Residential takeoff
Full quantity takeoff for detached homes, from footing excavation through finish carpentry, organized by division.
EA · SF · LFBartlett issued 37 new privately-owned residential permits in 2025, all single-family, at an average value of $308,400 per unit. We produce CSI-organized takeoffs and estimates for builders, subs and owners working in Shelby County — delivered in Excel and PDF within 24–48 hours.
Bartlett's 2025 permit mix — 37 single-family units, zero multifamily, $308,400 average value — means detached custom and production homes dominate takeoffs, not tower work. Shelby County's expansive clay subsoils drive pier-and-grade-beam foundation quantities, hot-humid summers set HVAC and insulation loads, and ZIP-code-adjusted pricing must reflect local material and labor rates.
Bartlett sits in Shelby County, northeast of Memphis, and its 2025 building permit record is almost entirely detached housing: 37 new privately-owned residential units, all single-family, with an average permitted value of $308,400 per unit. That profile shapes what a takeoff here needs to capture — full foundation and framing packages for custom and production homes, not core-and-shell commercial scopes. If your work spans the metro, our Tennessee construction estimating page covers how we price across the state.
We build estimates in Bluebeam Revu and PlanSwift with RSMeans data, then adjust material and labor pricing by ZIP code so your numbers track what suppliers and crews actually charge in this part of Shelby County. Every deliverable is organized by CSI MasterFormat division, with marked-up plan sets showing exactly where each quantity came from. For work just south of here, see Collierville construction estimating; for projects to the east, Jackson construction estimating.
For bidders. You need quantities you can defend in a bid review. We return division-organized takeoffs with marked-up plans, so every cubic yard of concrete and linear foot of framing shows its source.
For builders. Production and custom home builders use our estimates for buyout and budget tracking. Waste factors, unit costs and alternates are listed separately so you can swap scopes without rebuilding the sheet.
For owners. Owners and developers get a cost basis before committing to a design. We break the estimate into trade packages so you can compare bids apples to apples.
Select a bar to compare Bartlett with the largest Tennessee markets we cover.
37 new housing units in 2025 (-5.1% vs 2024).
37 single-family · 0 multifamily (0%).
Bartlett's 2025 numbers are modest: 37 new residential units, down from 39 in 2024 — a 5% dip — with zero multifamily units permitted. The average value per unit was $308,400, and the total permitted value was about $11M. That mix tells you bids here are won on detached-home scopes: slab or pier foundations, wood framing, asphalt shingle roofing, and residential MEP rough-ins. There is little call for the curtain wall, elevator and structural-steel packages that dominate larger markets. If you bid across the state, our Tennessee construction estimating page explains how we handle that spread; for a nearby market with more multifamily activity, see Franklin construction estimating.
The state recorded 19,558 new privately-owned residential units in 2025, and Bartlett's 37 units were 0.2% of that total — 24th of the 24 covered state cities by unit count. That ranking does not make the work simpler; it makes accuracy per unit more important, because a single missed foundation or framing item swings a small job's margin hard. Shelby County's expansive clay soils, hot-humid design conditions and local code amendments all feed into quantities. We price with ZIP-code-adjusted material and labor rates and organize every takeoff by CSI MasterFormat division. Builders working the eastern metro corridor also send us plans for Collierville construction estimating and Hendersonville construction estimating.
These are the scopes we take off most often for Bartlett and Shelby County projects, each delivered in Excel and PDF with marked-up plan sets.
Full quantity takeoff for detached homes, from footing excavation through finish carpentry, organized by division.
EA · SF · LFPier-and-grade-beam and slab-on-grade quantities sized for Shelby County's expansive clay subsoils.
CY · LF · TONStud, plate, header, joist and sheathing counts with typical waste factors applied and listed separately.
BF · LF · EAFootings, stem walls, slab and flatwork volumes with formwork and reinforcement broken out by pour.
CY · SF · LBAsphalt shingle and low-slope systems measured by squares, with underlayment, flashing and vent counts.
SQ · LF · EAResidential and light commercial mechanical, electrical and plumbing rough-in counts tied to fixture and device schedules.
EA · LF · TONClearing, grading, erosion control and utility trenching quantities for infill and small subdivision lots.
CY · SF · LFDivision-by-division estimates for retail, office and light industrial scopes when your Bartlett project is not residential.
SF · EA · TONBartlett's 2025 permits were all single-family, so builders here need fast, repeatable takeoffs for foundation, framing, and finishes on detached homes, not multifamily templates.
You are pricing against Memphis-area subcontractors who know local material costs. Our ZIP-adjusted RSMeans pricing and marked-up plans give you line-item backup for bid reviews.
Bartlett's older subdivisions have homes from the 1970s through the 2000s, and additions and kitchen or bath remodels require selective demolition quantities and matching existing framing.
West Tennessee soils and flat lots mean slab-on-grade and stem-wall foundations dominate. We quantify formwork, rebar, vapor barrier, and concrete by pour so your bid covers the actual yardage.
Steep-slope shingle roofs and brick or fiber-cement exteriors are standard here. We measure squares, ridge, valley, and starter course, plus soffit and fascia, from the elevation set.
If you are splitting a lot or building a small infill project in Bartlett, a trade-package estimate lets you compare contractor bids on scope rather than lump sums.
We estimate from plan sets for projects across Bartlett and the surrounding Shelby County communities. If your project is outside these areas, send the address and we will confirm coverage.
Bartlett's 2025 permit record was 37 single-family units and no multifamily, so detached housing drives most of the takeoff work here. We also estimate the light commercial and institutional projects that support those neighborhoods.
Custom and production homes on slab or crawl space. We take off foundation, framing, roofing, windows, and interior finishes by floor, with waste factors listed separately.
Watch for: Slab thickness, rebar schedule, and brick ledge dimensions.
Room additions, sunrooms, and garage conversions. The takeoff must tie new framing into existing structure, so we quantify headers, ties, and roof tie-in separately.
Watch for: Roof pitch match and wall framing size.
Kitchen and bath renovations, flooring replacement, and window upgrades. Selective demolition, temporary protection, and patch-and-match drywall are listed as separate line items.
Watch for: Existing substrate condition and lead-safe requirements.
Small office, retail, and church projects along the major corridors. We estimate masonry, structural steel, storefront, and MEP rough-in by CSI division.
Watch for: Fire-rated assemblies and ADA restroom counts.
Driveways, patios, sidewalks, and slab replacements. We measure square footage, thickness, base stone, and reinforcement, then convert to cubic yards per pour.
Watch for: Subgrade prep and expansion joint layout.
Shingle tear-offs and re-roofs on steep-slope homes. We count squares, ridge and hip, valley, and penetration flashing, plus dumpster and disposal as separate items.
Watch for: Decking replacement allowance and ice barrier at eaves.
Bartlett is a built-out Memphis suburb, so estimates are driven by residential code compliance, West Tennessee soils, and the logistics of working in established neighborhoods.
Bartlett issues its own residential permits, and plan review checks energy code compliance, egress, and smoke and CO alarm placement. The adopted IRC and IECC editions can change with each code cycle, so confirm the current edition and any local amendments with the Bartlett building department before you finalize your permit set. Allow time for review comments that can add glazing, insulation, or bracing scope.
Shelby County · Bartlett Building Department · IRC · IECCMuch of Shelby County is underlain by loess and clay soils that shrink and swell with moisture. Geotechnical reports often call for drilled piers, over-excavation, or moisture conditioning under slabs. That changes concrete yardage, rebar, and formwork quantities, so we price foundations from the soils report rather than a default detail. If no report is available, we carry an alternate line for pier foundations.
Loess soils · Drilled piers · Geotechnical report · Vapor barrierWest Tennessee sees high summer humidity, freeze-thaw cycles, and severe thunderstorm or tornado risk. Those conditions drive roof underlayment, flashing details, wind-rated shingles, and exterior moisture management. We include house wrap, flashing tape, and drainage plane quantities that a dry-climate estimate would miss. HVAC sizing also shifts with humidity load, so manual J assumptions belong in the MEP scope.
Freeze-thaw · Wind-rated shingles · House wrap · Manual JBartlett competes for trades with the broader Memphis market, where labor rates are lower than Nashville but availability tightens when large commercial projects start. We adjust labor hours by ZIP code and note where crew size or overtime assumptions affect the number. Your bid should separate material and labor so you can see which side is driving cost.
Memphis labor market · ZIP-adjusted rates · RSMeans · OvertimeBartlett's flat terrain and clay soils slow percolation, so lot grading, swales, and storm drainage are real cost items on infill and addition projects. We quantify cut and fill, topsoil stripping, and any required drainage structures from the civil sheets. On tight lots, limited equipment access and spoils haul-off add to the sitework number.
Flat terrain · Clay soils · Swales · Cut and fillMost building materials reach Bartlett from Memphis suppliers and distribution yards, so freight is short but fuel and delivery surcharges still move the number. Brick, shingles, and concrete are regional products with published price swings. We use current RSMeans data adjusted by ZIP code, then flag commodities where a quote should replace the database price before you sign a contract.
Memphis suppliers · Freight surcharges · RSMeans · Commodity pricingBartlett sits on the eastern edge of Shelby County, where expansive loess soils, summer storm loads, and a mostly single-family permit mix shape what belongs in each division. Here is how we build those local conditions into the line items you will actually price.
Most Bartlett lots are cut into gently rolling ground, so we take off unclassified excavation by cut depth and separate topsoil strip from structural fill. On tight infill lots, we carry a line for haul-off because there is often no room to waste spoil on site. Trenching for water, sewer, and downspout laterals is measured by linear foot with bedding stone and backfill shown separately. We also flag any lot that appears to need a retaining wall or swale, since those items rarely appear on the civil sheet but always show up in the field. For a deeper breakdown of these items, see our sitework estimating services.
Bartlett's housing stock runs to two-story traditional and brick-veneer plans, so framing takeoffs need wall height changes at the second-floor line and header schedules broken out by opening width. We count studs by wall segment with plates and blocking shown separately, then apply typical waste factors of 5 to 10 percent on dimensional lumber and more on engineered members cut to length. Roof framing is taken off by rafter or truss count with sheathing by square. If the plan shows a vaulted great room or a bonus room over the garage, we list the additional framing and the ceiling-height implications as their own lines. Framing estimating services can handle the full package.
Mechanical, plumbing, and electrical rough-in on a Bartlett house is usually priced from the plan's fixture and device counts, so we build a schedule of receptacles, switches, lights, and data outlets by room rather than a single allowance. Plumbing is taken off by fixture with supply and drain runs by linear foot, and HVAC by tonnage with ductwork by linear foot and register count. We call out the gas line to the range or water heater and the condensate drain separately, because those are common omissions. If the plan shows a tankless unit or a zoned system, that changes the equipment line. Our MEP estimating services handle the full set.
Foundations in this part of Shelby County commonly bear on stiff clay and silt, so we take off continuous footings, stem walls, and slab-on-grade separately rather than as a lump-sum yardage. We measure formwork by square foot of contact area, not by wall length, and list anchor bolts, sill seal, and vapor barrier as distinct lines. Driveway and patio flatwork is taken off at 4-inch thickness unless the plan calls for thicker sections at the apron. Post-tension or pier-and-beam details change the reinforcing takeoff enough that we ask for the structural sheet before we price. Our concrete estimating services cover these divisions in detail.
Roofs here take hail and summer wind, so we take off architectural shingles by square with starter, ridge, hip, and valley flashing as separate lines rather than bundled into the shingle quantity. Underlayment is measured by square with ice-and-water membrane shown at valleys and eaves per the plan detail. Brick veneer, house wrap, and weep screed belong in this division too, and we measure veneer by square foot of wall face, not by brick count. Ventilation — ridge vent, soffit vent, and any attic fan — is listed so you can see the balance. Roofing estimating services covers these assemblies.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24 in x 12 in | 18.5 | CY |
| 03 20 00 | Rebar, #4 continuous footing | 1,240 | LF |
| 06 10 00 | 2x4 stud wall, 8 ft plate | 2,860 | SF |
| 06 10 00 | 2x10 floor joists, 16 in o.c. | 1,920 | SF |
| 07 30 00 | Architectural shingles | 32 | SQ |
| 07 30 00 | Ice-and-water membrane at valleys | 180 | LF |
| 09 30 00 | Ceramic tile, baths and laundry | 310 | SF |
| 22 40 00 | Plumbing fixtures, rough and set | 9 | EA |
This example walks through a slab-on-grade takeoff for a 2,400-square-foot house on a Bartlett lot. Dimensions are illustrative and would be replaced by the actual plan dimensions before you price the job.
Step 1 — Establish the slab area. The plan shows a 40 ft by 60 ft footprint, or 2,400 SF. We add the garage apron and the front stoop separately rather than folding them into the main slab, because thicknesses differ.
Step 2 — Convert area to volume. The main slab is 4 in thick, so 2,400 SF x (4/12) ft = 800 CF. Dividing by 27 gives 29.6 CY. The garage apron is 20 ft x 20 ft at 5 in thick: 400 SF x (5/12) = 166.7 CF, or 6.2 CY. The stoop is 6 ft x 4 ft at 4 in: 24 SF x (4/12) = 8 CF, or 0.3 CY.
Step 3 — Add waste and round. Concrete is ordered in whole yards with a typical waste factor of 5 to 10 percent for slab work. Applying 7 percent to the total of 36.1 CY gives 38.6 CY, which we round to 39 CY.
| Step | Calculation | Quantity | Unit |
|---|---|---|---|
| Main slab | 2,400 SF x 0.333 ft | 29.6 | CY |
| Garage apron | 400 SF x 0.417 ft | 6.2 | CY |
| Stoop | 24 SF x 0.333 ft | 0.3 | CY |
| Subtotal | 29.6 + 6.2 + 0.3 | 36.1 | CY |
| With 7% waste | 36.1 x 1.07 | 38.6 | CY |
| Order quantity | rounded up | 39 | CY |
Step 4 — Carry the related lines. Vapor barrier is taken off at the slab area plus 6-in laps, so 2,400 SF becomes roughly 2,650 SF of 10-mil poly. Welded wire mesh or fiber reinforcement is measured by the same area. Anchor bolts are counted from the plate layout, and sill seal is measured by the perimeter of the exterior walls.
Step 5 — Check against the structural sheet. If the plan calls for a thickened edge, a turned-down footing, or a post-tensioned slab, the volume changes and the reinforcing takeoff changes with it. We do not price a slab from the architectural sheet alone. For a full foundation package, foundation estimating services covers the footing, stem wall, and slab together.
Pricing depends on the scope and the number of sheets, not on the city alone. A single-family takeoff is a smaller package than a full commercial set with MEP, sitework, and finishes. We quote from the plans you send, and our turnaround is typically 24 to 48 hours for most projects, with rush available. Send the plan set and we will confirm scope and price before we start.
Send the full plan set, including architectural, structural, civil, and MEP sheets, plus any specifications and the bid form. If you have a preferred unit price source or a labor rate you want used, note it. Marked-up plan sets come back with the Excel and PDF takeoff, organized by CSI MasterFormat division, so you can trace every quantity to the sheet it came from.
The figures we cite come from the U.S. Census Bureau Building Permits Survey. That survey counts permits issued by the city itself for new privately-owned residential units only, so it does not include commercial permits, additions, or renovations. For the 2025 survey year, Bartlett issued 37 new residential units, all single-family, with a permitted value of $11M, or an average of $308,400 per unit.
Yes. The city issues building permits for new residential construction and for additions and alterations that affect structural, electrical, plumbing, or mechanical systems. The specific submittal requirements, plan review turnaround, and inspection sequence are set by the local building department, so confirm the current adopted code edition and the submittal checklist with the department before you pull. We take off from the approved set, so permit comments that change the scope should be reflected before we price.
Much of Shelby County is underlain by loess and clay soils that shrink and swell with moisture. That drives foundation design toward continuous footings, pier-and-beam, or post-tensioned slabs rather than a simple spread footing. For a takeoff, it means we separate footing, stem wall, and slab quantities and carry reinforcing by bar size and length. The geotechnical report governs the final design, and we price from the structural sheet that follows it.
We apply waste by material rather than one blanket percentage. Dimensional lumber typically carries 5 to 10 percent, sheathing and drywall run higher because of cutoffs, and concrete is ordered in whole yards with a typical 5 to 10 percent allowance. Roofing is taken off by the square with starter and ridge cap as separate lines. You see the waste factor on each line, so you can adjust it to your own field practice.
Yes. We take off commercial work by CSI MasterFormat division, with separate quantities for sitework, concrete, structural steel, envelope, interiors, and MEP. Commercial sets usually carry more detail in the specifications than the drawings, so we ask for both. Our commercial estimating services cover retail, office, light industrial, and institutional scopes, and the same ZIP-code-adjusted pricing applies.
Yes. We cover Bartlett and the surrounding Shelby County market, including Collierville, and we also work in Franklin, Jackson, Johnson City, Hendersonville, and Kingsport. Material and labor pricing is adjusted by ZIP code, so a takeoff for a Bartlett address reflects the local market rather than a statewide average. If your project is outside these areas, send the address and we will confirm coverage.
We use Bluebeam Revu for plan markup and quantity extraction, PlanSwift for assemblies and linear takeoffs, and RSMeans data for unit cost reference. Deliverables come as Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets so you can see where each quantity came from. That format drops into most estimating and bid leveling workflows without reformatting.
Most projects turn around in 24 to 48 hours from the time we have a complete set of plans. Larger commercial packages or sets with incomplete MEP drawings take longer, and we tell you that up front rather than after the deadline. Rush service is available when your bid date is tight. Send the plans through our get an estimate page and we will confirm the schedule.
Send your plan set and we will confirm scope, turnaround, and price for a takeoff organized by CSI MasterFormat division.