Quick answer
Metal siding cost typically runs $4 to $14 per square foot installed, with steel at the low end and zinc or copper at the high end. Material alone is often $2 to $8 per square foot, and labor adds $2 to $6 per square foot depending on panel profile, height and access.
- Steel and aluminum panels are the cheapest common options; zinc and copper cost several times more.
- Standing seam and concealed-fastener profiles cost more to install than exposed-fastener corrugated panels.
- Trim, flashing, fasteners and underlayment commonly add 10 to 20 percent to the panel line.
- Two-story walls, complex geometry and occupied buildings push labor rates higher.
What Is Metal Siding Cost per Square Foot?
Installed metal siding typically runs about $3.50–$16.00 per square foot of wall area, with most residential and light commercial projects landing in the $6–$12 range. That spread is wide because metal siding covers everything from a 29-gauge corrugated panel on a barn to a 24-gauge standing seam wall on an architect-designed house. When someone asks how much does metal siding cost, the honest answer is that the number depends on what you are hanging and where you are hanging it.
Split the figure into its two halves and the range makes sense. Material alone runs roughly $1.50–$8.00 per square foot of panel, driven by metal type, gauge or mil thickness, coil coating and whether the panel is a commodity profile or a formed architectural system. Labor runs roughly $2.00–$8.00 per square foot, driven by profile complexity, wall height, scaffold or lift needs, corner and opening detailing, and local wage rates. A simple exposed-fastener panel on a single-story wall sits at the bottom of both ranges; a concealed-fastener or standing seam system on a tall, heavily articulated facade sits at the top.
"Per square foot" here means net wall area measured in elevation, not floor area. You measure the wall face — length times height — and the resulting number is the metal siding cost per square foot basis. Openings such as windows and doors are deducted or handled as separate line items, and trim, flashing, fasteners and sealants are priced separately because they are not part of the panel field. Confusing wall area with floor area is one of the most common ways an estimate goes wrong.
Metal siding is sold by the square (100 sq ft) of coverage or by the linear foot of panel, so the per-square-foot figure is a derived number, not a catalog price. Panel coverage width, not overall width, determines how many linear feet you need, and the difference between the two is where material quantities drift. A 36-inch overall panel with 34 inches of coverage takes more linear feet per square than the catalog width suggests. If you want the takeoff done from the elevations rather than from a rule of thumb, siding estimating services cover panel counts, trim and fasteners line by line, and a full construction cost estimating package puts those numbers into a bid-ready format.
Regional labor rates, gauge, finish warranty and substrate condition move the number more than brand does. Two panels with the same profile and coating from different manufacturers land within cents of each other per square foot; the same panel installed in a high-wage metro versus a rural market can swing the installed cost by several dollars. Substrate condition matters too — sheathing that is out of plane, missing or wet adds furring, strapping or repair before a single panel goes up. For a quick comparison, steel siding cost per square foot often sits at the lower end of the range, while aluminum siding cost per square foot runs higher due to material and coating differences. Specialty metals like zinc siding and copper siding push the per-square-foot figure well above the standard range because of raw material cost and specialized installation requirements.
Measure wall area in elevation and deduct openings before you apply any per-square-foot rate. A rate applied to gross wall area including windows will overstate the panel field and understate the trim.
Metal Siding Material Cost by Metal Type
Material-only pricing separates the metals far more clearly than installed pricing does. The table below gives typical U.S. ranges per square foot of panel for the common wall cladding metals. These are material costs only — no labor, trim, fasteners or accessories — and they vary by region, gauge, finish and order quantity.
| Metal | Typical material cost per sq ft | Typical wall gauge / thickness | Where it fits |
|---|---|---|---|
| Galvanized steel | $1.50–$4.00 | 26–29 gauge | Volume residential and agricultural panels, exposed fastener |
| Galvalume (Al-Zn coated steel) | $1.75–$4.50 | 26–29 gauge | Volume commercial and residential, better cut-edge corrosion resistance |
| Aluminum | $3.50–$9.00 | 0.032–0.050 in. | Coastal salt exposure, lighter weight, non-sparking |
| Zinc | $12.00–$25.00 | 0.7–1.0 mm | Architectural facades, self-healing patina, long lead times |
| Copper | $18.00–$40.00 | 16–20 oz | Architectural facades, standing seam, patina finish |
Galvanized steel and galvalume are the volume products and set the floor for metal siding material cost. Galvalume adds an aluminum-zinc coating that improves cut-edge and cut-end corrosion performance, which is why it is common on commercial walls and roofs. Gauge is the thickness driver for steel — common wall panels run 26 to 29 gauge, and stepping from 29 to 26 gauge adds material cost and stiffness in roughly equal measure. For aluminum and coated finishes, mil thickness of the coil coating matters as much as the metal thickness, because the paint system is what carries the finish warranty.
AISI and ASTM standards govern substrate and coating performance, and coil-coated finishes carry multi-year paint warranties tied to the coating system and the exposure environment. That warranty is only as good as the detailing around it. Copper and zinc patina over time, and both require compatible fasteners and flashing — mixing copper with galvanized or aluminum components in the same wall assembly invites galvanic corrosion at every contact point. Specify stainless or the matching metal for fasteners, clips and flashing whenever you step up to these architectural metals. For panel and trim quantities by metal type, material takeoff services break the wall into field, trim and accessory counts, and miscellaneous metals estimating covers the formed and fabricated pieces that do not come off a coil line.
Never mix copper or zinc with galvanized or aluminum fasteners and flashing. Galvanic corrosion at the contact points will show up as staining and fastener failure long before the panel itself wears out.
How Panel Profile Changes the Price
Corrugated metal is the cheapest profile per square foot and the simplest to install. It is an exposed fastener panel: gasketed screws pass through the panel face into the substrate, and the seal depends on the screw being driven square, to the right depth, with the gasket compressed but not crushed. Overdriven or underdriven screws are the leading cause of leaks on exposed fastener walls. Because the panel is short-span and light, material and labor both stay low, which is why corrugated and other exposed fastener profiles dominate agricultural, industrial and budget residential work.
Concealed fastener snap-lock panels cost more because the fasteners hide in the seam and the panel engages a clip or a preceding panel. That means tighter roll-forming tolerances, longer panels, more clips and less tolerance for a wall that is out of plane. Standing seam sits at the top of the wall cladding range: the seam is mechanically locked or snapped, clips allow the panel to move with thermal expansion and contraction, and the system is often specified for metal roofing and wall systems where weathertightness and thermal movement matter. The same panel profile can serve both roof and wall, which is why metal roofing and metal siding pricing are frequently quoted together on the same project.
Panel width and rib height drive installed cost more than most people expect. A narrower panel means more linear feet, more fasteners or clips per square foot, and more seams to detail. A taller rib adds stiffness and allows longer spans, but it also changes the trim profile at every corner, head and sill. Every one of those transitions is a formed trim piece with its own material and labor cost. When you compare two bids that look similar on the panel line, the difference is usually hiding in the accessory count.
Vertical orientation is standard for walls because it sheds water along the ribs and matches the panel's natural span direction. Horizontal applications need additional support — horizontal panels span between girts or furring, and every horizontal seam becomes a drainage detail that has to be flashed and sealed. That added framing and flashing shows up as labor, not material, and it is easy to miss in a quick takeoff. If the wall assembly includes insulation, air barrier or rainscreen components behind the panel, price those under thermal and moisture protection estimating rather than folding them into the siding line, and keep the roof-side quantities separate in roofing estimating when the same crew is hanging both. For premium metals, zinc siding and copper siding require specialized detailing and skilled labor, which can double or triple the installed cost compared to standard steel or aluminum panels.
Count clips or fasteners per square foot before you price a concealed fastener or standing seam wall. The accessory count, not the panel price, is usually what separates a profitable bid from a losing one.
Metal Siding Installation Cost and Labor Drivers
Metal siding installation cost typically runs $2.00–$8.00 per square foot installed. Simple gable walls with wide-open access sit at the low end. Complex facades, tall walls, occupied buildings and work over existing finishes push toward the high end. That range covers the full install package, not just the panel setter.
The metal siding labor cost you carry in a bid includes layout, cutting, fastening, and sealing every penetration. It also includes trim and flashing, which are measured in linear feet and often consume more hours per foot than the field of the wall. Because these tasks are interdependent, most crews bid them as a package per square, not as separate line items. If you need help breaking that package into crew-hours and bare costs, labor cost estimating services can build the rate from production assumptions rather than a lump sum.
Several drivers move the number. Wall height and scaffolding add setup and teardown time. Each corner, door and window adds cuts, trim and flashing. Long panels may require a crane or lift instead of a man lift. Substrate repair and old siding removal add separate labor and disposal. On public work, prevailing wage or union labor can roughly double the labor component, so a rate built from open-shop pricing will miss badly.
Manufacturer-certified installers may charge more per square foot, but certification is sometimes required to keep the finish warranty valid. If you subcontract the work, make sure the sub's scope matches the warranty terms. Subcontractor estimating services can help you level those bids so the low number is not hiding an excluded scope.
A labor rate quoted per square foot without a stated access plan, removal scope and trim allowance is not a bid-ready number. Ask what is excluded before you compare it to another quote.
Metal Siding Cost Formula and Worked Example
Use this metal siding cost formula to assemble a complete number instead of a material-only rate:
Total cost = (net wall area × waste factor × material rate) + (net wall area × labor rate) + trim, flashing and accessory cost + removal and disposal + equipment
Net wall area is gross elevation area minus openings. Trim and flashing are measured in linear feet, not square feet, because their cost tracks length along corners, openings, base and top terminations. A quantity takeoff service produces both quantities from the same elevation set so the two units reconcile.
Worked example (illustrative only). Take a 40 ft × 10 ft gable wall.
- Gross wall area: 40 × 10 = 400 sq ft
- Door: 3 × 7 = 21 sq ft
- Two windows: 2 × (3 × 4) = 24 sq ft
- Net wall area: 400 − 21 − 24 = 355 sq ft
- Panel to order with 10% waste: 355 × 1.10 = 390.5 sq ft
- Material: 390.5 × $3.00 = $1,171.50
- Labor: 355 × $4.00 = $1,420.00
- Trim and flashing: 120 linear ft × $4.50 = $540.00
- Total: $1,171.50 + $1,420.00 + $540.00 = $3,131.50
- Cost per net square foot: $3,131.50 ÷ 355 = $8.82 per sq ft
Note that labor is applied to net area, not to the waste-inflated panel quantity, because you do not install the offcuts. Material is applied to the ordered quantity. Mixing those two bases is one of the most common errors in a metal siding cost per linear foot conversion, where someone divides a square-foot total by perimeter and gets a meaningless rate.
All numbers above are illustrative. Replace the material rate, labor rate and trim rate with current local pricing before you use the result. If you want the takeoff checked against the drawings first, blueprint takeoff and estimating can verify the opening schedule and wall lengths.
Waste factor applies to material, not labor. Applying a 10% waste factor to both inflates the bid by roughly 10% of the labor line.
Send Your Elevations for a Metal Siding Takeoff
Upload your plans and elevations and we will return a bid-ready metal siding quantity takeoff with material and labor broken out, typically within 24 to 48 hours.
Using a Metal Siding Cost Calculator or Estimator
A metal siding cost calculator handles area times rate quickly, and that is about all it can do. It cannot see wall complexity, substrate condition, access constraints or code requirements. It also cannot tell you whether the panel gauge you selected meets the wind load for the building height and exposure. Use a calculator for a first-pass budget, then replace every input with a measured quantity before the bid goes out.
A metal siding cost estimator needs a specific input set: elevation drawings or field measurements, panel profile and gauge, a trim schedule, insulation and underlayment scope, removal scope, and an access plan. Underlayment and insulation decisions change both material cost and labor time, so they belong in the estimate, not in a general conditions allowance. The output should separate material, labor, equipment and subcontractor lines so you can adjust one without rebuilding the whole bid.
In a formal estimate these items are organized under CSI MasterFormat Division 07, Thermal and Moisture Protection, which covers siding and metal wall panels along with the associated air and water barriers. Keeping that structure makes your bid comparable to the next one and easier to audit later. If you use software for the takeoff, run a manual check on at least the wall lengths and opening counts before submission. A construction takeoff service can produce that independent check, and estimating software we work in covers the platforms the reconciled quantities can be delivered in.
If your calculator output and your manual takeoff differ by more than a few percent, find the discrepancy before you price it. The error is almost always in the opening deduction or the waste factor.
Metal Siding Cost vs Vinyl and Other Options
Comparing cladding options on first cost alone usually points to vinyl, but the full picture includes service life, maintenance and how each material behaves on your wall assembly. The table below shows typical installed cost ranges per square foot of wall area. All figures vary by region, scope, substrate condition and date, so treat them as planning ranges, not quotes.
| Cladding type | Typical installed cost per SF | Typical service life | Maintenance profile |
|---|---|---|---|
| Vinyl siding | $3–$8 | 20–40 years | Wash; can crack, fade and dent |
| Fiber cement | $6–$12 | 30–50 years | Repaint every 7–15 years |
| Stucco / EIFS | $8–$16 | 25–50 years | Patch and recoat; substrate-dependent |
| Steel siding (exposed fastener) | $8–$16 | 40–70 years | Repaint or recoat over time |
| Aluminum siding | $10–$20 | 40+ years | Dents; repaint or factory finish |
Metal siding cost vs vinyl is the comparison most owners ask about, and steel or aluminum siding typically lands above vinyl on day one. The trade-off is durability: metal resists fire, rot, insects and impact better than vinyl, and it can outlast it by decades, so cost per year of service often favors metal even when the sticker price does not. Fiber cement sits between vinyl and metal on price and needs periodic painting, while stucco and EIFS are substrate-dependent and repair differently from panelized cladding.
Insurance and code requirements can override first-cost logic. In wildfire or coastal zones, insurers and local amendments may push a project toward noncombustible or wind-rated cladding regardless of what vinyl would cost. If you are weighing assemblies across trades, interior and exterior finishes estimating helps you compare them on the same basis, and value engineering estimating shows where swapping profiles or gauges saves money without changing the material family. One warning: comparing only material price per square foot ignores trim, fasteners, underlayment and labor differences that can swing the installed number by several dollars per square foot.
When you compare cladding bids, normalize them to installed cost per square foot of wall area and state the assumed service life. A cheaper panel with half the life is not cheaper.
Metal Siding Replacement Cost and Retrofit Scope
Metal siding replacement cost is not just the price of new panels. It adds demolition, disposal and substrate repair to the new siding price, and on older buildings those items can rival the cladding itself. A complete replacement scope should include removal of the existing cladding, inspection and repair of sheathing and framing, a new weather barrier, flashing at openings and roof/wall intersections, and replacement of trim. If the existing wall has no underlayment or a failed vapor barrier, the retrofit is the moment to correct it.
Going over existing siding is sometimes possible, but it can trap moisture between layers and void manufacturer warranties, so it should be a deliberate, documented decision rather than a shortcut. When the old cladding contains lead paint or asbestos, abatement costs and handling requirements apply, and those are separate line items with their own disposal rules. Access matters too: a two-story wall over a finished landscape costs more to strip and dispose than a bare one-story wall with room for a dumpster.
As a planning rule, removal and disposal of existing cladding typically adds roughly 15–30% to the new metal siding installation cost, with the range driven by access, material type and whether hazardous abatement is involved. For scopes that include selective demolition and rebuild, demolition estimating services and remodeling estimating services cover the takeoff and pricing side. Price the substrate repair as a unit-rate allowance you can adjust once the wall is open, not as a lump sum you hope holds.
Carry a substrate repair allowance in the bid. Once cladding comes off, rotted sheathing and missing flashing are common and change orders on hidden conditions are hard to win.
Metal Siding Cost by Project Type
The same panel costs more per square foot on a small, complex building than on a large, simple one. Mobilization, detailing, and access drive that spread. A 2,000 SF garage re-side and a 40,000 SF warehouse may use identical 26-gauge R-panel, but the garage carries the same setup, lift rental, and trim fabrication across one-tenth the area. That is why metal siding cost per square foot is a project-level number, not a catalog price.
| Project type | Typical wall area | Cost drivers | Directional metal siding cost per SF of wall |
|---|---|---|---|
| Residential re-side | 1,500–3,500 SF | Steep roof access, many openings, removal and disposal | $8–$16 |
| Light commercial (retail, office, shop) | 3,000–15,000 SF | Storefront integration, parapets, mixed substrates | $9–$18 |
| Agricultural / metal building (PEMB) | 5,000–40,000 SF | Long panel runs, integrated structural package, minimal trim | $5–$11 |
| Multi-story commercial facade | 20,000–100,000+ SF | Scaffolding or swing stage, fire-rated assemblies, rainscreen detailing | $14–$30+ |
Ranges are for budgeting only and vary by region, scope, and date. They assume material plus installation on a prepared substrate.
Metal building and PEMB projects often bid siding inside the structural package, so the erector's price blends framing, sheathing, and panels. That changes how you carry metal siding cost for contractors: you may be comparing a package lump sum rather than a per-square-foot wall number. Review those packages through metal building estimating services before you level bids.
Multi-family and mixed-use projects add fire-rated wall assemblies and more windows, doors, and penetrations. Every opening adds trim, flashing, sealant, and labor, so trim quantities can climb faster than panel quantities. Warehouses and industrial buildings favor long, tall panels that reduce seams and labor per square foot, which is why their metal siding installation cost per SF is usually the lowest of any project type. For a full commercial scope review, see commercial estimating services.
Budget metal siding cost from wall elevation area and project complexity, not from a single national per-square-foot figure. The project type sets the labor spread before the panel is even selected.
Common Mistakes in Metal Siding Estimates
- Deducting openings but forgetting the trim and flashing around them. You remove 120 SF of panel for a roll-up door, then fail to add the jamb trim, header flashing, and sealant that door requires. The net quantity drops but the labor and material for the opening go up.
- Using floor area instead of wall elevation area. Metal siding is priced on wall face. A 10,000 SF building with 20-foot walls has roughly 8,000 SF of wall, not 10,000 SF. Using floor area badly understates or overstates the quantity depending on wall height and plan shape.
- Ignoring the waste factor or applying a flat 10% everywhere. A simple rectangular building may run 5–10% waste. A building with many corners, short panel runs, and stacked openings can run 15% or more because offcuts cannot be reused. The waste factor belongs in the takeoff, not as a guess at the end.
- Mixing up gauge and mil thickness. Gauge describes steel sheet thickness; mil describes paint or coating thickness. Pricing 24-gauge panels when the spec calls for 22-gauge, or confusing a 1-mil coating with a 1-mil substrate, changes both metal siding material cost and the warranty basis.
- Leaving out removal, disposal, scaffolding, lifts, and temporary protection. These items are easy to miss on a re-side and can add meaningful cost. Carry them as separate lines so the client sees them.
- Not checking whether the finish warranty requires a certified installer or specific fasteners. Some coil and paint warranties require approved installers and fasteners matched to the substrate. If you substitute, you may void the finish warranty and own the callback.
Run every metal siding cost formula against the actual wall takeoff, then have a second estimator check the openings, trim, and waste. An estimate review catches these gaps before bid day. If you need the takeoff and pricing built correctly the first time, use bid estimating services.
The most expensive mistake is the one that survives to the bid: a missing trim line or a wrong waste factor is invisible until the panels are on site and the change order is denied.
How to Reduce Metal Siding Cost Without Cutting Quality
- Standardize on one panel profile and color. Fewer profiles mean fewer trim types, fewer fastener SKUs, and less coil variation. That lowers metal siding material cost and simplifies ordering and returns.
- Design walls in panel-width multiples. If the panel covers 36 inches, a 36-foot wall run is 12 panels with no rip. A 34-foot run forces a cut panel and waste on every course. Adjusting dimensions during design is free; adjusting them after fabrication is not.
- Keep openings aligned vertically and avoid unnecessary corners and jogs. Stacked windows share jamb trim and flashing details. Every added corner adds trim, fasteners, sealant, and labor. Fewer jogs also means fewer short panel runs and less waste.
- Use exposed fastener panels where appearance and weathertightness allow. Corrugated metal and exposed fastener profiles cost less per square foot than standing seam, both in material and labor. Reserve standing seam and concealed fastener systems for visible facades and high-exposure walls.
- Buy trim and fasteners from the panel manufacturer. Matching trim and approved fasteners protect the finish warranty and avoid compatibility problems. Saving a few cents per fastener is not worth a denied warranty claim.
- Phase work to reduce lift and scaffolding time on tall buildings. Siding the lower walls while upper framing continues, or sequencing by elevation, keeps equipment on site for less total time. That directly reduces metal siding labor cost.
Value engineering is not about buying a thinner panel. It is about removing waste, unnecessary detailing, and equipment hours while keeping the specified performance. A structured value engineering estimating review shows which changes actually move the number. For early planning, a budget estimating service can test these options before drawings are final.
The cheapest panel is not always the cheapest wall. Standardizing profiles, dimensions, and details usually saves more than downgrading the metal.
When to Get a Professional Metal Siding Estimate
A professional takeoff pays for itself when the metal siding scope is bid competitively, when the wall area is large or broken into many planes, or when the work includes removing existing cladding and repairing the substrate underneath. Those conditions are where a rough metal siding cost estimator or a quick metal siding cost calculator built on averages starts to drift from the real number. If your project has any of them, have the quantities measured against the drawings before you price the job.
A professional estimate separates material, labor, equipment and subcontractor costs, and ties every quantity back to a sheet, elevation or detail. That structure is what lets you support a change order when the architect adds a return, or defend a buyout when the supplier's quote comes in high. On competitive work, it also shows you which line items carry the risk. If you are pricing as a general contractor, that separation is the difference between a bid you can manage and one you have to absorb.
For contractors who do not want to staff a full takeoff, an outsourced package can be delivered in 24–48 hours for most projects, with rush service available and same-day quotes on request. You upload the plans and specifications, and the takeoff comes back with panel counts, trim lengths, fastener quantities and labor hours you can drop into your pricing. That is the practical version of metal siding cost for contractors who bid several jobs a week and cannot afford to measure every elevation by hand. Our siding estimating services are built for exactly that workflow.
Use a second-opinion review before you submit a hard bid. A reviewer checks the takeoff for missing trim, flashing, sealants, access equipment and disposal, which are the items that quietly turn a winning bid into a loss. If you want that check without rebuilding the estimate, our estimate review services compare your numbers against the drawings and flag the gaps.
Scope Precision Estimate provides bid-ready takeoffs and estimates, and new clients can get 20% off. To start, get an estimate and upload your drawings. If you are weighing whether to keep the work in-house or send it out, our construction estimating services page explains the scope of what we deliver.
If your wall area is under roughly 1,000 square feet and the geometry is simple, a careful self-takeoff may be enough. Above that, or with complex elevations, the cost of a professional takeoff is usually smaller than the pricing error it prevents.
Frequently asked questions
How much does metal siding cost per square foot installed?
Installed metal siding cost typically falls between $4 and $14 per square foot of wall area. That range covers the panel, underlayment, trim, flashing, fasteners and labor. Steel and aluminum panels sit at the lower end, while zinc and copper sit at the upper end. Region, wall height, access, panel profile and project size all move the number, so treat any figure as a planning range and confirm it against a takeoff of your actual elevations.
Is metal siding cheaper than vinyl siding?
No. Vinyl siding typically installs for roughly $3 to $7 per square foot, while metal usually runs $4 to $14 per square foot. Metal costs more up front because of the material price and the more careful installation that concealed-fastener panels require. The trade-off is service life and impact resistance: metal holds up better to hail, wind and dents from lawn equipment, and it can be repainted rather than replaced.
What is the difference between steel siding and aluminum siding cost?
Steel siding is usually the cheaper of the two on a per-square-foot basis, and aluminum costs somewhat more because of the raw material price. Steel is stronger and more dent-resistant but needs a factory coating to resist rust. Aluminum will not rust, weighs less, and is easier to cut and form on site, which can offset part of the material premium. Both are priced per panel plus trim, so compare delivered material cost and labor separately.
How do I calculate how much metal siding I need?
Measure each wall elevation, multiply length by height to get gross area, then subtract openings for windows and doors. Add gable triangles at half the base times height. Divide the net area by the panel coverage width, not the panel width, since laps overlap. Add 5 to 10 percent for cuts, waste and future repairs. A full quantity takeoff service can produce this by elevation so your order matches the drawings.
Does metal siding cost more for a two-story house?
Yes, usually. The material cost per square foot stays roughly the same, but labor rises because crews need scaffolding, lifts or ladders, and production slows on upper walls. Expect the installed rate on second-story walls to run higher than the first story. Gable ends, dormers and tight lot lines that block equipment access add more. On a typical two-story home, the labor premium can be a meaningful share of the total.
What is the labor cost to install metal siding per square foot?
Labor for metal siding generally runs $2 to $6 per square foot of wall area. Simple corrugated panels with exposed fasteners install fastest. Standing seam, snap-lock and other concealed-fastener profiles take longer because panels must be aligned and seamed carefully. Height, scaffolding, trim work, cutouts around openings and the number of inside and outside corners all raise the labor rate. Get labor priced separately from material so you can compare bids.
How long does metal siding last compared to other siding?
Metal siding commonly lasts 40 to 70 years with a factory finish, and longer if it is repainted before the coating fails. Vinyl typically lasts 20 to 30 years before it becomes brittle and fades. Fiber cement lasts 30 to 50 years but needs repainting. Wood siding can last decades too, but only with regular painting or staining. Metal's long service life is the main reason its higher installed cost can pay back over time.
Do I need a permit to replace siding with metal?
In most U.S. jurisdictions, re-siding an existing wall is a permit item, and switching to metal can trigger additional review. Check with your local building department. Common requirements include a building permit, compliance with the International Residential Code or International Building Code for wind and attachment, and sometimes a separate approval in historic districts or coastal high-wind zones. Your installer should pull the permit and confirm the attachment schedule meets the local wind speed.