Scope Precision EstimateContact Us

Openings Estimating Services

Send your architectural plans, door schedules and specs. We return a door-by-door Division 08 takeoff in Excel and PDF, priced with ZIP-adjusted material and labor.

24–48 hours for most projectsTypical turnaround
Excel + marked-up PDFsOrganized by CSI section
ZIP-code pricingLocal material and labor
Price confirmed firstBefore any work starts
Sample estimate sheet
Division 08 — OpeningsSample format
Line itemQtyUnitCount
Hollow metal frame 3'-0" × 7'-0"128EA128 EA
Flush wood door 3'-0" × 7'-0"96EA96 EA
Hardware set — Group 196SET96 SET
Aluminum storefront 10'-0" high420SF420 SF
Glazing — 1/4" tempered1,260SF1,260 SF
Total openings items128 EA
Illustrative quantities. Waste factor applied as a separate line.
Frame anchors checked

What is openings estimating?

Openings estimating is the door-by-door takeoff of CSI MasterFormat Division 08: metal and wood doors, hollow metal frames, finish hardware sets, storefront, glazing and related accessories. Each opening is counted with its frame type, door type, handing, fire rating label and hardware set carried as separate lines. Deliverables come in Excel and PDF with marked-up plan sets.

  • Units are EA for doors, frames, hardware sets; SF for glazing and door faces.
  • Typical waste factor for hollow metal frames is 2–5%, but confirm with supplier.
  • The most costly miss is electrified hardware rough-in not carried in the hardware set.

Openings estimating is the door-by-door takeoff of Division 08: metal and wood doors, hollow metal door frames, finish hardware sets, storefront, glazing and the related accessories that hang off those openings. You need it when you are bidding a Division 08 package, buying out a door and hardware subcontract, or checking a submittal schedule against the architect's door schedule. The work is not a lump-sum allowance for "doors and hardware" — it is a count of every opening with its frame type, door type, handing, fire-rated door label and hardware set carried as separate lines.

Deliverable
Excel estimate + marked-up PDF plans
Organized by
CSI MasterFormat section
Turnaround
24–48 hours for most projects
Pricing
ZIP-code-adjusted material and labor pricing
Software
Bluebeam Revu, PlanSwift, RSMeans data

We take off from the same documents the subcontractor prices from: the door schedule, hardware schedule, floor plans, reflected ceiling plans, wall sections and the Division 08 specification sections. Each opening is tagged to the sheet and detail where it appears, so you can trace any line back to the drawing. Frames are separated by anchor condition — masonry strap, welded Z, snap-in or cast-in — because the anchor is often specified under a different section than the frame and gets missed. Hardware is grouped by set, not by piece, so keying, cylinder types and electrified rough-in stay attached to the opening they serve.

Our deliverables are organized by CSI MasterFormat division and come back in Excel and PDF with marked-up plan sets. Pricing uses RSMeans data adjusted by ZIP code for material and labor, so a hollow metal frame in a high-cost metro does not carry the same number as one in a rural county. Typical turnaround is 24–48 hours, with rush available. If your scope crosses into adjacent trades, we can coordinate the takeoff with Glass & Glazing Estimating for curtain wall and storefront, Wood, Plastics & Composites Estimating for architectural wood door leaves, and Interior & Exterior Finishes Estimating for door painting and wall finishes at openings.

If you are comparing bidders, an outsourced openings estimating company gives you a second set of quantities to check the low number against. We also take off the adjacent scopes that touch the opening: Fire Protection & Sprinkler Estimating where a rated wall carries a sprinkler head, and Fire Alarm & Low Voltage Estimating where door holders, releases and access control devices are wired to the opening. Send the bid package and we will return a line-item openings estimate for contractors, ready to drop into your bid form.

Services

What our openings quantity takeoff covers

We measure Division 08 from the door schedule and hardware schedule, then reconcile every opening against the floor plans and wall types. Frames, leaves, hardware, glazing and accessories are each carried as separate lines so you can see where the money sits. Related items that belong to other divisions are listed as exclusions with a note on where they should be picked up.

Hollow Metal Frames

Knock-down and welded frames measured by opening, with jamb depth, throat size and anchor condition (masonry strap, welded Z, snap-in).

EA

Wood Doors

Flush, stile-and-rail, veneer, plastic laminate and FRP door leaves priced by size, face and core, including factory machining.

EA

Finish Hardware Sets

Hinges, locksets, closers, exit devices, stops and silencers grouped by set, with keying and cylinder types attached to each opening.

SET

Electrified Hardware

Power transfer hinges, raceways, conduit stubs and electric strikes measured as rough-in per opening for access control integration.

EA

Fire-Rated Openings

20/45/60/90 minute labels, gasketing, self-closers and fire-rated glazing counted and priced with label requirements.

EA

Storefront & Entrances

Aluminum storefront, entrance doors, head, sill, jamb, mullion and corner conditions measured by LF and EA.

LF · EA

Glazing Infill

Vision lites, sidelites, tempered, laminated and fire-rated glazing priced by SF, including edge clearance and setting blocks.

SF

Accessories & Finishes

Access doors, roof hatches, louvers, thresholds, weatherstripping, sweeps, astragals, and door finish quantities by SF of door face.

EA · SF

What every openings estimating takeoff includes

  • Hollow metal frames — knock-down and welded, with jamb depth and throat size
  • Wood doors — flush, stile-and-rail, veneer, plastic laminate and FRP faces
  • Finish hardware sets — hinges, locksets, closers, exit devices, stops and silencers
  • Electrified hardware rough-in — power transfer hinges, raceways and conduit stubs
  • Door handing and swing — LH, RH, LHR, RHR, pairs and Dutch doors
  • Fire-rated openings — 20/45/60/90 minute labels, gasketing and self-closers
  • Aluminum storefront and entrance doors — head, sill, jamb, mullion and corner
  • Glazing infill — vision lites, sidelites, tempered, laminated and fire-rated glazing
  • Access doors and roof hatches — size, rating and mounting condition
  • Louvers and vents — fixed and operable, with screens and sill flashing
  • Thresholds, weatherstripping, sweeps and astragals at exterior openings
  • Door finish quantities — paint, stain or plastic laminate face by SF of door face
How we work

How our door and window estimator takes off a package

  1. Read the door scheduleWe start with the door and hardware schedule, not the plans. Every opening gets a tag, and we record the door type, frame type, handing, fire rating, hardware set and finish exactly as scheduled. Openings that appear on the plans but not the schedule are flagged for an RFI before pricing.
  2. Trace wall types and anchorsEach frame is matched to its wall assembly — CMU, metal stud, gypsum board or concrete — because the anchor condition changes the frame price. Masonry straps, welded Z's, snap-in anchors and cast-in anchors are separated by condition. We check the wall sections and details for jamb depth and throat size.
  3. Count leaves and hardwareLeaves are counted by type: hollow metal, wood veneer, plastic laminate, FRP. Hardware is grouped by set, then exploded into hinges by quantity and weight, locksets, closers, exit devices, stops and silencers. Electrified items are listed separately so the Division 26 conduit scope is visible.
  4. Measure storefront and glazingStorefront is measured as a linear perimeter for head, sill, jamb and mullion extrusions, then converted to SF of glazed area. Glazing infill is separated by type — tempered, laminated, fire-rated — because the per-SF price differs and the fire-rated glazing often hides in a rated wall not shown on the schedule.
  5. Price with ZIP-adjusted dataMaterial and labor are priced from RSMeans data adjusted by ZIP code. We keep frame, leaf, hardware and glazing as separate cost buckets so you can see which portion of the package is driving the number. Waste is applied as a separate line, not buried in the unit price.
  6. Mark up and deliverEvery opening is marked on the plan set with its tag and schedule reference. The Excel workbook is organized by CSI section with a summary tab by opening type. The PDF includes the marked-up plans so your estimator can spot-check any line against the drawing.

What we need from you

  • Door scheduleThe schedule is the primary takeoff source. Without it we work from plans and tag openings ourselves, which adds time and RFI risk.
  • Hardware scheduleHardware sets, keying schedule and cylinder types drive the hardware cost. If it is missing, we price from a typical set and note the assumption.
  • Floor plansPlans confirm opening counts, handing and wall types. We reconcile plan openings against the schedule and flag discrepancies.
  • Wall sections and detailsJamb depth, throat size and anchor condition come from the wall details. These change the frame price more than the door size does.
  • SpecificationsDivision 08 sections tell us what is specified versus what is shown. We also check Division 04, 07, 09 and 26 for scope that belongs at the opening.
  • Finish scheduleDoor finish — paint, stain, laminate — is measured as SF of door face. The finish schedule tells us which doors get which finish.
Sample output

Sample takeoff format

The sample below shows how a Division 08 takeoff is organized. Each line carries a CSI section, a measured quantity and a sheet reference so you can trace it back to the drawing.

Sample format — illustrative quantities
SectionLine itemQtyUnitRef.
08 11 00Hollow metal frame 3'-0" × 7'-0", 5-3/4" jamb, masonry strap anchors128EAA-201
08 14 00Flush wood door 3'-0" × 7'-0", 1-3/4" thick, paint grade96EAA-201
08 71 00Hardware set Group 1 — 3 hinges, lockset, closer, stop96SETA-601
08 43 00Aluminum storefront, 2" × 4-1/2" system, 10'-0" high420SFA-301
08 81 13Glazing — 1/4" tempered, vision lite and sidelite1,260SFA-301
08 33 00Coiling counter door, 8'-0" × 8'-0", chain hoist4EAA-201
08 34 53Detention door and frame, 3'-0" × 7'-0", security glazing6EAA-401
08 90 00Louver, fixed, 4'-0" × 4'-0", aluminum, bird screen12EAA-201
08 71 00Electrified hardware set Group 2 — card reader, power transfer hinge, request-to-exit24SETA-601
08 11 00Hollow metal frame 3'-0" × 7'-0", 5-3/4" jamb, welded Z anchors for metal stud64EAA-202
08 14 00Flush wood door 3'-0" × 7'-0", 1-3/4" thick, plastic laminate face32EAA-202
08 71 00Hardware set Group 3 — 3 hinges, deadbolt, closer, door stop48SETA-602

Units of measure we take off

Openings mix counted items with measured areas and lengths. The unit tells you whether the line is a schedule count, a wall opening area or a perimeter condition.

ItemUnitHow it's measured
Doors, frames, hardware sets, access panels, louversEACounted one per opening from the door schedule; pairs counted as two leaves.
Glazing, storefront, curtain wallSFWidth times height of the glazed area, measured inside the frame opening.
Storefront perimeter, head/sill/jamb extrusionsLFLinear run of each extrusion along the opening, including corners and expansion joints.
Hardware sets grouped by functionSETOne set per opening, grouped by function (Group 1, Group 2) per the hardware schedule.
Double-door leavesPAIROne pair equals two leaves and one frame with a pair of hinges per leaf.
Door face for paint, stain or laminateSFDoor width times height times two faces, plus edge banding if specified.
Thresholds, weatherstripping, sweeps and astragalsLFLinear length of each component along the opening perimeter, measured per door leaf.
Door closers, exit devices, locksets, hingesEACounted by piece from the hardware schedule; hinges counted by quantity per leaf.

Worked example: takeoff of a single door opening

This walkthrough uses an illustrative opening to show the sequence and math behind one line in the takeoff. Dimensions and quantities are illustrative and do not come from a specific project.

Opening: 3'-0" × 7'-0" single door in a 1-hour rated masonry wall, with a hollow metal frame, flush wood door, and Group 1 hardware set.

  1. Count the opening. From the door schedule, tag 101A: 1 EA door, 1 EA frame, 1 SET hardware. No calculation yet — just the count. Record the schedule page and detail reference for traceability.
  2. Measure the frame. Jamb depth from wall detail: 5-3/4" (CMU + furring). Frame throat: 5-1/4". Anchors: masonry strap, 3 per jamb, 2 at head = 3 + 3 + 2 = 8 straps. Frame is 1 EA. Note: if the wall were drywall, anchors would be different and priced under Division 09.
  3. Measure the door leaf. Nominal size 3'-0" × 7'-0" = 21 SF per face. Two faces = 42 SF for finish. Door is 1 EA. Edge banding: perimeter = 2 × (3 + 7) = 20 LF. If the door has a vision lite, subtract its area from the finish SF and add glazing.
  4. Hardware set. Group 1: 3 hinges (4-1/2" × 4-1/2", standard weight), 1 lockset, 1 closer, 1 stop, 1 silencer set. Counted as 1 SET, but components are listed separately for pricing. Verify hinge quantity and type from the hardware schedule.
  5. Fire rating. Opening is in a 1-hour wall, so door label = 20 min (per NFPA 80, a 20-min door is allowed in a 1-hour wall). Add smoke gasketing: 20 LF perimeter (head + jambs). Add closer and positive latch — already in Group 1. Confirm with local code if the wall is also a smoke barrier.
  6. Glazing. No vision lite scheduled. If added, measure glazed area: e.g., 10" × 30" = 300 sq in ÷ 144 = 2.08 SF. Round to 2.1 SF. For fire-rated glazing, note the rating and type (e.g., 20-min).
  7. Waste. Apply waste as a separate line: frames 2%, doors 3%, hardware 1% (fasteners, extra screws), glazing 5% (breakage). These are typical allowances; adjust based on project conditions.
  8. Convert to pricing units. Frame: 1 EA. Door: 1 EA. Hardware: 1 SET. Finish: 42 SF. Gasketing: 20 LF. Keep units consistent with RSMeans data.
  9. Price with ZIP-adjusted data. Material and labor from RSMeans, adjusted for the project ZIP code. Keep each component as a separate cost bucket. This allows you to see the cost impact of each component.
  10. Mark up. Tag the opening on the plan with 101A and cross-reference to schedule sheets. Include the hardware set number and any notes.

Result for this opening: 1 EA frame, 1 EA door, 1 SET hardware, 42 SF finish, 20 LF gasketing, 8 masonry straps. Repeat for every opening in the schedule. The totals roll up by CSI section. For a project with 150 openings, this process is repeated 150 times, with each opening verified against the schedule and plans.

Cost drivers

What drives door and window cost estimating

Relative impact on a typical estimate for this trade, based on estimator judgment. Select a bar for details.

Scale: 1 = minor, 5 = major relative impact. Estimator judgment, not measured data.
Relative impact 5 / 5

Fire rating and labels

A 90-minute door assembly costs more than a 20-minute assembly because of the label, the closer, the positive latch and the gasketing. Rated openings also require smoke seals and silencers. We check every opening against the wall rating, not just the schedule rating.

Frame anchor condition

A frame with welded Z anchors for a metal stud wall prices differently than the same frame with masonry straps for a CMU wall. The anchor is often specified in a different section than the frame, so it is missed at bid time. We separate anchors by condition and price each.

Fire rating and labels

A 90-minute door assembly costs more than a 20-minute assembly because of the label, the closer, the positive latch and the gasketing. Rated openings also require smoke seals and silencers. We check every opening against the wall rating, not just the schedule rating.

Hardware set complexity

A Group 1 set with three hinges and a lockset is a fraction of the cost of an electrified set with a card reader, power transfer hinge and request-to-exit. We group by set and explode the components so the electrified rough-in is visible to the electrical estimator.

Glazing type and area

Tempered, laminated and fire-rated glazing carry different per-SF prices. Fire-rated glazing is the most common miss because it appears in a rated wall that the door schedule marks as non-rated. We measure glazing by type and cross-check the wall rating.

Storefront versus entrances

Storefront is priced by SF of glazed area plus LF of head, sill, jamb and mullion. Entrance doors are priced per leaf with hardware. Automatic operators add actuators, safety sensors and a 120V power drop that is often left to Division 26.

Finish and lead time

Factory-finished doors cost more than field-painted doors but reduce field labor. Lead times for wood veneer and special function doors can exceed standard hollow metal by weeks. We note long-lead items so you can plan the buyout.

Access control and security integration

Card readers, electric strikes, request-to-exit devices and door position switches add material and coordination. The head-end and low-voltage wiring are Division 28, but the door hardware must be compatible. We list these items and note the interface so the security contractor and door subcontractor do not both assume the other has it.

Acoustic and weather ratings

Acoustic-rated door assemblies require gasketing, seals and sometimes double-leaf construction. Exterior doors need thresholds, weatherstripping and sweeps. These components are often omitted from the hardware schedule. We measure them by opening and include them under Division 08.

Scope gaps

Common scope gaps we catch

Openings packages leak money at the edges between divisions. These are the gaps we see most often and how we close them.

  • Frame anchors specified under a different section than the frame. We read the wall details and the Division 08 spec together, then list anchors as a separate line so they are not assumed furnished with the frame.
  • Fire-rated glazing in a rated wall where the door schedule marks the opening 'N'. We cross-check every opening against the wall rating on the plans and flag the ones that need fire-rated glazing or a rated door.
  • Electrified hardware rough-in — power supplies, request-to-exit, mag locks, raceway and conduit. We list these as Division 08 material but note the Division 26 conduit and wiring so the electrical bid carries it.
  • Automatic operators with actuators, safety sensors and header reinforcement. We call out the 120V power drop and the header condition so the door subcontractor and the electrician do not both assume the other has it.
  • Door closers on exterior doors with barrier-free requirements. Spring hinges or low-energy operators may be required instead of a standard closer. We check the accessibility details and note the substitution.
  • Kick plates, mop plates, armor plates and edge guards shown in the hardware sets but not on the door schedule. We reconcile the two schedules and add the plates to the door line so they are not lost.
  • Silencers, gasketing and smoke seals at rated openings. These are often listed in the hardware schedule as 'special' items and dropped at buyout. We carry them as separate lines by opening.
  • Blocking and backing in the wall assembly for closers, stops and grab bars at accessible toilets. This is Division 06 or 09 work, but it is triggered by the hardware. We flag it so the framing package includes it.
  • Thresholds, weatherstripping, sweeps and astragals at exterior and vestibule openings. These are frequently omitted from the hardware sets. We measure them by opening and list them under Division 08.
  • Finish hardware schedule coordination — Group 1 versus Group 2 sets, keying schedule and cylinder types. We map every opening to its set and flag openings that appear on the plan but not in the schedule.
  • Storefront backer plates, shim space and sealant by Division 07 versus Division 08. We note the split so the sealant contractor and the glazier do not both exclude it.
  • Roof hatch and access panel curb, flashing and safety railing by other trades. We list the hatch under Division 08 and note the curb and flashing as Division 07 so the roof package carries them.

Door and frame materials compared

The material you choose for the leaf and frame drives fire rating, hardware prep, finish, and lead time. The table below compares common options.

MaterialTypical useFire rating rangeHardware prepLead time
Hollow metalExterior, utility, and rated interior openings20–90 minStandard mortise or cylindrical prepStandard
Wood veneerArchitectural interiors, offices, high-end residential20 min with fire retardant treatmentStandard prep, may require blocking4–8 weeks
Plastic laminateHealthcare, schools, high-traffic interiors20 min with fire-rated coreStandard prep3–6 weeks
FRPRestrooms, locker rooms, wet environments20 min with fire-rated coreStandard prep2–4 weeks
Aluminum storefrontExterior entrances, vestibules, interior glazed wallsNot rated as a door; glazing may be ratedNarrow or medium stile prep4–6 weeks
Stainless steelKitchens, laboratories, detention20–90 minSecurity or standard prep6–10 weeks
Codes and standards

Codes and standards that affect openings takeoffs

Model codes

Openings are governed by the International Building Code (IBC) and International Residential Code (IRC) for fire ratings, egress, and accessibility. The IBC sets fire door ratings by wall assembly (e.g., 1-hour wall requires 20-minute door), and the IRC covers residential egress and smoke alarms. The International Energy Conservation Code (IECC) affects exterior door U-factors and air leakage, which can require specific thresholds and weatherstripping. The NEC covers power to electrified hardware and automatic operators. NFPA 80 and NFPA 101 set installation and egress requirements. Always confirm the adopted code edition with the local building department.

Industry standards

ASTM standards for doors and frames include ASTM E2074 for fire door assemblies and ASTM E283 for air leakage. Hardware standards come from BHMA (Builders Hardware Manufacturers Association) and ANSI, such as ANSI/BHMA A156.13 for mortise locks. The Door and Hardware Institute (DHI) publishes the hardware schedule format and keying guidelines. Glazing standards include ASTM C1036 for flat glass and ASTM C1048 for tempered and laminated glass. These standards define product performance and test methods that affect which products can be specified.

Specification sections

Division 08 sections that change cost include 08 11 00 (metal doors and frames) for frame anchors and jamb depths; 08 14 00 (wood doors) for face veneer and fire ratings; 08 71 00 (door hardware) for set groupings and keying; 08 81 00 (glazing) for glass type and thickness; and 08 43 00 (storefronts) for extrusion systems. Also read Division 04 20 00 for masonry openings, Division 09 21 16 for gypsum board assemblies, and Division 26 for electrical rough-in to electrified hardware.

Local amendments

Adopted code editions vary by state and jurisdiction. Some states adopt the IBC with amendments that change fire door ratings for specific occupancies or require additional egress hardware. Local amendments may also affect accessibility requirements for door hardware, such as maximum opening force. Always confirm the adopted code edition and any local amendments with the local building department before finalizing the takeoff.

Who we provide estimates for

Who uses our openings estimate for contractors

General contractors

You need a Division 08 number to complete a bid without carrying a door and hardware allowance. Our takeoff gives you a line-by-line package you can compare against subcontractor quotes and see where the spread is.

Door and hardware subcontractors

You bid from the same schedule we take off. Our marked-up plans and set-by-set hardware breakdown let you check your own count and catch openings you may have missed before you submit.

Developers and owners

You are budgeting before drawings are complete. Our takeoff from a preliminary schedule gives you a realistic Division 08 number and flags long-lead items so you can plan the buyout.

Architects

You want a cost check on your door and hardware schedule before it goes out for bid. We reconcile the schedule against the plans and report discrepancies for you to resolve with an addendum.

Estimators

You are building the bid and need a second set of eyes on the openings scope. Our Excel workbook is organized by CSI section with a summary tab, so you can drop it into your estimate and adjust unit prices.

Where we provide estimates

Openings Estimating in 20 states

Pricing is adjusted to the project ZIP code. Select a highlighted state to see the cities we cover there.

States we coverSelected
TX

Openings Estimating in Texas

Nation's largest construction market; Sun Belt population growth, data centers, semiconductor plants, and single-family home building.

Texas estimating services
Property types

Project types and what changes in the takeoff

The same door schedule logic applies across project types, but the mix of openings, wall assemblies, and hardware complexity shifts the takeoff effort and the cost drivers.

K-12 school

High count of rated openings, hardware sets with closers and exit devices, and access control at entries.

Watch for: Verify fire ratings on corridor walls and check for classroom security locksets.

Hospital / healthcare

Many acoustic and lead-lined doors, automatic operators at patient rooms, and electrified hardware for access control.

Watch for: Confirm acoustic ratings and lead-lined requirements; check for positive pressure room details.

Office building

Storefront and entrance doors dominate, with fewer interior rated openings and more glazing.

Watch for: Watch for storefront backer plates and sealant scope split between Divisions 07 and 08.

Warehouse / industrial

Large coiling doors, overhead doors, and few hollow metal frames; hardware is minimal.

Watch for: Check coiling door sizes and electrical rough-in for operators; confirm bollard protection.

Multifamily residential

Unit entry doors with heavy hardware sets, smoke seals, and fire-rated corridor doors.

Watch for: Verify unit door handing and keying schedule; check for peepholes and door viewers.

Retail / restaurant

Storefront, glass entrance doors, and back-of-house hollow metal with kick plates.

Watch for: Confirm automatic operator requirements and exterior weatherstripping details.

Government / detention

Security doors and frames, detention hardware, and vision panels with security glazing.

Watch for: Check for special function doors (08 34 53) and security glazing thickness.

Deliverables

What you receive

  • Excel workbook organized by CSI MasterFormat Division 08 section, with a summary tab by opening type and a detail tab by opening tag.
  • PDF takeoff report with the same line items, quantities, units and sheet references as the Excel workbook.
  • Marked-up plan set with each opening tagged and cross-referenced to the door schedule and hardware set.
  • Hardware set breakdown listing hinges by quantity and weight, locksets, closers, exit devices, stops and silencers per opening.
  • Electrified hardware list separating Division 08 material from Division 26 conduit and wiring, with rough-in notes.
  • Long-lead item list flagging wood veneer, special function doors and custom storefront extrusions with estimated lead times.
  • Assumptions and exclusions page stating what we priced, what we excluded, and which documents we used.
Checklist

Pre-bid checklist for openings

  • Verify door schedule against floor plans for missing or extra openings.
  • Confirm frame anchor type by wall assembly from sections and details.
  • Check fire rating of every opening against the wall rating.
  • Review hardware sets for electrified items and note Division 26 scope.
  • Confirm door handing and swing direction for each opening.
  • Check for acoustic or lead-lined requirements in special rooms.
  • Verify glazing type and thickness for vision lites and sidelites.
  • Confirm storefront perimeter and backer plate responsibility.
  • Check for automatic operators and associated power and safety sensors.
  • Review keying schedule and cylinder types with owner requirements.
  • Note long-lead items for wood veneer or special function doors.
  • Confirm threshold and weatherstripping details at exterior openings.
Client reviews

What clients say about Scope Precision Estimate

10 client reviews
SH
Steven HarrisCommercial Builder

The quality of the estimate exceeded our expectations. Their detailed breakdown of labor, materials, and project costs gave us confidence in our bid.

MA
Michael AndersonGeneral Contractor

The cost estimate was detailed, accurate, and easy to understand. It helped us prepare our bid confidently and stay competitive without overlooking important costs.

AW
Andrew WilsonGeneral Contractor

Highly recommended for construction cost estimating. The quantities were accurate, the pricing was well organized, and the final report was easy to review.

MD
Matthew DavisConstruction Manager

Their construction estimate was thorough and professionally prepared. It made our budgeting process much easier and helped us identify potential cost issues early.

CM
Christopher MillerResidential Builder

We needed a quick and accurate construction cost estimate, and they delivered exactly what we needed. Great attention to detail and a very responsive team.

BT
Brian TaylorProject Estimator

Fast, accurate, and dependable estimating service. They understood the project requirements quickly and provided a detailed estimate without unnecessary delays.

FAQ

Openings Estimating questions

What do you need to start an openings takeoff?

We need the door schedule, hardware schedule, floor plans, wall sections and details, Division 08 specifications, and the finish schedule. If the hardware schedule is missing, we can price from a typical set and note the assumption. The door schedule is the primary source; without it, we tag openings from plans, which adds time and RFI risk. Please also provide any addenda or bulletins that affect openings, and note the project ZIP code so we can apply the correct location factor for material and labor pricing.

How do you handle fire-rated openings that are not marked on the door schedule?

We cross-check every opening against the wall rating shown on the plans. If a wall is rated but the schedule marks the opening as non-rated, we flag it and price a rated assembly with the appropriate label, closer, and gasketing. This is one of the most common scope gaps we catch. We also verify that the door label matches the wall rating per NFPA 80 and note any required smoke gasketing or positive latch. If the wall rating is unclear, we issue an RFI and price the more conservative option.

Do you include electrified hardware and access control in your takeoff?

Yes. We list electrified hardware items such as card readers, electric strikes, power transfer hinges, and request-to-exit devices under Division 08 material. We also note the Division 26 conduit and wiring required, so the electrical estimator can carry that scope. This prevents both trades from assuming the other has it. We also identify any power supplies, controllers, and low-voltage cabling that may be part of the access control system, and we separate those costs for clarity.

What is your turnaround time for an openings estimate?

Most projects are returned in 24–48 hours. Rush service is available for a premium. Turnaround depends on the completeness of the documents and the number of openings. If the schedule is missing or incomplete, we may need additional time to tag openings from plans. For projects with more than 200 openings or complex hardware sets, we will confirm the schedule before starting. We deliver Excel and PDF files organized by CSI MasterFormat division, with marked-up plan sets.

How do you price the takeoff?

We use RSMeans data adjusted by ZIP code for material and labor. Each component — frame, door leaf, hardware, glazing — is kept as a separate cost bucket. Waste is applied as a separate line, not buried in unit prices. This lets you see which portion of the package is driving the cost. We also separate material and labor so you can adjust for your own crew rates or supplier discounts. The final estimate includes a summary by opening type and a detailed line-item breakdown.

Do you provide a marked-up plan set?

Yes. Every opening is tagged on the plan set with its schedule reference and hardware set. The PDF deliverable includes the marked-up plans so your estimator can spot-check any line against the drawing. The Excel workbook is organized by CSI section with a summary tab by opening type. We also include a list of assumptions and exclusions, and we highlight any openings that required interpretation or an RFI. This gives you a clear audit trail for your bid.

Can you take off storefront and curtain wall as part of the openings package?

Yes. We measure storefront as a linear perimeter for head, sill, jamb, and mullion extrusions, then convert to square feet of glazed area. Curtain wall is measured by SF of glazed area. Glazing infill is separated by type — tempered, laminated, fire-rated — because per-SF pricing differs. For larger glazing scopes, see our Glass & Glazing Estimating service. We also note backer plates, sealants, and flashing that may be specified under other divisions, so you can coordinate with the responsible trade.

What are the most common scope gaps you see in openings packages?

Frame anchors specified under a different section than the frame; fire-rated glazing in rated walls not marked on the schedule; electrified hardware rough-in left to Division 26; automatic operator power drops and header reinforcement; and thresholds, weatherstripping, and sweeps omitted from hardware sets. We list these as separate lines and note the responsible division. We also check for door silencers, kick plates, and wall stops that are often missed. Catching these before bid day reduces the risk of costly add-ons later.

How do you handle door handing and swing direction?

We record handing exactly as scheduled — LH, RH, LHR, RHR, pairs, Dutch, double-acting. If the schedule is ambiguous or missing handing, we flag it for an RFI. Handing affects hardware prep and frame preparation, so it must be correct before pricing. We also verify that the handing matches the floor plan swing direction, and we note any special conditions such as outswing exterior doors or pair doors with astragals. This level of detail prevents costly field modifications.

Do you account for lead times on long-lead doors?

Yes. We flag wood veneer doors, special function doors (e.g., detention, acoustic), and custom storefront extrusions with estimated lead times. This helps you plan the buyout and avoid schedule delays. Lead times vary by manufacturer and finish, so we note them as estimates. We also identify any items that may require early release or stored materials, and we can provide a separate list of long-lead items to help you prioritize procurement. This is especially important for projects with tight schedules.

Can you coordinate with other trades on the openings scope?

We can coordinate the takeoff with adjacent trades. For example, we work with our Glass & Glazing Estimating team for curtain wall and storefront, and our Interior & Exterior Finishes Estimating team for door painting and wall finishes. We also note Division 26 electrical rough-in for electrified hardware so the scope is not missed. If you have a specific coordination need, let us know and we will align our takeoff with your other estimates to avoid overlaps or gaps.

What if my project has unique or custom openings?

We take off custom openings from the details and specifications, just like standard ones. For special function doors such as detention or sound control, we read the specific section (e.g., 08 34 53 or 08 34 73) and price the components accordingly. If details are incomplete, we note assumptions and exclusions. We also research manufacturer data for custom hardware or framing systems to ensure accurate pricing. Our goal is to provide a complete estimate that reflects the actual scope, even for one-of-a-kind openings.

What does an openings cost estimating deliverable include beyond the door count?

Each opening carries its own line: door leaf, hollow metal frame, hardware set, glazing, and any Division 10 specialties such as vision panels or louvers. We separate material cost, installation cost and labor cost so you can see where the money sits. Quantities are tagged to the sheet and detail, and the Excel file is organized by CSI MasterFormat division so it drops straight into your bid package. Marked-up plan sets come with the PDF.

How does outsourced door and window estimating handle storefront and curtain wall?

Storefront and curtain wall are taken off by unit of measure — square foot for glazed area and linear foot for perimeter, sill and head conditions — with framing separated from glass. We read the window schedule and window type marks against the elevations, then carry the AAMA and ASTM E330 performance notes from the specification as line notes. If the scope is large, we coordinate with our glass and glazing team so the Division 08 and Division 08 glazing lines do not double-count.

Can an openings bid estimating service price electrified hardware and access control?

Yes. Electrified hinges, electric strikes, mag locks, request-to-exit devices and power supplies are taken off by set and listed under the opening they serve. We flag the rough-in that belongs to Division 26 or Division 28 so your electrical bid does not carry it twice. Where a door operator or card reader is specified, we note the device and the pathway, and you confirm the adopted code edition and any local amendment with the building department before you price the install.

What does door and window cost estimating include beyond the door count?

Door and window cost estimating covers the full opening assembly: hollow metal door and frame, hardware set, glazing, sealants, and the rough-in for electrified hardware. We price each line using RSMeans data adjusted by ZIP code, so material and labor reflect your market. The takeoff is organized by CSI Division 08, with Division 05 supports, Division 07 sealants, Division 09 finishes, Division 10 specialties, and Division 28 access control noted where they touch the opening. You get Excel and PDF with marked-up plan sets.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning. is a Senior Estimator with more than 15 years of professional experience in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Guides on this topic

Related services

Send your plans for an openings takeoff

Upload your door schedule, plans, and specs, and we will return a door-by-door Division 08 takeoff in Excel and PDF within 24–48 hours.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote
Call Us