Sitework takeoff
Cut and fill, undercut, retaining walls and erosion control measured from the grading plan for sloped Tompkins County sites.
CY · SF · LFIthaca sits in Tompkins County on steep, glaciated ground where foundation and sitework costs swing hard. We produce CSI-organized takeoffs in Excel and PDF, with marked-up plan sets, priced from ZIP-adjusted material and labor data.
Steep hillside sites drive retaining walls, stepped footings and deep undercut. Frost depth drives footing elevation. Multifamily wood frame dominates permitted volume. Short building seasons compress labor. Institutional and university work adds prevailing-wage and NYSERDA-driven envelope requirements that change unit costs.
Ithaca's permit mix tells you where the estimating risk sits. In 2025 the city issued permits for 207 new privately-owned residential units, up from 117 in 2024 — a 77% jump. Of those, 163 were multifamily, 79% of the total, at an average permitted value of $214,100 per unit. That is a multifamily town, and multifamily in Tompkins County means wood frame over steep ground, not flat suburban slabs.
We price that work from the dirt up. Our New York construction estimating team builds takeoffs in Bluebeam Revu and PlanSwift, then applies ZIP-code-adjusted material and labor pricing from RSMeans data. Deliverables are Excel and PDF, sorted by CSI MasterFormat division, with marked-up plan sets so you can see exactly what we measured. Most projects return in 24–48 hours. If your next bid is a multi-family building on South Hill or a residential infill near Fall Creek, send the set through our estimate request and we will tell you what we need.
For bidders. You need quantities you can defend at a bid opening. We give you line items by CSI division, waste factors stated, and marked-up plans, so you can trace every CY of concrete and every LF of footing back to a sheet.
For builders. You are buying out subs and ordering material. We produce takeoffs that match how you buy — LF of wall, SF of formwork, TON of rebar — priced with ZIP-adjusted labor so your budget holds through the season.
For owners. You want a budget before you commit. We deliver a division-level estimate with clear assumptions and exclusions, so you can compare options on a hillside site and see what the ground conditions actually cost.
Select a bar to compare Ithaca with the largest New York markets we cover.
207 new housing units in 2025 (+76.9% vs 2024).
44 single-family · 163 multifamily (79%).
Ithaca permitted 207 residential units in 2025 against 117 in 2024, a 77% increase, with $44M in permitted value. Multifamily was 163 of those units — 79% — and average value per unit was $214,100. For a bidder, that mix means your competition is pricing wood-frame multifamily, and your edge is in the sitework and foundation lines where hillside conditions vary block to block. The city ranks 5th of 24 covered New York cities by units and holds 5.7% of the 3,635-unit covered total. Compare that to downstate volume on our Long Beach and Hempstead pages and the difference is project type, not just count. Upstate, the money is in institutional and multifamily, and the risk is underground.
Most Ithaca sites slope. That pushes cost into retaining walls, stepped footings, undercut and backfill, and temporary erosion control — line items that a flat-lot template will miss. Frost depth in this part of New York is deep enough that footings bear well below grade, so excavation quantities run higher than coastal bids. Winter access and spring mud affect crane pads and subgrade stabilization. If you are bidding a sitework package or a foundation scope, we measure cut and fill from the grading plan and price haul-off separately. For institutional and university-adjacent work, confirm prevailing-wage applicability and the adopted code edition with the local building department before you lock labor rates.
We take off the divisions that carry the cost on Ithaca hillside and multifamily work, and we price them with local labor and material data.
Cut and fill, undercut, retaining walls and erosion control measured from the grading plan for sloped Tompkins County sites.
CY · SF · LFStepped footings, frost-depth wall heights, waterproofing and drainage priced for hillside residential and multifamily.
CY · SF · LFFormwork, reinforcement and placement for walls, slabs and retaining structures, with waste factors stated per line.
CY · SF · TONWood-frame multifamily floor, wall and roof systems, including sheathing, hardware and blocking counts.
LF · SF · EASteep-slope and low-slope assemblies, underlayment, flashing and insulation for Ithaca snow and ice conditions.
SF · SQ · LFPlumbing, HVAC and electrical quantities for multifamily and institutional layouts, coordinated with equipment schedules.
LF · EA · TONDivision-level budgets for institutional, retail and mixed-use projects, organized by CSI MasterFormat for bid comparison.
SF · LS · EAProcess-support buildings, equipment pads and utility scopes priced from drawings and specifications.
CY · LF · TONYou are bidding multifamily on South Hill and West Hill slopes, where footing and retaining wall quantities swing the bid. We hand you division-sorted quantities with marked-up plans so you can defend every number at a Tompkins County bid opening.
You need LF of wall, SF of formwork and TON of rebar before you commit a crew to a Cornell-area job. ZIP-adjusted labor pricing keeps your number honest across a short Ithaca building season.
You are comparing a Fall Creek infill against a suburban Tompkins County site. A division-level budget with stated assumptions shows what the ground conditions and utility extensions actually add before you close on the land.
You need a cost check while the set is still moving, not after CDs. We takeoff from your latest issue and flag scope gaps in envelope and MEP so your client sees the budget impact of each revision.
You are planning a renovation or addition near the colleges and need a defensible number for a board or lender. We separate hard costs by CSI division and list exclusions in writing.
You handle scattered residential and light commercial work around the city and cannot staff a full estimating department. Send plans or even a sketch, and we return quantities you can order material from.
We estimate projects across the city and the surrounding Tompkins County towns, from steep hillside lots to flat village infill. If your site is on this list, we already know the access and foundation questions to ask.
The 2025 permit data is clear: 163 of 207 new privately-owned residential units were multifamily, 79% of the total, at an average permitted value of $214,100 per unit. That mix drives what we price most — attached housing on sloped sites, with institutional and light commercial work filling in around it.
Three and four story wood-frame buildings over concrete podiums are the core of Ithaca's permit volume. We takeoff LF of bearing and shear wall, sheets of sheathing, and board feet of floor and roof framing from the architectural and structural sets.
Watch for: Podium-to-wood transition, fire separation at floor lines, shear nailing schedules.
Custom homes on South Hill and West Hill carry deep footings, stepped foundations and retaining walls. We measure formwork in SF of contact area, rebar by TON, and concrete by CY, then price excavation separately because rock and haul-off vary lot to lot.
Watch for: Rock excavation, retaining wall backfill, footing steps and drainage.
Units near the colleges are built for turnover, which means durable finishes and heavy MEP rough-in. We count plumbing fixtures, branch wiring devices and HVAC terminals per unit so your per-door cost is comparable across buildings.
Watch for: Fixture counts per unit, sprinkler coverage, sound and fire assemblies.
College and hospital work around East Hill brings lab casework, fume hoods and specialty mechanical. We takeoff from equipment schedules and coordinate with the MEP scope so ductwork, piping and electrical loads are not double-counted.
Watch for: Equipment schedules, hood exhaust, clean-room finishes, coordination gaps.
Downtown mixed-use buildings pair ground-floor commercial with apartments above. We separate the two occupancies in the estimate so you can see the cost of the storefront system, the residential build-out and the shared core independently.
Watch for: Storefront glazing, occupancy separation, shared egress and stairs.
Older Ithaca building stock means selective demolition, structural repair and new systems threaded through existing framing. We measure demolition by SF and LF, and carry allowances for concealed conditions rather than guessing at them.
Watch for: Selective demo, structural repair allowances, MEP tie-in and patching.
Two bids on the same drawings can differ by double digits here, and the reasons are usually local. These are the drivers we adjust for before we send a number.
Ithaca projects go through the city building department and, depending on scope, planning and environmental review. New York State has adopted a specific edition of the IBC and IRC, and the energy code adds envelope and mechanical requirements that show up as cost. Confirm the adopted edition and local amendments with the building department before you lock your estimate, because plan review comments can change assemblies after bid.
City of Ithaca building department · New York State Uniform Code · IECC energy codeMuch of the city sits on steep, glaciated ground with variable depth to rock. That drives excavation quantity, the need for rock removal, and footing design that steps with the slope. We price foundation scope from the geotechnical report where one exists, and where it does not we carry a stated allowance for over-excavation and backfill rather than assuming flat-site conditions.
Geotechnical report · stepped footings · rock excavation · retaining wallsIthaca winters shorten the sitework and concrete season and add frost-depth requirements to foundations. Cold-weather concrete protection, temporary heat and snow removal are real line items, not overhead. We also check roof snow load and drainage design against the adopted code, since heavy snow and ice damming affect both structure and roofing cost.
Frost depth · cold-weather concrete · snow load · temporary heatThe local trades pool is small and shared with college and hospital work, so labor rates and availability move with the institutional calendar. We price with ZIP-code-adjusted RSMeans labor and note where a trade is likely to be tight. If your project requires prevailing wage or union labor, tell us up front, because the wage basis changes the estimate materially.
RSMeans ZIP-adjusted labor · prevailing wage · union trades · crew availabilityHillside lots limit where equipment can sit and where spoil can go, which raises excavation and haul-off cost. Stormwater management, retaining structures and utility extensions to the lot line are frequently required and frequently underestimated. We measure utility runs in LF and drainage in LF of pipe and CY of stone, and we price erosion control as a separate division.
Stormwater management · utility extensions · erosion control · haul-offIthaca is off the main interstate freight lanes, so delivery lead times and freight charges on structural steel, trusses and mechanical equipment are worth pricing explicitly. New York State sales tax treatment differs between materials and capital improvements, and exempt organizations change the picture. Give us the tax status of the project and we will carry it correctly.
Freight and lead times · NY sales tax · exempt organizations · material escalationIthaca sits in Tompkins County, where steep slopes, lake-effect snow and a large student rental market drive the trades that matter most in a takeoff. Below is how that plays out line by line.
Most Ithaca sites in the hills above Cayuga Lake need cut-and-fill, not just strip-and-build. A takeoff should carry unclassified excavation by cubic yard, rock excavation split out separately, and a line for shoring or benching where the slope exceeds 3:1. Sediment control is its own bid item here because the city and county enforce stormwater rules on any disturbance over the state threshold. You will also see undercut and backfill for soft pockets near the lake plain. For hillside work, send us the grading plan and the geotech boring log so we can price rock versus soil correctly. Our sitework estimating services cover this trade in detail.
Ithaca's multifamily and student-housing work is mostly wood-frame over podium, so the framing takeoff is where budgets are won or lost. Count studs by wall type and height, not by square foot, and add plates, headers, blocking and sheathing separately. Floor trusses and I-joists should be priced from the supplier's layout, with rim board and squash blocks listed. Snow load governs roof framing, so confirm the ground snow load with the local building department before you set rafter spans. Waste factors for dimensional lumber typically run 5 to 10 percent, higher on cut-up rooflines. Our framing estimating services team builds this takeoff from the architectural sheets.
Cold winters and a large rental stock push MEP scope toward hydronic heat, high-efficiency boilers, and dedicated make-up air in dense units. A takeoff should count plumbing fixtures by type and floor, then branch piping by material and diameter, with separate lines for domestic water, sanitary, vent and gas. On the electrical side, count devices, panels, feeders and the service entrance by amperage, and carry fire alarm and low-voltage as their own divisions. Confirm the adopted code edition with the local building department before you finalize fixture counts. Our MEP estimating services deliver these divisions in MasterFormat order.
Frost depth in Tompkins County drives footings deeper than downstate bidders expect, and that shows up as extra cubic yards of concrete and more formwork. A foundation takeoff here needs separate lines for continuous footings, spread footings, stem walls, slab-on-grade with vapor barrier and rigid insulation, and any retaining walls tied to a walk-out basement. On sloped lots, count the step footings individually rather than averaging. Winter placement means cold-weather admixtures and blankets, which belong in the concrete line, not in general conditions. Send foundation and floor plans together so wall heights and anchor bolt counts stay consistent. See our concrete estimating services and foundation estimating services for the full breakdown.
Between lake-effect snow, freeze-thaw cycles and ice damming, the roofing scope in Ithaca is rarely just shingles. A complete takeoff includes underlayment, ice and water shield at eaves and valleys, drip edge, step and counterflashing, ridge vent and snow guards on steep pitches. On commercial and institutional roofs, separate the membrane, insulation thickness and taper, cover board, and metal edge. Pitch and building height change labor rates, so give us roof plans with slope annotations. We price these line items against ZIP-code-adjusted material and labor data. Roofing estimating services covers shingle, membrane and metal systems.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24 in x 12 in continuous | 38.5 | CY |
| 03 30 00 | Slab-on-grade concrete, 5 in with vapor barrier | 142 | CY |
| 05 10 00 | Structural steel columns and beams, podium | 4.8 | TON |
| 06 10 00 | 2x6 wall framing, 9 ft plate, studs at 16 in o.c. | 1,860 | LF |
| 06 10 00 | Floor trusses, 24 in deep, per supplier layout | 112 | EA |
| 07 30 00 | Asphalt shingles with ice and water shield at eaves | 9,400 | SF |
| 22 10 00 | Domestic water piping, PEX, 1/2 in through 2 in | 3,250 | LF |
| 26 20 00 | Panelboards and feeders, 120/208V, per riser diagram | 14 | EA |
This example prices the continuous footing for a two-unit duplex on a sloped lot in Tompkins County. Dimensions are illustrative; substitute your own plan dimensions before you use the result.
Take a continuous footing 24 inches wide by 12 inches deep, running 180 linear feet around the perimeter, plus two interior bearing lines at 32 feet each. Convert the section to square feet, then to cubic feet per linear foot, then apply a waste factor. Typical waste for formed footings runs 5 percent; add more if the excavation is over-excavated and backfilled with lean concrete.
| Step | Calculation | Result | Unit |
|---|---|---|---|
| Perimeter footing length | 180 LF given | 180 | LF |
| Interior bearing lines | 2 x 32 LF | 64 | LF |
| Total footing length | 180 + 64 | 244 | LF |
| Section area | 24 in x 12 in ÷ 144 | 2.00 | SF |
| Volume per LF | 2.00 SF x 1 LF ÷ 27 | 0.0741 | CY/LF |
| Net concrete volume | 244 LF x 0.0741 CY/LF | 18.08 | CY |
| Waste at 5 percent | 18.08 x 1.05 | 18.98 | CY |
| Order quantity, 1/4 CY rounding | 18.98 rounded up | 19.25 | CY |
At that point you have the concrete line only. The same footing takeoff still needs formwork measured in square feet of contact area, rebar priced by bar size and total weight, anchor bolts counted per plate location, and a separate line for any stepped footings created by the slope. On a hillside duplex, expect the step footings to add formwork and labor even when the concrete volume barely moves.
For pricing, we apply ZIP-code-adjusted material and labor rates for the Ithaca area rather than a statewide average, because ready-mix and forming labor both move with distance from the batch plant. Deliver the foundation plan, the structural notes and the geotech report, and we return the takeoff in Excel and PDF organized by CSI MasterFormat division with the plan set marked up. Most projects come back within 24 to 48 hours, and rush turnaround is available when a bid date is close. If you want this run against your own duplex plans, send them through our get an estimate page.
Yes. We price from ZIP-code-adjusted material and labor data rather than a statewide average, so ready-mix, lumber and trade labor reflect the Ithaca market. That matters on hillside sites where haul distance and access time change the labor component. We work in Bluebeam Revu, PlanSwift and RSMeans data, and deliver Excel and PDF takeoffs organized by CSI MasterFormat division with the plan set marked up.
Most projects come back within 24 to 48 hours after we receive a complete set of plans and specifications. Larger multifamily or institutional packages can take longer, and we will tell you upfront if that is the case. Rush turnaround is available when your bid date is close. Sending architectural, structural and MEP sheets together avoids a second pass and keeps the divisions consistent.
Sloped lots in the hills around Cayuga Lake usually mean stepped footings, retaining walls and more formwork than a flat-lot plan shows. Soft pockets near the lake plain may require undercut and backfill, which is a separate line from structural fill. Send the geotech boring log with the foundation plan so we can separate rock excavation from soil excavation instead of carrying one blended number.
Yes. Wood-frame over podium, garden-style apartments and student rental buildings are common here, and they are the project types where unit counts, repeated floor plans and MEP fixture counts drive the estimate. We build the takeoff floor by floor so repeated units are priced once and multiplied, with any variation at the ground floor or roof level carried separately. Our multi-family estimating services page covers that workflow.
We cover the full MasterFormat set, from Division 02 sitework through Division 33 utilities, including concrete, masonry, metals, wood, thermal and moisture protection, doors and windows, finishes, and the MEP divisions. On institutional work in Tompkins County we often carry fire protection, conveying equipment and low-voltage as their own divisions. Tell us which divisions you self-perform and we can flag the rest as subcontractor scope.
We add cold-weather admixtures, blankets and temporary heat to the concrete and general conditions lines when a project is scheduled between November and March. That is a real cost in Ithaca, not a rounding error. If your schedule is not set, we can price both a summer and a winter scenario so you can see the difference before you commit to a start date.
Yes. We compare the sub's scope and quantities against our own takeoff and list what is missing, what is duplicated and what is excluded. That is how most of the scope gaps above get caught before the bid is submitted rather than after the award. Send the quote, the plans and the specifications together so we can match line items to divisions.
We deliver Excel and PDF takeoffs organized by CSI MasterFormat division, with the plan set marked up so you can see where each quantity came from. The markup shows footing runs, wall lengths, roof areas and fixture locations. That makes it easy to check our numbers against the drawings and to hand the same package to a subcontractor for pricing.
The permit figures come from the U.S. Census Bureau Building Permits Survey for 2025, counting permits issued by the city itself for new privately-owned residential units only. That means additions, alterations and commercial permits are not in the count. In 2025 Ithaca issued 207 residential units, up from 117 in 2024, with 163 of those units multifamily and a permitted value of $44 million.
Yes. We cover Ithaca and the surrounding area, and we also work in nearby upstate and downstate markets including Elmira, Poughkeepsie, Saratoga Springs and Amherst. If your project is in a smaller Tompkins County town, send the address with the plans so we can apply the right ZIP-code adjustment. Our New York construction estimating services page lists the markets we cover across the state.
Send your plans and specifications and we will return a MasterFormat takeoff in Excel and PDF, usually within 24 to 48 hours.