Sitework takeoffs
Clearing, excavation, backfill, dewatering and import for tight infill lots and waterfront sites.
CY · SF · TONJersey City permitted 2,098 new privately-owned residential units in 2025, 91% of them multifamily. We produce CSI-organized quantity takeoffs and estimates for the infill, mid-rise and warehouse work that defines Hudson County bidding.
Jersey City pricing turns on dense infill logistics, Hudson River waterfront pile and shoring scope, multifamily MEP repetition across 1,914 permitted units, union labor rates in Hudson County, and warehouse conversions near the Holland Tunnel approach. ZIP-code-adjusted material and labor pricing keeps each division grounded in the city rather than a state average.
Jersey City is the second-largest city in New Jersey by permitted residential volume in our covered set, and 2025 data shows 2,098 new privately-owned units against 2,601 the year before — a 19% pullback that makes every bid tighter. Multifamily accounts for 1,914 of those units, or about 91%, so the typical package here is a mid-rise or high-rise residential shell with repetitive MEP stacks, not scattered single-family. Single-family permits were 184, which means custom-home bidders compete for a small slice of the market.
We build takeoffs the way Hudson County general contractors buy: by CSI MasterFormat division, with concrete, structural steel, framing, roofing and MEP separated so you can price your own self-performed work and subcontract the rest. If your project is in Newark, Paterson, Elizabeth or Edison, the same format applies through our New Jersey construction estimating coverage. Send a plan set through get an estimate and we return Excel and PDF quantities with marked-up drawings, typically in 24–48 hours.
For bidders. You need quantities fast enough to beat a bid date. We return division-level takeoffs in 24–48 hours, with concrete, framing and MEP broken out so you can adjust labor and markups without rebuilding the sheet.
For builders. Mid-rise residential in Jersey City repeats floor to floor. We quantify one typical floor and extend it, flagging the ground-floor, roof and waterfront pile scope that does not repeat, so your buyout matches the drawings.
For owners. Use the estimate to compare contractor bids line by line. Quantities arrive organized by CSI division with marked-up plan sets, so scope gaps between bidders surface before award rather than in a change order.
Select a bar to compare Jersey City with the largest New Jersey markets we cover.
2,098 new housing units in 2025 (-19.3% vs 2024).
184 single-family · 1,914 multifamily (91%).
Of 2,098 new privately-owned residential units permitted in Jersey City in 2025, 1,914 were multifamily — about 91% — and total permitted value was $347M, or roughly $165,500 per unit. That average spans everything from wood-frame low-rise to concrete high-rise, so it is a sanity check, not a budget. Units fell 19% from 2,601 in 2024, and Jersey City still carried 32.3% of the 6,503 units permitted across the 25 state cities we track, ranking 2nd. When volume drops, bidders shave numbers to win, and the estimate is what keeps a low bid from becoming a loss. For projects outside Hudson County, see our Newark construction estimating page.
Jersey City sits on fill and glacial soils along the Hudson River waterfront, so deep foundations, pile caps and dewatering show up early in the estimate, and shoring is a real line item on any site with an existing party wall. Dense infill means crane picks, street closures and material staging are constrained, and Hudson County union labor rates apply to most mid-rise and high-rise trades. Warehouse and last-mile distribution work near the tunnel approaches carries its own slab, racking and sprinkler scope. Confirm the adopted code edition — IBC, IECC, NEC and NFPA 13 among them — with the Jersey City building department before you finalize any division.
Every takeoff below is organized by CSI MasterFormat division, priced with ZIP-code-adjusted material and labor, and delivered in Excel and PDF with marked-up plan sets.
Clearing, excavation, backfill, dewatering and import for tight infill lots and waterfront sites.
CY · SF · TONPiles, pile caps, grade beams, mat slabs and waterproofing for Hudson River waterfront construction.
LF · CY · SFFormwork, rebar, cast-in-place walls and elevated slabs, separated by typical floor and pour sequence.
CY · SF · TONWood and light-gauge framing for low-rise, plus metal stud and sheathing quantities for mid-rise.
LF · SF · EAPlumbing risers, HVAC, electrical feeders and fire sprinkler mains repeated across multifamily floors.
LF · EA · TONTPO, modified bitumen and green-roof assemblies, including insulation, flashing and roof drains.
SF · LF · EAFull-building budgets for mid-rise and high-rise residential, with per-unit and per-square-foot roll-ups.
SF · UNIT · LSWarehouse, retail and office fit-outs, including slab, racking, dock equipment and sprinkler scope.
SF · EA · LSBidding mid-rise residential in Downtown and Journal Square, you need division-level quantities in 24–48 hours so your buyout and self-perform numbers hold before the bid date.
Concrete, framing and MEP subs pricing repetitive floor plates need one typical floor quantified and extended, with ground-floor and roof exceptions flagged so the bid does not carry phantom scope.
You are comparing infill multifamily pro formas across Hudson County. A division-organized takeoff lets you test hard-cost assumptions against your own budget before committing to a GC.
You need a quantity check during design development for waterfront and historic-district projects, before details are final, to keep the owner's budget aligned with the drawings.
Renovation and capital work on older Jersey City housing stock needs unit-price line items for masonry, roofing and MEP replacements so you can compare contractor proposals on equal scope.
The city's dense infill and warehouse demand means slab, racking and sitework packages move fast. We quantify slab-on-grade, dock equipment and utility runs so your bid is complete.
We estimate projects across Hudson County and the surrounding counties, using the same CSI MasterFormat structure whether the plan set is a high-rise in Downtown or a warehouse near the port.
The 2025 permit mix is 91% multifamily, so most of our Jersey City work is residential mid-rise and high-rise, with a smaller share of single-family, commercial and industrial packages.
Six to twelve stories with repetitive floor plates, podium parking and amenity decks. We quantify one typical floor and extend it, then break out ground-floor, roof and mechanical penthouse scope separately.
Watch for: Podium slab thickness, transfer beams, unit-mix variations
Towers near Exchange Place and Newport with curtain wall, concrete or steel frame, and stacked MEP risers. We separate core and shell from fit-out so you can price each trade package.
Watch for: Curtain wall takeoff, elevator counts, riser shaft dimensions
Infill and renovation work in the Heights and Greenville, often on narrow lots with existing foundations. We measure framing, roofing and MEP replacements from marked-up plans.
Watch for: Existing foundation reuse, party-wall conditions, roof pitch
Port-adjacent distribution buildings with slab-on-grade, tilt-up or masonry walls, and heavy sitework. We quantify slab thickness, dock equipment, and utility runs to the building.
Watch for: Slab flatness, dock levelers, stormwater detention scope
Ground-floor retail with residential above, common along Newark Avenue and Journal Square. We separate commercial storefront, residential shell and shared MEP so each pro forma stands alone.
Watch for: Storefront glazing, separate utility metering, grease lines
Office, medical and retail interiors in Downtown and along the waterfront. We take off partitions, ceilings, HVAC distribution and electrical devices by room, using the architect's finish plan.
Watch for: Above-ceiling coordination, sprinkler relocation, device counts
Jersey City sits on glacial soils and waterfront fill, under Hudson County review and New Jersey's adopted codes, so quantities shift with foundation design, flood elevation and the city's inspection sequence.
New Jersey adopts the IBC and IRC with state amendments, and Jersey City enforces them through its construction office plus Hudson County review where applicable. High-rise residential triggers sprinkler and standpipe requirements under NFPA 13 and the adopted building code. Confirm the adopted edition and local amendments with the Jersey City building department before you price fire protection, egress and accessibility, because plan review comments can add scope after bid.
IBC · IRC · NFPA 13 · Jersey City building departmentMuch of the waterfront and Journal Square area is underlain by fill, tidal marsh deposits and glacial varves, so deep foundations are common. You may see timber or concrete piles, pile caps, and mat slabs instead of spread footings. We take off pile lengths, cap volumes and dewatering from the geotechnical report and foundation plan. Confirm the geotech recommendations for your specific block, because rock depth and fill thickness vary sharply over short distances.
Geotechnical report · pile caps · mat slab · dewateringCoastal flood zones and storm surge affect waterfront and low-lying areas, driving elevation requirements, flood vents, and flood-resistant materials below the design flood elevation. Wind loads near the harbor can govern cladding and roof attachment. We quantify flood vents, breakaway walls and elevated MEP pads when the plans show them. Confirm the effective FIRM panel and local floodplain ordinance with the city before finalizing foundation and ground-floor scope.
FIRM panel · design flood elevation · wind load · flood ventsJersey City and Hudson County projects often carry prevailing wage or project labor agreement requirements on publicly funded work, which changes the labor rate you apply to each division. Even on private mid-rise, tight sites and limited laydown push labor productivity down. We price with ZIP-code-adjusted labor and flag divisions where the rate assumption matters most. Confirm wage determinations and any PLA for your project before you lock the estimate.
Prevailing wage · project labor agreement · ZIP-code-adjusted laborInfill lots in Jersey City are small, and stormwater management rules can require detention or infiltration even on tight sites. You may need to price underground chambers, flow-control structures, and connection to combined sewers. We quantify excavation, backfill and pipe runs from the civil sheets. Confirm the local stormwater ordinance and sewer connection requirements with the city and the utility authority before you buy out the sitework package.
Stormwater detention · combined sewer · flow-control structure · civil sheetsDowntown and waterfront sites have almost no laydown area, so deliveries are sequenced and concrete may be pumped from street closures. We take off quantities that reflect crane and pump placement, and we separate material from labor so you can adjust for supplier pricing. Confirm truck routes, street closure permits and any local material taxes with the city and your suppliers, because logistics can add cost that a plan-only takeoff misses.
Crane placement · concrete pump · street closure permit · material pricingJersey City's mix of infill multifamily, warehouse conversions, and tight urban lots changes what you measure and how you price it. Here is where that shows up in the quantities.
Most Jersey City sites are infill, so excavation quantities are driven by shoring, not by open-cut area. On a typical 25-ft-wide lot you are pricing soldier piles or sheet piling along two property lines, plus trucking of contaminated urban fill that cannot stay on site. Rock is shallow in parts of the Palisades ridge, so include a rock allowance by cubic yard rather than a lump sum. You also need to measure dewatering, since the water table near the Hudson waterfront sits high. For a full sitework takeoff, see our sitework estimating services.
Mid-rise multifamily here is typically concrete podium with wood or light-gauge framing above, or full steel for warehouse conversions. That means your framing takeoff has to split by level and system. Measure wood joists by linear feet with blocking and rim board, light-gauge studs by linear feet with track and bracing, and steel by ton with connections and fireproofing. On adaptive reuse of old warehouse buildings, verify existing joist spacing and capacity before you price new loads. See our framing estimating services.
Multifamily MEP in Jersey City is usually split: landlord metered or individually metered, PTAC or VRF, and sprinklered per NFPA 13 or 13R depending on height and occupancy. Your takeoff should count fixtures by type, pipe by linear feet and diameter, duct by pound or linear feet, and devices by count. Do not forget the fire pump and standpipe if the building exceeds the local threshold. Confirm the adopted code edition with the Jersey City building department. For a division-by-division MEP takeoff, see our MEP estimating services.
Foundations in Jersey City are usually mat slabs or pile caps, not spread footings, because of fill and high groundwater. Your takeoff should separate pile caps, grade beams, slab-on-grade, and elevated slabs by thickness and reinforcement, because rebar is priced per ton and formwork per square foot of contact area. Add waterproofing to the below-grade walls and a mud slab under the mat. Concrete pumping is often required on tight lots. For foundations, see our foundation estimating services and concrete estimating services.
Flat roofs dominate in Jersey City, so measure by the square (100 sq ft) with tapered insulation, cover board, and membrane. Add roof drains, scuppers, and parapet flashing by linear feet. On taller buildings, include a roof hatch and a davit or crane base for future membrane replacement. For podium decks and terraces, separate the waterproofing from the pavers and pedestals. Wind uplift is a real driver near the waterfront, so confirm the design pressure on the drawings. See our roofing estimating services for a full assembly takeoff.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Mat slab concrete, 4000 psi | 1,250 | CY |
| 03 30 00 | Pile caps, 4000 psi | 380 | CY |
| 03 20 00 | Reinforcing steel, Grade 60 | 185 | TON |
| 05 12 00 | Structural steel, columns and beams | 95 | TON |
| 06 10 00 | Wood framing, floor joists | 48,000 | LF |
| 07 50 00 | Roof membrane, TPO 60 mil | 22,500 | SF |
| 22 10 00 | Domestic water piping, Type L copper | 12,400 | LF |
| 21 13 00 | Sprinkler piping, Schedule 40 black steel | 9,800 | LF |
This example uses illustrative dimensions for a 6-story, 60,000 sq ft multifamily building on a 100 ft by 100 ft lot. The mat slab is 30 in thick under the tower footprint, with a 12 in thick podium slab at grade. We calculate concrete volume, formwork, and reinforcement, then apply waste factors.
| Step | Calculation | Quantity | Unit |
|---|---|---|---|
| Mat slab area | 100 ft × 100 ft | 10,000 | SF |
| Mat slab volume | 10,000 SF × 2.5 ft | 25,000 | CF |
| Convert to CY | 25,000 CF ÷ 27 | 926 | CY |
| Add 5% waste | 926 CY × 1.05 | 972 | CY |
| Formwork, perimeter | 400 LF × 2.5 ft | 1,000 | SF |
| Formwork, add 10% waste | 1,000 SF × 1.10 | 1,100 | SF |
| Rebar, 150 lb/CY | 972 CY × 150 lb | 145,800 | LB |
| Convert to tons | 145,800 LB ÷ 2,000 | 73 | TON |
For the podium slab, assume 12 in thick over the same footprint: 10,000 SF × 1 ft = 10,000 CF ÷ 27 = 370 CY, plus 5% waste = 389 CY. Formwork for the podium edges is measured separately. Reinforcement at 120 lb/CY gives 389 × 120 = 46,680 lb = 23.3 tons.
These quantities feed directly into your pricing. In Jersey City, you also need to add pumping, curing, and a vapor barrier under the slab. The vapor barrier is measured by square foot of area plus 10% laps. If the mat is post-tensioned, the rebar quantity changes to strand and anchors, which we take off by count and linear feet. Always confirm the concrete strength and thickness with the structural drawings, and check the local building department for any special inspection requirements.
Yes. We cover Jersey City and the nearby cities of Newark, Paterson, Elizabeth, and Edison. If your project is in Hudson County or the surrounding region, we can provide a takeoff organized by CSI MasterFormat division. See our New Jersey construction estimating page for statewide coverage.
Most of our Jersey City work is multifamily residential, followed by commercial and industrial. The city issued 2,098 new privately-owned residential units in 2025, and 91% of those were multifamily. That matches what we see: mid-rise apartments, podium buildings, and warehouse conversions. We also estimate smaller single-family and two-family infill projects.
Most projects are returned in 24–48 hours. Rush service is available if you have a bid deadline. The turnaround depends on the size and complexity of the drawings, and whether you need a full quantity takeoff or a pricing review. Send your plans and we will confirm the schedule.
We use Bluebeam Revu for plan markup, PlanSwift for quantity takeoff, and RSMeans data for pricing. Deliverables are in Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets so you can see exactly what we measured and where.
Yes. We adjust material and labor pricing by ZIP code using RSMeans data. That means your estimate reflects the local market in Jersey City, not a national average. If you are comparing bids from different areas, this keeps the numbers comparable.
Yes. Warehouse conversions are common in Jersey City, especially near the waterfront and the Marion and Bergen-Lafayette areas. These projects require careful takeoff of existing structure, new MEP systems, and fireproofing. We will break out demolition, new partitions, and structural upgrades separately so you can price each scope.
We need the architectural, structural, and MEP drawings in PDF or CAD, plus any specifications and addenda. If you have a bid form or a scope sheet, include that too. For renovations, existing condition drawings help. Once we have the files, we confirm the scope and delivery date.
The permit numbers on this page come from the U.S. Census Bureau's Building Permits Survey for 2025. That survey counts new privately-owned residential units only, so it does not include commercial, industrial, or non-residential permits. The city issued 2,098 units in 2025, down 19% from 2,601 in 2024.
Yes. While multifamily dominates, we also estimate single-family and two-family homes. In 2025, Jersey City issued 184 single-family permits. For these projects we take off foundations, framing, roofing, and finishes by division. See our residential estimating services for more detail.
We do not provide code compliance review, but we do note where a scope item is driven by code, such as sprinklers, fireproofing, or energy code insulation. You should confirm the adopted code edition with the Jersey City building department. Our takeoff will include the quantities you need to price those items.
Email your drawings and we will return a division-by-division takeoff with marked-up plans, usually within 24–48 hours.