Scope Precision EstimateContact Us

Demolition Estimating Services

Send your demolition plans, specs, and hazardous material reports. We return a Division 02 takeoff priced by removal method and waste stream, ready for your bid.

24–48 hours for most projectsTypical turnaround
Excel + marked-up PDFsOrganized by CSI section
ZIP-code pricingLocal material and labor
Price confirmed firstBefore any work starts
Sample estimate sheet
Division 02 — Existing ConditionsSample format
Line itemQtyUnitVolume
Interior partition removal 8 ft1,250LF1,250 LF × 8 ft × 0.67 ft / 27 = 248.1 CY
Slab-on-grade breakout 6 in4,800SF4,800 SF × 0.5 ft / 27 = 88.9 CY
Structural steel removal18.5TON18.5 TON
Asphalt paving removal 3 in2,400SY2,400 SY × 0.25 ft / 27 = 22.2 CY
ACM floor tile removal3,200SF—
Total debris volume359.2 CY
Illustrative quantities. Waste factor applied as a separate line.
Haul and tipping included

What is demolition estimating?

Demolition estimating is a quantity takeoff and pricing of removal work, organized by CSI MasterFormat Division 02. We measure LF of partition, SF of slab, CY of debris, TON of scrap, and LB of regulated waste, then price labor, equipment, disposal, and permits. Deliverables are Excel and PDF files with marked-up plan sets, typically in 24–48 hours.

  • Units: LF, SF, CY, TON, LB, EA for removal and disposal.
  • Typical waste factors for demolition debris range from 5% to 15% by volume, depending on material and method.
  • The most common costly miss is asbestos-containing material abatement, which can trigger change orders and schedule delays.

Demolition estimating services are not a single lump sum line. A demolition cost estimate is a takeoff built from removal method, structure type, and disposal route. We price selective and full demolition, plus site clearing, by the same units your field crew uses: LF of partition, SF of slab on grade, CY of construction and demolition debris, TON of scrap, and LB of regulated waste. If you are bidding a gut renovation, a tear-down, or a phased demolition with facade retention, you need quantities that separate hand work from machine work and track each waste stream to its disposal facility.

Deliverable
Excel estimate + marked-up PDF plans
Organized by
CSI MasterFormat section
Turnaround
24–48 hours for most projects
Pricing
ZIP-code-adjusted material and labor pricing
Software
Bluebeam Revu, PlanSwift, RSMeans data

We organize every demolition takeoff by CSI MasterFormat Division 02, with support scope in Division 01 74 19 for construction waste management and Division 31 23 16 for excavation and backfill of removed foundation walls and pile caps. That structure lets you drop our numbers into your bid form and compare your productivity rates to ours. For projects that combine demolition with new construction, we coordinate the demo scope with Concrete Estimating Services and Structural Steel Estimating so the removal limits match the new work.

Most demolition estimates are delivered in 24–48 hours as Excel and PDF files with marked-up plan sets. We use Bluebeam Revu, PlanSwift, and RSMeans data with ZIP-code-adjusted material and labor pricing. A demolition estimator on our team reviews the plan set for utility disconnection, hazardous materials abatement scope, and debris box placement before pricing. If your project also includes sitework, we can align the demo takeoff with Sitework Estimating Services for a single bid package. Start by sending your plans to our get an estimate page.

Services

What our demolition cost estimating covers

We take off selective and full demolition from your drawings and specifications, then price each line by removal method and disposal route. The estimate separates hand demolition from machine demolition, tracks hazardous materials by weight, and includes haul and tipping as separate line items. You get a Division 02 takeoff that shows exactly what is removed, how it comes out, and where it goes.

Selective Interior Demolition

Measure and price removal of partitions, ceilings, and floor finishes by SF, including hand work and protection.

SF · LF · EA

Structural Demolition

Take off slabs, decks, beams, and columns by SF, CY, or TON, separating machine and hand methods.

SF · CY · TON

Paving Removal

Quantify asphalt and concrete paving, base, and curb removal by SF and SY, including hauling.

SF · SY · CY

Steel Salvage

Identify and price reinforcing and structural steel separation, cutting, and salvage credit by TON.

TON · EA

Roofing Removal

Measure roofing membrane, ballast, and insulation removal by SF, including disposal and deck repair.

SF · CY

MEP Removal

Take off duct, pipe, conduit, and fixture removal by LF and EA, including capping and disposal.

LF · EA

Hazardous Abatement

Price asbestos-containing material and other regulated waste abatement by SF and LB, with disposal documentation.

SF · LB · EA

Foundation Breakout

Quantify foundation, footing, and slab-on-grade breakout by CY, including excavation and backfill.

CY · SF

What every demolition estimating takeoff includes

  • Selective interior demolition of partitions, ceilings, and floor finishes by SF
  • Structural demolition of slabs, decks, beams, and columns by SF, CY, or TON
  • Asphalt and concrete paving removal by SF and SY, including base and curb
  • Reinforcing steel and structural steel separation and salvage by TON
  • Roofing and membrane removal by SF, including ballast and insulation
  • MEP removal: duct, pipe, conduit, and fixtures by LF and EA
  • Asbestos-containing material abatement and disposal by SF and LB
  • Interior and exterior wall removal by LF and SF, load-bearing and non-load-bearing
  • Foundation, footing, and slab-on-grade breakout by CY
  • Equipment and tank removal, including cutting, rigging, and disposal by EA
  • Temporary shoring, bracing, and dust partition installation by LF and SF
  • Dumpster, roll-off, and trucking by CY and haul count
How we work

How we take off demolition quantities

  1. Review hazmat and scopeWe start with the hazardous material survey and the demolition scope narrative. If the survey is missing, we flag it as a bid qualification. We mark asbestos-containing materials, lead paint, and other regulated waste on the plan set and separate them into their own line items so abatement is not buried in general demolition. We also check the survey report for material condition and quantity, cross-referencing with specification section 02 82 00 to confirm who carries abatement and disposal costs.
  2. Separate selective vs. fullOn selective demolition, we trace each partition, ceiling, and finish removal boundary on the architectural plans. On full demolition, we work from structural plans to identify members by size and material. This separation drives the production rate: hand work for selective, machine work for full, and saw-cutting at the transition. We also note any phasing or sequencing requirements shown on the demolition plan, such as retaining a wall for temporary support.
  3. Measure by removal methodWe measure LF of partition by height, SF of slab by thickness, and TON of steel by member weight. For concrete, we convert SF and thickness to CY, then apply a swell factor for haul. For steel, we use AISC weight per foot and separate salvage value from disposal cost. We also account for reinforcing steel in concrete by using typical rebar densities per cubic yard, and we measure openings and deductions per standard takeoff rules.
  4. Price disposal and haulEach waste stream gets its own haul and tipping line. We calculate truckloads from debris volume and truck capacity, then apply ZIP-code-adjusted landfill tipping fees. Recycling credits are tracked separately for concrete, asphalt, and scrap metal. This is where most demolition bids lose money. We also include any special handling requirements, such as manifesting for regulated waste or scheduling restrictions at the landfill.
  5. Check support scopeWe review temporary shoring, dust partitions, utility disconnects, and protection of adjacent structures. These items often sit in Division 01 or in general requirements, not Division 02. We pull them into the estimate so your bid reflects the full cost of keeping the building standing while you tear part of it down. We also verify that the demolition sequence is constructible and flag any conflicts with the structural drawings.
  6. Deliver marked-up setYou receive an Excel workbook and PDF organized by CSI MasterFormat division, with marked-up plan sets showing removal limits, hazmat locations, and haul routes. Quantities are traceable to sheet references so your estimator can audit any line before submitting the bid. We also include a summary of assumptions and qualifications, such as missing surveys or unclear utility scope, to help you decide what to carry in your bid.

What we need from you

  • Demolition plansArchitectural and structural sheets showing removal limits, partitions, and structural members. PDF or DWG.
  • Hazmat surveyAsbestos, lead, and other regulated material report. If unavailable, we note it as a qualification.
  • SpecificationsDivision 02 sections and Division 01 74 19 for waste management. We need salvage and recycling requirements.
  • Site logisticsDumpster locations, haul routes, loading dock restrictions, and working hours. These drive production rates.
  • Utility informationDisconnect points for water, sewer, gas, and electric. Capping and temporary service requirements.
  • Bid formYour bid form or schedule of values so we can format the estimate to match your submission.
Sample output

Sample demolition quantity takeoff

A partial takeoff from a mid-size commercial gut renovation. Quantities are illustrative and show the format we deliver.

Sample format — illustrative quantities
SectionLine itemQtyUnitRef.
02 41 19Selective demolition of gypsum board partitions, 8 ft high1,250LFA-201
02 41 16Slab-on-grade breakout, 6 in thick, reinforced4,800SFS-101
02 41 16Structural steel beam removal, W18×5018.5TONS-301
02 41 13Asphalt paving removal, 3 in thick, including base2,400SYC-101
02 82 33ACM floor tile and mastic removal and disposal3,200SFH-101
02 41 19Metal stud partition removal, non-load-bearing850LFA-202
02 41 16Concrete footing breakout, 3 ft × 3 ft × 1 ft12EAS-102
02 41 19Suspended ceiling removal, including grid and tiles5,600SFA-203
02 41 16Concrete curb removal, 6 in × 18 in320LFC-102
02 41 19Door and frame removal, including hardware24EAA-204

Units of measure in our demolition takeoff

Demolition quantities are only useful if the unit matches the removal method. We measure each item the way it is priced and hauled.

ItemUnitHow it's measured
Slab, deck, roof, and wall area removedSFMeasured from architectural and structural plans, deducting openings over 10 SF
Concrete, masonry, and debris by volumeCYCalculated from thickness and area; includes void space for mixed debris
Wall, curb, pipe, conduit, and fence removedLFTaken off centerline or face, with height noted for volume conversion
Fixtures, doors, windows, equipment, and tanksEACounted from floor plans and schedules, tagged for salvage or disposal
Structural steel, rebar, and scrap metalTONConverted from LF or SF using member weight per foot from AISC tables
Asbestos-containing material and regulated wasteLBMeasured from hazmat survey by material type and condition
Haul volume and truckload countsCYConverted from debris volume using truck capacity and swell factor
Permit, notification, and stand-by timeLSAllowance based on jurisdiction and inspection requirements

Worked example: selective demolition of a partition and slab opening

This example shows how we take off a small selective demolition scope: removing a non-load-bearing gypsum board partition and cutting a slab opening for a new stair. All dimensions are illustrative and do not represent a specific project.

Step 1 – Partition removal

  • From architectural plan A-201, partition runs 42 LF at 9 ft high.
  • Wall area = 42 LF × 9 ft = 378 SF.
  • Deduct door opening: 1 opening 3 ft × 7 ft = 21 SF.
  • Net wall area = 378 − 21 = 357 SF.
  • Convert to volume for haul: 357 SF × 0.375 ft (4-5/8 in stud wall) = 133.9 CF.
  • Volume in CY = 133.9 / 27 = 4.96 CY.

Step 2 – Slab opening

  • Opening size 10 ft × 12 ft = 120 SF.
  • Slab thickness 6 in = 0.5 ft.
  • Volume = 120 SF × 0.5 ft = 60 CF.
  • Convert to CY = 60 / 27 = 2.22 CY.
  • Add saw cutting: perimeter = 2 × (10 + 12) = 44 LF.

Step 3 – Waste factor

  • Apply 15% waste to partition debris: 4.96 CY × 1.15 = 5.70 CY.
  • Apply 10% waste to concrete debris: 2.22 CY × 1.10 = 2.44 CY.
  • Waste is shown as a separate line, not buried in the net quantity.

Step 4 – Haul and disposal

  • Total debris volume = 5.70 + 2.44 = 8.14 CY.
  • Assume 20 CY roll-off container: 8.14 / 20 = 0.41 containers → 1 container.
  • Truckloads: 1 load.
  • Tipping fee at local landfill: apply ZIP-code-adjusted rate per ton.
  • Estimated weight: partition debris ~ 5.70 CY × 0.15 ton/CY = 0.86 ton; concrete ~ 2.44 CY × 2.0 ton/CY = 4.88 ton; total = 5.74 ton.

Step 5 – Salvage and special handling

  • Metal studs: 42 LF × 9 ft × 0.5 lb/ft = 189 lb → 0.09 ton. Salvage credit tracked separately.
  • No asbestos-containing material identified in this scope.

Step 6 – Support items

  • Temporary dust partition: 42 LF × 10 ft high = 420 SF.
  • Negative air machine: 1 EA for duration.
  • Saw cutting: 44 LF.

This takeoff is delivered as line items under CSI sections 02 41 19 (Selective Structure Demolition) and 02 41 16 (Structure Demolition). The waste factor, haul, and salvage are separate lines so you can adjust them to your own disposal rates. For projects that also include new concrete or steel, we coordinate removal limits with Concrete Estimating Services and Structural Steel Estimating.

Cost drivers

What drives demolition bid estimating

Relative impact on a typical estimate for this trade, based on estimator judgment. Select a bar for details.

Scale: 1 = minor, 5 = major relative impact. Estimator judgment, not measured data.
Relative impact 5 / 5

Removal method

Hand demolition costs more per unit than machine demolition but is required where structure remains or access is tight. Saw-cutting and coring add labor and equipment. We price each area by the method your means and methods specify, not a blended rate.

Removal method

Hand demolition costs more per unit than machine demolition but is required where structure remains or access is tight. Saw-cutting and coring add labor and equipment. We price each area by the method your means and methods specify, not a blended rate.

Disposal route

Landfill tipping fees vary by ZIP code and waste stream. Concrete and asphalt may go to a crusher for recycling, while mixed debris goes to a transfer station. Haul distance and truck capacity determine the number of loads, which is often the largest variable in the bid.

Hazardous materials

Asbestos and lead abatement require licensed contractors, containment, and third-party clearance. The cost is driven by material type, condition, and square footage or linear footage. We price abatement separately so you can carry it as a dedicated line with its own markup.

Structural complexity

Load-bearing wall removal, facade retention, and temporary shoring add engineering and labor. The sequence of removal matters: you cannot remove a column before the beam above is supported. We include shoring and bracing as separate line items based on the demolition sequence.

Site access and protection

Urban sites with limited staging, protected sidewalks, and adjacent structures require dust partitions, negative air machines, and daily cleanup. These costs scale with the perimeter and duration of the work, not just the volume of debris removed.

Waste stream separation

Specifications often require separating concrete, metal, wood, and gypsum board for recycling. This adds labor for sorting and separate containers, but can reduce tipping fees. We price the labor for separation and the container count by stream.

Permits and notifications

Demolition permits, utility disconnect notices, and inspector stand-by time vary by jurisdiction. Some cities require a pre-demolition survey or a waste management plan. We include allowances based on the local requirements and flag any missing documentation.

Scope gaps

Common scope gaps we catch in a demolition estimate

Demolition bids are lost on items that never appear on the demolition sheet. We review the full document set to find them before you submit.

  • Hazardous material survey, testing, and notification costs often sit in Division 01 or in a separate abatement contract. We check the survey report and specification section 02 82 00 to confirm who carries them.
  • Temporary shoring, bracing, and facade retention for selective demolition are frequently shown only on the structural sheets, not on the demolition plan. We trace the removal limits against the structural drawings.
  • Dust control, negative air machines, and wet demolition water are sometimes in Division 01 general requirements. We pull them into the estimate as separate line items by SF of containment.
  • Utility disconnects, capping, and temporary services are often left to the owner or a separate trade. We list them as qualifications if the scope is unclear.
  • Dumpster pulls, haul distance, and landfill tipping fees by waste stream are rarely broken out. We calculate truckloads and apply ZIP-code-adjusted tipping fees per stream.
  • Recycling and salvage credit tracking is required by specification but not priced. We add a line for documentation and tracking.
  • Permit fees, demolition notifications, and inspector stand-by time are sometimes omitted. We include a LS allowance based on the jurisdiction.
  • Protection of adjacent structures, sidewalks, and landscaping is often missing from the demolition plan. We add line items for temporary protection and repairs.
  • Dewatering and groundwater control during excavation of removed foundations are sometimes overlooked. We include pumping and disposal if the scope requires it.

Removal method and disposal route by material

Each material stream has its own production rate and disposal path. We price them separately so you can see where the cost sits.

MaterialTypical removal methodUnit of measureDisposal route
Gypsum board partitionsHand demolition, manual loadingSF, CYMixed debris landfill or gypsum recycling
Concrete slab and footingsMachine breakout, saw cuttingCY, SFConcrete recycling or landfill
Structural steelTorch cutting, crane pickTONScrap metal recycling
Asphalt pavingMilling or breakoutSY, TONAsphalt recycling or landfill
Asbestos-containing materialsLicensed abatement, containmentSF, LBRegulated landfill with manifest
Duct and pipingHand or machine removalLF, EAScrap metal or mixed debris
Wood framing and millworkHand demolitionLF, SFWood recycling or landfill
Suspended ceiling systemsHand demolitionSFMetal recycling and tile disposal
Codes and standards

Codes and standards that affect demolition estimates

Model codes

Demolition work is governed by the International Building Code (IBC) Chapter 33, which covers safeguards during demolition, and the International Existing Building Code (IEBC) for alterations. The IEBC classifies work as repair, alteration, or change of occupancy, which affects how much demolition is required. The International Fire Code (IFC) regulates hot work and impairment of fire protection systems during demolition. The NEC (NFPA 70) applies to temporary power and utility disconnects. Confirm the adopted code edition with the local building department.

Industry standards

ASTM E1368 covers visual inspection for asbestos, and ASTM E2356 covers comprehensive building surveys. ACI 318 and ACI 301 govern concrete removal and shoring. AISC 303 and AISC 360 apply to steel demolition and temporary bracing. SMACNA guidelines cover duct removal. NRCA guidelines cover roofing removal. These standards influence quantities by setting testing requirements, allowable removal methods, and safety provisions.

Specification sections

CSI Division 02 sections are the core: 02 41 13 Selective Site Demolition, 02 41 16 Structure Demolition, 02 41 19 Selective Structure Demolition, 02 41 91 Selective Demolition and Salvage, 02 82 00 Asbestos Remediation, and 02 82 33 Removal and Disposal of Asbestos-Containing Materials. Division 01 74 19 Construction Waste Management and Disposal sets recycling and reporting requirements. Division 31 23 16 Excavation and Fill and 31 23 23 13 Trench Backfill apply to backfilling removed foundation areas. Read these sections for salvage requirements, disposal restrictions, and testing obligations that change cost.

Local amendments

Adopted code editions vary by state and municipality. Some jurisdictions require a pre-demolition asbestos survey, a waste management plan, or specific recycling rates. Local amendments may restrict working hours, dust control measures, or haul routes. Always confirm the adopted edition and any amendments with the local building department. For projects in specific states, see our Texas estimating, California estimating, Florida estimating, New York estimating, and North Carolina estimating pages.

Who we provide estimates for

Demolition estimating for owners and subcontractors

General contractors

You need a Division 02 number that matches your bid form and separates abatement, haul, and salvage. We format the estimate so you can drop it into your schedule of values and see where your production rates differ.

Demolition subcontractors

You bid multiple projects a week and need a second set of quantities to check your own takeoff. Our marked-up plan sets show removal limits and hazmat locations so you can catch a missed partition or an unmarked ACM.

Developers and owners

You are comparing demolition bids and need to know why they vary. Our estimate breaks out removal method, disposal route, and hazardous material handling so you can see which bid is missing scope.

Architects

You need a cost check on the demolition scope before issuing the final drawings. Our takeoff shows the volume of debris and the number of truckloads, which helps you adjust the waste management plan and recycling goals.

Where we provide estimates

Demolition Estimating in 20 states

Pricing is adjusted to the project ZIP code. Select a highlighted state to see the cities we cover there.

States we coverSelected
TX

Demolition Estimating in Texas

Nation's largest construction market; Sun Belt population growth, data centers, semiconductor plants, and single-family home building.

Texas estimating services
Property types

Demolition project types we estimate

The takeoff changes with the structure type, removal method, and disposal route. Here is how we adjust quantities for common demolition projects.

Interior gut renovation

Measure partitions, ceilings, and finishes by SF and LF; separate hand work from machine work; track salvage items.

Watch for: Hazardous materials in finishes; protection of existing structure; dust control and negative air.

Full building demolition

Take off structural members by TON, slab by CY, and total debris volume; include foundation breakout and backfill.

Watch for: Utility disconnects; permit and notification; haul distance and landfill restrictions.

Selective structural demolition

Trace removal limits on structural sheets; measure beams, columns, and slab openings by SF and TON; include shoring.

Watch for: Load path and temporary support; sequence of removal; facade retention.

Site clearing and paving removal

Measure asphalt and concrete paving by SF and SY; include base and curb; calculate haul volume.

Watch for: Base thickness and subgrade; recycling of asphalt and concrete; dust and stormwater controls.

Industrial equipment removal

Count equipment by EA; measure piping and duct by LF; include rigging and cutting; separate salvage.

Watch for: Weight and rigging requirements; utility disconnects; special waste streams.

Partial demolition with new construction

Coordinate removal limits with new work; separate demolition from new build; include temporary weather protection.

Watch for: Interface between old and new; structural connections; sequencing with new construction.

Deliverables

What you receive

  • Excel workbook organized by CSI MasterFormat Division 02, with each line item traceable to a sheet reference.
  • PDF estimate with marked-up plan sets showing removal limits, hazmat locations, and haul routes.
  • Separate line items for abatement, haul, tipping fees, and salvage credits.
  • Bid qualifications listing missing information such as hazmat survey or utility disconnect scope.
  • Production rate assumptions for hand demolition, machine demolition, and saw-cutting.
  • Waste stream summary with CY of debris, truckload counts, and recycling tonnage.
  • 24–48 hour turnaround for most projects, with rush available.
Checklist

Pre-bid demolition checklist

  • Confirm hazardous material survey is complete and current.
  • Verify removal limits on architectural and structural plans.
  • Check specification Division 02 and 01 74 19 for salvage and recycling.
  • Identify utility disconnect and capping responsibilities.
  • Review site logistics: dumpster locations, haul routes, working hours.
  • Confirm permit and notification requirements with local jurisdiction.
  • Assess need for temporary shoring or facade retention.
  • Determine dust control and negative air requirements.
  • Calculate haul distance and landfill tipping fees by waste stream.
  • Verify protection of adjacent structures and landscaping.
  • Check for dewatering needs during foundation removal.
  • Confirm final cleaning and site restoration scope.
Client reviews

What clients say about Scope Precision Estimate

10 client reviews
BT
Brian TaylorProject Estimator

Fast, accurate, and dependable estimating service. They understood the project requirements quickly and provided a detailed estimate without unnecessary delays.

RW
Robert WilliamsEstimating Manager

Professional and reliable estimating service. The detailed quantity takeoff helped us reduce pricing errors and submit our proposal on time.

JR
James RichardsonConstruction Project Manager

Excellent construction estimating service. The team provided a comprehensive takeoff and cost breakdown that saved us hours of manual work.

KM
Kevin MartinezCivil Contractor

Great experience from start to finish. The detailed material takeoff and cost estimate helped us prepare a much more accurate project budget.

DT
Daniel ThompsonCommercial Contractor

Very impressed with the accuracy and turnaround time. Their estimate gave us a clear picture of material and labor costs before starting the project.

SH
Steven HarrisCommercial Builder

The quality of the estimate exceeded our expectations. Their detailed breakdown of labor, materials, and project costs gave us confidence in our bid.

FAQ

Demolition Estimating questions

How do you price demolition when the hazmat survey is missing?

If the hazmat survey is not provided, we flag it as a bid qualification and do not include abatement costs. We may include an allowance based on typical conditions for the building type and age, but we clearly state that it is an allowance. You should obtain the survey before submitting a firm bid. Without it, you carry the risk of undiscovered asbestos or lead, which can be significant.

What is the difference between selective and full demolition in your takeoff?

Selective demolition removes specific interior or structural elements while the building remains. We measure partitions, ceilings, and finishes by SF and LF, and separate hand work from machine work. Full demolition removes the entire structure. We measure structural members by TON, slab by CY, and include foundation breakout. The two scopes have different production rates and disposal routes, so we price them separately.

Do you include dumpster and hauling costs in the estimate?

Yes. We calculate debris volume in CY, convert to truckloads based on container size, and apply ZIP-code-adjusted landfill tipping fees. Haul distance and number of loads are shown as separate line items. We also include recycling credits for concrete, asphalt, and scrap metal when applicable. This breakdown lets you compare disposal costs across bids and adjust for your own haulers.

How do you handle asbestos and lead abatement in the estimate?

We price abatement as a separate line item under CSI 02 82 00 and 02 82 33, using quantities from the hazmat survey by material type and condition. We include containment, negative air, and third-party clearance testing if required. Abatement is typically performed by a licensed subcontractor, so we show it as a dedicated line with its own markup. We also note any notification or manifest requirements.

Can you estimate demolition for a project that also includes new construction?

Yes. We coordinate the demolition takeoff with the new construction scopes. For example, we align removal limits with Concrete Estimating Services for new foundations and Structural Steel Estimating for new steel. This ensures that the demolition quantities match the new work and that there are no overlaps or gaps. We can deliver a combined estimate or separate packages.

What production rates do you use for hand vs. machine demolition?

We use production rates based on RSMeans data adjusted for local conditions, and we separate hand demolition from machine demolition. Hand demolition is typically used for selective interior work and tight access, while machine demolition is used for full structures and open areas. Rates vary by material, height, and accessibility. We state the assumed rates in the estimate so you can adjust them.

How do you calculate truckloads and haul volume?

We calculate debris volume in CY from dimensions and thickness, then apply a swell factor to account for material expansion after removal. We divide total volume by the capacity of the specified container (e.g., 20 CY roll-off) to determine the number of pulls. Truckload counts are based on container size and haul distance. We show both volume and load counts so you can verify with your hauler.

What is your turnaround time for a demolition estimate?

Most demolition estimates are delivered in 24–48 hours after we receive complete plans, specifications, and the hazmat survey. Rush service is available for an additional fee. If the hazmat survey is missing or the scope is unclear, we may need additional time to review and flag qualifications. We confirm the schedule when you send the documents.

Do you provide marked-up plan sets with the estimate?

Yes. Every estimate includes marked-up plan sets in PDF showing removal limits, hazardous material locations, and haul routes. We use Bluebeam Revu to mark up the drawings. The markups are traceable to the quantities in the Excel workbook, so your estimator can audit any line. This is especially useful for verifying that all partitions and structural elements are included.

How do you handle salvage and recycling credits?

We track salvage items such as structural steel, copper piping, and reusable fixtures by unit and weight. Recycling credits for concrete, asphalt, and scrap metal are calculated based on local market rates and shown as separate line items. We also include labor for sorting and documentation if required by specification. Credits are clearly identified so you can decide whether to carry them in your bid.

What if the demolition plans don't show temporary shoring or dust partitions?

We review the structural drawings and general requirements to identify temporary shoring, bracing, and dust partitions that may not be on the demolition plan. If they are not shown, we include them as line items based on the removal sequence and code requirements. We also flag any missing information as a qualification. These items are often overlooked but can be significant cost drivers.

Can you estimate demolition for projects outside the United States?

We focus on U.S. projects and use ZIP-code-adjusted pricing for material and labor. For projects outside the U.S., we can provide quantities and takeoff but cannot apply U.S. pricing. We recommend using local pricing data. Our estimates are organized by CSI MasterFormat, which is used internationally, so you can map the quantities to your local cost database.

Do you provide outsourced demolition estimating for general contractors?

Yes. Outsourced demolition estimating is most of what we do for general contractors. You send the plan set, specifications, and any abatement survey, and we return a Division 02 takeoff with line items by removal method, a disposal route for each waste stream, and a bid-ready Excel file. We flag scope gaps such as missing utility disconnection notes, unlabeled slab on grade thickness, or a deconstruction plan that does not match the demolition drawings, so you can send an RFI before the bid due date.

What does a demolition takeoff services package include for subcontractors?

Demolition takeoff services for subcontractors include a quantity survey by CSI section 02 41 00, a unit price schedule, and a marked-up plan set showing removal limits. We separate hand work from machine work, list concrete saw cutting and wall sawing by LF, and break out hauling and disposal by truckload. You get the same quantities we priced, so you can adjust labor rate, crew size, or dumpster rental assumptions and see the effect on your demolition bid estimate.

How do you build a demolition estimate for developers and owners?

Demolition estimating services for developers and owners start with the site plan, as-built drawings, and any Phase I ESA or Phase II ESA findings. We price full structure demolition, foundation removal, and site clearing, then add allowances for waste characterization, universal waste, and PCB caulk if the survey is incomplete. The result is a cost breakdown by work sequence and phasing plan, with exclusions and clarifications listed, so you can compare bids at bid leveling.

How do you build a demolition estimate for contractors?

We start with plan reading and a scope review against CSI Section 02 41 00 Demolition. We measure each removal item by unit, assign a production rate, and add equipment, labor, disposal, and general conditions. The estimate includes a line for each waste stream, from C&D debris to regulated waste, with disposal quotes and recycling facility rates. We deliver an Excel and PDF package with marked-up plans so your project manager can review quantities before bid submission.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning. is a Senior Estimator with more than 15 years of professional experience in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Guides on this topic

Send your demolition plans for a bid-ready estimate

Upload your drawings, specifications, and hazmat survey to our [get an estimate](/get-estimate/) page and receive a Division 02 takeoff with marked-up plan sets in 24–48 hours.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote
Call Us