Wood, Plastics & Composites Estimating

Send your architectural, structural, and finish plans. We return a Division 06 estimate in Excel and PDF, organized by CSI section with marked-up plan sets.

24–48 hours for most projectsTypical turnaround
Excel + marked-up PDFsOrganized by CSI section
ZIP-code pricingLocal material and labor
Price confirmed firstBefore any work starts
Sample estimate sheet
Division 06 — Wood, Plastics & CompositesSample format
Line itemQtyUnitBoard
2x6 stud wall, 9 ft plate2,840LF2,840 LF
2x10 floor joist 16 in o.c.3,200LF3,200 LF
3/4 in T&G subfloor sheathing4,200SF4,200 SF
7/16 in OSB wall sheathing6,800SF6,800 SF
Pre-hung interior door unit42EA42 EA
Total board feet—
Illustrative quantities. Waste factor applied as a separate line.
Blocking and connectors included

What is Wood, Plastics & Composites estimating?

Wood, Plastics & Composites estimating is the Division 06 takeoff and pricing of rough carpentry, sheathing, engineered lumber, trusses, finish carpentry, and architectural woodwork. Quantities are measured in board feet, linear feet, square feet, and each, then priced with ZIP-code-adjusted material and labor data. Deliverables are an Excel workbook and PDF marked-up plan set.

  • Board feet, linear feet, square feet, and each are the primary units.
  • Typical waste factors run 5–10% for lumber and 10% for panel goods.
  • The most costly miss is connector hardware and FRT plywood exclusions.

Division 06 covers more ground than most packages on the street. It runs from 06 10 00 Rough Carpentry and 06 16 00 Sheathing through 06 17 53 shop-fabricated wood trusses, then into 06 20 00 Finish Carpentry and 06 40 00 Architectural Woodwork. If your bid is a lump sum per square foot, the first change order for connector hardware or FRT plywood erases the margin.

Deliverable
Excel estimate + marked-up PDF plans
Organized by
CSI MasterFormat section
Turnaround
24–48 hours for most projects
Pricing
ZIP-code-adjusted material and labor pricing
Software
Bluebeam Revu, PlanSwift, RSMeans data

We take off the structural frame, the sheathing and WRB layer, and the finished millwork as three separate disciplines, because each one fails differently. A board-foot conversion error on an LVL beam is not the same risk as a missed plastic-laminate edge build-up on a nurses' station counter. You get an Excel workbook organized by CSI section, a PDF for review, and a marked-up plan set showing where every quantity came from. Most projects return in 24–48 hours, with rush available.

Our wood takeoff services and plastics takeoff services start with plan reading against the specifications, then a quantity takeoff in Bluebeam Revu or PlanSwift. We check span tables, grade stamps, pressure treatment notes, fire retardant treatment, and connection details before any material pricing goes in. For FRP composites and composite panels, we confirm resin type, panel thickness, and attachment method, since those drive both cost and structural performance. Board-foot conversions for glulam, laminated veneer lumber, parallel strand lumber, and wood I-joists follow the Wood Handbook conventions, and heavy timber is measured separately from light framing.

We price from ZIP-code-adjusted material and labor data in RSMeans, and we measure in Bluebeam Revu and PlanSwift. If your package touches cold-formed framing, siding, or vapor retarders inside the same wall assembly, those lines land in the estimate where they belong rather than getting carried by a framing sub who excludes them. Related scopes like Framing Estimating Services, Millwork & Casework Estimating, and Lumber Takeoff & Estimating follow the same format, so you can roll them into one bid tab.

Services

What our wood estimating company covers in Division 06

We measure from the structural and architectural sheets together, because a wall section on A-301 often controls sheathing type and blocking that the framing plan does not show. The estimate separates rough carpentry, sheathing and WRB, and finish carpentry so you can see which scope you are carrying and which you are passing to a sub.

Rough Carpentry

Plates, studs, blocking, joists, rafters, and sheathing measured by wall type and floor or roof area.

LF · SF · EA

Engineered Lumber

LVL beams, PSL columns, LSL rim, and I-joists priced per piece with layout and cutting allowance.

LF · EA

Wood Trusses

Shop-fabricated roof and floor trusses priced per truss with delivery and setting allowance.

EA

Sheathing & WRB

Wall, roof, and subfloor panels with tape, housewrap, and flashing accessories by area.

SF · LF

Connectors & Fasteners

Hangers, hold-downs, straps, mudsill anchors, and plate washers counted from schedules.

EA

Exterior Trim

Fascia, rake, soffit, corner boards, and frieze measured by linear foot of profile.

LF

Architectural Casework

Base, wall, and tall cabinets plus plastic-laminate counters priced per casework elevation.

LF · SF · EA

Interior Trim & Stairs

Base, casing, crown, stools, aprons, stringers, treads, risers, and handrail by linear foot.

LF · EA

What every wood, plastics & composites estimating takeoff includes

  • 2x plates, studs, and blocking by wall type in LF or pieces per height
  • Floor joists, rim board, bridging, and subfloor sheathing in SF
  • Roof rafters, ridge, hip, and valley members, plus roof sheathing
  • Engineered lumber: LVL beams, PSL columns, LSL rim, I-joists
  • Shop-fabricated wood trusses priced per truss with setting allowance
  • Wall and roof sheathing panels with tape and WRB where specified
  • Pressure-treated sill plates, sill sealer, and anchor bolt plate washers
  • Structural connectors: hangers, hold-downs, straps, mudsill anchors
  • Exterior trim: fascia, rake, soffit, corner boards by LF
  • Architectural casework: base, wall, and tall cabinets, plastic-laminate counters
  • Interior trim: base, casing, crown, window stools, and apron by LF
  • Stair systems: stringers, treads, risers, handrail, and balusters
How we work

How we run a plastics bid estimating and composites takeoff

  1. Plan and spec cross-checkWe read the structural framing plan against the architectural wall sections and the spec book. A note on S-201 may call out 7/16 in OSB, while A-501 shows a fluid-applied WRB over ZIP System. Both sheets control the same wall, so we resolve the conflict before measuring anything. We also check the life-safety sheet for fire-retardant-treated lumber requirements that may not appear on the framing plan. This step prevents costly assumptions that lead to change orders.
  2. Wall and floor framing takeoffWe trace each wall type on the framing plan, tag it by stud size and spacing, and measure plates, studs, and blocking in LF. Floor joists are measured by span and spacing, with rim board, bridging, and subfloor sheathing carried as separate lines. Openings for doors and windows are deducted from sheathing and added back as headers and trimmer studs. We also account for double top plates and any special blocking for grab bars or equipment supports shown on architectural sheets. This ensures the lumber list is complete for procurement.
  3. Roof and truss takeoffRafters, ridge, hip, and valley members are measured from the roof plan, with roof sheathing and underlayment in SF. Shop-fabricated trusses are counted per truss from the truss layout, then priced with delivery, crane pick, and temporary bracing as separate lines because the supplier quote often excludes them. We verify truss profiles and bearing conditions against the architectural roof plan to catch any discrepancies. This approach gives you a complete installed cost for the roof framing package.
  4. Connector and hardware countWe count hangers, hold-downs, straps, mudsill anchors, and SDS screws from the connector schedule and the framing plan. Each connector is tagged to the member it supports, so the count ties back to the joist and stud takeoff rather than being a lump-sum allowance. We cross-reference the connector schedule with the framing plan to ensure no hardware is missed, especially at shear walls and moment frames. This detailed count helps you avoid the common overrun on connector hardware.
  5. Finish carpentry and woodworkInterior trim, exterior trim, stairs, and casework are measured from the architectural elevations and cabinet schedule. Base, casing, and crown are measured in LF per room; cabinets are counted EA by type; countertops are measured in SF with edge build-up and cutouts priced separately. We also check for special trim profiles, radius corners, and decorative woodwork that may require custom millwork. This ensures the finish package is fully captured for your bid.
  6. Pricing and assemblyQuantities are priced with ZIP-code-adjusted material and labor from RSMeans, with waste factors applied as separate visible lines. The workbook is organized by CSI section, and the marked-up plan set shows the measurement path for every major quantity. We include a summary tab that rolls up rough carpentry, sheathing, and finish carpentry so you can see the total Division 06 cost at a glance. This format allows you to adjust waste factors and labor burdens to match your own field conditions.

What we need from you

  • Architectural setFloor plans, elevations, wall sections, and interior elevations. These control finish carpentry, casework, and trim quantities.
  • Structural setFraming plans, foundation plan, and roof framing plan. These control joist, rafter, beam, and connector takeoff.
  • Spec bookDivision 06 sections and any Division 07 sections that specify sheathing, WRB, or siding inside the same assembly.
  • SchedulesDoor, window, cabinet, and finish schedules. We count EA items from these rather than scaling from plans.
  • Truss layoutSupplier truss drawings or a truss layout sheet. Without it, trusses are carried as an allowance, not a firm count.
  • Addenda and RFIsAny issued addenda or answered RFIs that change sheathing type, connector schedule, or trim profile.
Sample output

Sample takeoff format

This is how a Division 06 line item appears in the workbook. Each row carries a CSI code, a spec-level description, a quantity, a unit, and the sheet reference for the measurement.

Sample format — illustrative quantities
SectionLine itemQtyUnitRef.
06 10 002x6 stud wall, 9 ft plate, 16 in o.c.2,840LFS-201
06 10 002x10 floor joist, 16 in o.c., #2 DF3,200LFS-202
06 16 003/4 in T&G subfloor sheathing, glued and screwed4,200SFS-202
06 16 007/16 in OSB wall sheathing with taped seams6,800SFA-501
06 17 53Shop-fabricated wood roof truss, 24 ft span38EAS-301
06 20 005/8 x 3-1/4 in primed MDF base1,260LFA-601
06 41 00Base cabinet, 24 in deep, plastic-laminate finish18EAA-701
06 41 00Plastic-laminate countertop with 4 in backsplash210SFA-701
06 10 00Pressure-treated 2x6 sill plate with sill sealer320LFS-201
06 10 00LVL beam, 5-1/4 x 14 in, 20 ft length3EAS-301

Units of measure we take off in

Mixing units on the same line is the fastest way to lose money on a Div 06 bid. These are the units we use and how each one is measured from the drawings.

ItemUnitHow it's measured
Dimension lumber, timbers, and engineered woodBFNominal thickness × width × length in inches ÷ 12, summed by member size and species
Plates, joists, studs, trim, fascia, and railingsLFCenterline length along the member, with laps and openings deducted or added per plan
Sheathing, subfloor, underlayment, and deckingSFSurface area of the framed plane, measured to outside of plates or framing
Trusses, columns, posts, beams, cabinets, and doorsEACounted from the framing plan, elevation, or cabinet schedule, one line per type
Countertops and edge profilesSF / LFTop surface in SF; edge build-up, backsplash, and radius corners in LF
Concrete in deck footings and slab-on-grade subfloorCYVolume from footing schedule or slab thickness × area ÷ 27
Connector hardware and steel connectorsLB / EACounted from the connector schedule and multiplied by catalog weight per piece
Composite decking and claddingLF / SFBoard length for decking and fascia; surface area for cladding panels

Worked example: takeoff of a 40 ft interior bearing wall

This example shows how we take off a single 40 ft long, 9 ft high interior bearing wall with a 3 ft door opening. All dimensions are illustrative. The wall is framed with 2x6 studs at 16 in. on center, single bottom plate, double top plate, and 7/16 in. OSB sheathing on one side. We use a 5% waste factor for lumber and 10% for sheathing, applied as separate lines.

Step 1: Measure wall length and height

  • Wall length: 40 ft
  • Wall height: 9 ft
  • Door opening: 3 ft wide, 7 ft high

Step 2: Calculate plates

  • Bottom plate: 1 × 40 LF = 40 LF
  • Top plates: 2 × 40 LF = 80 LF
  • Total plate LF: 120 LF
  • Convert to pieces: 120 LF ÷ 16 ft (standard length) = 7.5 pieces → round up to 8 pieces
  • Board feet: 8 pieces × 16 ft × (2 in. × 6 in. ÷ 12) = 8 × 16 × 1 = 128 BF

Step 3: Calculate studs

  • Studs at 16 in. o.c.: (40 ft × 12 in./ft) ÷ 16 in. = 30 spaces → 31 studs
  • Add 2 extra studs for door opening (trimmers and king studs) = 33 studs
  • Subtract 1 stud for the opening (no stud in the middle of the door) = 32 studs
  • Stud length: 9 ft wall height minus 4.5 in. for plates (1.5 in. bottom + 3 in. double top) = 8 ft 7.5 in. → use 9 ft studs to allow for cutting
  • Total stud LF: 32 × 9 ft = 288 LF
  • Pieces: 288 LF ÷ 16 ft = 18 pieces
  • Board feet: 18 pieces × 16 ft × 1 BF/ft = 288 BF

Step 4: Calculate blocking

  • Assume 10% of wall area for blocking at mid-height and openings: 40 ft × 9 ft × 0.10 = 36 SF
  • Blocking LF: 36 SF ÷ 0.5 ft (blocking width) = 72 LF
  • Pieces: 72 LF ÷ 2 ft (typical block length) = 36 pieces
  • Board feet: 36 pieces × 2 ft × 1 BF/ft = 72 BF

Step 5: Calculate sheathing

  • Wall area: 40 ft × 9 ft = 360 SF
  • Subtract door opening: 3 ft × 7 ft = 21 SF
  • Net sheathing area: 360 - 21 = 339 SF
  • Add 10% waste: 339 × 1.10 = 373 SF → round up to 375 SF
  • Panels: 375 SF ÷ 32 SF per 4x8 sheet = 11.7 → 12 sheets

Step 6: Apply waste factors as separate lines

  • Lumber waste 5%: (128 + 288 + 72) × 0.05 = 24.4 BF
  • Sheathing waste 10%: already included in Step 5, but we show it as a separate line: 339 × 0.10 = 33.9 SF

Step 7: Summarize quantities

ItemQuantityUnit
2x6 plates128BF
2x6 studs288BF
2x6 blocking72BF
Lumber waste (5%)24.4BF
7/16 in. OSB sheathing339SF
Sheathing waste (10%)33.9SF

This wall takeoff would be repeated for each wall type and combined with floor, roof, and finish carpentry takeoffs to build the full Division 06 estimate.

Cost drivers

What moves the plastics cost estimating number

Relative impact on a typical estimate for this trade, based on estimator judgment. Select a bar for details.

Scale: 1 = minor, 5 = major relative impact. Estimator judgment, not measured data.
Relative impact 5 / 5

Engineered vs. dimensional

LVL beams, PSL columns, LSL rim, and I-joists are quoted by the piece but priced by volume or LF. A 16 in deep LVL beam costs more per BF than a 2x10, and the board-foot conversion has to match the supplier's pricing basis or the bid misses by a wide margin.

Sheathing type

OSB, plywood, ZIP System, and DensGlass carry different unit costs and different waste factors. A taped ZIP System wall adds tape, rollers, and a fluid-applied WRB line that a plain OSB wall does not carry. The spec book and wall section control which one is in the base bid.

Engineered vs. dimensional

LVL beams, PSL columns, LSL rim, and I-joists are quoted by the piece but priced by volume or LF. A 16 in deep LVL beam costs more per BF than a 2x10, and the board-foot conversion has to match the supplier's pricing basis or the bid misses by a wide margin.

Connector hardware

Hangers, hold-downs, straps, and SDS screws are routinely the largest Div 06 overrun on a wood-frame job. A typical floor system can carry hundreds of hangers, and the count has to come from the connector schedule, not a square-foot allowance.

Truss delivery and setting

Truss supplier quotes often exclude crane pick, temporary bracing, and delivery beyond a certain radius. On a two-story plan with a 24 ft span, the setting allowance can run into five figures. We carry it as a separate line so you can see it before you bid.

FRT and treated material

Fire-retardant-treated lumber and plywood at rated assemblies, and pressure-treated material within 6 in of grade, carry a premium over standard material. These are often specified in a footnote on the life-safety sheet rather than in the framing plan, so they get missed in a plan-only takeoff.

Finish carpentry profile

A flat 1x4 casing and a built-up crown with a backband are both measured in LF but carry very different labor and material costs. Cabinet countertop edge profiles, radius corners, and sink cutouts are priced per LF or EA, so a per-SF countertop allowance understates the finish scope.

Waste factors

Waste factors for lumber, sheathing, and trim vary by material and installation method. Typical waste factors range from 5% for engineered lumber to 10-15% for trim and siding. We apply waste as a separate visible line so you can adjust it based on your crew's experience and site conditions.

Scope gaps

Common scope gaps we catch

These are the Division 06 items that most often get excluded from a framing sub's quote and then come back as a change order. We carry each one as a visible line in the estimate.

  • Blocking for grab bars, TV mounts, cabinet rails, and future handrail attachments is shown on architectural sheets but rarely on the framing plan. We scan the equipment and millwork elevations and add blocking by LF.
  • Fire-retardant-treated lumber and plywood at rated walls and roof assemblies is often specified in a footnote on the life-safety sheet. We read the UL design and carry FRT material as a separate line.
  • Sheathing upgrades such as ZIP System, taped seams, fluid-applied WRB, and drainage mat are frequently bid as alternates. If the base spec calls for them, they belong in the base bid, not in an alternate column.
  • Truss delivery, crane pick, and temporary bracing are usually excluded from the truss supplier's quote. We add a setting allowance based on truss count, span, and site access.
  • Connector hardware is the largest Div 06 overrun on most wood-frame jobs. We count hangers, hold-downs, and SDS screws from the connector schedule and price them by catalog weight.
  • Pressure-treated material for sill plates, deck ledgers, and members within 6 in of grade is easy to miss when the framing plan shows a generic sill detail. We check the foundation plan and wall section for the treated zone.
  • Moisture content and acclimation requirements for interior trim and cabinets are in the spec book but not on the plans. We note them so the schedule and temporary heat allowance are not left to the installer.
  • Carpenter labor burden, per-diem, and travel for out-of-town crews on remote sites are not in RSMeans labor rates. We flag them when the project ZIP code is more than 50 miles from a major labor market.
  • Countertop edge profiles, radius corners, and cutouts for sinks and cooktops are priced per LF or EA, not per SF. A per-SF countertop line without edge build-up understates the casework package.
  • Shop drawings, submittals, and mock-up panels for architectural woodwork are a Div 06 cost under 06 40 00. They are often left to the millwork sub and then added as a change order.
  • Stair code compliance — riser/tread dimensions and handrail height — depends on the locally adopted IRC or IBC edition. We flag the stair takeoff for confirmation with the local building department.
  • Vapor retarders and air barriers inside the same wall assembly are Division 07 work, but the framing sub often assumes someone else is carrying them. We list them as an exclusion with a pointer to the thermal package.

Material selection: what changes the composites cost estimating number

The choice between OSB and plywood, dimensional and engineered lumber, or treated and FRT material affects unit cost, waste factor, and sometimes the framing layout itself.

Material optionUnit cost basisTypical waste factorWhen it is specified
OSB sheathingPer SF5-10%Standard wall and roof sheathing where code allows.
Plywood sheathingPer SF5-10%High-moisture areas or where required for shear value.
ZIP System sheathingPer SF (includes tape)5-8%When a taped WRB is specified in lieu of housewrap.
Dimensional lumber (2x)Per BF or LF5-10%Standard framing for studs, plates, and joists.
LVL beamsPer BF or piece2-5%Long spans or where dimensional lumber is not adequate.
I-joistsPer LF or piece3-5%Floor systems with long spans or where dimensional lumber is not adequate.
Pressure-treated lumberPer BF or LF5-10%Sill plates, deck ledgers, and members within 6 in. of grade.
FRT lumber and plywoodPer BF or SF5-10%Rated wall and roof assemblies per life-safety plan.
Composite deckingPer LF5-10%Exterior decks and balconies where specified.
Codes and standards

Codes and standards that affect the takeoff

Model codes

The IRC prescriptive tables for stud spacing, header and joist spans, and bearing conditions set member sizes, so a 2x6 wall at 16 in. o.c. becomes 2x6 at 24 in. o.c. only where the table allows. The IBC routes engineered wood design to the NDS and sets fire-retardant-treated lumber requirements by occupancy and height. The IECC drives continuous insulation thickness, taped or sealed sheathing joints, and rim joist insulation, which adds line items beyond framing. For decks, guard and stair geometry come from the IRC. Confirm the adopted edition with the local building department.

Industry standards

ASTM D5456 governs structural composite lumber, D2559 covers adhesives for structural wood, and D7032 addresses wood-plastic composite deck boards and guardrails, which sets span ratings and stair stringer details. APA performance-rated panel marks on plywood and OSB tell you the span rating and exposure durability, which changes sheathing thickness and nailing schedule. AWC's WFCM and NDS supply design values and connection detailing. TPI quality criteria apply to metal plate connected trusses. These standards change panel thickness, connector counts, and waste factors in the takeoff.

Specification sections

In Division 06, read 06 10 00 Rough Carpentry for blocking, sheathing, and fasteners; 06 16 00 Sheathing for panel type, thickness, and attachment; 06 17 53 Shop-Fabricated Wood Trusses for design loads, bearing, and delivery; 06 20 00 Finish Carpentry for trim profiles and stair components; and 06 40 00 Architectural Woodwork for casework and countertops. Also read 06 05 23 for fastenings and connectors. Submittal, mockup, and quality assurance clauses add samples, testing, and inspection line items that carry cost.

Local amendments

Adopted editions range from the 2015 to the 2024 IRC and IBC, and amendments vary by state and municipality. Common changes include bracing methods, fire-retardant-treated lumber mandates, wildfire-zone exterior detailing, and energy code compliance paths that alter sheathing and insulation. Some jurisdictions require third-party inspection of connectors or specific deck ledger attachment details. Because these amendments shift material and labor, confirm the adopted edition and any local amendments with the local building department before you finalize the estimate.

Who we provide estimates for

Who uses this composites estimating company deliverable

General contractor

You need a Division 06 number you can carry in the bid without a framing sub's exclusions biting you later. The workbook separates rough carpentry, sheathing, and finish carpentry so you can see which scope you are holding and which you are passing down.

Framing subcontractor

You bid the structural frame and sheathing, and you want a board-foot lumber list and a connector count that ties to the plan. The estimate gives you quantities by member size and spacing, plus a separate line for hangers and hold-downs so you can price your own material markup.

Millwork subcontractor

You need cabinet counts by type, countertop SF with edge build-up, and trim LF by profile. The estimate carries each of these as a separate line, so you can check the architect's schedule against the plan quantities before you commit to a lump sum.

Developer or owner

You want to compare Div 06 bids on the same scope basis. The estimate shows the unit basis for each line — BF, LF, SF, EA — so a low bid that excludes connectors or FRT material is visible before you award.

Architect

You need a cost check on the wood, plastics, and composites package before the design is frozen. The marked-up plan set shows where quantities came from, so you can confirm that the sheathing type, trim profile, and cabinet schedule match the drawings.

Where we provide estimates

Wood, Plastics & Composites Estimating in 20 states

Pricing is adjusted to the project ZIP code. Select a highlighted state to see the cities we cover there.

States we coverSelected
TX

Wood, Plastics & Composites Estimating in Texas

Nation's largest construction market; Sun Belt population growth, data centers, semiconductor plants, and single-family home building.

Texas estimating services
Property types

Project types and what changes in the takeoff

The takeoff method stays the same, but the mix of line items and the risk profile shift with the project type. Here is what we watch for in common Div 06 scopes.

Single-family residence

Heavy on dimensional lumber, sheathing, and trusses; finish carpentry in LF; cabinets counted EA.

Watch for: Watch for FRT at garage walls, treated sills, and stair code compliance per adopted IRC.

Multi-family wood-frame

Repetitive units allow per-unit takeoff; connectors and blocking multiply quickly; sheathing upgrades common.

Watch for: Watch for fire-rated assemblies requiring FRT plywood and special fastening schedules.

Commercial office fit-out

Finish carpentry dominates: casework, trim, and plastic-laminate counters; little structural framing.

Watch for: Watch for countertop edge profiles, radius corners, and sink cutouts priced per LF or EA.

Retail shell

Exposed structure may require higher-grade lumber or composite cladding; trusses for large spans.

Watch for: Watch for composite decking and railing in LF, and special inspection for engineered lumber.

Institutional (school, hospital)

Extensive architectural woodwork: casework, trim, and solid surface; strict submittal and mock-up requirements.

Watch for: Watch for moisture content specs and acclimation before installation; shop drawings as a cost item.

Deck and porch

Composite decking and railing in LF; pressure-treated framing; concrete footings in CY.

Watch for: Watch for ledger board attachment per IRC, and hidden fasteners counted per SF.

Garage and shop

Simple framing but often includes FRT at common walls and heavy-duty shelving or workbench casework.

Watch for: Watch for treated sill plates and blocking for future equipment.

Deliverables

What you receive

  • Excel workbook organized by CSI MasterFormat Division 06 section, with quantities, units, and pricing basis visible on every line.
  • PDF estimate for review and distribution, formatted for bid tab comparison.
  • Marked-up plan set showing the measurement path for wall, floor, roof, and finish carpentry quantities.
  • Board-foot lumber list by member size, species, and treatment for material procurement.
  • Connector hardware count by type, tied to the framing plan and connector schedule.
  • Separate waste factor and labor burden lines so you can adjust them to your own field conditions.
  • Turnaround in 24–48 hours for most projects, with rush available when your bid date is close.
Checklist

Pre-bid checklist for Division 06

  • Verify sheathing type and thickness on wall sections and spec book.
  • Check for FRT requirements on life-safety sheets and UL designs.
  • Confirm truss layout and whether delivery and setting are included.
  • Count connector hardware from schedule, not square-foot allowance.
  • Identify pressure-treated zones within 6 in. of grade.
  • Review cabinet and countertop schedules for edge profiles and cutouts.
  • Check stair dimensions against adopted IRC or IBC edition.
  • Confirm waste factors for lumber, sheathing, and trim.
  • Note moisture content and acclimation specs for interior woodwork.
  • Check for blocking for grab bars, TV mounts, and handrails.
  • Verify if vapor retarders and air barriers are in Div 06 or Div 07.
  • Confirm labor burden and per-diem for remote sites.
Client reviews

What clients say about Scope Precision Estimate

10 client reviews
KM
Kevin MartinezCivil Contractor

Great experience from start to finish. The detailed material takeoff and cost estimate helped us prepare a much more accurate project budget.

DT
Daniel ThompsonCommercial Contractor

Very impressed with the accuracy and turnaround time. Their estimate gave us a clear picture of material and labor costs before starting the project.

SH
Steven HarrisCommercial Builder

The quality of the estimate exceeded our expectations. Their detailed breakdown of labor, materials, and project costs gave us confidence in our bid.

MA
Michael AndersonGeneral Contractor

The cost estimate was detailed, accurate, and easy to understand. It helped us prepare our bid confidently and stay competitive without overlooking important costs.

AW
Andrew WilsonGeneral Contractor

Highly recommended for construction cost estimating. The quantities were accurate, the pricing was well organized, and the final report was easy to review.

MD
Matthew DavisConstruction Manager

Their construction estimate was thorough and professionally prepared. It made our budgeting process much easier and helped us identify potential cost issues early.

FAQ

Wood, Plastics & Composites Estimating questions

How do you handle board-foot conversions for engineered lumber?

We convert all engineered lumber to board feet using the nominal dimensions and length, then price per board foot or per piece based on the supplier's basis. For example, a 5-1/4 in. × 14 in. LVL beam 20 ft long is 5.25 × 14 × 240 ÷ 12 = 1,470 BF. We show the conversion on the line so you can verify against your supplier's quote. This method applies to LVL, LSL, and PSL, and we note whether the supplier prices per piece or per BF.

What is the typical waste factor for wood framing?

Typical waste factors range from 5% for engineered lumber to 10-15% for trim and siding. We apply waste as a separate visible line so you can adjust based on your crew's experience and site conditions. For example, we might use 5% for 2x lumber, 10% for OSB sheathing, and 15% for interior trim. These factors account for cutting, culling, and damage, but not for design changes or errors in the field.

Do you include connector hardware in the estimate?

Yes. We count hangers, hold-downs, straps, mudsill anchors, and SDS screws from the connector schedule and the framing plan. Each connector is tagged to the member it supports, so the count ties back to the joist and stud takeoff. We price them by catalog weight or each, depending on the supplier's basis. If the schedule is incomplete, we use typical details from the plans and note the assumption.

How do you price trusses?

We count trusses from the truss layout and price them per truss. Delivery, crane pick, and temporary bracing are carried as separate lines because the truss supplier's quote often excludes them. We also verify truss profiles and bearing conditions against the architectural roof plan to catch discrepancies. If the truss layout is not available, we carry trusses as an allowance per square foot of roof area and flag it for confirmation.

What is FRT lumber and when is it required?

FRT stands for fire-retardant-treated lumber. It is required at rated wall and roof assemblies, often specified in a footnote on the life-safety sheet. We read the UL design and carry FRT material as a separate line. It carries a premium over standard material, so missing it can significantly affect the bid. We also check if the FRT is required for the entire assembly or only specific members, as that changes the quantity.

Do you take off cabinets and countertops?

Yes. We count cabinets by type from the cabinet schedule and measure countertops in square feet with edge build-up and cutouts priced separately. Edge profiles, radius corners, and sink cutouts are priced per linear foot or each, not per square foot, so a per-SF allowance understates the finish scope. We also verify that the countertop material and thickness match the specification, as solid surface and quartz have different fabrication costs.

How do you handle blocking for grab bars and TV mounts?

We scan the equipment and millwork elevations for blocking requirements and add blocking by linear foot. This is often shown on architectural sheets but not on the framing plan, so it is a common miss. We include it as a separate line so you can see the cost. We also check for blocking at handrails, door hinges, and wall-mounted casework, and note the backing material required.

What is the turnaround time for a Division 06 estimate?

Most projects return in 24–48 hours. Rush service is available when your bid date is close. The turnaround depends on the completeness of the documents and the complexity of the scope. We will confirm the schedule when you send the plans. For large multi-family projects, we may need additional time to complete the takeoff, but we will provide a preliminary summary within the standard turnaround.

What deliverables do you provide?

You receive an Excel workbook organized by CSI MasterFormat Division 06 section, a PDF estimate for review, and a marked-up plan set showing the measurement path. We also provide a board-foot lumber list and a connector hardware count. Waste factors and labor burden are shown as separate lines. The marked-up plans use Bluebeam Revu and are color-coded by material type for easy verification.

How do you handle sheathing upgrades like ZIP System?

If the base spec calls for ZIP System or taped seams, we include the tape, rollers, and fluid-applied WRB as separate lines. We do not carry them as alternates unless the spec explicitly says so. This ensures the base bid is complete and you avoid a change order for a scope that was always required. We also verify the panel thickness and fastener schedule, as ZIP System may require specific nails.

Do you check stair code compliance?

We flag the stair takeoff for confirmation with the local building department because riser/tread dimensions and handrail height depend on the locally adopted IRC or IBC edition. We measure the stair components from the plans and note the code reference so you can verify compliance before installation. We also check for variations in the number of risers, landing dimensions, and guard height, which can affect material quantities.

What information do you need to start?

We need the architectural set, structural set, spec book, schedules (door, window, cabinet, finish), truss layout, and any addenda or RFIs. If the truss layout is not available, we carry trusses as an allowance. The more complete the documents, the more accurate the estimate. We also request the geotechnical report if there are foundation considerations, and the energy code compliance forms if they affect sheathing.

Do you provide outsourced wood estimating for contractors who already have an in-house team?

Yes. Outsourced wood estimating is often used to cover overflow or to check an in-house takeoff before a bid package goes out. We measure from your plan set and specifications, apply the same waste factors and board-foot conversions, and return an Excel workbook plus a marked-up PDF. You can compare our quantities line by line against yours. Turnaround is 24–48 hours for most projects, with rush available.

How do your plastics estimator and composites estimator handle FRP and plastic lumber scopes?

A plastics estimator measures FRP composites, plastic lumber, and composite panels by LF, SF, or EA depending on the assembly. We check resin type, panel thickness, attachment method, and whether the specification calls for ASTM or ANSI standards testing. For plastic lumber decking and trim, we confirm span tables and connection details. These lines are kept separate from wood framing so the bid package stays clean.

Can you produce a wood estimate for contractors that includes load calculations and span tables?

We do not stamp engineering, but we do read the structural drawings and confirm that the specified members match the span tables and load calculations shown. If a beam size looks undersized for the span, we flag it before pricing. We also check grade stamps, pressure treatment, fire retardant treatment, and connection details. That review is part of every wood estimate for contractors we deliver.

Do you provide outsourced plastics estimating for contractors who already have an in-house team?

Yes. We work as an outsourced plastics estimating extension of your team, taking the takeoff and pricing off your desk while your estimator stays on bid strategy. You send the plan set and specs, we return an Excel workbook by CSI section, a PDF, and a marked-up plan set. We carry labor productivity, equipment costs, overhead and profit, and contingency as separate lines so you can adjust markups without redoing the takeoff.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning. is a Senior Estimator with more than 15 years of professional experience in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Guides on this topic

Related services

Send your Division 06 plans for a fixed-price estimate

Upload your architectural and structural sets, and we will return a complete wood, plastics, and composites takeoff in Excel and PDF within 24–48 hours.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.