Scope Precision EstimateContact Us
Henderson, NV

Construction estimating services in Henderson, NV

We produce quantity takeoffs and cost estimates for Henderson contractors, developers and owners — residential, commercial and industrial work priced with ZIP-code-adjusted material and labor, organized by CSI MasterFormat division and returned in 24–48 hours.

24–48 hours for most projectsTypical turnaround
Every CSI divisionSitework through MEP
Henderson ZIP pricingLocal material and labor
Price confirmed firstBefore any work starts
Census BPS · Henderson · 2025
Henderson new housing permits2025
New housing units3,590Change vs. 2024+9%Permitted construction value$417MAverage value per unit$116,100Rank among covered Nevada cities#1
Single-family: 2,582 (72%)Multifamily: 1,008 (28%)
U.S. Census Bureau, Building Permits Survey, 2025. Residential only.
Real permit data

What makes construction estimating in Henderson, NV different?

Caliche and expansive clay soils that drive over-excavation and import, extreme summer heat that shifts concrete placement and roofing schedules, Clark County and City of Henderson permitting, and a residential mix where multifamily is 28% of permitted units. Those four factors move sitework, structural and MEP costs more than national averages suggest.

  • Henderson permitted 3,590 new housing units in 2025, #1 among the Nevada cities we cover.
  • About 28% were in multifamily buildings; 72% were single-family.
  • Permit volume was up 9% compared with 2024.

Henderson sits in Clark County at the southeast edge of the Las Vegas Valley, where the ground is the first cost driver. Caliche layers and expansive clays are common in the foothills, so foundation and sitework scopes routinely carry over-excavation, import fill and lime or cement stabilization that a generic estimate will miss. Summer design temperatures above 110°F affect concrete mix designs, curing, roofing adhesives and MEP equipment selection, and those choices show up as line items, not assumptions. We build estimates from the plans and specifications, not from square-foot averages, so your bid reflects what is actually drawn.

We work from Bluebeam Revu, PlanSwift and RSMeans data, with material and labor adjusted by ZIP code for Henderson. Deliverables come in Excel and PDF, sorted by CSI MasterFormat division, with marked-up plan sets so you can trace every quantity back to the sheet it came from. Most projects turn around in 24–48 hours, and rush service is available when a bid date moves. If you are pricing work across the valley, our Nevada construction estimating team covers the whole state, and we regularly support Las Vegas and North Las Vegas projects with the same format.

Coverage
Henderson and nearby Nevada communities
Deliverable
Excel estimate + marked-up PDF plans
Pricing basis
Henderson ZIP-code material and labor costs
Turnaround
24–48 hours for most projects
Software
Bluebeam Revu, PlanSwift, RSMeans data
01

For bidders. Hard-bid contractors get division-by-division quantities with waste factors, unit costs and a bid summary you can drop into your proposal. We flag scope gaps and alternates so you can qualify your number before submission.

02

For builders. Production builders and subcontractors use our takeoffs for buyout, change-order pricing and monthly draws. Framing, foundation, roofing and MEP quantities come with marked-up plans so your superintendent can verify counts in the field.

03

For owners. Developers and owners get a budget-level estimate before design is complete, then updated estimates at each milestone. We separate hard costs, sitework and soft-cost allowances so you can see where the contingency is going.

Henderson by the numbers

Henderson's residential construction pipeline

Select a bar to compare Henderson with the largest Nevada markets we cover.

3,590New housing units, 2025
30.2%Of all units in the Nevada cities we cover
$417MPermitted residential value
28%In multifamily buildings
New housing units permitted in 2025. Source: U.S. Census Bureau, Building Permits Survey.
This city

Henderson

3,590 new housing units in 2025 (+9.3% vs 2024).

2,582 single-family · 1,008 multifamily (28%).

Permit volume and what it means for your bid

Henderson issued 3,590 new privately-owned residential units in 2025, up 9% from 3,286 in 2024, according to the U.S. Census Bureau Building Permits Survey. That is 30.2% of the 11,895 units permitted across the 14 covered Nevada cities, and it ranks Henderson first among them. Single-family units were 2,582 and multifamily 1,008, so multifamily is 28% of the total. Permitted value was $417M, an average of $116,100 per unit. For bidders, that mix means two different estimating problems: repetitive single-family plans where framing and foundation quantities must be exact, and multifamily podiums where MEP, fire protection and elevators carry the risk. Our multi-family estimating services and residential estimating services are built around those two workflows, and the state-level picture is on our Nevada page.

Soil, heat and the trades that absorb the variance

In Henderson, sitework and foundation scopes absorb more variance than any other division. Caliche ripping, over-excavation, import and compaction testing are real line items, not allowances, and a takeoff that ignores them will lose money on the first change order. Summer heat affects concrete placement windows, curing compounds, roofing adhesive compatibility and HVAC equipment derates, so we price those items against the specification rather than a national average. Because Henderson is a suburban market with ongoing infill, you also see demolition, utility relocations and traffic control on redevelopment sites. If your project is heavy on earthwork or structural concrete, start with sitework estimating services and foundation estimating services; both are priced with Clark County conditions in mind.

Services

Construction estimating services in Henderson, NV

We estimate the divisions that carry the most risk in Henderson — earthwork, concrete, framing, envelope and MEP — and deliver them in a format your team can bid from.

Sitework takeoffs

Caliche ripping, over-excavation, import fill, compaction and utility trenching quantities for Henderson sites.

CY · LF · TON

Concrete estimating

Footings, stem walls, slabs-on-grade, podium decks and tilt-up panels priced with hot-weather mix and curing requirements.

CY · SF

Foundation estimating

Spread footings, post-tension slabs and mat foundations with rebar, vapor barrier and anchor bolt counts.

CY · LB · EA

Framing takeoffs

Wood and light-gauge framing with stud counts, sheathing, trusses, hardware and typical waste factors.

LF · SF · EA

Roofing estimating

Tile, shingle, TPO and modified bitumen systems with insulation, flashing and heat-compatible adhesives.

SF · SQ

MEP estimating

Mechanical, electrical and plumbing quantities for residential and commercial, including equipment schedules and fixtures.

LF · EA · TON

Commercial estimating

Tenant improvements, retail shells and office build-outs with division-level detail for hard bids.

SF · LS

Industrial estimating

Warehouse and light-industrial scopes with slab, racking, dock equipment and power distribution quantities.

SF · CY · EA
Who we provide estimates for

Who we prepare Henderson estimates for

General contractors

Hard-bid GCs pricing Henderson jobs need division-level quantities that survive a Clark County bid review. We break out caliche removal, import fill and summer curing so your number holds after award.

Residential production builders

With 3,590 new privately-owned residential units permitted in Henderson in 2025, builders need repeatable takeoffs per plan. We deliver framing, foundation and MEP quantities by model so buyout and draws stay consistent.

Multifamily developers

Multifamily was 1,008 of those units — 28% of Henderson's 2025 residential permits. We estimate unit-mix repetition, podium and Type III wood scopes, and shared MEP risers with per-unit cost splits.

Subcontractors

Concrete, framing, roofing and MEP subs bidding Henderson work get quantities tied to marked-up sheets. You can verify footing counts, roof squares and fixture counts before you sign a scope.

Architects and designers

Design teams use our budget estimates at schematic and design-development stages to keep Henderson projects inside pro formas. We separate hard costs from sitework and soft-cost allowances at each milestone.

Owners and developers

Owners compare Henderson bids apples-to-apples when every proposal follows CSI MasterFormat divisions. We flag alternates, exclusions and scope gaps so you see what each number actually includes.

Where we provide estimates

Henderson areas and nearby communities we cover

We estimate Henderson projects from the Las Vegas Valley floor up into the foothill communities, and we cover the surrounding Clark County cities with the same division-by-division format.

Central and established Henderson

  • Downtown Henderson / Water Street
  • Lake Las Vegas
  • Green Valley
  • Green Valley Ranch
  • Whitney Ranch
  • Black Mountain

South and east Henderson growth corridors

  • Cadence
  • Inspirada
  • MacDonald Highlands
  • Anthem
  • Seven Hills
  • Lake Mead Parkway corridor
Property types

Types of Henderson properties we estimate

Henderson's 2025 residential permit mix ran heavily to single-family — 2,582 units against 1,008 multifamily — and the commercial work follows the resort, retail and industrial corridors along the valley's southeast edge.

Single-family homes

Production and custom homes in Cadence, Inspirada and the foothill communities. We take off foundation, framing, roofing and MEP by plan, with waste factors applied to each trade.

Watch for: Caliche over-excavation, post-tension slab quantities, roof tile waste

Multifamily and apartments

Podium and garden-style projects made up 28% of Henderson's 2025 residential permits. We estimate unit-mix repetition, shared corridors and central plant or split-system MEP scopes.

Watch for: Per-unit cost splits, riser counts, balcony and railing linear footage

Retail and restaurant shells

Tenant-ready shells and white-box interiors along the Water Street and Lake Mead corridors. We separate base-building scope from tenant improvement allowances so the two numbers stay distinct.

Watch for: Grease interceptor, hood make-up air, storefront glazing

Light industrial and warehouse

Distribution and flex buildings serving the valley's logistics demand. We take off tilt-up or CMU walls, slab flatness, dock equipment and ESFR sprinkler coverage by bay.

Watch for: Slab thickness and joint layout, dock count, fire pump sizing

Hospitality and resort support

Hotel, casino and entertainment projects tied to the Las Vegas resort market. Estimates carry high MEP density, specialty finishes and long-lead equipment allowances.

Watch for: Kitchen exhaust, show systems, long-lead switchgear

Institutional and civic

Schools, clinics, municipal and public-safety buildings in Henderson and Clark County. We price to the adopted code edition and separate owner-furnished equipment from contract scope.

Watch for: Code edition in effect, OSHPD-style inspections, owner-furnished items

Local factors

What changes a construction estimate in Henderson

Two Henderson projects of the same square footage can land far apart once ground conditions, code cycle and trade labor are priced honestly.

Clark County permitting and code cycle

Henderson permits run through Clark County and the city's building department, and the adopted editions of the IBC, IRC, IECC, NEC and IPC/UPC drive real scope. Energy-code envelope values, fire sprinkler requirements under NFPA 13 and seismic detailing all change quantities. Confirm the adopted edition with the local building department before you lock an estimate, because a code cycle change can move insulation, glazing and structural line items.

Clark County · City of Henderson building department · IBC/IRC · IECC · NFPA 13

Caliche, expansive clay and foundations

Foothill lots in Anthem, MacDonald Highlands and Seven Hills frequently hit caliche that must be ripped or blasted, then replaced with import fill. Expansive clays require lime or cement stabilization, deeper footings or post-tension slabs. Those items are measured by volume, not allowance, so a takeoff that skips them understates the foundation package. Our foundation estimating services price over-excavation, backfill and reinforcement separately.

Caliche · Expansive clay · Post-tension slabs · Import fill

Desert heat, wind and flash flooding

Summer design temperatures above 110°F push concrete mix designs toward retarders and ice, and hot-weather roofing adhesives carry different coverage rates. Monsoon winds drive roof attachment schedules and screen-enclosure engineering. Localized flash flooding in the valley's washes affects retention, grading and finished-floor elevations. Climate-driven items belong in the estimate as quantities, not as a general condition.

110°F design temperature · Monsoon wind · Flash flooding · Roof attachment

Union and open-shop labor mix

Southern Nevada runs a mix of union and open-shop trades, and the labor burden you carry changes the bottom line more than material pricing does. Overtime on summer concrete pours, night work on occupied properties and per-diem for traveling specialty crews all belong in the labor column. We adjust material and labor pricing by ZIP code so Henderson rates are not blended with other markets.

Union and open-shop trades · Labor burden · Overtime · ZIP-code-adjusted pricing

Sitework, drainage and land use

Henderson sites range from flat valley parcels to sloped foothill lots with retaining walls and switchback driveways. Mass grading, wet and dry utilities, wash crossings and retention basins are frequently the largest single division on a residential subdivision. Setbacks, hillside ordinances and dust-control requirements add scope. We price sitework as its own division so it does not get buried in a general conditions allowance.

Mass grading · Wet and dry utilities · Retention basins · Dust control

Materials, logistics and Nevada taxes

Most concrete, aggregate and masonry come from local valley producers, but specialty finishes, structural steel and mechanical equipment often ship from out of state. Freight, fuel surcharges and long-lead dates belong in the estimate. Nevada's tax treatment of construction materials and equipment affects the bottom line, and so does the cost of storing material on tight Henderson lots. Confirm current tax treatment with your accountant.

Local aggregate producers · Freight and fuel surcharges · Long-lead equipment · Nevada material tax treatment
Henderson estimating guide

How Henderson conditions show up in a takeoff, trade by trade

Henderson sits on caliche and expansive soils in the Mojave Desert, and Clark County's adopted code cycle drives what you have to show on the plans. Here is how that changes quantities, units and line items in five trades we price every week.

Sitework and grading

Caliche is the first cost driver. If the geotech report classifies the upper strata as cemented caliche, you cannot price the cut as common earth; the takeoff needs a separate line for ripping or rock excavation, usually measured by cubic yard in place, plus an allowance for over-excavation and backfill with import. Desert flash flooding means retention basins, area drains and desert landscaping per the local water-efficiency rules, so plan on a landscape conversion line and a separate drainage scope. We take off cut and fill from the civil sheets by cross-section, not by plan area, because a 3-foot cut over a pad is not the same quantity as a 3-foot cut across a slope. For more detail on these items, see our sitework estimating services.

Framing and drywall

Wood framing is typical for Henderson single-family and low-rise multifamily, with engineered floor systems over crawl spaces or slabs. We take off wall plates in linear feet, studs by count with a waste factor, and sheathing by square foot, then convert to board feet where your lumber supplier prices that way. Interior drywall is measured by square foot of finished wall and ceiling area, with separate lines for moisture-resistant board in baths and garages. The desert heat matters here: roof sheathing and underlayment quantities should reflect the actual roof plane area, not the footprint, because hip roofs add 15 to 25 percent over the plan area. For a full breakdown of these quantities, see our framing estimating services.

MEP rough-in

Mechanical, electrical and plumbing quantities on Henderson projects are driven by fixture counts and equipment schedules, not by square footage alone. We count plumbing fixtures by type, then run fixture-unit calculations for the water and waste lines; on the electrical side we count devices, fixtures and panel schedules, and we take off conduit and wire by linear foot using the riser and floor plans. HVAC is priced by tonnage and by linear feet of duct, with separate lines for flex, hard duct and insulation. The adopted energy code affects equipment efficiency and duct sealing, so verify the current edition with the local building department. Our MEP estimating services page shows the format we deliver.

Concrete and foundations

Expansive clay in the Las Vegas Valley means post-tensioned slabs and deepened footings are common on Henderson residential and light commercial work. The takeoff has to separate slab-on-grade square footage from footing linear feet, because the PT tendon layout, edge forms and anchorages are priced per square foot or per linear foot, not lump sum. We count pour strips, construction joints and doweled edges, and we list vapor barrier and granular base separately. ACI 318 governs the structural concrete, but the geotech report dictates the soil treatment depth and the required embedment. If you are pricing a tract plan, our concrete estimating services page shows how we break out per-plan quantities so you can compare lots.

Roofing

Henderson roofs deal with intense UV, monsoon wind and occasional hail, so underlayment and flashing details are not optional. Tile and asphalt shingle are the common residential assemblies; low-slope commercial work usually goes to modified bitumen or single-ply. We take off roofing by the square (100 square feet) of actual roof surface, then add starter, ridge, hip and valley linear feet, plus pipe boots, vents and drip edge by count. On tile roofs, the batten and underlayment are separate lines. Wind uplift requirements come from the adopted code edition and the local amendments; confirm the current edition with the Clark County Building Division before you price fasteners. Our roofing estimating services page lists the line items we include by default.

Scope gaps we see on Henderson bids

  • Caliche ripping and rock excavation left out of the sitework bid because the geotech report was not read before pricing.
  • Post-tension slab edge forms, anchorages and pour strips omitted when the concrete quote was based on square footage only.
  • Roof underlayment and flashing counted as one lump sum instead of by the square and linear foot.
  • Duct sealing and insulation required by the adopted energy code not carried as a separate line in the HVAC bid.
  • Landscape conversion and retention basin work treated as owner-furnished when the civil plans show them in the contract.
  • Temporary power, dust control and SWPPP items not assigned to any trade on the bid form.
Free tool

Concrete volume calculator

Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.

Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.

Result
19.4CY
Net volume18.5 CY
Cubic feet500 CF
Ready-mix trucks (10 CY)2
80 lb bags (premix)875

Need the full takeoff with pricing? Upload your plans.

How it works

How we estimate a Henderson project

  1. Read the full setArchitectural, structural, civil and MEP drawings, the geotechnical report and every addendum.
  2. Check Henderson conditionsLocal code edition, site and drainage requirements, soils and any hazard rules are confirmed before the takeoff starts.
  3. Take off by CSI sectionQuantities measured and color-coded on the plans, so every number traces to a sheet.
  4. Price to HendersonMaterial and labor costs adjusted to the project ZIP code, or to your own supplier quotes and crew rates.
  5. Check and deliverA second estimator checks quantities before the estimate goes out.
Sample output

Sample takeoff: single-family residence in Henderson, NV

Sample format — illustrative quantities
SectionLine itemQtyUnit
03 30 00Slab-on-grade, 4 in. PT2,450SF
03 30 00Footing concrete, 12x24 in.186LF
05 12 00Structural steel beam, W8x1042LF
06 10 00Wall framing, 2x4 studs1,840LF
06 16 00Roof sheathing, 7/16 in. OSB3,120SF
09 29 00Drywall, 1/2 in. interior4,680SF
07 30 00Roofing, tile underlayment31SQ
22 11 00Plumbing rough-in, PEX1,260LF

Worked example: slab-on-grade concrete for a Henderson single-family home

We are pricing a 2,450-square-foot single-family slab on a Henderson lot. The dimensions below are illustrative; your plan set and geotech report govern. The slab is 4 inches thick over a 6-inch granular base with a vapor barrier, and the perimeter footing is 12 inches wide by 24 inches deep. The garage apron adds 24 feet of footing. The driveway is excluded; it is a separate line.

First, convert the slab thickness to feet: 4 in. ÷ 12 = 0.333 ft. Multiply by the slab area to get volume in place: 2,450 SF × 0.333 ft = 816 cubic feet. Divide by 27 to convert to cubic yards: 816 ÷ 27 = 30.2 CY. Add a typical 5 percent waste factor for slab concrete: 30.2 × 1.05 = 31.7 CY.

Next, compute the perimeter footing. The plan shows 186 linear feet of footing. The cross-section is 12 in. × 24 in., which is 1 ft × 2 ft = 2 square feet. Volume in place: 186 LF × 2 SF = 372 cubic feet = 13.8 CY. Add 5 percent waste: 13.8 × 1.05 = 14.5 CY.

Now add the vapor barrier and base. Vapor barrier is measured by area with a 10 percent lap allowance: 2,450 SF × 1.10 = 2,695 SF, which is about 30 squares of 100 SF. Granular base at 6 inches: 2,450 SF × 0.5 ft = 1,225 cubic feet = 45.4 CY, with a 10 percent compaction allowance, so 50 CY.

Finally, summarize the concrete order. Total concrete for slab and footing: 31.7 + 14.5 = 46.2 CY. Round up to 47 CY to account for pump priming and small overruns. The table below shows each step so you can check the math against your own plan dimensions.

StepCalculationResult
Slab volume in place2,450 SF × 0.333 ft ÷ 2730.2 CY
Slab with 5% waste30.2 CY × 1.0531.7 CY
Footing volume in place186 LF × 2 SF ÷ 2713.8 CY
Footing with 5% waste13.8 CY × 1.0514.5 CY
Vapor barrier with 10% lap2,450 SF × 1.102,695 SF
Granular base with 10% compaction2,450 SF × 0.5 ft ÷ 27 × 1.1050 CY
Total concrete order31.7 + 14.5, rounded up47 CY

If you want this breakdown run against your actual plan set, send the drawings through our get an estimate page.

FAQ

Henderson construction estimating questions

What does a typical residential takeoff for a Henderson home include?

We break the estimate down by CSI MasterFormat division, starting with sitework and concrete, then framing, roofing, drywall, and MEP rough-in. Each line shows quantity, unit and the plan sheet it came from. For a 2,450-square-foot single-family home, the takeoff typically runs 40 to 60 pages in Excel and PDF, including marked-up plan sets. We use ZIP-code-adjusted material and labor pricing for Henderson, so the unit costs reflect the local market rather than a national average.

How does Henderson's soil affect foundation quantities?

The Las Vegas Valley has areas of caliche and expansive clay, and the geotech report will tell you whether the soils require over-excavation, soil treatment or deepened footings. In a takeoff, that shows up as separate lines for rock excavation, import backfill and post-tension slab reinforcing. You cannot price the foundation from the architectural plan alone; the structural sheets and the geotech report together determine the footing depth and slab thickness. Confirm the required soil treatment with the local building department and the geotech engineer before you lock the quantity.

Do you price Clark County plan review comments into the estimate?

We price the scope shown on the drawings you send. If the plan reviewer requires a change, such as additional shear wall hold-downs or a revised drainage plan, that is a scope change and we can reprice the affected divisions. It helps to send the comment letter with the revised sheets so we can tie each new line item to the reviewer's note. We do not guess at what the reviewer will ask for; we price what is documented.

What turnaround should I expect for a Henderson project estimate?

Most projects are returned in 24 to 48 hours, and rush service is available if your bid date is close. Turnaround depends on the size of the plan set and how many trades you want priced. A single-family takeoff is usually faster than a multifamily or commercial package with MEP and sitework. We deliver Excel and PDF files organized by CSI MasterFormat division, with marked-up plan sets so you can see exactly where each quantity came from.

Can you estimate both residential and commercial work in Henderson?

Yes. We price single-family and multifamily residential, plus commercial and light industrial scopes. Henderson's permit mix shows both: the city issued 3,590 new privately-owned residential units in 2025, and commercial work continues along the corridors. The takeoff format is the same, but the divisions change. A commercial shell might emphasize structural steel, exterior skin and rooftop units, while a residential plan emphasizes framing, drywall and residential HVAC. We adjust the line items to the project type.

How do you handle Nevada sales tax and freight in material pricing?

Material pricing is ZIP-code-adjusted, which means the unit costs reflect the local market, including typical freight from suppliers serving the Las Vegas Valley. Nevada sales tax treatment depends on the project and the supplier; we do not add a blanket tax line unless your bid form asks for it. If you need tax shown separately, tell us and we will list it as a distinct line so your accounting team can handle it. Freight for specialty items, such as long-span trusses, is called out when it is a significant cost.

What is the difference between a quantity takeoff and a full estimate?

A quantity takeoff lists material quantities by CSI division with units, such as cubic yards of concrete or square feet of drywall. A full estimate adds labor, equipment, and pricing to those quantities, and may include general conditions and markup depending on what you ask for. We can deliver either. Most contractors want the full estimate so they can compare it directly to a subcontractor bid. If you only need quantities for a material order, tell us and we will strip out the pricing columns.

Where does the Henderson permit data on this page come from?

The permit figures come from the U.S. Census Bureau, Building Permits Survey, for 2025. The survey counts permits issued by the city itself for new privately-owned residential units only; it does not include commercial permits or alterations. Henderson issued 3,590 residential units in 2025, up from 3,286 in 2024, with 2,582 single-family and 1,008 multifamily units. The permitted value was $417 million, and the average value per unit was $116,100. These figures describe residential permitting activity, not construction cost.

Do you cover projects in Las Vegas, North Las Vegas and other nearby cities?

Yes. We cover Henderson and the surrounding valley, including Las Vegas, North Las Vegas, Reno and Sparks. The soil and climate conditions are similar across the Las Vegas Valley, so the takeoff approach carries over. If your project is in Reno or Sparks, the winter conditions and logistics differ, and we adjust the pricing basis accordingly. You can see the state-level overview on our Nevada construction estimating page, or the city pages for Las Vegas and Reno.

What files do you need to start a Henderson estimate?

Send the architectural, structural, civil, and MEP plan sets in PDF, along with any specifications, geotech report and addenda. If you have a bid form, include it so we can match the line items to your format. Marked-up drawings are helpful but not required. We return the takeoff in Excel and PDF, organized by CSI MasterFormat division, with a marked-up plan set showing where each quantity was measured. You can upload plans through our get an estimate page.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Send your Henderson project plans for a quote

Upload your plan set and we will return a CSI-formatted takeoff in 24 to 48 hours, with quantities you can check line by line.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote
Call Us