Millwork & Casework Estimating

Send your architectural drawings, cabinet schedule and finish specs. We return a line-item takeoff of cabinets, countertops and trim in Excel and PDF, organized by CSI MasterFormat division.

24–48 hours for most projectsTypical turnaround
Excel + marked-up PDFsOrganized by CSI section
ZIP-code pricingLocal material and labor
Price confirmed firstBefore any work starts
Sample estimate sheet
Division 06 — Wood, Plastics & CompositesSample format
Line itemQtyUnitBoard
Base cabinets 24" deep186LF186 LF
Wall cabinets 30" high124LF124 LF
Plastic-laminate countertop 1.25"210SF210 SF
Wood base molding 5.25"340LF340 LF
Cabinet hardware1,240EA—
Total measured quantity—
Illustrative quantities. Waste factor applied as a separate line.
Edge profile measured separately

What is millwork and casework estimating?

Millwork and casework estimating is the takeoff and pricing of architectural woodwork under CSI Division 06, including cabinets, countertops and trim. Quantities are measured in LF, SF, EA and LF of edge, then priced with ZIP-code-adjusted material and labor rates. Deliverables are Excel and PDF files with marked-up plans.

  • Units used: LF for runs and trim, SF for faces and countertops, EA for cabinets and hardware.
  • Typical waste factor for sheet goods and solid stock runs 5–10%, but confirm with your fabricator.
  • The most common costly miss is countertop edge profile and cutouts, which are often left out of Division 06 pricing.

Millwork estimating turns a set of architectural drawings and a cabinet schedule into priced quantities you can carry into a bid or buyout. If you are a general contractor pricing a Division 06 package, a millwork subcontractor checking a plan before you commit to a number, or an owner comparing bids, you need the same thing: a takeoff that separates cabinet boxes, faces, countertops and trim by unit of measure instead of one lump sum. That is what we produce.

Deliverable
Excel estimate + marked-up PDF plans
Organized by
CSI MasterFormat section
Turnaround
24–48 hours for most projects
Pricing
ZIP-code-adjusted material and labor pricing
Software
Bluebeam Revu, PlanSwift, RSMeans data

We take off architectural woodwork under Division 06, including 06 40 00 Architectural Woodwork, 06 41 00 Architectural Wood Casework, 06 41 13 Wood-Veneer-Faced Casework, 06 41 16 Plastic-Laminate-Faced Casework, 06 41 93 Cabinet Hardware, 06 46 00 Wood Trim and 06 48 00 Wood Paneling. Countertops sit under Division 12 35 30 and 12 36 00, so we break out 12 36 40 Stone Countertops, 12 36 53 Plastic-Laminate-Clad Countertops and 12 36 61 Simulated Stone Countertops as separate lines. Each line carries a quantity in LF, SF, EA or LF of edgebanding, a drawing reference and the spec section it belongs to. We work from your plan set in Bluebeam Revu and PlanSwift, apply ZIP-code-adjusted material and labor pricing from RSMeans data, and deliver Excel and PDF files with marked-up plans so you can see exactly where each number came from.

Most projects return in 24–48 hours. Rush turnaround is available when a bid date is close. If you are pricing a full wood package, pair this with our lumber takeoff and framing estimating services so the rough and finish scopes do not overlap.

Services

What the millwork takeoff covers

We measure the casework, countertop and trim scope the way a millwork estimator does — by CSI section, by unit and by face material — so your pricing follows the same breakdown the spec uses. The list below is the standard scope. Anything outside it is noted as an exclusion so you can price it separately or send it back to us.

Cabinet Boxes

Base, wall and tall cabinet boxes measured by LF of run and EA unit count, including end panels and fillers.

LF · EA

Vanity & Lavatory

Vanity and lavatory cabinets priced by EA, grouped by width and sink configuration, with cutout allowances.

EA

Cabinet Faces

Plastic-laminate, wood-veneer and thermofoil faces measured in SF by face type, including doors and drawer fronts.

SF

Countertops

Countertops measured in SF by material, plus LF of edge profile for square, bevel, bullnose and ogee edges.

SF · LF

Countertop Cutouts

Sink, cooktop, faucet and soap dispenser cutouts counted by EA, with separate pricing for undermount and drop-in sinks.

EA

Cabinet Hardware

Hinges, slides, pulls and shelf standards counted by EA, including soft-close upgrades and specialty hardware.

EA

Trim & Molding

Base, shoe, crown, chair rail and picture molding measured by LF by profile, including door and window casing.

LF

Paneling & Wainscot

Wood paneling and wainscot measured in SF by panel type, plus trim LF for rails, stiles and caps.

SF · LF

What every millwork & casework estimating takeoff includes

  • Base, wall and tall cabinets — LF run and EA unit count
  • Vanity and lavatory cabinets — EA by width and sink configuration
  • Plastic-laminate, wood-veneer and thermofoil faces — SF by face type
  • Countertops — SF by material, plus LF of edge profile
  • Countertop cutouts — sink, cooktop, faucet and soap dispenser, EA
  • Cabinet hardware — hinges, slides, pulls and shelf standards, EA
  • End panels, finished sides, fillers, scribes and toe kicks — LF or SF
  • Base, shoe, crown, chair rail and picture molding — LF by profile
  • Door and window casing — LF by width and profile
  • Wood paneling and wainscot — SF by panel type, plus trim LF
  • Adjustable shelves and shelf pin holes — LF and EA
  • Backsplash — SF by height and material
How we work

How we take off a millwork package

  1. Read the cabinet schedule and elevationsWe start with the cabinet schedule and interior elevations, not the floor plan. The schedule gives unit widths, heights and types; the elevations show finished ends, fillers, scribes and toe kick. We note every discrepancy between the two and flag it in the marked-up set before we measure. For example, if the schedule lists a 36" base cabinet but the elevation shows a 42" cabinet with a finished end panel, we mark both sheets and add a query line. We also check that the schedule includes all units shown on the plans, such as vanities, islands and specialty cabinets.
  2. Measure cabinet runs by typeWe measure base, wall and tall cabinet runs along the face in LF, then count individual boxes in EA where the schedule breaks them out. Corner cabinets, blind corners and diagonal configurations are measured as separate lines because they carry different box and face costs. For a typical kitchen, we separate base cabinets (24" deep, 34.5" high), wall cabinets (12" or 13" deep, 30", 36" or 42" high) and tall cabinets (84", 90" or 96" high). We also note the number of adjustable shelves per cabinet, measured in LF, and the quantity of shelf pin holes in EA.
  3. Break out faces and edge treatmentFor each cabinet run we calculate SF of face material by type — plastic laminate, wood veneer, thermofoil or melamine — and LF of edge banding or applied edge profile. A cabinet box with a laminate face and a veneer face is two different lines, even if the box is identical. We measure the face area of doors, drawer fronts and finished ends separately, and we note the edge treatment: 3mm PVC edge banding, 1mm edge tape, or applied wood edge. Book-matched veneer requires sequencing and is measured with the grain direction noted.
  4. Take off countertops and cutoutsCountertops are measured in SF by material — plastic laminate, solid surface, quartz or stone — and the edge profile is measured in LF around the perimeter. Sink, cooktop, faucet and soap dispenser cutouts are counted in EA, with the drilling pattern noted from the plumbing fixture cut sheet. We also measure the LF of backsplash by height (4", 18" or full-height) and note the material. For islands, we measure the countertop SF and the edge LF separately, and we flag any waterfall edges that require mitered corners and a substrate.
  5. Measure trim and panelingBase, shoe, crown, casing and chair rail are measured in LF by profile and species. Paneling and wainscot are measured in SF by panel type, with trim and reveals excluded from the panel field. We check that trim at cabinet-to-wall, cabinet-to-ceiling and cabinet-to-floor transitions is included. For example, a cabinet run that ends at a wall typically requires a filler and a scribe, measured in LF, and a base molding return. We also count the number of outside corners in EA for corner guards or mitered returns.
  6. Apply pricing and organize by CSIWe apply ZIP-code-adjusted material and labor pricing from RSMeans data, then organize the takeoff by CSI MasterFormat division — Division 06 for casework, trim and paneling, Division 12 36 00 for countertops. The Excel file carries the quantities; the PDF carries the marked-up plans. Each line includes the CSI section number, a description, the quantity, the unit of measure and a drawing reference. We also provide a separate summary sheet that totals quantities by unit and by CSI section, so you can quickly check the overall scope.

What we need from you

  • Architectural drawingsFloor plans, interior elevations and reflected ceiling plans. Elevations are required for cabinet runs and trim heights.
  • Cabinet scheduleUnit types, widths, heights, depths and quantities. If the schedule is on a separate sheet, send it.
  • Finish specsDivision 06 and Division 12 36 00 sections, plus any finish schedule showing face material and countertop type.
  • Hardware specHinge type, slide type, pull style and any soft-close or full-extension requirements. This drives the EA count.
  • Countertop cut sheetsSink, cooktop and faucet cut sheets so we can count cutouts and note drilling patterns.
  • Bid date and ZIP codeThe bid date sets our turnaround; the ZIP code sets the material and labor pricing adjustment.
Sample output

Sample casework takeoff

This is the format you receive. Each line carries a CSI section, a quantity, a unit and a drawing reference so you can trace it back to the sheet.

Sample format — illustrative quantities
SectionLine itemQtyUnitRef.
06 41 16Plastic-laminate base cabinet, 24" deep, 34.5" high186LFA-501
06 41 16Plastic-laminate wall cabinet, 30" high, 12" deep124LFA-501
06 41 13Wood-veneer tall cabinet, 84" high, 24" deep18EAA-502
12 36 53Plastic-laminate countertop, 1.25" thick, square edge210SFA-503
12 36 40Quartz countertop, 3 cm, ogee edge86SFA-503
06 41 93Cabinet hardware — hinges, slides, pulls1,240EAA-504
06 46 13Wood base molding, 5.25" profile, paint grade340LFA-505
06 46 16Wood door casing, 3.5" profile, paint grade210LFA-506
06 41 16Finished end panel, plastic laminate, 24" deep x 34.5" high12EAA-501
06 41 16Filler strip, plastic laminate, 3" wide48LFA-501
06 41 93Shelf standards and pins, adjustable shelves96EAA-504
12 36 53Backsplash, plastic laminate, 4" high60LFA-503

Units of measure we use

Millwork quantities are not interchangeable. A cabinet run measured in LF does not tell you the SF of face material, and a countertop measured in SF does not include the LF of edge. We report each separately.

ItemUnitHow it's measured
Base cabinetsLFMeasured along the front of the cabinet run, excluding fillers and end panels
Wall cabinetsLFMeasured along the face, by height (30", 36", 42") and depth (12", 13")
Tall and pantry cabinetsEACounted individually by height (84", 90", 96") and width
Plastic-laminate facesSFFace area of doors, drawer fronts and finished ends, by panel
Wood-veneer facesSFFace area by veneer cut and species, including book-match direction
CountertopsSFPlan area of the top, by material type, plus LF of edge
Countertop edgeLFPerimeter of the top where an edge profile is applied, including islands
Countertop cutoutsEAEach sink, cooktop, faucet hole and soap dispenser counted separately
Cabinet hardwareEAEach hinge, slide, pull, knob and shelf standard counted by type
Trim — base, casing, crownLFMeasured along the wall or opening, by profile and species
Paneling and wainscotSFFace area of the panel field, excluding trim and reveals

Worked example: base cabinet run and countertop

This example walks through the quantities for one kitchen base cabinet run and its countertop. All dimensions are illustrative and do not come from a real project.

Scope: A straight run of base cabinets along a 12'-0" wall. Cabinets are 24" deep, 34.5" high, plastic-laminate faced. Countertop is 1.25" plastic laminate with a square edge and a 4" backsplash. One double-bowl sink cutout and one faucet hole.

Step 1 — Measure the cabinet run.

  • Wall length: 12'-0".
  • Subtract a 3" filler at the left wall and a 3" filler at the right wall: 12'-0" minus 0.5' = 11.5 LF of cabinet run.
  • Unit count: assume cabinets come in 24" wide boxes. 11.5 LF × 12 in/ft ÷ 24 in = 5.75, so 6 units (the last unit is a 18" wide cabinet to fit).

Step 2 — Calculate face area.

  • Each base cabinet has a door and a drawer front. For a 24" wide unit, door face = 22" wide × 22" high = 484 sq in. Drawer front = 22" wide × 6" high = 132 sq in. Total face per unit = 616 sq in.
  • For 6 units: 6 × 616 = 3,696 sq in. Convert to SF: 3,696 ÷ 144 = 25.67 SF.
  • Add finished end panel at the exposed right side: 24" deep × 34.5" high = 828 sq in = 5.75 SF.
  • Total plastic-laminate face area = 25.67 + 5.75 = 31.42 SF. Round to 32 SF.

Step 3 — Countertop area.

  • Top length = 11.5 LF (same as cabinet run). Top depth = 25" (24" cabinet + 1" overhang).
  • Area in SF: 11.5 LF × (25 ÷ 12) ft = 11.5 × 2.083 = 23.96 SF. Round to 24 SF.

Step 4 — Edge profile.

  • Perimeter of the top: front edge = 11.5 LF. Left end = 25" = 2.08 LF. Right end = 25" = 2.08 LF. Back edge against wall = 0 LF (no edge).
  • Total edge LF = 11.5 + 2.08 + 2.08 = 15.66 LF. Round to 16 LF.

Step 5 — Cutouts.

  • Sink cutout: 1 EA.
  • Faucet hole: 1 EA (some specs require 3 holes; check cut sheet).
  • Soap dispenser: 0 EA (not specified).

Step 6 — Backsplash.

  • Height = 4" = 0.333 ft. Length = 11.5 LF.
  • Area = 11.5 × 0.333 = 3.83 SF. But backsplash is often measured in LF: 11.5 LF.

Step 7 — Hardware.

  • Hinges: 2 per door × 6 doors = 12 EA (some cabinets have 3 hinges; check spec).
  • Drawer slides: 1 pair per drawer × 6 drawers = 6 pairs, or 12 EA individual slides.
  • Pulls: 1 per door + 1 per drawer = 6 + 6 = 12 EA.
  • Shelf standards: not applicable for base cabinets.

Step 8 — Waste factor.

  • Plastic laminate: typical waste 10% for face material. 32 SF × 1.10 = 35.2 SF.
  • Countertop: typical waste 10% for laminate. 24 SF × 1.10 = 26.4 SF.
  • Edge banding: typical waste 5%. 16 LF × 1.05 = 16.8 LF.
  • We report waste as a separate line, not baked into the measured quantity.

Summary table (sample format — illustrative quantities):

SectionLine itemQtyUnit
06 41 16Plastic-laminate base cabinet, 24" deep, 34.5" high11.5LF
06 41 16Base cabinet units, 24" wide6EA
06 41 16Plastic-laminate face area32SF
06 41 16Finished end panel1EA
12 36 53Plastic-laminate countertop, 1.25" thick24SF
12 36 53Countertop edge, square profile16LF
12 36 53Sink cutout1EA
12 36 53Faucet hole1EA
12 36 53Backsplash, 4" high11.5LF
06 41 93Hinges12EA
06 41 93Drawer slides (pairs)6PR
06 41 93Pulls12EA

This is the level of detail you receive. Each line ties back to a drawing sheet and a CSI section.

Cost drivers

What drives millwork cost estimating

Relative impact on a typical estimate for this trade, based on estimator judgment. Select a bar for details.

Scale: 1 = minor, 5 = major relative impact. Estimator judgment, not measured data.
Relative impact 5 / 5

Face material

Plastic laminate, wood veneer, thermofoil and melamine carry different material and labor costs for the same box. Veneer adds sequencing and book-match direction, which raises shop time. Thermofoil requires a membrane press and can be more expensive for small runs. We measure SF by face type so you can price each separately, and we note the edge treatment (3mm PVC, 1mm tape, or applied wood edge) because it affects both material and labor.

Face material

Plastic laminate, wood veneer, thermofoil and melamine carry different material and labor costs for the same box. Veneer adds sequencing and book-match direction, which raises shop time. Thermofoil requires a membrane press and can be more expensive for small runs. We measure SF by face type so you can price each separately, and we note the edge treatment (3mm PVC, 1mm tape, or applied wood edge) because it affects both material and labor.

Countertop material

Plastic laminate, solid surface, quartz and stone differ in slab size, edge build-up and fabrication time. Stone and quartz also carry cutout and polishing costs that laminate does not. Solid surface requires a substrate and seams that are glued and sanded. We break out SF by material and LF of edge, and we note the number of seams and the edge profile (square, bullnose, ogee, waterfall) because each adds fabrication time.

Edge profile

A square edge, bullnose, ogee or waterfall edge changes the LF of fabrication and the number of seams. Waterfall edges on islands add mitered corners and often require a substrate. A bullnose edge on a plastic-laminate top is typically applied as a separate strip and then trimmed and filed. We measure edge LF separately from top SF, and we note the edge build-up thickness (1.25", 1.5", 3cm) because it affects material yield.

Hardware specification

Soft-close hinges, full-extension slides, pull-outs and trash pull-outs are counted in EA and priced per unit. A hardware upgrade can add hundreds of EA to a mid-size project. For example, a 30-cabinet kitchen might have 60 hinges, 40 slides, 30 pulls and 10 shelf standards. We count each type from the hardware spec, and we note the finish (chrome, brushed nickel, oil-rubbed bronze) because it can affect cost.

Site conditions

Out-of-plumb walls and out-of-level floors drive filler and scribe quantities, which are measured in LF. A job with irregular walls needs more field fitting and more trim. We note where the drawings show conditions that will require extra scribe, such as a wall that is out of plumb by more than 1/4" over 8 feet. We also measure the LF of toe kick and base shoe, which are often affected by floor levelness.

Finish and species

Paint-grade and stain-grade trim carry different material costs, and stain-grade requires touch-up after installation. Exposed wood paneling adds finish SF. For example, stain-grade oak or maple costs more than paint-grade poplar or MDF, and it requires careful handling to avoid scratches. We note the finish requirement on each trim and paneling line, and we separate paint-grade from stain-grade so you can price them correctly.

Project size and repetition

Large projects with repetitive cabinet types benefit from shop efficiency, while small custom projects with unique configurations cost more per unit. Repetition reduces setup time and material waste. For example, a 200-unit apartment building with identical kitchens will have a lower per-unit cost than a custom home with one-of-a-kind cabinets. We measure quantities by type and note the repetition so you can adjust your pricing accordingly.

Scope gaps

Common scope gaps we catch

Millwork bids go wrong when a quantity is measured in the wrong unit or left out of the schedule. These are the gaps we look for on every takeoff.

  • Finished end panels and exposed cabinet sides shown on elevations but missing from the cabinet schedule. We compare each elevation against the schedule and add the missing EA.
  • Filler strips and scribes at walls, corners and out-of-plumb conditions. These are measured in LF and often left out because they are not a cabinet box.
  • Toe kick, toe kick return and base shoe at cabinet runs. The toe kick is measured in LF and is separate from the base molding line.
  • Countertop edge profile measured as LF, not SF. A 210 SF top with a 60 LF perimeter needs both numbers to price the edge fabrication.
  • Sink, cooktop, faucet and soap dispenser cutouts and drilling. These are counted in EA from the plumbing fixture cut sheets, not from the countertop plan.
  • Backsplash height and material — 4", 18" or full-height — and the LF of the run. A full-height backsplash adds SF and often a substrate.
  • Hardware upgrades such as soft-close hinges, full-extension slides and pull-outs. These are counted in EA and priced per unit, and they are frequently omitted from the base hardware line.
  • Blocking and backing inside walls for cabinet and countertop attachment. This belongs in Division 06 rough carpentry or Division 05, and we flag it as an exclusion.
  • Wood trim at cabinet-to-wall, cabinet-to-ceiling and cabinet-to-floor transitions. These are measured in LF and are easy to miss when the trim plan stops at the cabinet line.
  • Stain, paint or clear finish on exposed wood trim and paneling. This belongs in Division 09, and we note it so it is not double-priced in the millwork package.
  • Access panels and removable panels for plumbing and electrical. These are counted in EA and are often shown only on the plumbing or electrical sheets.
  • Freight, crating, delivery and jobsite protection for casework. These are Division 01 or supplier costs, and we list them as exclusions so you can price them separately.
  • Fire-rated or moisture-resistant substrates behind tile and stone. These belong in Division 09 and are not part of the countertop or backsplash line.
  • Corner cabinets, blind corners and diagonal corner configurations. These are measured as separate lines because they carry different box and face costs.

Face and top materials compared

The same cabinet box can carry different face and top materials. We measure each by its own unit so you can price the material you actually specify.

MaterialTypical useUnit of measureWhat changes in the takeoff
Plastic laminateCabinet faces, countertops, backsplashSF for faces and tops, LF for edgesEdge treatment (3mm PVC vs. applied wood edge) adds LF; cutouts for sinks and cooktops counted in EA.
Wood veneerHigh-end cabinet faces, panelingSF by face area, with grain direction notedBook-matching and sequencing increase shop time; measure face area and note veneer cut (plain, quarter, rotary).
ThermofoilCabinet doors and drawer fronts, especially in kitchens and bathsSF of face areaRequires membrane press; small runs may be more expensive; measure face area and note edge profile.
MelamineCabinet interiors, shelving, utility cabinetsSF of face areaEdge banding is typically 1mm or 3mm PVC; measure LF of edge banding separately.
Solid surfaceCountertops, integrated sinks, shower wallsSF of top area, LF of edgeSeams are glued and sanded; count seams in LF; cutouts and coved backsplash add cost.
QuartzCountertops, islands, backsplashSF of top area, LF of edgeEdge profile (square, bullnose, ogee, waterfall) adds LF; cutouts for sink and faucet counted in EA.
GraniteCountertops, islandsSF of top area, LF of edgeSlab layout and seam placement affect yield; measure SF and note edge profile and cutouts.
Butcher blockCountertops, islands, work tablesSF of top area, LF of edgeEdge treatment often square or rounded; measure LF of edge and note finish (oil, lacquer).
Codes and standards

Codes and standards that affect millwork quantities

Model codes

The International Building Code (IBC) and International Residential Code (IRC) govern where millwork is allowed and how it must be installed. The IRC addresses cabinet and countertop installation in dwellings, including clearance to ranges and protection of combustible surfaces. The IBC covers interior finishes and flame-spread ratings for wood paneling in commercial occupancies. The International Energy Conservation Code (IECC) can affect cabinet depth and insulation around exterior walls. The National Electrical Code (NEC) requires receptacles in islands and peninsulas, which may require cutouts in casework. Plumbing codes (IPC/UPC) set sink and faucet rough-in dimensions that drive countertop cutouts. Confirm the adopted code edition with the local building department.

Industry standards

Architectural woodwork is governed by the Architectural Woodwork Standards (AWS), published by AWI, which defines grades (Economy, Custom, Premium) and affects material selection, joinery, and finish. The Woodwork Institute (WI) also publishes manual of millwork standards. For countertops, ASTM C1364 covers solid surface material, and ASTM C615 covers granite. The National Kitchen & Bath Association (NKBA) publishes guidelines for clearances and work triangles, which can influence cabinet and countertop dimensions. These standards change quantities: a Premium grade may require thicker veneer or more careful matching, increasing SF and LF.

Specification sections

An estimator must read Division 06 sections: 06 40 00 Architectural Woodwork, 06 41 00 Architectural Wood Casework, 06 41 13 Wood-Veneer-Faced Casework, 06 41 16 Plastic-Laminate-Faced Casework, 06 41 93 Cabinet Hardware, 06 46 00 Wood Trim, and 06 48 00 Wood Paneling. Countertops are under Division 12 36 00: 12 36 40 Stone Countertops, 12 36 53 Plastic-Laminate-Clad Countertops, and 12 36 61 Simulated Stone Countertops. Each section specifies materials, fabrication, and installation, which directly affect cost. For example, a spec requiring solid wood drawer boxes instead of particleboard adds material cost and may change hardware selection.

Local amendments

Local jurisdictions may adopt different editions of the IBC, IRC, IECC, NEC, and plumbing codes, and may amend them. For example, some states require additional blocking for cabinet attachment in seismic zones, or have specific requirements for countertop support in commercial kitchens. Amendments can also affect where wood paneling is allowed and what fire ratings are required. Always confirm the adopted code edition and local amendments with the local building department before finalizing your bid. We note code-related exclusions in our takeoff but do not provide code compliance review.

Who we provide estimates for

Who uses this millwork estimate for contractors

General contractors

You need a Division 06 and 12 36 00 quantity breakdown to check subcontractor bids and to price the scope if you self-perform. The takeoff gives you LF, SF and EA quantities you can mark up with your own labor and overhead.

Millwork subcontractors

You are bidding a cabinet, countertop and trim package and need to verify the plan quantities before you commit. The takeoff separates face material, edge profile and hardware so you can price each line against your shop rates.

Developers and owners

You are comparing bids and want to know whether the quantities are consistent across bidders. A line-item takeoff shows where one bidder included finished ends and another did not.

Architects

You are checking a contractor's schedule of values or a change order for added casework. The takeoff ties each quantity back to a sheet and a CSI section, so you can see what was measured.

Where we provide estimates

Millwork & Casework Estimating in 20 states

Pricing is adjusted to the project ZIP code. Select a highlighted state to see the cities we cover there.

States we coverSelected
TX

Millwork & Casework Estimating in Texas

Nation's largest construction market; Sun Belt population growth, data centers, semiconductor plants, and single-family home building.

Texas estimating services
Property types

Project types and what changes

The takeoff method stays the same, but the emphasis shifts by project type. Here is what we adjust for common building types.

Multifamily apartments

Repetitive unit types: measure one unit, multiply by count, but verify each unit type has its own schedule.

Watch for: Watch for mirrored units and corner units with different cabinet configurations.

Custom single-family homes

One-off layouts with unique cabinets, islands and built-ins; measure every run and count every box.

Watch for: Watch for custom heights, depths and specialty finishes not in the standard schedule.

Hospitality and hotels

Guest room casework, vanities, and public area millwork; often includes stone tops and paneling.

Watch for: Watch for large quantity of identical units and the need to separate public vs. guest room scopes.

Healthcare and clinics

Casework in exam rooms, nurses' stations and labs; often requires solid surface or stainless steel.

Watch for: Watch for infection control requirements, moisture-resistant substrates, and access panels.

Corporate offices

Reception desks, break room cabinets, and conference room millwork; often includes plastic laminate and wood veneer.

Watch for: Watch for design intent: veneer matching, edge profiles, and integrated power/data cutouts.

Retail and restaurants

Display cases, service counters, and back-of-house cabinets; often includes stainless steel and stone.

Watch for: Watch for health department requirements, grease-resistant materials, and equipment cutouts.

Institutional and education

Classroom cabinets, science lab casework, and library shelving; often includes chemical-resistant surfaces.

Watch for: Watch for heavy-duty hardware, lockable cabinets, and ADA compliance for sinks and counters.

Deliverables

What you receive

  • Excel takeoff organized by CSI MasterFormat division, with one line per item and a quantity in LF, SF or EA.
  • PDF takeoff with the same lines, formatted for printing and markup.
  • Marked-up plan set showing where each quantity was measured, with sheet references on every line.
  • Separate lines for face material, edge profile, hardware and cutouts so you can price each against your own rates.
  • A list of exclusions and scope gaps, with the division each excluded item belongs to.
  • ZIP-code-adjusted material and labor pricing from RSMeans data, applied to each line.
  • Turnaround in 24–48 hours for most projects, with rush available when a bid date is close.
Checklist

Pre-bid checklist for millwork packages

  • Verify cabinet schedule matches interior elevations.
  • Check for finished end panels and exposed sides.
  • Confirm countertop edge profile and thickness.
  • Count all sink, cooktop, and faucet cutouts.
  • List hardware type and quantity per cabinet.
  • Measure filler and scribe at walls and corners.
  • Include toe kick and base shoe in LF.
  • Note backsplash height and material.
  • Check for blocking and backing requirements.
  • Identify access panels for plumbing and electrical.
  • Confirm stain or paint finish on exposed wood.
  • Review freight and delivery responsibilities.
Client reviews

What clients say about Scope Precision Estimate

10 client reviews
AW
Andrew WilsonGeneral Contractor

Highly recommended for construction cost estimating. The quantities were accurate, the pricing was well organized, and the final report was easy to review.

MD
Matthew DavisConstruction Manager

Their construction estimate was thorough and professionally prepared. It made our budgeting process much easier and helped us identify potential cost issues early.

CM
Christopher MillerResidential Builder

We needed a quick and accurate construction cost estimate, and they delivered exactly what we needed. Great attention to detail and a very responsive team.

BT
Brian TaylorProject Estimator

Fast, accurate, and dependable estimating service. They understood the project requirements quickly and provided a detailed estimate without unnecessary delays.

RW
Robert WilliamsEstimating Manager

Professional and reliable estimating service. The detailed quantity takeoff helped us reduce pricing errors and submit our proposal on time.

JR
James RichardsonConstruction Project Manager

Excellent construction estimating service. The team provided a comprehensive takeoff and cost breakdown that saved us hours of manual work.

FAQ

Millwork & Casework Estimating questions

How do you handle cabinet schedules that conflict with elevations?

We compare every cabinet in the schedule against the interior elevations. When a unit appears in one but not the other, we mark both sheets and add a query line to the takeoff. For example, if the schedule lists a 36" base cabinet but the elevation shows a 42" cabinet with a finished end panel, we measure both and note the discrepancy. You get a marked-up plan showing exactly where the conflict is, so you can resolve it with the architect before you price.

Do you measure countertops in square feet or linear feet?

We measure countertop area in square feet (SF) and edge profile in linear feet (LF). These are separate lines because they are priced differently. A 24 SF top with a 16 LF perimeter will have one line for the top and one for the edge. We also count cutouts in each (EA). This matches how fabricators price: material by SF, edge fabrication by LF, and cutouts per opening.

What is the typical waste factor for plastic laminate and solid surface?

Typical waste factors are 10% for plastic laminate face material and countertops, and 5% for edge banding. Solid surface and stone often carry 15% waste due to slab layout and seam placement. We apply waste as a separate line so you can see the measured quantity and the waste quantity separately. If your supplier has a different yield, you can adjust the waste line without changing the measured takeoff.

How do you count cabinet hardware?

We count each hinge, drawer slide, pull, knob, and shelf standard in each (EA). For example, a base cabinet with one door and one drawer typically has two hinges, one pair of slides, one pull, and one knob. We read the hardware spec to determine type and finish, because soft-close hinges and full-extension slides are counted separately from standard hardware. We also note shelf standards and pins for adjustable shelves, measured in EA.

Do you include blocking and backing in the millwork takeoff?

No. Blocking and backing inside walls belong in Division 06 rough carpentry or Division 05, not in the architectural millwork package. We flag them as exclusions and note the division they belong to, so you can price them separately. If the drawings show blocking that is not specified elsewhere, we still list it as an exclusion to avoid double-pricing.

How do you handle stain and paint finishes on trim and paneling?

Finish stain, paint, or clear coat on exposed wood belongs in Division 09. We measure the trim and paneling quantities in LF and SF, and we note the finish requirement on each line. We separate paint-grade from stain-grade because they carry different material and labor costs. We do not include the finish application in the millwork takeoff, but we list it as an exclusion so you can price it under Division 09.

What is the turnaround time for a millwork takeoff?

Most projects return in 24–48 hours. Rush turnaround is available when a bid date is close. The time depends on the size of the package and the completeness of the documents. A single-family kitchen with a clear schedule may take less time than a multifamily project with multiple unit types. We confirm the schedule when you send the plans.

What file formats do you deliver?

We deliver an Excel takeoff organized by CSI MasterFormat division, with one line per item and quantities in LF, SF, or EA. We also provide a PDF with the same lines, formatted for printing and markup. The marked-up plan set is included as a PDF showing where each quantity was measured, with sheet references on every line. This gives you a traceable record for bid review or change orders.

Can you break out quantities by building or unit type?

Yes. For multifamily or hospitality projects, we can separate quantities by building, floor, or unit type. This helps you price repetitive units and compare bids. We need a unit matrix or floor plans that identify each unit type. We then measure each type once and multiply by the count, noting any mirrored or corner units that change the cabinet layout.

How do you handle countertop cutouts for sinks and cooktops?

We count each cutout in each (EA) based on the plumbing and appliance cut sheets. A double-bowl sink may require one cutout, while a cooktop requires another. Faucet holes are counted separately, as some specs require one, two, or three holes. We note the drilling pattern from the cut sheet. If the cut sheets are not available, we measure from the countertop plan and flag the assumption.

Do you include freight and delivery in the takeoff?

No. Freight, crating, delivery, and jobsite protection are typically Division 01 or supplier costs. We list them as exclusions so you can price them separately. If your supplier includes delivery in the material price, you can add it to the material line. We note the exclusion so you do not overlook it when comparing bids.

What is the difference between plastic-laminate-faced and wood-veneer-faced casework?

Plastic-laminate-faced casework uses a laminate sheet bonded to a substrate, typically particleboard or MDF. Wood-veneer-faced casework uses a thin slice of real wood bonded to a substrate. Veneer requires sequencing and book-matching, which adds shop time. We measure face area in SF by type and note the edge treatment. The same cabinet box can carry either face, so we separate them into different lines for pricing.

What does your outsourced millwork estimating service include?

We produce a full quantity takeoff from your architectural drawings, cabinet schedule and shop drawings. Lines are broken out by CSI section — 06 40 00, 06 41 00, 06 46 00 and Division 12 countertops — with quantities in LF, SF, EA and LF of edgebanding. We also prepare a bill of materials and a cut list when the scope calls for it, so your shop can price plywood, solid stock and custom casework directly from the takeoff.

How does a casework estimator handle cabinet schedules?

A casework estimator reconciles the cabinet schedule against the elevations and floor plans before measuring anything. We check that every cabinet tag on the plan appears in the schedule, that widths and depths match the wall conditions, and that finish notes align with the spec section. When a schedule conflicts with an elevation, we flag it and price the larger quantity so your bid does not come up short.

What is included in your casework cost estimating?

Casework cost estimating covers cabinet boxes, faces, countertops, trim and hardware, each priced by unit of measure. We apply ZIP-code-adjusted material and labor rates from RSMeans data and break out plastic-laminate, wood-veneer and solid-surface finishes separately. The deliverable is an Excel file organized by CSI division with marked-up plans, so you can see the drawing reference behind every quantity and adjust for your own buyout.

What does your millwork bid estimating service include?

Our millwork bid estimating service breaks out casework, countertops, trim, and paneling by CSI section — 06 40 00, 06 41 00, 06 46 00, and 12 35 30 — with quantities in LF, SF, EA, and cubic feet where volume matters. We flag AISI standards and ANSI/BHMA hardware requirements, note GREENGUARD and CARB Phase 2 compliance items, and deliver Excel and PDF files with marked-up plans so you can see the source of every number.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning. is a Senior Estimator with more than 15 years of professional experience in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Guides on this topic

Ready to price your millwork package?

Send your plans, cabinet schedule, and finish specs to get a line-item takeoff in 24–48 hours.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.