Sitework takeoff
Clearing, excavation, backfill and utility trench quantities for tight Nassau County lots with limited laydown area.
CY · SF · LFValley Stream permitted 70 new privately-owned residential units in 2025, 63 of them multifamily. We produce CSI MasterFormat takeoffs and estimates for bidders, builders and owners working in Nassau County, priced with ZIP-code-adjusted material and labor.
Multifamily density — 90% of 2025 permitted units — drives concrete, framing and MEP scope. Nassau County labor rates, NYC-area material logistics, Long Island coastal flood and frost-depth requirements, and tight village review timelines all move the number. We price each from ZIP-adjusted data.
Valley Stream sits in Nassau County on the Queens border, where most of the work we price is multifamily, mixed-use and commercial infill rather than greenfield subdivision. The 2025 permit data reflects that: 70 new privately-owned residential units, 63 multifamily, with a permitted value of $19M and an average of $273,800 per unit. For a bidder, that mix means concrete, framing and MEP packages carry the estimate, and sitework scope is small but unforgiving on tight lots.
We build takeoffs in Bluebeam Revu and PlanSwift against RSMeans data, then adjust material and labor to the project ZIP code. Deliverables come as Excel and PDF organized by CSI MasterFormat division, with marked-up plan sets so your reviewer can trace every quantity back to the sheet. Turnaround is 24–48 hours for most projects. Start with our New York construction estimating overview, or send plans straight to the estimate request page.
For bidders. You need quantities you can defend at bid opening. We return division-by-division takeoffs with waste factors, unit costs and marked-up plans so you can adjust labor crews and still hit the submission window.
For builders. You are buying out subs and ordering long-lead material. We break concrete, framing, roofing and MEP scopes into bid packages with clear quantities, so you can compare proposals line by line instead of lump sums.
For owners. You are testing feasibility before committing to a design. We give you a cost model by CSI division, tied to ZIP-adjusted pricing, so you can see which scope drives the budget and where to value-engineer.
Select a bar to compare Valley Stream with the largest New York markets we cover.
70 new housing units in 2025 (+268.4% vs 2024).
7 single-family · 63 multifamily (90%).
The 2025 Building Permits Survey counts 70 new privately-owned residential units in Valley Stream, up from 19 in 2024 — a 268% increase. Multifamily accounts for 63 units, or 90% of the total, at a permitted value of $19M and $273,800 per unit. For an estimator, that concentration means the money sits in structural concrete, wood or steel framing, and MEP rough-in rather than in sitework. Single-family permits were only 7 units, so residential estimating here is mostly a multifamily exercise. Valley Stream ranks 13th of 24 covered New York cities by units and holds 1.9% of the covered state total of 3,635 units. If you bid in this market, price the vertical scope first and treat the site package as a smaller, risk-managed line. Our multi-family estimating team handles this scope regularly.
Valley Stream is a Nassau County village, and its cost base is set by Long Island labor and logistics, not upstate rates. Material deliveries run through the same supply chain that serves Queens and western Nassau, so concrete, lumber and mechanical equipment pricing tracks the metro market. Coastal flood provisions and local frost depth affect foundation and below-grade details, and each village enforces its own review sequence — confirm the adopted code edition and permit path with the local building department before you lock a schedule. We adjust RSMeans material and labor to the project ZIP code rather than applying a county average. Bidders comparing Valley Stream to nearby work should also look at our Freeport and Hempstead pages, where the trade mix is similar.
We cover the divisions that carry cost on Valley Stream multifamily, commercial and residential projects.
Clearing, excavation, backfill and utility trench quantities for tight Nassau County lots with limited laydown area.
CY · SF · LFFootings, frost walls, slab-on-grade and elevated decks priced by mix design and formwork contact area.
CY · SFFrost-depth footings, waterproofing, drainage board and sump scope for Long Island below-grade conditions.
LF · SFWood and light-gauge studs, joists, sheathing and hardware counted from plan and section, with typical waste.
LF · SF · EAMembrane, insulation, flashing and edge metal measured from roof plans for flat multifamily roofs.
SQ · LFPlumbing, HVAC and electrical rough-in counts by fixture, diffuser and device for multifamily units.
EA · LF · TONSingle-family and small multifamily budgets from foundation through finishes, organized by CSI division.
SF · EAMixed-use and retail shell and interior packages priced with ZIP-adjusted Nassau County labor and material.
SF · CY · TONYou are bidding Nassau County infill jobs against three or four competitors, so the concrete and framing quantities have to be tight enough to hold a margin without losing the award.
Your Valley Stream projects are mostly 63-unit-scale multifamily buildings, so you need a division-by-division model before you commit to a construction loan or a GMP with your builder.
On narrow lots near the Queens line, footing, slab-on-grade and retaining wall quantities decide the bid; you need rebar tonnage and formwork square footage you can defend.
Wood-frame multifamily over podium is common here, and your bid lives or dies on stud counts, sheathing square footage and the waste factor you carry on each floor.
Sprinkler, domestic water and HVAC scope in mid-rise residential has to be counted by fixture, riser and linear foot, not estimated as a percentage of the building cost.
You are renovating or adding to an existing Nassau County building and need a cost model to compare contractor proposals on the same scope, unit prices and quantities.
We price work throughout the Village of Valley Stream and the surrounding Nassau County communities along the Queens border and the South Shore. If your project is in one of these areas, send the plans and we will confirm scope before starting.
The 2025 permit data shows 70 new privately-owned residential units in Valley Stream, 63 of them multifamily, so most of what we price is attached housing and small commercial infill rather than single-family subdivision work.
Three- and four-story wood-frame or masonry buildings on infill lots, usually with parking at grade. We take off by floor: footings, slab, framing, sheathing, roof, then MEP rough-in per unit.
Watch for: Per-unit MEP counts, corridor and stair square footage, fire separation assemblies.
Ground-floor retail or office with apartments above, common along the commercial corridors. The estimate splits into two cost structures: commercial storefront systems below, residential assemblies above.
Watch for: Storefront glazing, separate utility services, floor-to-floor height changes.
Tear-down and rebuild projects on existing lots, 7 new single-family units permitted in 2025. Small footprint, but full trade coverage: foundation, framing, roofing, MEP and finishes.
Watch for: Demolition and disposal, tight-site staging, utility reconnections.
Tenant improvements along the commercial strips, where the shell exists and the estimate is interior scope only. We count partitions, ceilings, storefront, grease duct and ADA fixtures.
Watch for: Grease duct and hood scope, ADA restroom counts, landlord vs tenant split.
Schools, synagogues and community buildings in the area, often phased around occupied spaces. We separate the estimate by phase so the owner can see cost per stage.
Watch for: Phasing and temporary protection, acoustical assemblies, occupied-building access.
Dormers, rear extensions and full interior gut work on older Nassau County housing stock. Existing conditions drive the estimate, so we carry allowances for concealed framing and MEP replacement.
Watch for: Concealed conditions, structural tie-ins, window and door matching.
Two bids on the same Valley Stream drawings can differ by more than the contractor's markup. These are the six drivers we adjust for before we send a number.
New York State adopts the International Code Council family, and the Village of Valley Stream enforces its own building, fire and zoning requirements on top. Multifamily projects trigger sprinkler, egress and energy-code review that changes wall assemblies and MEP scope. Confirm the adopted code edition and any local amendments with the Village building department before you price, because the edition in force sets insulation values, sprinkler thresholds and stair enclosure requirements.
IBC · IRC · IECC · NFPA 13Much of the South Shore sits on glacial outwash sands and silts, with areas of fill and high groundwater near the marsh edges. That pushes foundation design toward deeper footings, engineered fill or piles, and it makes dewatering a real line item rather than an allowance. A geotechnical report is the first document we ask for on any Valley Stream project with a basement or a podium slab.
Glacial outwash soils · High groundwater · Geotechnical report · DewateringLong Island wind loads and the regional snow load drive roof framing, shear nailing and connection hardware, and coastal flood provisions apply to low-lying parcels near the South Shore inlets. Wind-borne debris and flood elevation requirements can change glazing, anchorage and the height of the first floor. These items are easy to miss on a drawing set that was designed for a different jurisdiction.
Wind load · Snow load · Flood elevation · Coastal provisionsNassau County labor sits inside the New York metro wage area, and prevailing wage applies to public work. Even on private multifamily, the available crews for concrete, sprinkler and elevator work are shared with Manhattan and Brooklyn projects, so productivity assumptions from a slower market will not hold. We adjust labor hours to the trade and the ZIP code rather than applying a single regional factor.
Prevailing wage · Nassau County trades · New York metro labor · Crew availabilityInfill lots along the Queens border are narrow, often with no staging area and a driveway shared with a neighbor. That changes crane or pump placement, spoil removal and the cost of moving material by hand. Stormwater management is also reviewed at the local level, so dry wells, recharge basins and impervious-coverage limits can add sitework scope before the building starts.
Limited staging · Spoil removal · Stormwater review · Impervious coverageAlmost everything arrives by truck from distributors in Nassau, Suffolk or New Jersey, so delivery windows, street permits and laydown space affect the material cost as much as the supplier quote. Sales tax treatment on materials depends on whether you are buying as a contractor or an owner, and that difference shows up in the bottom line. We price material at the ZIP code and note where freight or a street permit should be carried separately.
ZIP-adjusted pricing · Freight · Street permits · Sales tax treatmentValley Stream sits in Nassau County, where a 90% multifamily share of 2025 permitted units means stacked, repetitive floor plans that reward disciplined quantity work. Each trade below carries a local quirk that changes the numbers.
Nassau County's dense lots leave little room for stockpiles, so your sitework takeoff needs to price export of unsuitable material rather than on-site balancing. Long Island's glacial till and scattered clay pockets mean the geotech report drives how much undercut you carry; typical over-excavation runs 12 to 24 inches below footing elevation where organics appear. Stormwater is the bigger cost driver: Nassau County and Village of Valley Stream review of recharge and drainage means dry wells, leaching pools, and sediment control are separate line items, not allowances. Track cut and fill by station, and separate topsoil strip from structural fill. Our sitework estimating services break these into measurable units.
Valley Stream's multifamily share favors wood-frame over podium or light-gauge infill, so framing takeoffs hinge on floor-to-floor repetition. Count studs by wall segment with plates, headers, and blocking separated; typical waste runs 5% to 10% on dimensional lumber and 10% on sheathing. Long Island wind exposure pushes shear panel nailing schedules and hold-downs into the structural package, and those hardware counts are easy to undercount. Truss vs. stick framing changes both labor and crane days. If you are pricing a mid-rise, our framing estimating services and multi-family estimating services handle the repeated-unit multiplier without double-counting corridors and stairs.
Stacked multifamily plans let you count fixtures per unit type and multiply, but the riser diagrams and corridor mains must be measured independently. Plumbing takeoff needs fixture counts, water and waste riser lengths by diameter, and venting, with cast iron vs. PVC changing both material and labor. HVAC in Valley Stream is typically split-system or VRF with ductwork per unit; count diffusers, line sets, and condensate runs by unit, then add common-area equipment. Electrical runs by device count, home-run length, and panel schedule. Our MEP estimating services organize all three by CSI division so nothing hides in a single trade.
Most Valley Stream residential work is slab-on-grade or crawl, with full basements common on the older platted blocks near the village core. A foundation takeoff here has to separate footings, stem walls, slab, and any pier or pile work, because the geotech often pushes you to helical piles or mini-caissons on filled ground. Include formwork by contact area, not by concrete volume, and carry a waste factor of about 5% on ready-mix with a pump surcharge line if access is tight. Vapor barrier, rigid insulation under slab, and anchor bolt embeds are frequently missed. Our foundation estimating services and concrete estimating services both start from the same marked-up plan set.
Coastal Nassau County exposure means wind uplift ratings and ice/water membrane at eaves matter more than in inland markets. A roofing takeoff should separate field membrane or shingle area from perimeter, ridge, hip, valley, and penetration flashing, because flashing labor rarely scales with square footage. On flat roofs, tapered insulation layout and drain locations are their own quantities. Include housewrap or fluid-applied WRB by wall area, plus window and door flashing tape by linear foot of opening perimeter. Typical waste on shingles runs 10% to 15% depending on roof complexity. Our roofing estimating services quantify these separately so the bid reflects the actual roof geometry.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24"x12" continuous | 38.5 | CY |
| 03 30 00 | Slab-on-grade concrete, 5" thick | 412 | CY |
| 05 12 00 | Structural steel lintels and embeds | 1,240 | LB |
| 06 10 00 | 2x6 stud wall framing, 16" o.c. | 9,850 | LF |
| 06 16 00 | Wall sheathing, 7/16" OSB | 14,200 | SF |
| 07 30 00 | Asphalt shingle roofing, field | 6,400 | SF |
| 22 10 00 | Plumbing fixture rough-in, per unit | 24 | EA |
| 23 31 00 | Ductwork, flexible and sheet metal | 3,100 | LB |
This walk-through shows how a continuous footing takeoff converts plan dimensions into ready-mix quantity and cost. All dimensions are illustrative, not from a specific project.
Assume a rectangular building footprint 80 ft by 40 ft with one interior bearing line running the long direction. The continuous footing is 24 in wide by 12 in deep. Perimeter length is 2 x (80 + 40) = 240 LF. Interior bearing adds 80 LF, so total footing length is 320 LF.
Convert cross-section to square feet: 24 in = 2.0 ft, 12 in = 1.0 ft, so area is 2.0 SF per linear foot. Volume before waste is 320 LF x 2.0 SF = 640 CF. Divide by 27 to get cubic yards: 640 / 27 = 23.7 CY.
Apply a typical 5% waste factor for ready-mix: 23.7 x 1.05 = 24.9 CY, rounded to 25 CY. If the geotech requires over-excavation and a gravel base, that is a separate line under 31 23 00, not part of the footing concrete.
| Step | Calculation | Result | Unit |
|---|---|---|---|
| Perimeter footing length | 2 x (80 + 40) | 240 | LF |
| Interior bearing length | 80 | 80 | LF |
| Total footing length | 240 + 80 | 320 | LF |
| Cross-section area | 2.0 ft x 1.0 ft | 2.0 | SF |
| Volume before waste | 320 x 2.0 | 640 | CF |
| Volume in cubic yards | 640 / 27 | 23.7 | CY |
| With 5% waste | 23.7 x 1.05 | 24.9 | CY |
Pricing then uses ZIP-code-adjusted material and labor rates for the Valley Stream area, with formwork, reinforcing, and vapor barrier carried as separate line items. If you want this level of detail on your own plans, our concrete estimating services and foundation estimating services both deliver Excel and PDF takeoffs organized by CSI MasterFormat division, usually within 24 to 48 hours.
The figures come from the U.S. Census Bureau's Building Permits Survey for 2025, counting permits issued by the city itself for new privately-owned residential units only. Valley Stream recorded 70 total units, up from 19 in 2024, with 63 multifamily and 7 single-family. That is a 268% change year over year. The survey does not capture commercial, industrial, or renovation permits, so treat it as a residential activity indicator, not a full construction market measure.
New York State adopts the Uniform Fire Prevention and Building Code, which references the IBC, IRC, IPC, and NEC families, but the Village of Valley Stream enforces its own local amendments and the Nassau County health and drainage requirements. Energy work follows the state energy code, which tracks IECC editions. Because adopted editions change on a state cycle and the village may amend them, confirm the exact edition and any local amendments with the Valley Stream building department before you finalize a scope.
Much of Nassau County sits on glacial outwash and till, with scattered clay and filled areas near older platted blocks. That means footing designs sometimes shift to helical piles or mini-caissons, and over-excavation with gravel backfill becomes a real line item. We do not assume a soil condition. We take the geotech report, read the bearing elevation and any undercut notes, and quantify excavation, backfill, and disposal separately from the footing concrete itself.
Yes. Long Island has a strong union presence in the trades, and the labor component of a takeoff changes materially depending on which crew you plan to use. We build the estimate with ZIP-code-adjusted labor rates and can present a union or open-shop basis. Tell us which you intend to bid, and we will keep the material and labor lines separate so you can swap the labor basis without rebuilding the whole estimate.
Send the architectural, structural, and MEP plan sets, the geotech report if you have one, and any specifications or addenda. A scope narrative or bid form helps us match your line-item structure. If you only have partial drawings, tell us which trades to price and which to leave as allowances. We return Excel and PDF takeoffs organized by CSI MasterFormat division, with marked-up plan sets, usually within 24 to 48 hours.
Yes, and that is most of what we see in Valley Stream, where multifamily made up 90% of 2025 permitted residential units. We build a per-unit-type quantity model, then add the corridor, stair, elevator, and common-area scope separately so it is never buried in a per-unit multiplier. That structure also makes it easy to re-price if the unit count or mix changes during design.
Drainage is one of the most under-priced items on Long Island bids. We quantify dry wells, leaching pools, catch basins, piping by diameter, and sediment and erosion control by count and length, based on the site plan and the county or village review comments. We carry them as separate line items under Division 31 and 33 rather than an allowance, so you can see exactly what the stormwater scope is costing.
Yes. Residential drives the permit numbers here, but Nassau County also has retail, office, light industrial, and institutional work. The takeoff method is the same: quantity by CSI division from the drawings and specs, priced with ZIP-code-adjusted material and labor. For anything with process piping, heavy electrical, or specialized equipment, send the equipment schedules and single-line diagrams so we can quantify the actual scope.
We apply typical industry waste factors by material rather than one blanket percentage. Dimensional lumber runs about 5% to 10%, sheathing and drywall about 10%, ready-mix concrete about 5%, and shingles about 10% to 15% depending on roof geometry. Where a project has heavy cutting, complex geometry, or small order quantities, we note the assumption in the estimate so you can adjust it if your supplier or crew behaves differently.
Most projects are returned within 24 to 48 hours, with rush service available when your bid date is tight. Deliverables are Excel workbooks and PDF reports organized by CSI MasterFormat division, plus marked-up plan sets showing what was measured. Every quantity traces back to a drawing sheet or specification section, so you can audit the numbers before you submit your bid.
Send your plan set and specs and we will return a CSI-organized takeoff with marked-up drawings, usually within 24 to 48 hours.