Sitework takeoff
Clearing, stripping, rock excavation, structural fill and storm quantities for Putnam County karst and clay sites.
CY · SF · LFWe produce material and labor takeoffs for Cookeville contractors, developers and owners. Plans come back in Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets and ZIP-code-adjusted pricing for Putnam County and the Upper Cumberland.
Cookeville pricing is driven by Putnam County clay and karst soil conditions, plateau winter weather that shortens exterior production windows, a 16% multifamily share in the 2025 residential permit mix, rising material freight from Nashville, and a labor pool shared with nearby Algood and Baxter. Each factor changes quantity, waste and unit cost.
Cookeville sits on the Eastern Highland Rim, where shallow rock and expansive clay show up in foundation and sitework quantities on almost every plan set. We take off those scopes the way a Putnam County superintendent builds them: stripping depths, undercut limits, footing over-excavation and backfill measured in cubic yards, not allowances. If you bid work across the Upper Cumberland, our Tennessee construction estimating page covers the statewide pricing basis.
Residential volume here is real but choppy. Cookeville issued 321 new privately-owned residential units in 2025, down 24% from 422 in 2024, with 269 single-family and 52 multifamily units and a permitted value of $74M. That mix means you are often pricing a small subdivision or a scattered-lot custom home alongside a light commercial shell. We return most takeoffs in 24–48 hours, in Excel and PDF, so a bid due Friday can still be reviewed line by line. Contractors working the Nashville corridor can also compare our Spring Hill and Gallatin coverage.
For bidders. You get division-by-division quantities, waste factors stated, and marked-up plans so you can check every wall, footing and roof plane before you sign a bid bond. Useful when three Cookeville GCs are chasing the same school or retail package.
For builders. Production builders get repeatable takeoffs for plan sets used across Putnam County lots, with quantities adjusted for the rock and clay you actually hit. Change orders stay defensible because the original scope is documented.
For owners. Owners and developers get a scope baseline to compare contractor bids against, plus a clear list of exclusions and assumptions. That is how you catch a low bid that left sitework or MEP rough-in out.
Select a bar to compare Cookeville with the largest Tennessee markets we cover.
321 new housing units in 2025 (-23.9% vs 2024).
269 single-family · 52 multifamily (16%).
Cookeville permitted 321 new privately-owned residential units in 2025 against 422 in 2024, a 24% drop, with a permitted value of $74M and an average of $231,700 per unit. Single-family accounted for 269 units and multifamily 52, a 16% multifamily share. For bidders, that means fewer starts but larger average scope per house. Cookeville ranked 14th of 24 covered state cities by units and took 1.6% of the 19,558 statewide units, so the market is steady rather than hot. Price your overhead and supervision against a slower draw schedule, and expect more competition on each bid. Contractors who also work east toward Oak Ridge or Maryville can smooth the gaps.
The dominant local project types are single-family subdivisions, duplex and small multifamily infill, light commercial along the interstate corridor, and institutional work around the university. Sitework carries unusual risk: karst features and shallow limestone can force rock excavation measured by the cubic yard, and expansive clay under footings often triggers undercut and structural fill. Winter on the plateau shortens concrete and asphalt placement windows, which pushes curing protection and temporary heat into the estimate. Labor is shared with Algood, Baxter and Monterey, so crew rates and availability move with the Nashville market. Compare our La Vergne and Morristown pages for how we handle similar soil and weather profiles elsewhere in the state.
We take off the scopes that drive cost on Upper Cumberland projects, from clearing through MEP rough-in, using Bluebeam Revu, PlanSwift and RSMeans data with ZIP-code-adjusted pricing.
Clearing, stripping, rock excavation, structural fill and storm quantities for Putnam County karst and clay sites.
CY · SF · LFFootings, stem walls, slab-on-grade and paving measured with formwork, reinforcement and finish by area.
CY · SF · TONSpread footings, pier and grade beam, and undercut limits priced for expansive clay and shallow rock.
CY · LF · EAFloor, wall and roof framing with stud counts, headers, sheathing and typical waste factors stated.
LF · SF · EAShingle, standing seam and low-slope membrane systems with underlayment, flashing and ridge quantities.
SQ · LF · EAPlumbing, HVAC and electrical rough-in counts for duplex, multifamily and light commercial buildings.
EA · LF · TONCustom and production homes priced division by division, ready for a Cookeville bid due date.
SF · EA · LSRetail, office and institutional shells and fit-outs taken off to CSI MasterFormat division level.
SF · EA · LSYou need division-by-division quantities to compare against three or four competing bids, with sitework and concrete broken out so a low number on the shell does not hide an undercut allowance.
Scattered-lot building around Cookeville means the same floor plan sits on different soil profiles. We re-run footing, backfill and slab quantities per lot instead of reusing one takeoff across the subdivision.
Rock on the Eastern Highland Rim changes your bid more than labor does. We measure stripping, trench rock, undercut and structural fill in cubic yards so your number reflects the depth you actually dig.
Footing over-excavation, stem wall height and slab thickness drive your form and yardage counts. We take those off wall by wall from the structural sheets, not from a square-foot allowance.
Cookeville's retail and medical office packages along the corridors need MEP rough-in, storefront and site utility quantities priced separately so you can phase the shell and tenant fit-out.
You want a scope baseline before you open bids. We list exclusions and assumptions in writing, which is how you catch a proposal that left paving, drainage or electrical gear out.
We take off work across Putnam County and the Upper Cumberland, from in-town infill lots to acreage tracts along the Highway 111 and I-40 corridors. If your project is outside the city limits, the jurisdiction and adopted code edition change, so confirm those with the local building department.
Cookeville issued 321 new privately-owned residential units in 2025, 269 of them single-family, alongside light commercial and institutional work tied to Tennessee Tech and the medical corridor. That mix is what our takeoffs are built around.
Scattered-lot and subdivision houses on slab or crawl space, with framing, roofing and MEP taken off per plan. We adjust footing and backfill quantities for the rock and clay we see across Putnam County lots.
Watch for: Footing over-excavation, slab thickness, roof pitch and waste on framing lumber.
The 52 multifamily units permitted in 2025 represent a small but steady share of local work. We take off repeated unit types once and multiply, then price common areas, stairs and site utilities separately.
Watch for: Unit-type repetition, fire separation, common-area MEP and parking counts.
Retail, office and medical buildings along the main corridors. Divisions 3 through 9 are measured from the architectural and structural sets, with storefront, canopy and site work broken out for phased bidding.
Watch for: Storefront glazing, structural steel tonnage, canopy footings and curb quantities.
Interior build-outs inside existing shells need demolition, partition, ceiling and MEP quantities that match the as-built conditions. We measure from the lease plan and flag anything that depends on field verification.
Watch for: Existing conditions, sprinkler relocation, ceiling grid and electrical panel capacity.
School additions, church buildings and civic projects around Cookeville carry prevailing-wage and bonding requirements. We keep quantities clean by division so your bid form maps directly to the specification sections.
Watch for: Prevailing wage, bonding, division 10 specialties and site phasing around occupied buildings.
Pre-engineered metal buildings and small manufacturing spaces need slab, foundation and utility quantities priced separately from the building package. We take off the civil and structural scopes so you can compare vendor quotes.
Watch for: Slab thickness and reinforcement, PEMB anchor bolts, dock equipment and trench drains.
Two estimates for the same square footage can differ by double digits here once you account for soil, code edition and the depth of the site work. These are the drivers we price explicitly rather than bury in an allowance.
Cookeville and Putnam County enforce adopted building, residential, plumbing, mechanical, electrical and fire code editions, and the edition in force changes what you must build. Confirm the current edition and any local amendments with the Cookeville building department before you lock quantities for egress, fire separation, insulation or sprinkler scope. We price to the code family named in your drawings and flag where the spec and the adopted edition disagree.
IBC · IRC · IECC · NFPA 13The Eastern Highland Rim geology means shallow limestone and clay that shrinks and swells with moisture. That drives footing over-excavation, undercut and structural fill quantities, and it can force deeper piers or a reinforced slab where a plain slab would fail. We measure these in cubic yards from the geotechnical recommendation, not from a per-square-foot allowance, because the depth is what moves your number.
Geotechnical report · Footing over-excavation · Structural fill · Under slab vapor barrierCookeville gets steady rainfall and enough winter frost to set footing depth. Site drainage, downspout discharge, swales and retention requirements add sitework quantities that never appear on the architectural sheets. Frost depth and footing elevation should be confirmed against the adopted code and the geotechnical report, since both change excavation and concrete yardage.
Frost depth · Storm drainage · Retention · Erosion controlThe Upper Cumberland labor pool is smaller than Nashville's, so trades like masonry, drywall finishing and specialty electrical can be stretched across several active jobs. That affects how you phase a project and how much overtime you carry. We price labor from ZIP-code-adjusted rates and note where a scope depends on a single crew being available when you need it.
ZIP-code adjusted labor · Crew loading · Overtime · Trade sequencingAcreage tracts outside the city limits often need clearing, grubbing, temporary access and utility extensions before a foundation goes in. Steep driveways, culvert sizing and septic or sewer tie-in distances change the site package substantially. We take off clearing by acre, access by linear foot and utilities by trench length so the site number is not a lump sum.
Clearing and grubbing · Utility trenching · Culverts · Septic or sewer tie-inConcrete, lumber and steel prices move with regional supply, and freight from Nashville-area suppliers adds to delivered cost on smaller Cookeville orders. Tennessee's tax treatment of construction materials and any local surcharges should be confirmed with your accountant and the supplier. We price materials at current delivered cost and separate sales tax so your bid total is not overstated.
Delivered material cost · Freight · Sales tax · Supplier lead timesCookeville sits on the Eastern Highland Rim, where shallow limestone, expansive clay and a wet climate shape quantities in every division. These are the trade-level effects we price into a Putnam County takeoff.
Rock excavation is the line that moves fastest here. On Highland Rim sites we carry a rock allowance by cubic yard, not a lump sum, because weathered limestone and chert seams show up in test pits but not on the geotech plan. Topsoil strip is measured in square yards to a stated depth, then separated from unsuitable clay. Structural fill is priced by compacted cubic yard with a shrinkage factor applied to the bank volume. Silt fence, inlet protection and a construction entrance are counted by linear foot and each, per the site plan. For a full division-by-division site package, see our sitework estimating services.
Framing quantities follow the plan's wall types. We count studs by linear foot of wall at 16 in. on center plus plates, headers and blocking, then convert to pieces by lumber length. Floor joists are taken off by span and spacing, with rim board and bridging as separate lines. Roof framing is measured by square of roof area, with ridge, hip and valley linear feet for cut stock. Sheathing is by sheet count, not square footage, so the estimator sees the panel layout. Waste on dimensional lumber typically runs 5–10% depending on roof complexity. Framing estimating services covers the full division 06 takeoff.
Mechanical, electrical and plumbing takeoffs are counted by fixture and by run. We count receptacles, switches, lights, data drops, supply and return grilles, and plumbing fixtures by type, then measure branch piping and ductwork by linear foot and size. Panel schedules and service size are listed by ampere rating. Interior finishes are measured by room: drywall by square foot with a typical 10% waste on board, tape and mud by square foot, paint by square foot of wall and ceiling, and flooring by square foot with a 5–7% waste factor. MEP estimating services carries the division 22, 23 and 26 lines.
Expansive clay drives foundation scope. We take off continuous footings by linear foot, stem walls by linear foot and height, and slab-on-grade by square foot with thickened edges at bearing walls. Rebar is measured by bar size and lap, not by tonnage alone, because lap lengths change with bar diameter. Vapor barrier and granular base are separate lines. Flatwork — driveways, walks, patios — is measured by square foot with a typical 5% waste factor on formed edges. Our concrete estimating services and foundation estimating services break these lines out by pour and by mix design.
Cookeville's rainfall and summer humidity put underlayment and flashing detail on the critical path. We take off roof area by square, then add starter course, ridge cap, hip and valley flashing by linear foot, and pipe boots and vents by each. Ice and water shield is measured by square foot at eaves, valleys and penetrations per the adopted code edition — confirm that edition with the Cookeville building department. Wall sheathing, house wrap and flashing tape are separate lines. For steep-slope and low-slope assemblies, see roofing estimating services.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24 in. x 12 in. | 18.4 | CY |
| 03 20 00 | Rebar, #4 continuous footing | 2,340 | LF |
| 04 20 00 | CMU stem wall, 8 in. | 1,180 | SF |
| 06 10 00 | 2x4 stud wall, 8 ft, 16 in. OC | 2,460 | LF |
| 06 10 00 | 7/16 in. OSB wall sheathing | 96 | SHT |
| 07 30 00 | Architectural shingles | 34.5 | SQ |
| 09 29 00 | 1/2 in. drywall, walls and ceiling | 4,820 | SF |
| 09 30 00 | Ceramic tile flooring | 410 | SF |
This example sizes a slab-on-grade pour for a one-story house on a Crawl Space or slab foundation typical of Putnam County. Dimensions are illustrative — your plan controls. We assume a 40 ft x 60 ft rectangular footprint, 4 in. slab thickness, 12 in. x 12 in. thickened edges on all four sides, and a 10% waste factor on concrete.
Step 1 — Slab area. 40 ft x 60 ft = 2,400 SF.
Step 2 — Slab volume. 2,400 SF x (4 in. / 12 in.) = 2,400 x 0.333 = 800 CF.
Step 3 — Thickened edge volume. Perimeter = 2 x (40 + 60) = 200 LF. Edge volume = 200 LF x 1 ft x 1 ft = 200 CF. Subtract the slab already counted over the edge: 200 LF x 1 ft x 0.333 ft = 66.6 CF. Net edge = 200 - 66.6 = 133.4 CF.
Step 4 — Total volume before waste. 800 + 133.4 = 933.4 CF. Convert to cubic yards: 933.4 / 27 = 34.57 CY.
Step 5 — Waste. 34.57 x 1.10 = 38.0 CY.
| Step | Calculation | Result | Unit |
|---|---|---|---|
| Slab area | 40 x 60 | 2,400 | SF |
| Slab volume | 2,400 x 0.333 | 800 | CF |
| Edge net volume | 200 - 66.6 | 133.4 | CF |
| Total volume | 800 + 133.4 | 933.4 | CF |
| Convert to CY | 933.4 / 27 | 34.57 | CY |
| With 10% waste | 34.57 x 1.10 | 38.0 | CY |
The same logic applies to footings, stem walls and flatwork. If the geotech report calls for a capillary break or thicker edge, adjust the volume and re-check the waste factor. For multi-story or multi-family slabs, split the takeoff by pour and by mix design so the ready-mix supplier can schedule trucks.
Pricing depends on project size, number of sheets and trade count. We quote per project, not per square foot, because a 40-sheet residential set and a 200-sheet commercial set take different effort. Send your plans and we will return a fixed quote before any work starts. Most estimates are delivered in 24–48 hours, with rush service available when your bid date is close.
Standard turnaround is 24–48 hours for most projects. That covers a full CSI MasterFormat takeoff, marked-up plan set, and Excel and PDF deliverables. If you are bidding a Putnam County school or a Cookeville commercial project with a hard deadline, tell us the bid date and we will confirm rush availability before you send files.
Yes. We use ZIP-code-adjusted material and labor pricing with RSMeans data, so the labor hours and material costs reflect the Cookeville area rather than a national average. Freight and tax treatment are listed separately. If your supplier has quoted a specific price for concrete, lumber or steel, send it and we will use your number instead of the database rate.
We deliver Excel workbooks and PDF takeoffs organized by CSI MasterFormat division, plus a marked-up plan set showing what was measured. The Excel file is set up so you can adjust quantities, waste factors and unit costs during bid review. We work in Bluebeam Revu, PlanSwift and RSMeans data, and we can match your own estimating template on request.
Yes. We take off single-family homes, duplexes, multi-family buildings, retail, office, light industrial and institutional work. Residential Estimating Services covers divisions 03 through 16 for houses and small multifamily. Commercial Estimating Services covers larger assemblies, including structural steel, curtain wall and full MEP. Multi-family projects get a unit-by-unit takeoff so you can compare building types.
We carry rock as a separate line by cubic yard with a stated depth assumption, because weathered limestone and chert on the Eastern Highland Rim does not show up consistently on test borings. If your geotech report gives a rock elevation, we use it. If not, we show the allowance clearly so you can adjust it before bid. Never bury rock in a lump-sum earthwork number.
We show material costs before tax and list tax treatment as a separate line, because taxability varies by contract type and by whether the contractor is acting as a retailer or a consumer. Confirm the current Tennessee rate and any local option with your accountant or the Tennessee Department of Revenue. We do not include tax in the base material cost unless you ask us to.
Send the architectural, structural, civil and MEP drawings, the specification book, and any addenda. A geotech report helps with earthwork and foundations. If you have a bid date, tell us. If you have supplier quotes or a subcontractor scope sheet, send those too. The more complete the set, the fewer assumptions we have to list.
The permit figures come from the U.S. Census Bureau, Building Permits Survey. They count permits issued by the city itself for new privately-owned residential units only. They do not include commercial permits, additions, alterations or units permitted outside the city limits. Use them as a demand signal, not as a count of all construction activity in Putnam County.
Yes. We cover Spring Hill construction estimating, La Vergne construction estimating, Morristown construction estimating, Oak Ridge construction estimating, Maryville construction estimating and Gallatin construction estimating, plus the rest of the state through our Tennessee construction estimating page. If your project is outside these cities, send the address and we will confirm coverage.
Email your drawings and bid date, and we will return a fixed quote and a 24–48 hour turnaround window.