from your drawings.
Watch for: Slab thickness, dock levelers, fire pump and sprinkler demand.
Hampton's coastal setting and Peninsula labor market move numbers in ways that inland Virginia estimates do not capture. These are the drivers we build into every takeoff.
Much of Hampton falls in FEMA flood zones, and the city enforces floodplain and wind provisions that add elevation, anchoring and glazing line items. Confirm the adopted code edition and local amendments with the Hampton building department before you finalize your bid. We flag flood-zone items in the takeoff so you can price them separately.
FEMA flood zones · IBC · IRC · Hampton building departmentCoastal plain soils in Hampton often include soft clays, loose sands and a shallow water table, so spread footings may not work. Piles, helical piers and grade beams are common, and we take them off by count and depth. Get a geotechnical report before pricing foundations; the difference between a spread footing and a pile cap can change your number substantially.
Geotechnical report · helical piers · driven piles · grade beamsHampton sits in a high-wind region, and roof assemblies, cladding and window systems must meet wind-borne debris and uplift requirements. We include hurricane straps, enhanced fastening and moisture barriers as separate line items. Roofing estimates here should account for high-wind-rated membranes and flashing details that inland projects do not need.
Wind-borne debris · uplift straps · roofing underlayment · flashingThe Peninsula labor pool is shared with Newport News, Portsmouth and the shipyard, so trade rates reflect that competition. Federal and port-adjacent projects may carry Davis-Bacon or state prevailing wage requirements, which change labor burdens. We price labor with ZIP-adjusted RSMeans data, but you should confirm wage determinations for any funded project.
Davis-Bacon · RSMeans data · Peninsula labor pool · wage determinationsFlat, low-lying sites in Hampton need careful grading, storm drainage and sometimes pump stations. We take off clearing, excavation, storm pipe, structures and utility extensions by length and count. Verify utility tap fees and connection charges with the city, since those can be a significant line item on infill lots.
Storm drainage · utility tap fees · grading · pump stationsMaterials arrive through the Port of Virginia or regional suppliers, so freight and lead times affect pricing. Virginia sales and use tax applies to materials, and some localities add a local portion; confirm current rates with your accountant. We price material with ZIP-code-adjusted data and note long-lead items in the estimate.
Port of Virginia · Virginia sales and use tax · lead times · freightHampton sits on the Peninsula at the mouth of the Chesapeake Bay, so tidal floodplain rules, shallow groundwater and hurricane wind loads drive real quantity differences in every division. Here is how those conditions land in a line-item takeoff.
Tidal influence means the seasonal high water table can sit within a few feet of grade across much of the city, so your sitework takeoff needs underdrain, stone and geotextile quantities based on the geotech report, not a default detail. Bid items typically include clearing and grubbing by acre, mass excavation by cubic yard with a shrink or swell factor applied, and storm pipe by linear foot with structures counted each. Confirm the adopted stormwater and floodplain requirements with the Hampton building department and the local wetlands board before you price dewatering. For a full civil package, our sitework estimating services break these items out by CSI division.
Wind design governs here. Roof sheathing nailing schedules, continuous load path hardware, and rated roof-to-wall connectors add material that a generic framing takeoff will miss. Count joist hangers, hurricane ties and hold-downs each, and carry sheathing by sheet with a waste factor appropriate to hip and valley cuts. On the envelope side, house wrap, flashing and sealant quantities scale with wall area and penetration count, not just floor area. Framing estimating services can carry the hardware schedule alongside the lumber list so the two reconcile. Confirm the adopted wind speed and exposure category with the local building department.
Humidity control is the driver on the mechanical side: carry dehumidification, condensate management and duct insulation values as separate items rather than burying them in a tonnage figure. Plumbing takeoffs on slab-on-grade work need underground rough-in by linear foot, cleanouts each, and backwater valves where the sanitary line sits below the flood elevation. Electrical takeoffs should separate service entrance gear, panelboards, branch wiring by linear foot and devices each. Our MEP estimating services produce these divisions in the same MasterFormat structure, and multi-family estimating services applies the same logic unit by unit.
Hampton's coastal plain soils are often soft marine clays and silty sands, which pushes foundation systems toward deeper footings, thickened slabs or piles on larger buildings. A takeoff should carry concrete by cubic yard for footings, grade beams and slab on grade separately, plus vapor barrier by square foot and reinforcement by ton or by linear foot of rebar. Watch the waste factor on formed footings in tight lots near the water; typical form waste runs higher when you cannot stockpile. Our foundation estimating services and concrete estimating services both organize quantities this way, with mix designs and cure notes carried as separate line items.
Low-slope roofs on commercial and industrial work in Hampton take membrane by square, insulation by square at the specified R-value, and cover board by square, with fasteners counted per square based on the deck type. Steep-slope residential roofs need underlayment by square, starter and ridge by linear foot, and venting by each. Wind uplift ratings matter more than the manufacturer's base warranty here, so carry the attachment schedule as its own line so a bid leveler can see it. Roofing estimating services handle both low- and steep-slope takeoffs with these quantities split out.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 31 23 16 | Mass excavation, crawl space | 310 | CY |
| 03 30 00 | Footing concrete, 24 in. wide | 42 | CY |
| 03 20 00 | Rebar, #4 and #5 combined | 6.8 | TON |
| 06 10 00 | Wall framing lumber, 2x4 and 2x6 | 4,950 | LF |
| 06 10 00 | Roof-to-wall connectors and hold-downs | 184 | EA |
| 06 16 00 | Roof sheathing, 7/16 in. OSB | 96 | SHT |
| 07 30 00 | Asphalt shingles and underlayment | 34 | SQ |
| 22 11 00 | Underground sanitary rough-in, 4 in. PVC | 128 | LF |
This is an illustrative calculation, not a quote. Assume a rectangular crawl-space foundation, 44 ft by 28 ft outside face, with a 24 in. wide by 12 in. deep continuous spread footing and two interior pier pads. Dimensions are illustrative and would be replaced by the plan dimensions on your set.
Step 1 — Perimeter. 2 × (44 + 28) = 144 linear feet of continuous footing.
Step 2 — Cross-section area. 24 in. wide × 12 in. deep = 2.0 ft × 1.0 ft = 2.00 square feet.
Step 3 — Volume before waste. 144 LF × 2.00 SF = 288 cubic feet. Divide by 27 to convert: 288 ÷ 27 = 10.67 cubic yards.
Step 4 — Pier pads. Two pads at 30 in. × 30 in. × 12 in. deep: 2.5 ft × 2.5 ft × 1.0 ft = 6.25 cubic feet each, so 12.50 cubic feet total, or 0.46 cubic yards.
Step 5 — Apply waste. Typical waste on formed continuous footings runs 5 to 8 percent. At 7 percent: (10.67 + 0.46) × 1.07 = 11.91 cubic yards. Round the order to 12 cubic yards.
| Step | Calculation | Result | Unit |
|---|---|---|---|
| Perimeter | 2 × (44 + 28) | 144 | LF |
| Section area | 2.0 × 1.0 | 2.00 | SF |
| Footing volume | 144 × 2.00 ÷ 27 | 10.67 | CY |
| Pier pads | 2 × 6.25 ÷ 27 | 0.46 | CY |
| With 7% waste | 11.13 × 1.07 | 11.91 | CY |
| Order quantity | rounded up | 12 | CY |
What changes in Hampton. If the geotech report calls for a deeper footing to reach bearing soil, the depth term in Step 2 grows and the volume scales with it. If the water table is high, add a gravel base course and a vapor barrier as separate line items, and carry dewatering under Division 31 rather than absorbing it into the concrete price. Rebar, formwork and anchor bolts are priced separately; the concrete volume above is only the ready-mix quantity. Send the plan set and we will run the same sequence against your actual dimensions through our concrete estimating services.
The figures come from the U.S. Census Bureau Building Permits Survey for 2025, which counts new privately-owned residential units permitted by the city itself. Hampton issued 100 such units in 2025, up from 68 in 2024, a 47 percent increase, with a permitted value of $19M and an average value per unit of $185,500. All 100 units were single-family; multifamily was zero. The survey covers residential permits only, so commercial and industrial permit activity is not reflected in those numbers.
It can. If any part of the structure sits in a mapped flood zone, the design flood elevation can push mechanical equipment, electrical panels and utility connections above a certain height, which adds conduit, wiring, piping and platform framing that a standard takeoff would not carry. Foundation venting and flood openings in crawl-space walls are counted each. Confirm the current flood insurance rate map panel and the adopted code edition with the Hampton building department before you finalize quantities.
We carry the load path as its own set of line items: connectors, straps, anchor bolts, and the nailing schedule called out on the structural sheets. That means counting hardware each rather than rolling it into a lumber allowance, and carrying sheathing by sheet with a waste factor that reflects the actual roof geometry. If the plans specify a rated assembly, we note it in the takeoff so the bid leveler can see the scope was priced.
Send the architectural, structural, civil and MEP sheets as a PDF set, plus any specifications, geotech report and addenda. If you have a bid date, tell us and we will schedule around it. We return Excel and PDF takeoffs organized by CSI MasterFormat division with marked-up plan sets, so you can trace every quantity back to the sheet it came from. Most projects turn around in 24 to 48 hours.
Yes. We use RSMeans data adjusted by ZIP code for material and labor pricing, which accounts for the local market rather than a national average. That matters on trades where the Hampton Roads labor pool is tighter, and on materials with freight sensitivity. The quantity takeoff itself is separate from pricing, so you can apply your own subcontractor quotes to our quantities if you prefer.
We do both. On the residential side, that includes single-family homes on crawl space or slab, additions and renovations. On the commercial side, it includes tenant fit-outs, retail, light industrial and institutional work. The divisions and units of measure are the same; what changes is the level of detail in the specifications and the number of trades involved. Our residential estimating services and commercial estimating services pages describe the deliverables for each.
We carry dewatering as a Division 31 line item with a stated method and duration, because on shallow-water-table sites it is a real cost that bidders routinely leave out. If the geotech report gives a seasonal high water table elevation, we note it in the takeoff so the estimator can size the system. We do not invent a dewatering price without a basis; we flag it as an allowance and let you confirm the approach with your excavation subcontractor.
You get an Excel workbook and a PDF, both organized by CSI MasterFormat division, with quantities, units and a description of each line item. The PDF includes the plan set marked up so you can see exactly where each quantity was measured. We also provide a summary tab by division so you can drop the numbers into your estimating software. Nothing is buried in a single lump sum.
Yes. We cover the surrounding Peninsula and Hampton Roads area, including Newport News, Portsmouth, Suffolk and Richmond, and we work statewide across Virginia. The pricing adjustment is by ZIP code, so a project in a neighboring city gets rates for that location, not Hampton's. If your project is elsewhere in the state, start with our Virginia construction estimating page and we will route it correctly.
Most projects are delivered in 24 to 48 hours. Rush turnaround is available when you have a hard bid date, and we will confirm the schedule before starting. The limiting factor is usually the completeness of the plan set; if structural or MEP sheets are missing, we will tell you what we can price and what has to be carried as an allowance rather than guessing at quantities.
Send your PDF plan set and bid date, and we will return a division-organized takeoff with marked-up sheets, typically within 24 to 48 hours.