Multifamily Takeoffs
Full-building quantity surveys for the three- and four-story infill projects that dominate Paterson's permit pipeline.
SF · EA · LFWe produce quantity takeoffs and cost estimates for Paterson contractors, developers, and owners — ZIP-code-adjusted material and labor pricing, organized by CSI MasterFormat division, with marked-up plan sets returned in 24–48 hours for most projects.
Paterson's pipeline is almost entirely multifamily infill: 275 of 277 permitted residential units in 2025 were multifamily, averaging $63,700 per unit. That means tight urban lots, Passaic County hillside and riverfront grades, deep foundation and sheeting scope, party-wall and fire-separation assemblies, and full MEP layouts in buildings where every trade stacks vertically.
Paterson sits in Passaic County at the falls of the Passaic River, and its construction market reflects that geography: dense blocks of older masonry and frame buildings, steep streets on the east side, and a steady flow of infill multifamily projects filling small parcels. The city ranked third in New Jersey by size and issued 277 new privately-owned residential units in 2025, 99% of them multifamily. That mix rewards estimators who can price a full building from a single set — foundations, framing, roofing, and MEP — rather than a single trade.
We build takeoffs the way a general contractor bids here: quantity survey first, then ZIP-code-adjusted material and labor pricing using RSMeans data, with Bluebeam Revu and PlanSwift for measurement and markups. You get Excel and PDF deliverables organized by CSI MasterFormat division, plus marked-up plan sets showing what was measured. If you are also bidding work outside the city, our New Jersey construction estimating team covers the same format across the state, and neighboring markets like Newark and Jersey City share many of the same urban-infill conditions.
For bidders. You need a defensible number before the bid date. We measure from your set, flag scope gaps, and hand back a division-by-division estimate you can carry into your proposal without rebuilding it.
For builders. You are buying out trades and ordering material. We give you quantities by unit — CY of concrete, LF of pipe, TON of steel — so purchase orders and subcontractor scopes line up with the drawings.
For owners. You are testing a pro forma or comparing contractor bids. We provide a third-party quantity takeoff and cost basis organized by CSI division so you can see where the spread between bids actually sits.
Select a bar to compare Paterson with the largest New Jersey markets we cover.
277 new housing units in 2025 (-24.3% vs 2024).
2 single-family · 275 multifamily (99%).
The 2025 permit data is unusually concentrated: 277 total residential units, of which 275 were multifamily and only 2 were single-family. Average permitted value was $63,700 per unit across $18M of construction. For bidders, that means the work in Paterson is mostly three- and four-story infill buildings on small lots, not scattered single-family renovations. The estimating consequence is that you rarely price one trade in isolation — a typical set includes shallow foundations or mat slabs, wood or light-gauge framing above, full sprinkler and standpipe scope, and stacked plumbing. Our multi-family estimating services and MEP estimating services are built for exactly that package. If your bid calendar also includes suburban work, the surrounding markets behave differently; see Edison for comparison.
Permitted units fell about 24% from 366 in 2024 to 277 in 2025. Paterson still accounted for 4.3% of the 6,503 units permitted across the covered New Jersey cities we track, ranking fifth by units among them. A smaller pie with the same number of bidders means estimate accuracy matters more than ever: a missed line item is harder to absorb when margins are thin. That is where a second set of eyes on quantities pays for itself. We measure from the drawings, apply typical waste factors by material, and show our assumptions so you can adjust them to your own productivity. The state-level picture is on our New Jersey construction estimating page.
Every takeoff is measured from your plan set and priced with ZIP-code-adjusted material and labor data, then delivered by CSI MasterFormat division.
Full-building quantity surveys for the three- and four-story infill projects that dominate Paterson's permit pipeline.
SF · EA · LFFootings, mat slabs, retaining walls, and sheeting priced for tight lots and Passaic County hillside grades.
CY · SF · LFFormwork, reinforcement, and placement quantities with typical waste factors for foundations, slabs, and site walls.
CY · TON · SFWood and light-gauge studs, joists, sheathing, and hardware counted by floor for stacked multifamily plans.
LF · EA · SFMembrane and shingle areas, insulation, flashing, and edge metal measured from roof plans and sections.
SQ · LF · SFPlumbing stacks, HVAC distribution, and electrical rough-in priced for buildings where every trade stacks vertically.
LF · EA · TONExcavation, backfill, utilities, and paving for small urban parcels with limited laydown and staging area.
CY · LF · TONTenant fit-outs and mixed-use ground floors along the city's commercial corridors, priced by division.
SF · EA · LFYou are bidding gut renovations and new infill multifamily on tight Passaic County lots where staging is minimal. We measure the full set and flag scope gaps before your number goes in.
With 275 of the 277 new residential units permitted in 2025 being multifamily, your pro forma lives or dies on unit-cost accuracy. We deliver division-by-division quantities you can carry into a lender package.
You are pricing masonry, roofing, or MEP on a building you did not design. We hand back quantities by unit so your scope matches the drawings and you avoid buying another trade's work.
Your set is going to bid and you want a cost check before contractors mark it up. We produce a quantity survey tied to your sheet numbers so revisions are traceable.
You are renovating a two- or three-family house on the east side and comparing contractor bids. A third-party takeoff shows you where the spread between proposals actually sits.
Passaic County infill and warehouse demand keeps light-industrial and storage work moving. We price slab, steel, and sitework quantities against the same ZIP-adjusted basis as your other bids.
We measure from plan sets for projects anywhere in Passaic County and the surrounding urban core. If your site is in one of these areas, the estimating basis is the same ZIP-adjusted material and labor pricing.
The city's 2025 permit mix was almost entirely multifamily, with 277 new privately-owned residential units issued and 99% of them in buildings of two units or more. That shapes what we measure most often.
Three- to six-story wood-frame or masonry buildings on small parcels, often with ground-floor parking. We take off foundations, framing, roofing, and MEP from one set so your bid covers the whole building.
Watch for: Fire separation, egress stairs, and sprinkler coverage.
Renovations and new builds on the east side and Hillcrest, where lots are narrow and existing structures are old. We measure selective demolition alongside new work so your scope is not double-counted.
Watch for: Selective demo, shoring, and utility reconnections.
Ground-floor retail with residential above, common along downtown corridors. These sets carry two occupancy types, so we separate commercial and residential finishes by CSI division.
Watch for: Occupancy separation and separate MEP systems.
Older masonry and mill buildings converted to apartments. Structural reinforcement, new floor openings, and full MEP replacement drive the cost, and the existing drawings rarely match field conditions.
Watch for: Structural reinforcement and hazardous-material abatement.
Small-bay storage and distribution buildings serving Passaic County's infill demand. We price slab-on-grade, pre-engineered or structural steel, and sitework quantities together.
Watch for: Slab thickness, dock equipment, and site paving.
Retail and office build-outs in existing downtown shells. Demising walls, storefront, and HVAC distribution are the main quantities, and the base-building conditions set the scope.
Watch for: Base-building condition and landlord work letter.
Paterson is not a flat suburban market. The combination of old infrastructure, steep terrain, and dense lots changes quantities in ways that a generic cost per square foot will miss.
Paterson projects go through the city building department and, for many sites, Passaic County review. New Jersey adopts the IRC and IBC with state amendments, and floodplain or historic-district review can add months before a shovel moves. Confirm the adopted code edition and any local amendments with the building department, and price permit fees and inspection sequencing into your soft costs.
Paterson building department · Passaic County · IBC/IRC state amendmentsMuch of the city sits on glacial soils and fill from the Passaic River corridor, with bedrock close to grade in the higher sections. That means deeper footings, rock excavation, and underpinning on adjacent properties are common. We measure excavation, backfill, and concrete by CY from the geotechnical report and the structural sheets, not from a default depth.
Glacial soils · rock excavation · underpinningThe Passaic River floods, and low-lying blocks near the falls and the river corridor carry floodplain requirements that raise finished-floor elevations. That adds fill, retaining walls, and sometimes pier foundations. We price those items from the civil and structural drawings rather than assuming a standard slab-on-grade.
Passaic River floodplain · finished-floor elevation · retaining wallsNorth Jersey trades are union-heavy and crews move between Paterson, Newark, and Jersey City, so wage rates and availability shift with the regional backlog. We apply ZIP-code-adjusted labor from RSMeans data, which keeps your labor line tied to this market instead of a national average.
Union trades · RSMeans labor · North Jersey backlogSmall infill lots leave no room for material staging, and steep east-side streets make deliveries slow. Combined with older combined-sewer infrastructure, stormwater detention is often required on site. We include staging allowances, shoring, and detention quantities so the estimate reflects how the work is actually built.
Combined sewers · stormwater detention · limited stagingMasonry, structural steel, and mechanical equipment all move through a dense urban corridor where truck access and crane placement are constrained. We price delivery and handling based on the site plan, and we separate sales tax and prevailing-wage requirements where the funding source triggers them. Confirm tax treatment with your accountant.
Urban delivery · crane placement · NJ sales taxPaterson's 2025 permit mix was almost entirely multifamily — 275 of 277 new residential units — so the takeoffs that matter here are mid-rise wood and steel over podium, plus the dense infill renovation work that fills the rest of the city. Each trade below carries a local wrinkle you have to price, not assume.
Most Paterson infill lots are tight, partially paved, and ringed by existing buildings, so the takeoff has to separate machine excavation from hand work along property lines. Track demolition by square foot of slab-on-grade and by linear foot of curb, sidewalk, and retaining wall, and carry haul-off in cubic yards with a swell factor. On sites near the Passaic River, expect a dewatering allowance and confirm the flood zone before you price the subbase. Because lots are small, spoil stockpile area is usually zero and every yard leaves by truck. Our sitework estimating services break these items out by area and depth rather than a lump sum.
The typical Paterson multifamily job is wood frame over a concrete podium, sometimes with a steel transfer level. Take off floor and roof framing by board foot using actual lumber lengths, then add typical waste of 5 to 10 percent for dimensional lumber and more for engineered panels. Count joist hangers, hold-downs, and shear-panel nailing by piece, since those small items drive the framing labor. Podium and transfer steel goes by ton with connection material counted separately. Our framing estimating services and multi-family estimating services produce this as a floor-by-floor schedule so your superintendent can stage deliveries.
Multifamily work here means repeated wet-wall stacks, so plumbing should be taken off per fixture group per unit type and multiplied, not by pipe foot alone. HVAC is typically split-system or VRF with roof or podium equipment, and ductwork is measured by pound and by linear foot of run. Electrical takeoff runs by device, fixture, and panel schedule, with a separate riser count. Any building of this size needs a sprinkler system, and the design is delegated to a specialty contractor, so carry a scope line and an allowance. Our MEP estimating services coordinate these divisions so the plumbing, HVAC, and electrical quantities reconcile.
Paterson sits on glacial sands, gravels, and scattered rock, with fill in the older mill corridors, so footing design varies block to block. Take off spread footings by count with form area and rebar tonnage, and mat or pile caps by cubic yard. Add a rock excavation line at a stated percentage until the geotech report says otherwise, and price a mud slab under any mat. Interior slabs on grade in these buildings carry a vapor barrier and often a topping, so keep the two separate. Our foundation estimating services and concrete estimating services both track formwork, reinforcing, and concrete as three quantities, because a single cubic-yard number hides the labor.
Flat roofs dominate on Paterson multifamily buildings, usually modified bitumen or TPO over tapered insulation, and steep-slope shingle shows up on the two- and three-family houses. Take off membrane by square, insulation by board foot at each thickness, and flashing by linear foot at parapets, curbs, and penetrations. Masonry and brick facades on the older blocks need a separate line for repointing and lintel replacement, often measured by the square foot of wall. Wind uplift and ice-dam detailing are specified by the designer, so confirm the roof assembly before pricing. Our roofing estimating services include the flashing and accessory schedule, not just the field area.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Podium slab concrete, 8 in. | 310 | CY |
| 03 20 00 | Footing and slab reinforcing | 24.5 | tons |
| 05 12 00 | Podium transfer steel and connections | 38 | tons |
| 06 10 00 | Floor and roof framing, wood | 96,400 | BF |
| 06 10 00 | Shear panels and hold-downs | 1,180 | EA |
| 07 54 00 | TPO roof membrane and insulation | 142 | SQ |
| 22 11 00 | Plumbing fixture groups by unit type | 64 | GRP |
| 21 13 00 | Sprinkler design-build allowance | 1 | LS |
The podium slab is the one concrete element that sets the schedule for everything above it, so it is worth pricing line by line. Dimensions below are illustrative; substitute your own structural drawings.
Assume a footprint of 120 ft by 80 ft with a slab thickness of 8 in.
| Step | Calculation | Result |
|---|---|---|
| Plan area | 120 ft × 80 ft | 9,600 SF |
| Volume | 9,600 SF × (8 ÷ 12) ft | 6,400 CF |
| Volume in cubic yards | 6,400 ÷ 27 | 237.0 CY |
| Waste and overpour | 237.0 × 1.05 | 248.9 CY |
| Form area at perimeter | 2 × (120 + 80) ft × 0.667 ft | 266.8 SF |
| Vapor barrier | 9,600 SF × 1.10 lap | 10,560 SF |
For reinforcing, a typical slab of this type runs near 60 lb per cubic yard of concrete for light mesh and temperature steel, but the structural drawings govern and a podium slab often carries heavier top and bottom mats. At 60 lb per CY, 248.9 CY gives roughly 14,934 lb, or about 7.5 tons — well under the 24.5 tons in the sample above, which is why you take reinforcing from the bar list rather than a rule of thumb.
Three local adjustments change the number. First, pump or conveyor placement: tight Paterson lots usually cannot take a direct chute, so add pump setup and a line for extra labor. Second, cold-weather protection between November and March, since a winter pour needs blankets and heated enclosures that are not in the concrete line. Third, curing and finish: a slab receiving a floor topping is finished differently than one exposed in a garage, so split the finish line by area.
Finally, reconcile the concrete against the formwork and the reinforcing. If the three quantities do not scale together, one of them is wrong. We deliver this as a division 03 takeoff with the bar list and the form area attached, so your concrete subcontractor can price labor against the same quantities you bid.
Most Paterson projects we price are multifamily buildings, so the takeoff runs from division 02 sitework through division 26 electrical, with division 03 concrete, 05 steel, 06 wood framing, and 07 roofing carrying the bulk of the value. We deliver it in Excel and PDF, organized by CSI MasterFormat division, with the marked-up plan set so you can trace every quantity back to the sheet. If you only need one trade, such as concrete or MEP, we can scope the estimate to that division.
Most projects come back in 24 to 48 hours, and we can rush when a bid date is close. Turnaround depends on sheet count and how many disciplines are involved; a full multifamily building with MEP takes longer than a single-trade concrete package. Send the drawings and the bid date together and we will confirm the schedule before we start. If the plans are incomplete, tell us what is missing so we can carry an allowance rather than guess.
They come from the U.S. Census Bureau Building Permits Survey for 2025, which counts permits issued by the city of Paterson for new privately-owned residential units only. That survey reported 277 units for 2025 against 366 in 2024, a decline of about 24 percent, with 275 of the 277 units multifamily. Because the survey covers residential only, it says nothing about commercial or industrial permits, so do not read it as a total construction volume for the city.
Yes. We use ZIP-code-adjusted material and labor pricing built on RSMeans data, so a Paterson address prices differently than a rural New Jersey address. That matters for prevailing-wage projects, for union versus open-shop labor assumptions, and for material freight into a dense city where deliveries are scheduled rather than dropped. Tell us the labor basis you are bidding under and we will match it. If you carry your own historical unit costs, we can apply those instead.
Yes, and those jobs need a different approach than new construction. Existing conditions drive the scope, so we take off demolition by area and by linear foot, then price new work against the drawings. Watch for masonry repointing, lintel replacement, and undersized existing structure that the drawings may not show. We mark assumptions clearly so you can walk the site and confirm them. Anything not visible on the plans should be carried as an allowance with a stated basis.
Send the architectural, structural, and MEP drawings, the specification book, and any addenda, plus the bid date and the trade packages you want broken out. If you have a geotechnical report, send it, because it changes the foundation takeoff. Tell us the labor basis, the unit types if it is multifamily, and any scope you are self-performing. Missing information is the main cause of a slow estimate, so send what exists even if the set is incomplete.
Yes. We price work across Passaic and Bergen counties and the surrounding market, including Newark, Jersey City, Elizabeth, Edison, and Trenton. The takeoff method is the same; what changes is the local pricing adjustment and the code edition the designer is working under. If your project is in a town we have not listed, send the address and we will confirm coverage. Our New Jersey construction estimating services page lists the full set of cities we handle.
Design-build scopes such as fire protection, sometimes fire alarm, and specialty equipment are not fully designed at bid time, so we carry them as an allowance with a stated basis: coverage area, head count, riser size, and whether it is a wet or dry system. We flag the allowance in the summary so you can see what is not a firm number. If a subcontractor quote arrives later, we can plug it in and reissue the estimate so your bid reflects the real scope.
You get an Excel workbook and a PDF, organized by CSI MasterFormat division, with quantities, units, and line-item descriptions you can edit. The marked-up plan set shows where each quantity came from, so a reviewer can check the count. We use Bluebeam Revu and PlanSwift for takeoff and RSMeans data for pricing. If your team works in a different format, tell us at the start and we will match your template rather than send a generic sheet.
Yes, and for Paterson multifamily work it is usually the right way to bid. We take off a typical one-bedroom, two-bedroom, and studio unit, then multiply by the unit count for plumbing, electrical, and finishes. That lets you see cost per unit type and catch a mix change quickly. The base building — structure, envelope, roof, and site — stays as a single scope. Our multi-family estimating services cover both the per-unit and base-building views.
Send your drawings, specifications, and bid date, and we will return a division-by-division takeoff in Excel and PDF, usually within 24 to 48 hours.