Sitework takeoffs
Cut and fill, stripping, erosion control, and utility trenching for hillside and river-terrace sites where grades change fast.
CY · LF · TONScope Precision Estimate produces CSI MasterFormat takeoffs and marked-up plan sets for contractors bidding work in New Castle, Lawrence County, and the surrounding western Pennsylvania corridor. We price material and labor by ZIP code and deliver Excel and PDF quantities in 24–48 hours for most projects.
New Castle estimating turns on four local drivers: Lawrence County's aging masonry and mill-era building stock, hillside and river-terrace sitework along the Shenango River, freeze-thaw cycles that drive frost-depth footings and roof snow loads, and sparse new residential permitting that pushes bid volume toward renovation, demolition, and small commercial work.
New Castle sits in Lawrence County, about an hour north of Pittsburgh and close to the Ohio line, where the Shenango River and its terraces shape how sites drain and how foundations get set. Most of the work we price here is not new subdivision construction. It is mill-era masonry and brick buildings being renovated, small commercial fit-outs, demolition and abatement packages, and residential repair scopes where the existing structure decides the quantity more than the drawings do.
We build takeoffs the way a bid actually gets assembled: CSI MasterFormat divisions, marked-up plan sets, and quantities you can hand to a supplier or a subcontractor without re-measuring. Material and labor pricing is ZIP-code adjusted, so a New Castle bid does not carry Pittsburgh or Philadelphia pricing by accident. If you are pricing across the region, start with our Pennsylvania construction estimating page, or compare scopes with nearby Easton and Johnstown work.
For bidders. You need quantities fast enough to hit a bid date. We return most takeoffs in 24–48 hours, organized by division, with marked-up plans so you can defend every line in a scope review.
For builders. You are buying material and scheduling crews. We break out units by assembly — concrete, framing, roofing, MEP — so your purchase orders and labor hours match the estimate rather than a lump sum.
For owners. You are comparing contractor proposals on a renovation or small commercial project. We give you a third-party quantity baseline and a division-level budget you can check bids against.
Select a bar to compare New Castle with the largest Pennsylvania markets we cover.
0 new housing units in 2025 (-100% vs 2024).
0 single-family · 0 multifamily (0%).
The U.S. Census Bureau Building Permits Survey shows New Castle issued 0 new privately-owned residential units in 2025, down from 1 unit in 2024, a 100% change, ranking 22 of 25 among the covered Pennsylvania cities. Statewide, those covered cities totaled 5,912 units, and New Castle's share rounds to 0%. Read that as a market signal, not a dead market: when new residential permitting is this thin, the bid volume lives in renovation, adaptive reuse, demolition, and small commercial and institutional work. Contractors pricing here should expect existing-condition takeoffs, selective demolition quantities, and unit-price backup rather than clean new-build plans. Our Pennsylvania construction estimating page covers how we handle that mix statewide.
Statewide demand drivers — Philadelphia and Pittsburgh redevelopment, life-sciences campuses, and warehouse growth along the I-78 and I-81 corridors — sit east and south of Lawrence County, so New Castle contractors often travel for work. That travel changes estimating: labor rates, per diem, and mobilization have to be built into the bid rather than assumed. If your backlog reaches toward the Lehigh Valley or central PA, our Easton, Hazleton, and Lebanon pages describe the same CSI-organized deliverable for those markets. Locally, the steady work is renovation of older housing stock, municipal and school building repairs, and light industrial and warehouse space along the Route 422 and I-376 corridors.
These are the scopes we price most often for Lawrence County and western Pennsylvania projects, each delivered by CSI MasterFormat division with marked-up plans.
Cut and fill, stripping, erosion control, and utility trenching for hillside and river-terrace sites where grades change fast.
CY · LF · TONFootings, walls, slabs, and flatwork priced with local frost depth and freeze-thaw exposure in mind for western PA.
CY · SF · LFSpread footings, stem walls, waterproofing, and drainage for renovations where existing foundations set the scope.
CY · SF · LFWood and light-gauge framing counts for additions and gut renovations, including blocking and sheathing waste.
LF · SF · EATear-off, underlayment, membrane, and flashing for low-slope commercial and steep-slope residential roofs.
SQ · LF · EAPlumbing, HVAC, and electrical takeoffs for commercial fit-outs and residential system replacements in older buildings.
LF · EA · TONDivision-level budgets for retail, office, and light industrial work along Route 422 and the I-376 corridor.
SF · LS · EARepair, remodel, and addition estimates for New Castle's older housing stock, including selective demolition.
SF · LF · EABidding mill-era masonry renovations and small commercial fit-outs along the Shenango River, where existing walls and floors drive quantities more than the drawings do.
Pricing brick repointing, lintel replacement, foundation underpinning and slab work on Lawrence County buildings where concealed conditions change the scope after demolition.
You need separate quantities for structural demolition, selective interior strip-out and regulated material handling so the bid survives a scope review with the owner.
Comparing contractor proposals on a downtown building purchase or a conversion, and you want a division-level baseline before you sign a construction contract.
Checking that your drawings produce a buildable quantity set, and catching missing assemblies before the project goes out to three or four bidders.
Scoping roof replacement, exterior masonry repair and mechanical replacement on older rental stock where the same repair repeats across several buildings.
We price projects across Lawrence County and the surrounding western Pennsylvania and eastern Ohio corridor. If your site is inside one of these areas, the takeoff carries the right ZIP-code-adjusted pricing.
The city issued no new privately-owned residential permits in 2025, after one in 2024, so most of the work here is renovation, repair and small commercial rather than new subdivision construction. These are the property types we price most often.
Brick and stone commercial buildings with wood floor joists, tall storefront openings and parapets. Takeoff has to measure existing wall area, not the architect's new finish square footage, and separate repointing from full reconstruction.
Watch for: Lintels, parapet rebuild, concealed joist rot
Retail, office and restaurant build-outs in existing shells downtown and along the commercial corridors. Partition layout, ceiling height and the condition of the existing mechanical system set the scope more than the tenant plan does.
Watch for: Existing HVAC capacity, ADA restroom upgrades
Roof replacement, porch rebuilds, foundation repair and interior renovation on older single-family and two-family houses. Quantities come from field measurement because as-built drawings rarely exist for this housing stock.
Watch for: Roof sheathing, porch footings, window headers
Upper-floor apartments carved out of former commercial buildings, plus renovation of existing small apartment buildings. Unit counts, corridor lengths, fire separation and separate utility metering drive the division-level quantities.
Watch for: Fire-rated assemblies, sound isolation, egress
Shop buildings, storage and small manufacturing space near the river and the highway corridors. Slab thickness, column spacing, overhead door sizes and utility service capacity are the line items that move the number most.
Watch for: Slab reinforcement, service amperage, clear height
Structural demolition, interior strip-out and site clearing on blighted or storm-damaged buildings. Volume of debris, haul distance and regulated material handling are the quantities that decide whether the bid holds.
Watch for: Asbestos and lead survey, disposal tonnage
Two bids on the same New Castle building can differ by a wide margin because of conditions that never appear on the drawings. These are the drivers we price explicitly rather than bury in a contingency.
New Castle and Lawrence County review projects under the Pennsylvania Uniform Construction Code, with the adopted edition of the IBC, IRC and IECC varying by amendment cycle. Renovation and change-of-occupancy permits trigger separate plan review and sometimes accessibility upgrades that the base scope does not include. Confirm the adopted code edition and local amendments with the city or county building department before you lock the estimate.
Pennsylvania UCC · IBC · IECC · city building departmentThe Shenango River valley carries alluvial soils and fill from a long industrial history, so bearing capacity and groundwater depth vary between a downtown lot and a hillside parcel. Underpinning, over-excavation and dewatering are common line items on renovation projects where the original footings are shallow and undocumented. A geotechnical report or test pit log changes the foundation quantity more than any other single input.
Alluvial soils · fill · underpinning · dewateringWestern Pennsylvania design conditions include roughly 30 psf ground snow load, freeze depth near 36 inches and summer humidity that drives roof ventilation and moisture detailing. Ice damming at eaves and freeze-thaw cycling on exterior masonry are recurring repair drivers on older buildings. Use the snow load and frost depth your local code official confirms for the specific site.
Ground snow load · frost depth · ice damming · freeze-thawNew Castle sits in the Pittsburgh-Youngstown corridor, and masonry, abatement and mechanical crews are limited relative to demand. Travel time from Pittsburgh or Youngstown, prevailing wage requirements on publicly funded work, and overtime on occupied renovations all move the labor line. Price the crew you can actually staff, not the crew the schedule assumes.
Prevailing wage · crew travel · occupied renovation · overtimeSloping lots, river terraces and combined storm and sanitary lines in older parts of the city make sitework quantities hard to read from a plan. Erosion and sediment control, temporary water handling, and the condition of existing storm inlets are frequently missed in bids. A site visit or utility locate before pricing saves more than it costs.
Erosion and sediment control · storm inlets · combined sewers · site gradingBrick, structural steel and specialty mechanical equipment often ship from Pittsburgh, Cleveland or Youngstown, so freight and lead time belong in the estimate. Pennsylvania sales tax treatment differs between a materials purchase and a construction contract, and that difference shows up in the final number. Match the material quote basis to how the contract is written.
Freight and lead time · Pennsylvania sales tax · material quotes · supplier termsLawrence County's housing stock, river terrain and the region's slow new-construction pace shape what a New Castle takeoff actually contains. Below is how we break the work down, division by division.
Most New Castle work is renovation or infill on tight city lots, so the sitework section carries more demolition and haul-off than a greenfield job. We measure selective demolition by square foot of slab and by linear foot of curb, wall and pipe, then separate disposal from salvage. On slopes toward the Shenango River and Neshannock Creek, cut and fill is measured by cross-section rather than a single average depth. Erosion and sediment control items are counted by linear foot of silt fence and by each inlet protection device. A full sitework takeoff on a redevelopment lot frequently runs 10 to 15 percent of the hard-cost total.
New Castle's building stock splits two ways: heavy timber and masonry buildings downtown, and wood-frame housing on the surrounding blocks. For steel, we take off by piece count and weight in pounds, with connection plates and anchor bolts listed individually. For wood framing, we measure wall, floor and roof areas by square foot, then convert to board feet and piece counts for studs, joists, sheathing and headers. Roof framing over older buildings usually needs sistered rafters or new trusses, which we price as an alternate. Our framing estimating service covers this division in detail.
Mechanical, electrical and plumbing takeoffs in New Castle turn on whether the building is being gutted or patched. On gut renovations we count fixtures, devices, diffusers and light fixtures by each, and pipe and duct by linear foot with fittings by each. On occupied buildings, we add temporary heat, phased tie-ins and fire alarm device counts room by room. Domestic water and sanitary lines in older buildings frequently need replacement back to the main, which we carry as a separate linear-foot line. Our MEP estimating service lists the input drawings we need to price these divisions.
Western Pennsylvania freeze-thaw cycles push air-entrainment and mix-design requirements into the concrete line items, not just the note column. We take off footings by cubic yard with formwork by square foot of contact area, then break out slab-on-grade by thickness and reinforcement type. Interior slabs in older New Castle buildings often need undercut and aggregate base replacement, which we carry as a separate cubic-yard line. Flatwork is measured by square foot with joint spacing, dowels and sealant counted separately. See our concrete takeoff process for how we present these quantities.
Low-slope membrane roofs dominate the commercial and institutional buildings along the downtown grid, while steep-slope shingle roofs cover the residential blocks. We take off membrane by square foot including flashing, edge metal by linear foot, and insulation by square foot at each thickness layer. On tear-offs, we count dumpster loads separately because older roofs here often carry two or three prior layers. Air and water barrier, sealants and masonry repointing go in the same division for renovation work. Roofing takeoffs are quoted per square and per square foot depending on the system.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 02 41 19 | Selective demolition, interior partitions | 3,840 | SF |
| 03 30 00 | Cast-in-place concrete, footings | 34 | CY |
| 05 12 00 | Structural steel, lintels and beams | 2,150 | LB |
| 06 10 00 | Rough carpentry, wall framing | 4,120 | SF |
| 07 21 00 | Thermal insulation, walls and roof | 6,300 | SF |
| 07 54 00 | TPO membrane roofing, 60 mil | 2,400 | SF |
| 09 29 00 | Gypsum board assemblies | 5,760 | SF |
| 23 31 00 | HVAC ductwork and diffusers | 410 | LF |
This example sizes studs, plates and sheathing for the exterior walls of a two-story gut renovation. Dimensions are illustrative and would be replaced by actual plan dimensions in a real takeoff.
The building measures 40 ft by 28 ft in plan, two stories, with a wall height of 10 ft per story and a 2 ft parapet on the front wall only.
| Step | Calculation | Result | Unit |
|---|---|---|---|
| Perimeter | 2 × (40 + 28) | 136 | LF |
| Wall area, two stories | 136 × 10 × 2 | 2,720 | SF |
| Parapet area, front wall | 40 × 2 | 80 | SF |
| Gross wall area | 2,720 + 80 | 2,800 | SF |
| Deduct openings | 18 windows × 15 SF + 4 doors × 21 SF | 354 | SF |
| Net wall area | 2,800 − 354 | 2,446 | SF |
| Studs at 16 in. o.c. | 2,446 ÷ 1.333 | 1,835 | EA |
| Stud waste, typical 8% | 1,835 × 1.08 | 1,982 | EA |
| Bottom and top plates | 136 LF × 3 plates × 2 stories | 816 | LF |
| Plate waste, typical 5% | 816 × 1.05 | 857 | LF |
| Sheathing | 2,446 × 1.10 | 2,691 | SF |
Three points matter on this takeoff. First, the parapet is measured separately because it sits above the top plate and needs its own blocking and cap flashing. Second, openings are deducted at rough-opening size, not unit size, so the deduction is smaller than a window schedule suggests. Third, stud count at 16 in. o.c. is a linear-foot conversion, not a piece count from the plan; a real takeoff would count corners, intersections and headers individually and add blocking by each location.
Cold-weather framing in Lawrence County affects the schedule more than the material quantity. If the building is dried in after November, the framing package usually needs temporary heat and enclosures carried as a general condition, not in Division 06. We price both and show them separately so you can see the cost of the schedule you chose.
For the full division breakdown on a project like this, see our Pennsylvania construction estimating services page.
For a gut renovation we need the architectural, structural, mechanical, electrical and plumbing sheets, plus any demolition plan. If the building is pre-1950, a survey or existing-conditions report helps because wall and floor framing often differs from what the drawings assume. If you only have a scope narrative, we can still price from it, but we will list assumptions and exclusions so you know what is not covered.
We price labor at the rate basis you tell us to use. If the project is publicly funded and carries a prevailing wage requirement, send the wage determination and we will build the rates into the labor hours rather than applying a blanket multiplier. Otherwise we use ZIP-code-adjusted market rates for Lawrence County. Tell us at the start which basis applies, because it changes the labor column materially.
Yes. We take off selective demolition by square foot of partition, slab and roof area, and by linear foot of pipe, duct and curb. Abatement is listed as a separate line with its own unit and is never bundled into general demolition. On older New Castle buildings, assume some abatement scope until a survey says otherwise, and confirm the applicable regulations with the Pennsylvania Department of Environmental Protection and your local building department.
Yes. Permit sets are common for residential additions and small commercial work here, and we price them with a written list of assumptions. We flag items that permit drawings typically leave to the contractor, such as temporary utilities, final grading, and connection fees. Those become exclusions or allowances in the estimate so the bid total is not a surprise later.
We add cold-weather items as separate lines: temporary heat and enclosures, concrete accelerators or heated blankets, and additional cure time in the schedule. Masonry and stucco work below the manufacturer's minimum temperature gets its own note. These items are not part of the trade quantity, so we show them in general conditions where you can decide whether to carry them or shift the schedule.
Most projects come back in 24 to 48 hours, and rush service is available if your bid date is close. Larger gut renovations with full MEP scope take longer because we take off each division separately. Send the plans and your bid date through our estimate request form and we will confirm the delivery time before starting.
Yes. Supervision, temporary facilities, hoisting, dumpsters, final cleaning and permits are listed under general conditions, not buried in a trade division. That structure lets you compare our number against a competitor's bid line by line. If your bid form requires a different structure, tell us and we will reorganize the estimate to match it.
We carry rock excavation as a separate unit, usually by cubic yard, with an assumed depth and a note about the basis. Western Pennsylvania soils include shale and sandstone at varying depths, so a test pit or geotechnical report changes the number significantly. If no borings exist, we price the soil portion and add a rock allowance with a stated quantity so you can adjust it after excavation begins.
The permit figures we cite come from the U.S. Census Bureau Building Permits Survey, and they count new privately-owned residential units only. They do not include commercial permits, renovations or additions. In New Castle, the city issued 0 new residential units in 2025 after 1 in 2024, which is why most of the local estimating demand is for renovation, adaptive reuse and commercial work rather than new housing.
Yes. We cover Lawrence County and the surrounding region, including Easton, Lebanon, Hazleton, Johnstown, McKeesport and Pottstown. The takeoff method is the same, but labor rates, permit requirements and soil conditions differ by county, so we price each location on its own basis. Send the project address with the plans and we will apply the right ZIP-code adjustment.
Send your drawings, scope notes and bid date, and we will return a division-by-division takeoff in Excel and PDF within 24 to 48 hours.