Sitework takeoff
Clearing, rock excavation, cut and fill, and erosion control for ridge lots where haul-off quantities change the bid.
CY · SF · LFScope Precision Estimate delivers material and labor takeoffs for Oak Ridge contractors and developers. We price from your plan set, organize by CSI MasterFormat division, and return Excel and PDF with marked-up drawings in 24–48 hours.
Oak Ridge pricing is shaped by Anderson County labor availability, steep and rocky ridge terrain that drives foundation and sitework cost, TVA-served industrial and DOE-adjacent work, a 40% multifamily share of permitted units, and ZIP-code-adjusted material pricing from RSMeans data.
Oak Ridge sits in Anderson County, where the ridge-and-valley terrain means foundation and sitework quantities swing widely from one lot to the next. We build takeoffs that separate rock excavation, unsuitable fill, and retaining wall quantities instead of burying them in a single earthwork line. That matters when your bid is competing against contractors who priced from a square-foot number. If you also work across the region, our Tennessee construction estimating coverage extends to Maryville and Morristown.
We work from your PDF plans and specs, mark up the sheets, and return an Excel workbook organized by CSI MasterFormat division with a PDF summary. Pricing uses ZIP-code-adjusted material and labor from RSMeans data, so Oak Ridge numbers are not Knoxville numbers with a different cover page. Typical turnaround is 24–48 hours for most projects, with rush available. Send a set through our estimate request and we will confirm scope before we start.
For bidders. You need quantities you can defend in a bid review. We break out concrete, framing, roofing, and MEP by division with units and waste factors stated, so you can adjust labor burden and markup without rebuilding the takeoff.
For builders. You are buying material and scheduling crews. We give you a takeoff tied to your plan sheets, with marked-up drawings showing what was measured, so your superintendent can check quantities against deliveries.
For owners. You are comparing budgets before design is final. We price the drawings you have and flag scope gaps by division, giving you a baseline you can carry into the next design iteration.
Select a bar to compare Oak Ridge with the largest Tennessee markets we cover.
226 new housing units in 2025 (-1.7% vs 2024).
135 single-family · 91 multifamily (40%).
Oak Ridge issued 226 new privately-owned residential units in 2025, down about 2% from 230 in 2024, according to the U.S. Census Bureau Building Permits Survey. Single-family units totaled 135 and multifamily 91, so 40% of permitted units were in multifamily buildings. Permitted value was $34M, an average of $148,300 per unit. For bidders, that mix means two different estimating problems in the same city: scattered single-family infill with individual utility taps and driveways, and multifamily podium or garden-style buildings where repetition and unit-mix counts drive the budget. Oak Ridge ranked 16 of 24 covered state cities by units and accounted for 1.2% of the 19,558 covered state total. If you bid multifamily here, our multi-family estimating services break costs down by building and by unit type.
Oak Ridge's construction market is not only residential. The city's history and its industrial and research employers keep a steady flow of laboratory, light-industrial, and institutional renovation work moving through plan rooms. Those projects carry process piping, cleanroom finishes, and mechanical scope that residential estimators often miss. On the residential side, ridge lots in Anderson County frequently require drilled piers, engineered fill, or retaining walls, and the quantity difference between a flat lot and a sloped one can exceed the framing package. We price those items as separate lines with units, not as allowances. Contractors bidding both sides of the market can see our industrial estimating services and commercial estimating services pages for the divisions we cover. Confirm all code requirements with the City of Oak Ridge building department and Anderson County before you finalize a bid.
We measure from your plan set and return quantities by CSI MasterFormat division. These are the scopes we price most often for Oak Ridge and Anderson County work.
Clearing, rock excavation, cut and fill, and erosion control for ridge lots where haul-off quantities change the bid.
CY · SF · LFFootings, stem walls, slab-on-grade, and pier quantities for sloped lots and multifamily podium decks.
CY · SFDrilled piers, grade beams, and retaining wall takeoffs where shallow soils or grade change require deeper support.
LF · CYWall, floor, and roof framing counted by member size and length, with sheathing and hardware separated.
BF · LF · EASlope-adjusted squares, underlayment, flashing, and ridge vent quantities for steep and complex roof plans.
SQ · LFPlumbing fixture counts, HVAC tonnage, and electrical device and feeder takeoffs for residential and light commercial.
EA · LF · TONFull-house takeoffs for single-family infill and custom homes, organized by division for bid review.
SF · EAUnit-mix counts and building-by-building quantities for garden-style and podium projects in Oak Ridge.
EA · SFYou are pricing against contractors who know the local rock and fill conditions. We separate excavation, backfill, and haul-off so your bid reflects what the site actually needs.
You need quantities by division, not a lump sum. We mark up the sheets and give you board feet, squares, and cubic yards with waste stated so you can set your own labor.
Oak Ridge permits about 135 single-family units a year. We take off framing, foundation, and finishes from your plan set so you can order material and schedule trades.
Roughly 40% of permitted units here are multifamily. We break out unit mixes, common areas, and MEP rough-in by building so you can compare bids on equal scope.
Oak Ridge has a long industrial and research base. We estimate process-support buildings, labs, and utility work from specs, with equipment and piping quantities separated from base building.
You need a baseline before design is final. We price the drawings you have, flag scope gaps by CSI division, and note assumptions so you can carry the number into the next iteration.
We take off plans for projects across Anderson County and the surrounding ridge-and-valley corridor. If your job is outside Oak Ridge, send the address with the plans and we will price to that ZIP code.
The 2025 permit mix here is about 135 single-family units and 91 multifamily units, with an average permitted value near $148,300 per unit. Those two categories drive most of the takeoff work, and industrial and institutional projects fill out the rest.
Stick-built homes on sloped lots, often with walkout basements and retaining walls. We take off foundation, framing, roofing, and finishes from the plan set, with waste factors stated by material.
Watch for: Rock excavation, footing steps, and lumber waste on cut-up rooflines.
Garden-style and low-rise buildings with repeated unit plans. We break out quantities by building and unit type so you can compare bids on the same scope and check common-area allowances.
Watch for: Unit mix counts, corridor lengths, and MEP fixture counts per unit.
Tear-downs and infill on older platted lots where utilities and grading are already in place. We measure the new footprint against the existing conditions shown on the survey and note what must be removed.
Watch for: Demolition quantities, utility relocations, and tight-site staging.
Shops, warehouses, and research support space tied to the region's industrial base. We take off structural steel, slab, envelope, and process utilities from the specs and separate equipment from base building.
Watch for: Equipment pads, process piping, and specialty ventilation scope.
Office, medical, and retail fit-outs in existing shells. We measure partitions, ceilings, doors, and MEP rough-in from the architectural and MEP sheets, and flag what the landlord's shell already provides.
Watch for: Landlord scope limits, sprinkler modifications, and ADA upgrades.
Room additions, kitchen and bath remodels, and structural repairs on older housing stock. We take off new work and note where existing framing, wiring, or plumbing likely needs replacement.
Watch for: Hidden conditions, temporary weather protection, and disposal.
Oak Ridge sits in the ridge-and-valley section of East Tennessee, where the ground, the weather, and the local code office all move quantities. These are the drivers we look at before we price a set.
Oak Ridge issues its own building permits, and plan review looks at the adopted editions of the IBC, IRC, and IECC along with local amendments. Review comments can change wall assemblies, egress, and energy details after you have priced the set. We note the code edition and any deferred submittals on the estimate so you can carry an allowance for revisions. Confirm the adopted editions and any local amendments with the Oak Ridge building department before you finalize your bid.
City of Oak Ridge building department · IBC · IRC · IECCThe ridge-and-valley terrain means shallow limestone and shale are common, and some lots carry expansive clay. Rock excavation is priced by the cubic yard and can swing a sitework package more than any other line. We separate rock, unsuitable fill, and structural fill, and we take off footing steps and retaining walls from the grading plan rather than carrying a square-foot allowance. A geotechnical report changes these quantities, so send it if you have one.
Rock excavation · Unsuitable fill · Retaining walls · Geotechnical reportEast Tennessee gets about 50 inches of rain a year, with summer thunderstorms and occasional winter ice. That drives drainage quantities, roof underlayment, and exterior detailing. We take off gutters, downspouts, area drains, and swales from the civil sheets, and we note freeze-protection depths for water and irrigation lines. Ice-and-water membrane at eaves and valleys is a line item worth checking against the roof plan, not a blanket allowance.
Roof drainage · Freeze protection · Ice-and-water membrane · Civil sheetsOak Ridge draws trades from the Knoxville metro, so labor rates and crew availability track that market rather than a small-town scale. Specialty trades such as process piping, lab casework, and elevator work are limited, and their pricing reflects travel and scheduling. We price labor from ZIP-code-adjusted RSMeans data for the project address and state the labor burden assumption so you can adjust it to your own payroll. If your schedule is compressed, note it, because overtime changes the labor column.
RSMeans data · Labor burden · Knoxville metro trades · OvertimeMany Oak Ridge lots slope, and some streets are narrow with limited staging. That affects excavation haul-off, crane and concrete truck access, and the amount of temporary erosion control you need. We take off silt fence, inlet protection, and stabilized construction entrance from the SWPPP or site plan, and we note where access limits equipment size. Steep driveways and retaining walls are separate line items, not part of the building pad.
SWPPP · Erosion control · Retaining walls · Equipment accessTennessee has no state income tax, and the state's growth keeps material demand steady across the region. Most material comes through Knoxville distributors, so freight is short but lead times on specialty items still matter. We price material at ZIP-code-adjusted rates and list alternates where a substitution changes cost. Sales tax treatment on materials depends on your contract and exemptions, so confirm it with your accountant before you build it into the bid.
Knoxville distributors · Freight · Sales tax · Material alternatesOak Ridge sits in Anderson County, where ridge-and-valley terrain, karst-prone limestone, and a steady mix of federal-contractor upgrades and residential infill shape what estimators price. The notes below show where those local conditions change quantities, waste factors, and line items in a takeoff.
Most Oak Ridge sites on the ridges above the Clinch River require cut-and-fill balancing rather than a simple strip. A takeoff should separate unclassified excavation from rock excavation, because limestone and shale are common and blasting or hoe-ramming is priced differently. Track topsoil strip by depth, not by area alone, and include erosion-control line items such as silt fence measured in linear feet and temporary seeding in square yards. For a full breakdown of these items, see our sitework estimating services. Confirm local sediment and erosion control requirements with the Anderson County or City of Oak Ridge building department, since the adopted ordinance edition can change what is required on a plan set.
Oak Ridge residential framing is predominantly wood-frame with engineered floor systems. A takeoff should convert plan dimensions into linear feet of plates, studs by length, headers by size, and joists by span, then add a typical 5–10% waste for cuts and culls. Sheathing is measured in sheets, not square feet, so the number of 4x8 sheets is what the lumber yard prices. Roof trusses are usually quoted by the truss supplier, but the takeoff still needs bearing, bracing, and sheathing quantities. Our framing estimating services page covers how we present these quantities by floor and by wall type.
MEP takeoffs in Oak Ridge follow the same CSI divisions as anywhere, but the quantities come from fixture counts, home-run lengths, and equipment schedules. Count plumbing fixtures by type, measure DWV and supply piping in linear feet by diameter, and list HVAC equipment by tonnage and SEER rating. Electrical takeoffs should include device counts, homeruns by circuit, panel schedules, and service entrance size. Our MEP estimating services page explains how we cross-check these against the drawings. Because Tennessee follows the IRC and IECC with local amendments, confirm the adopted edition with the building department before locking in insulation values or ventilation rates.
Slab-on-grade construction is typical, but ridge sites often need stepped footings and deeper pier foundations where soil bearing is marginal. In a takeoff, count continuous footings in linear feet, isolated spread footings by each, and slab area in square feet with a typical 5–10% waste factor for ready-mix. Include vapor barrier under slab, welded wire mesh or fiber reinforcement, and control-joint layout. Our concrete estimating services and foundation estimating services pages show how we organize these divisions. Verify the adopted residential or commercial code edition with the local building department before finalizing footing depths or reinforcement.
The Tennessee Valley gets heavy summer thunderstorms, hail, and occasional ice, so roofing takeoffs should include underlayment, ice-and-water shield at valleys and eaves, drip edge in linear feet, and ridge and hip caps. Asphalt shingle quantities are ordered by the square (100 square feet), and steep-slope waste typically runs higher than the 10% used for low-slope. Ventilation is often overlooked: ridge vent, soffit vent, and baffles are separate line items. Our roofing estimating services page shows the format we use. Confirm local wind and hail provisions with the building department, since the adopted code edition determines the required underlayment and fastening.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24"x12" continuous | 186 | LF |
| 03 30 00 | Slab-on-grade concrete, 4" thick | 2,140 | SF |
| 05 10 00 | Structural steel lintels and columns | 420 | LB |
| 06 10 00 | Wall framing, 2x4 studs at 16" o.c. | 3,860 | LF |
| 06 10 00 | Floor joists, engineered I-joists | 2,480 | LF |
| 07 30 00 | Asphalt shingles, architectural | 38 | SQ |
| 09 20 00 | Gypsum wallboard, 1/2" on walls | 6,920 | SF |
| 22 00 00 | Plumbing rough-in, DWV and supply | 1,240 | LF |
This example uses illustrative dimensions for a one-story, 1,800-square-foot house with a 400-square-foot garage, typical of infill construction on the ridges around Oak Ridge. The slab is 4 inches thick over a 4-inch compacted gravel base, with a 10-mil vapor barrier. We calculate concrete volume, add a typical 10% waste factor for ready-mix, and convert to cubic yards. The same method applies to any slab, but the dimensions here are not from a real project.
| Step | Calculation | Result | Unit |
|---|---|---|---|
| Slab area | 1,800 SF house + 400 SF garage | 2,200 | SF |
| Concrete volume | 2,200 SF × (4 in ÷ 12 in/ft) | 733.3 | CF |
| Convert to cubic yards | 733.3 CF ÷ 27 CF/CY | 27.16 | CY |
| Waste factor (typical 10%) | 27.16 CY × 1.10 | 29.88 | CY |
| Order quantity | Round up to nearest quarter yard | 30.00 | CY |
| Gravel base | 2,200 SF × (4 in ÷ 12 in/ft) ÷ 27 | 27.16 | CY |
| Vapor barrier | 2,200 SF ÷ 100 SF per roll | 22 | rolls |
| Formwork | Perimeter of slab, 180 LF + 80 LF | 260 | LF |
The takeoff should list the concrete, gravel, vapor barrier, and formwork as separate line items under CSI Division 03. If the plans call for thickened edges or a turned-down footing at the perimeter, those volumes are added before the waste factor. In Oak Ridge, where limestone can be close to the surface, the excavation line item is kept separate so rock removal is not buried in the concrete price. For a full division-by-division format, see our residential estimating services page. Confirm the adopted code edition for slab thickness and reinforcement with the local building department, since requirements can change with the edition in force.
Send your plans and specifications through our get an estimate page. We review the drawings, confirm the scope, and return a takeoff in Excel and PDF organized by CSI MasterFormat division, with marked-up plan sets. Most projects are returned in 24–48 hours, and rush service is available. If you have a bid date, tell us up front so we can schedule accordingly.
Most Oak Ridge projects are returned within 24–48 hours of receiving complete plans. Larger or multi-building projects may take longer, and we will tell you the schedule before we start. Rush service is available when your bid date is tight. The clock starts when we have the full set of drawings and specifications, not when you first inquire.
Yes. We cover Oak Ridge and Anderson County, plus nearby cities such as La Vergne, Cookeville, Morristown, Maryville, Bristol, and Mount Juliet. If your project is elsewhere in Tennessee, see our Tennessee construction estimating page for coverage. Distance does not change how we prepare the takeoff, but it can affect material pricing if the supplier base is different.
We deliver Excel workbooks and PDF reports organized by CSI MasterFormat division, with marked-up plan sets showing what we measured. Quantities are separated by unit of measure, and waste factors are shown as a separate line so you can adjust them. We use Bluebeam Revu, PlanSwift, and RSMeans data, and pricing is adjusted by ZIP code for material and labor.
Rock excavation is listed as a separate line item from unclassified excavation, because the cost difference is significant. If the geotechnical report or site history suggests shallow limestone, we note it and recommend a unit price for rock rather than a lump sum. Confirm site conditions with a geotechnical engineer before finalizing the bid, since we price from the documents you provide.
Yes. We prepare takeoffs for single-family homes, multi-family buildings, and commercial projects. Oak Ridge has a mix of residential infill and institutional or federal-contractor work, and the takeoff format is the same regardless of project type. For multi-family, see our multi-family estimating services page; for commercial, see our commercial estimating services page.
No. Permit fees, impact fees, and utility connection charges are not part of a construction takeoff unless you specifically ask us to include them. Those are set by the City of Oak Ridge or Anderson County and change with the adopted fee schedule. We recommend confirming current fees with the local building department and adding them as a separate line in your bid.
The permit figures come from the U.S. Census Bureau, Building Permits Survey, for 2025. The survey counts permits issued by the city itself for new privately-owned residential units only. It does not include commercial permits, additions, or renovations. In 2025, Oak Ridge issued 226 residential units, down about 2% from 230 in 2024.
We use RSMeans data adjusted by ZIP code for the Oak Ridge area, which reflects local material and labor costs. Labor rates can vary with crew availability and the trade, so we show quantities and let you apply your own labor rates if you prefer. The takeoff is built so you can swap in your own pricing without redoing the quantities.
Yes. Oak Ridge has a significant industrial and federal-contractor presence, and we prepare takeoffs for industrial scopes including process piping, equipment pads, and structural steel. For these projects, we need the equipment schedules and specifications in addition to the drawings. See our industrial estimating services page for the divisions we cover.
Send your plans and specifications through our get an estimate page, and we will return a division-by-division takeoff in 24–48 hours.