Thermal & Moisture Protection Estimating

Send your Div 07 plan set and specs. We return a marked-up set with quantities by CSI section, in Excel and PDF, in 24–48 hours.

24–48 hours for most projectsTypical turnaround
Excel + marked-up PDFsOrganized by CSI section
ZIP-code pricingLocal material and labor
Price confirmed firstBefore any work starts
Sample estimate sheet
Division 07 — Thermal & Moisture ProtectionSample format
Line itemQtyUnitQuantity
Below-grade membrane, 60 mil12,400SF12,400 SF
Rigid insulation, 2 in polyiso18,600SF18,600 SF
TPO roof membrane, 60 mil42,000SF420 SQ
Fiber cement lap siding 5/16 in9,800SF9,800 SF
Spray fireproofing, 1 hr, 1-1/2 in6,200SF6,200 SF
Total measured quantity—
Illustrative quantities. Waste factor applied as a separate line.
Termination bar and counterflashing included

What is thermal and moisture protection estimating?

Thermal and moisture protection estimating is the takeoff and pricing of CSI MasterFormat Division 07 scopes: waterproofing, insulation, roofing, siding, stucco, EIFS, fireproofing, firestopping and sealants. We measure from your plan set, tag lines to sheets, and deliver Excel and PDF organized by section with ZIP-adjusted material and labor pricing.

  • Units include SF, LF, squares, R-value, and EA for drains and boots
  • Typical waste factors range from 5–10% for membrane and 10–15% for batt
  • The most common costly miss is air barrier continuity at window and door frames

Division 07 is where a bid can look complete and still lose money, because the scope crosses six sub-trades that each read the drawings differently. We take off the waterproofing, insulation, roofing, siding, stucco, EIFS and fireproofing scopes as one Div 07 package, so the transition details that usually fall between two subs — membrane termination at grade, air barrier continuity at window frames, base flashing at roof curbs — are priced in one place instead of assumed by nobody.

Deliverable
Excel estimate + marked-up PDF plans
Organized by
CSI MasterFormat section
Turnaround
24–48 hours for most projects
Pricing
ZIP-code-adjusted material and labor pricing
Software
Bluebeam Revu, PlanSwift, RSMeans data

You need this takeoff when you are bidding a Div 07 package, when a GC asks you to carry a division you do not normally self-perform, or when your own estimator is buried and the bid date is inside the week. We measure from your plan set, tag every line to the sheet it came from, and organize the output by CSI MasterFormat section so it drops into your bid form without reformatting. Roofing membrane, standing seam metal roofing, vapor barrier and below-grade waterproofing quantities are separated by assembly, and every line carries square feet, linear feet or roof squares as the unit of measure so your pricing sheet stays consistent.

If your scope touches adjacent work, we flag it: the Waterproofing Estimating Services and Insulation Estimating Services pages cover those sub-scopes in more detail, and the Trade Estimating Services by CSI Division page shows how Div 07 lines up with Div 03, 04 and 05. We also cross-check U-value and UL fire ratings and FM approvals against the spec schedule before the takeoff is released, and note where a listed assembly changes the accessory count.

We use Bluebeam Revu, PlanSwift and RSMeans data, with material and labor pricing adjusted by ZIP code. Turnaround is 24–48 hours for most projects, with rush available.

Services

What the Div 07 thermal and moisture protection takeoff covers

We measure the full parent division from below-grade membrane to roof edge metal, plus the sub-scopes most subs bid separately. The list below is what lands in the Excel workbook. Anything outside it is named in the exclusions with a pointer to the division that owns it.

Waterproofing Takeoff

Below-grade sheet, cementitious and reactive waterproofing measured by wall area, footing width and SF.

SF · LF · EA

Insulation Takeoff

Batt, board and spray foam insulation priced by R-value, cavity depth and net area.

SF · R-value

Roofing Takeoff

TPO, EPDM, mod-bit, BUR and shingle roofing measured by square with flashing and edge metal.

SQ · LF · EA

Siding Takeoff

Vinyl, fiber cement and metal panel siding measured by wall area with trim and soffit lineal feet.

SF · LF

Stucco & EIFS Takeoff

Three-coat stucco and EIFS systems measured by wall area, including control joints and casing beads.

SF · LF

Fireproofing Takeoff

Spray-applied fire-resistive material tracked by member type, hourly rating and thickness.

SF · LF · HR

Firestopping Takeoff

Rated penetration firestopping counted by penetration type, size and assembly listing.

EA · LF

Joint Sealants Takeoff

Sealants measured by joint length and bead width, including backer rod and primer.

LF · width

What every thermal & moisture protection estimating takeoff includes

  • 07 11 00 — dampproofing and 07 13 00 sheet waterproofing, by wall area and footing width
  • 07 16 00 — cementitious and reactive waterproofing, by SF and bag count
  • 07 21 00 — batt, board and spray foam insulation, by R-value and cavity depth
  • 07 22 00 — roof and deck insulation, cover board, taper and crickets at drains
  • 07 25 00 / 07 26 00 / 07 27 00 — weather barrier, vapor retarder and air barrier, by wall area
  • 07 31 00 — shingles and shakes, by square, with starter, ridge and hip lineal feet
  • 07 41 00 / 07 51 00 / 07 53 00 / 07 54 00 — metal panel, BUR, mod-bit and single-ply roofing, by square
  • 07 60 00 — flashing and sheet metal: base, counter, step, drip edge, gravel stop, coping
  • 07 81 00 — spray-applied fire-resistive material, tracked by member type and hourly rating
  • 07 84 00 — firestopping at rated penetrations, by penetration type and size
  • 07 92 00 — joint sealants, by LF of joint and bead width
  • Roof drains, scuppers, vents, pipe boots and curb flashings, counted by size
How we work

How we take off a Div 07 package in PlanSwift

  1. Read the assembly specsWe start at the specification sections, not the plans, because the assembly build-up drives the quantity. A 07 21 00 section that calls for 2 in polyiso plus a 1/2 in cover board is two line items and two fastener counts, not one. We note the vapor retarder class and permeance requirement for the project climate zone before measuring anything.
  2. Set the takeoff layersIn Bluebeam Revu we build separate layers for membrane, insulation, barrier, flashing and penetrations, keyed to the architectural and roof plans. Deduct rules are set at the start: openings over 10 SF come out of wall area, roof curbs stay in as separate EA, and parapet inner and outer faces are measured independently.
  3. Measure field, then detailsField area is fast; the money is in the details. We trace base flashing at every roof-to-wall junction, count termination bar at the top of below-grade membrane, and measure cant and fillet at inside and outside corners. Penetration boots, pitch pans and equipment curb flashings are counted individually from the roof plan.
  4. Price with ZIP-adjusted dataMaterial and labor are priced from RSMeans data adjusted to the project ZIP code. Board, batt and membrane carry waste factors as separate lines so you can see them. Access equipment — boom lift, swing stage, pump for spray foam — is priced as its own line rather than buried in the square-foot rate.
  5. Reconcile the sub-scopesBefore the workbook is released we check the seams: air barrier continuity at window and door frames, membrane termination at grade, base flashing at roof curbs, firestopping at every rated penetration. Where a detail crosses into another trade, we note it in the workbook so your bid carries it or excludes it in writing.
  6. Mark up and deliverEvery quantity is tagged to the sheet and detail it came from, and the plan set is returned marked up so you can trace any line back. The workbook is organized by CSI section with a summary tab by sub-scope, so you can split waterproofing, roofing and fireproofing into separate bid packages without re-keying.

What we need from you

  • Full plan setArchitectural, roof, foundation and wall sections, plus the reflected ceiling plan where spray fireproofing is rated.
  • Spec sectionsDivisions 07, 03, 05 and 09 as they apply, so we can see the assembly build-up and who carries each layer.
  • Bid formYour bid form or schedule of values, so the takeoff comes back in the line structure you have to submit.
  • Roof planThe roof plan drives drains, curbs, crickets and taper. Without it we estimate penetration counts from sections.
  • Wage and union statusPrevailing wage, union or open shop changes the labor rate and can change the membrane system you can afford.
  • Project ZIP codeMaterial and labor pricing is adjusted by ZIP code, so the same square footage prices differently across markets.
  • Access constraintsOccupied building, tight site, height over 40 ft or no crane access all change the access line and the production rate.
Sample output

Sample takeoff output

This is the format a Div 07 workbook comes back in. Quantities are illustrative and every line is tagged to the sheet it was measured from.

Sample format — illustrative quantities
SectionLine itemQtyUnitRef.
07 13 00Sheet waterproofing, 60 mil, vertical foundation wall12,400SFA-201
07 21 00Batt insulation, R-21, 5-1/2 in stud cavity18,600SFA-501
07 54 00TPO membrane, 60 mil, mechanically attached420SQR-101
07 60 00Base flashing, 24 ga. Kynar, roof-to-wall1,180LFR-102
07 81 00Spray fireproofing, 1 hr beam, 1-1/2 in thick6,200SFS-301
07 84 00Firestopping, 4 in pipe through rated wall84EAFP-201
07 11 00Dampproofing, bituminous, foundation wall8,200SFA-202
07 22 00Roof insulation, 2 in polyiso, adhered42,000SFR-103
07 92 00Joint sealant, 1/2 in bead, control joints2,400LFA-601
07 31 00Asphalt shingles, 30 yr, with starter and ridge180SQR-104

Units of measure: square feet, linear feet and roof squares

Div 07 quantities do not all reduce to one unit, and mixing them up is how a bid gets short. These are the units we measure and report, with the drawing basis for each.

ItemUnitHow it's measured
Below-grade membraneSFWall area from footing top to finish grade, plus horizontal membrane by footing width
Board and batt insulationSFNet wall or ceiling area, deducting openings over 10 SF
Spray polyurethane foamBFCavity depth in inches times area, converted to board feet
Roof membraneSQField area in 100 SF squares, with perimeter and penetration details separate
Flashing and edge metalLFDeveloped length along walls, curbs, parapets and roof edges
Roof drains and penetrationsEACounted by size and type from the roof plan
Spray fireproofingSFSurface area by member size and hourly rating, thickness in inches
FirestoppingEACounted by penetration type, pipe or cable size and rating

Worked example: takeoff for a small commercial roof

This example walks through a Div 07 takeoff for a 100 ft by 80 ft low-slope roof with a 2 ft parapet. All dimensions are illustrative. We show every calculation so you can see how quantities are derived and where waste is applied as a separate step.

Step 1 — Measure field area.

  • Roof plan shows a rectangle 100 ft x 80 ft.
  • Field area = 100 ft x 80 ft = 8,000 SF.
  • Convert to squares: 8,000 SF ÷ 100 = 80 SQ.

Step 2 — Measure parapet flashing.

  • Parapet runs along all four sides: perimeter = 2 x (100 ft + 80 ft) = 360 LF.
  • Flashing height: 2 ft up the parapet plus 8 in over the roof edge = 2.67 ft.
  • Base flashing area = 360 LF x 2.67 ft = 961 SF.
  • Convert to LF of flashing: 360 LF (measured along the wall).

Step 3 — Count penetrations.

  • Roof plan shows: 4 roof drains, 2 pipe boots, 1 equipment curb, 1 vent stack.
  • Total = 8 EA.

Step 4 — Measure insulation.

  • Roof insulation covers field area minus curb opening (4 ft x 6 ft = 24 SF).
  • Net insulation area = 8,000 SF – 24 SF = 7,976 SF.
  • Convert to squares: 7,976 SF ÷ 100 = 79.76 SQ.

Step 5 — Apply waste factors.

  • Membrane waste: 5% for TPO. 80 SQ x 1.05 = 84 SQ.
  • Insulation waste: 3% for board. 79.76 SQ x 1.03 = 82.15 SQ.
  • Flashing waste: 5% for metal. 360 LF x 1.05 = 378 LF.

Step 6 — Summarize quantities.

SectionLine itemQtyUnit
07 54 00TPO membrane, 60 mil84SQ
07 22 00Roof insulation, 2 in polyiso82.15SQ
07 60 00Base flashing, 24 ga. Kynar378LF
07 60 00Counterflashing, 24 ga. Kynar378LF
07 54 00Roof drains4EA
07 54 00Pipe boots2EA
07 54 00Equipment curb flashing1EA
07 54 00Vent stack flashing1EA

Step 7 — Price. Material and labor are priced from RSMeans data adjusted to the project ZIP code. Access equipment is priced separately. The final workbook shows each line with material and labor split, so you can adjust rates or quantities as needed.

This is the level of detail we provide for every Div 07 takeoff. The dimensions here are illustrative; your project will have its own measurements.

Cost drivers

What moves the thermal and moisture protection cost estimating number

Relative impact on a typical estimate for this trade, based on estimator judgment. Select a bar for details.

Scale: 1 = minor, 5 = major relative impact. Estimator judgment, not measured data.
Relative impact 5 / 5

Assembly build-up

A wall that adds a 1/2 in cover board over 2 in polyiso adds a second material line, a second fastener count and a second labor pass. The square footage barely changes, but the installed cost per SF can move by a third. We price each layer separately so you can see which one is driving the bid.

Assembly build-up

A wall that adds a 1/2 in cover board over 2 in polyiso adds a second material line, a second fastener count and a second labor pass. The square footage barely changes, but the installed cost per SF can move by a third. We price each layer separately so you can see which one is driving the bid.

Roof system choice

TPO, EPDM, mod-bit and standing seam metal price differently per square and carry different attachment methods, fastener counts and warranty terms. Mechanically attached, adhered and induction-welded assemblies also change the labor rate. The roof plan and the spec section together decide which one you are bidding.

Access and height

Below-grade membrane is priced off a ladder or scaffold; a 60 ft parapet is priced off a swing stage or boom lift. Access equipment is a real line item, and fall protection requirements change the crew size. We price access separately so you can see what the height is costing you.

Waste and over-application

Board and batt carry a typical waste factor, but spray foam and spray fireproofing carry an over-application allowance instead, because thickness is controlled in the field and inspectors check it. We show both as separate lines rather than burying them in the unit rate.

Warranty requirements

Manufacturer warranties on roofing and waterproofing often require an approved applicator, a specified minimum thickness, and inspection hold points during installation. Those requirements can add a manufacturer's representative inspection cost and limit which crews can install the work, which affects the labor rate.

Climate zone

The vapor retarder class and permeance requirement change with climate zone, and that changes the assembly. A Class I retarder under a slab is a different product and a different detail than a Class III retarder in a wall. We read the energy code notes on the plan set and price the assembly as specified.

Substrate and surface preparation

Concrete that needs grinding or patching before membrane, wood sheathing that needs a primer, and metal deck that needs a primer or a specific adhesive all add labor and material lines. We measure surface prep separately because it is often shown only in the spec section, not on the plan.

Scope gaps

Scope gaps we catch

Most Div 07 losses come from a detail that two trades each assumed the other was carrying. These are the ones we see most often, and where they hide.

  • Termination bar, sealant and counterflashing at the top of below-grade membrane. It hides in the wall section at the transition to framing, and it is usually the last detail on the sheet. We measure it as a separate LF line.
  • Protection board over vertical membrane before backfill. It appears in the spec section but not on the plan, so it never gets measured. We add it as a separate SF line keyed to the waterproofing area.
  • Cants, fillets and base flashing at inside and outside roof corners. These are drawn on the roof plan details but rarely measured. We trace each corner and count the LF of cant and base flashing.
  • Roof penetration boots, pitch pans and equipment curb flashings. They are on the roof plan as symbols, not dimensions. We count each one by size and type, including the ones shown only on the mechanical plan.
  • Tapered insulation and cricket fill around drains. The roof plan shows the drain but not the taper. We compute the average thickness from the slope and price the fill by SF and by CY where lightweight concrete is used.
  • Fasteners, plates, adhesives and seam tape. They are separate from board SF and are usually listed in the spec under accessories. We carry them as their own line so they do not disappear into the unit rate.
  • Air barrier continuity at transitions to window, door and roof assemblies. This crosses into [Openings Estimating Services](/openings-estimating-services/) and [Interior & Exterior Finishes Estimating](/interior-exterior-finishes-estimating/), so each trade assumes the other has it. We flag it in the workbook as a coordination item.
  • Firestopping at every rated penetration, not just the mechanical and electrical ones. Sprinkler, data and duct penetrations are often missed. We count them by penetration type and size from the rated wall and floor plans.
  • Roof edge metal, gravel stop and coping. These are often shown on architectural elevations but not on the roof plan, so they get missed. We measure LF of edge metal, including splice plates and cleats, and price it as a separate line.

Div 07 systems: unit of measure, waste, and accessories

Each system has its own unit, typical waste factor, and accessory items that must be carried. This table helps you compare and ensure nothing is missed.

SystemUnitTypical waste factorAccessories to carry
Below-grade membrane (sheet)SF5–10%Termination bar, protection board, mastic, seam tape
Below-grade membrane (fluid-applied)SF3–5%Primer, reinforcing fabric, protection board
Batt insulationSF3–5%Vapor retarder, tape, fasteners
Rigid board insulationSF3–5%Fasteners, washers, tape, sealant
Spray polyurethane foamBF5–10% over-applicationMasking, primer, thermal barrier
TPO membraneSQ5%Fasteners, plates, seam tape, termination bar
EPDM membraneSQ5%Adhesive, splice tape, termination bar
Modified bitumenSQ5–7%Mastic, flashing cement, fasteners
Standing seam metal roofSQ3–5%Clips, underlayment, sealant, trim
Fiber cement sidingSF5–10%Corner trim, starter strip, J-channel, fasteners
Spray fireproofing (SFRM)SF10–20% over-applicationMasking, primer, adhesive
Intumescent coatingSF5–10%Primer, topcoat, masking
Codes and standards

Codes and standards that affect Div 07 takeoffs

Model codes

Div 07 work is governed by the International Building Code (IBC) and International Residential Code (IRC), with energy provisions in the International Energy Conservation Code (IECC). The IBC sets requirements for weather protection, fire ratings, and moisture control. The IECC dictates insulation R-values and vapor retarder classes by climate zone. For roofing, the IBC references wind uplift and fire classification. Fireproofing requirements come from IBC Chapter 7 based on building type and hourly ratings. Confirm the adopted code edition with your local building department, as editions vary by jurisdiction. The National Electrical Code (NEC) may affect firestopping at electrical penetrations, and the International Plumbing Code (IPC) affects roof drainage.

Industry standards

ASTM standards define material properties and test methods: ASTM D4434 for PVC roofing, ASTM D4637 for EPDM, ASTM E96 for vapor transmission, ASTM E84 for surface burning. NRCA provides installation guidelines for roofing systems. SMACNA covers sheet metal flashing. For fireproofing, ASTM E119 and UL 263 test hourly ratings. Insulation standards include ASTM C578 for rigid foam and ASTM C665 for mineral fiber. These standards are referenced in specifications and affect which products qualify and how they are installed, which impacts labor and material costs.

Specification sections

CSI MasterFormat Division 07 sections must be read in full. Key sections: 07 11 00 Dampproofing, 07 13 00 Sheet Waterproofing, 07 21 00 Thermal Insulation, 07 22 00 Roof and Deck Insulation, 07 25 00 Weather Barriers, 07 26 00 Vapor Retarders, 07 27 00 Air Barriers, 07 31 00 Shingles, 07 51 00 Built-Up Roofing, 07 53 00 Elastomeric Membrane Roofing, 07 54 00 Thermoplastic Membrane Roofing, 07 60 00 Flashing and Sheet Metal, 07 81 00 Applied Fireproofing, 07 84 00 Firestopping, 07 92 00 Joint Sealants. Each section specifies products, thicknesses, and installation methods that change quantities and unit costs. For example, a 07 21 00 section may require a specific R-value and fastener pattern, adding labor.

Local amendments

Local jurisdictions may amend model codes, changing insulation requirements, fire ratings, or wind uplift. Coastal areas often have stricter wind requirements, affecting fastener counts and membrane attachment. Some states adopt older editions of the IECC, altering vapor retarder requirements. Fireproofing thickness may be adjusted by local amendments. Always confirm the adopted code edition and amendments with the local building department before finalizing your bid. Our estimates are based on the code information you provide, but we recommend verifying with the authority having jurisdiction.

Who we provide estimates for

Who sends us Div 07 plans

Waterproofing and roofing subcontractors

You bid the same assemblies repeatedly and need the detail quantities — termination bar, base flashing, penetration boots — measured the same way every time. The workbook drops into your bid form by CSI section, so you can adjust the field labor rate without rebuilding the takeoff.

General contractors carrying Div 07

You are assembling a bid with a division you do not self-perform, and you need to know what a complete Div 07 number looks like before you compare sub quotes. We show the scope gaps so you can see which quote is missing what.

Insulation and siding contractors

Your scope depends on the wall assembly and the opening deductions, and the air barrier transition is usually someone else's line. We measure net wall area with the deduct rules stated, and flag the transitions that cross into openings and finishes.

Fireproofing and firestopping subcontractors

Spray fireproofing is priced by member size and hourly rating, and firestopping is priced by penetration type. Both are easy to undercount from a floor plan. We track them by rating and by penetration schedule so the quantity holds up at inspection.

Developers and owners

You are comparing Div 07 numbers across bidders and need to know whether the spread is scope or price. A line-by-line takeoff by CSI section shows which bidder excluded the protection board, the taper or the firestopping.

Where we provide estimates

Thermal & Moisture Protection Estimating in 20 states

Pricing is adjusted to the project ZIP code. Select a highlighted state to see the cities we cover there.

States we coverSelected
TX

Thermal & Moisture Protection Estimating in Texas

Nation's largest construction market; Sun Belt population growth, data centers, semiconductor plants, and single-family home building.

Texas estimating services
Property types

Project types and what changes in the takeoff

The Div 07 scope shifts with building type, height, and occupancy. These are common project types we estimate and the key differences in the takeoff.

Low-rise commercial (1–3 stories)

Roof area drives membrane and insulation quantities; wall area moderate; fireproofing only at rated assemblies.

Watch for: Check parapet flashing height and roof drain count; confirm insulation thickness from energy code.

High-rise residential

Large wall area for air barrier and insulation; many window and door penetrations; fireproofing at structural members.

Watch for: Window and door transitions create air barrier continuity gaps; firestopping at every rated penetration.

Warehouse / industrial

Large roof area with few penetrations; minimal wall insulation unless conditioned; fireproofing on columns and beams.

Watch for: Roof expansion joints and large equipment curbs; verify fireproofing rating and thickness.

Healthcare / hospital

Complex roof with many penetrations; strict air barrier and vapor retarder requirements; firestopping at every rated wall.

Watch for: Mechanical screens and equipment curbs; infection control during installation may add labor.

Education / school

Moderate roof area; fireproofing at gymnasium and auditorium structures; insulation for energy code.

Watch for: Roof access and fall protection; firestopping at rated corridors and shafts.

Parking garage

Traffic coating on decks (Div 07 18 00) and waterproofing at plaza decks; insulation only if conditioned.

Watch for: Deck preparation and slope to drains; protection board at planters.

Mixed-use

Combination of roof types (TPO over retail, shingle over residential); varied wall assemblies.

Watch for: Transition details between roof systems; air barrier continuity at different wall types.

Deliverables

What you receive

  • Excel workbook organized by CSI MasterFormat section, with a summary tab by sub-scope and a separate waste and accessory tab.
  • PDF takeoff report with the same line items, formatted for printing and for attaching to a bid.
  • Marked-up plan set showing every measured area, lineal foot and counted item tagged to the sheet and detail it came from.
  • Line-item pricing with material and labor split, using ZIP-code-adjusted RSMeans data.
  • Scope-gap memo listing the details that cross into other trades, with the division that owns each one.
  • Access and equipment line items priced separately from the installed material and labor.
  • Rush turnaround available when the bid date is inside 24 hours.
Checklist

Pre-bid checklist for Div 07 scopes

  • Confirm the vapor retarder class and permeance for the climate zone.
  • Check roof plan for drains, scuppers, and penetration count.
  • Verify insulation R-value and thickness in wall and roof sections.
  • Review spec sections for accessory items (fasteners, tape, sealant).
  • Measure termination bar and counterflashing at membrane top.
  • Count firestopping at every rated penetration, not just MEP.
  • Check air barrier continuity at window and door openings.
  • Note access constraints: height, occupied building, crane availability.
  • Confirm waste factors and over-application allowances with spec.
  • Verify manufacturer warranty requirements and approved applicator.
  • Check for prevailing wage or union labor requirements.
  • Review local amendments for wind uplift and fire ratings.
Client reviews

What clients say about Scope Precision Estimate

10 client reviews
SH
Steven HarrisCommercial Builder

The quality of the estimate exceeded our expectations. Their detailed breakdown of labor, materials, and project costs gave us confidence in our bid.

MA
Michael AndersonGeneral Contractor

The cost estimate was detailed, accurate, and easy to understand. It helped us prepare our bid confidently and stay competitive without overlooking important costs.

AW
Andrew WilsonGeneral Contractor

Highly recommended for construction cost estimating. The quantities were accurate, the pricing was well organized, and the final report was easy to review.

MD
Matthew DavisConstruction Manager

Their construction estimate was thorough and professionally prepared. It made our budgeting process much easier and helped us identify potential cost issues early.

CM
Christopher MillerResidential Builder

We needed a quick and accurate construction cost estimate, and they delivered exactly what we needed. Great attention to detail and a very responsive team.

BT
Brian TaylorProject Estimator

Fast, accurate, and dependable estimating service. They understood the project requirements quickly and provided a detailed estimate without unnecessary delays.

FAQ

Thermal & Moisture Protection Estimating questions

What is the turnaround time for a Div 07 takeoff?

Most projects are completed in 24–48 hours. Rush service is available if your bid date is sooner. The time depends on the size and complexity of the project, and how quickly we receive complete plans and specs. We start as soon as we have the necessary documents and will confirm the delivery time when you send them. For a typical low-rise commercial roof, we can deliver within 24 hours if plans and specs are provided in PDF. Larger projects with multiple buildings may take up to 48 hours. We will give you a firm delivery time when we review your documents.

What file formats do you deliver?

We deliver an Excel workbook organized by CSI MasterFormat section, with a summary tab by sub-scope and a separate tab for waste and accessories. You also get a PDF takeoff report and a marked-up plan set showing every measurement. The Excel file is formatted so you can drop it into your bid form without reformatting. Each line item includes the CSI section number, description, quantity, unit, material cost, labor cost, and total. The marked-up plan set uses Bluebeam Revu and shows dimensions, counts, and annotations for each takeoff item.

Do you price the takeoff or just provide quantities?

We provide both quantities and pricing. Material and labor are priced using RSMeans data adjusted to the project ZIP code. We show material and labor as separate lines, and waste and access equipment are listed separately. If you prefer to use your own pricing, you can easily replace our rates with yours in the Excel workbook. Our pricing includes ZIP-code adjustments for material and labor, so you get costs that reflect your local market. We also note any assumptions about productivity or crew size.

How do you handle waste factors?

Waste factors are applied as separate line items so you can see them. Typical waste factors vary by material: 5% for membrane, 3–5% for insulation, 5–10% for siding. For spray-applied products like foam and fireproofing, we show an over-application allowance instead. These are based on industry standards and can be adjusted to match your experience. For example, TPO membrane waste is typically 5%, but if your project has many penetrations, we may increase it to 7%. We list waste separately so you can adjust it in the Excel workbook.

Can you split the takeoff by sub-trade?

Yes. The Excel workbook includes a summary tab by sub-scope, so you can separate waterproofing, insulation, roofing, siding, and fireproofing into individual bid packages. Each line item is tagged to its CSI section, making it easy to filter and subtotal by trade. For example, all 07 11 00 and 07 13 00 items are grouped under waterproofing, while 07 21 00 and 07 22 00 items are under insulation. This allows you to send specific scopes to subcontractors without sharing the entire estimate.

What if my project has unique details not covered in the specs?

We measure from the drawings and specifications you provide. If a detail is unclear or missing, we will note it in the scope-gap memo and estimate based on typical industry practice. You can then adjust the quantity or clarify with the design team. We flag any assumptions we make so you can review them. For example, if a roof transition detail is not shown, we will assume a standard flashing detail and note it. This ensures you are aware of potential gaps before you bid.

Do you account for local code requirements?

We read the code notes on your plan set and specifications, such as climate zone for vapor retarders or wind uplift requirements. However, we do not independently verify local amendments. We recommend you confirm the adopted code edition with your local building department, as requirements can vary and affect quantities like insulation thickness or fastener patterns. For instance, if your project is in a high-wind area, the fastener spacing may be tighter, increasing material and labor. We rely on the code information you provide.

How do you handle access equipment and scaffolding?

Access equipment such as boom lifts, swing stages, and scaffolding is priced as separate line items, not buried in the unit rate. We consider project height, site constraints, and duration. If you have a preferred method or equipment, let us know and we will price accordingly. This allows you to see the cost impact of access and adjust if needed. For example, a 5-story building may require a 60-ft boom lift, which we price by the day or week. We also account for mobilization and setup time.

What information do you need to start a takeoff?

We need the full plan set (architectural, roof, foundation, wall sections), specification sections (especially Div 07, 03, 05, 09), your bid form or schedule of values, project ZIP code, and any special requirements like prevailing wage or access constraints. The more complete the information, the faster and more accurate the takeoff. If you have a scope sheet or a list of subcontractors you plan to use, that helps us format the deliverable. We also need to know the bid date so we can prioritize your project.

Can you provide a takeoff for just one sub-scope, like roofing only?

Yes. While we specialize in full Div 07 packages, we can take off individual sub-scopes such as roofing, waterproofing, insulation, siding, stucco/EIFS, or fireproofing. The deliverable format remains the same, organized by CSI section. This is useful if you only need a specific trade or want to check a single scope. For example, if you are bidding only the roofing package, we will focus on sections 07 51 00 through 07 60 00 and provide a detailed takeoff with quantities and pricing for that scope only.

How do you handle firestopping quantities?

Firestopping is counted by penetration type and size, based on the rated wall and floor plans. We count each penetration, including those for mechanical, electrical, plumbing, and data. The quantity is reported as each (EA) and priced by type. This ensures you capture all required firestopping, which is often undercounted. For example, a 2-hour rated wall may have 10 pipe penetrations and 5 cable trays, each requiring a specific firestop system. We list them separately so you can price accurately.

What is your accuracy rate?

We do not publish a specific accuracy rate, as it depends on the quality of the plans and specifications. Our takeoffs are based on precise measurements from the documents you provide, using industry-standard methods. We mark up the plan set so you can trace every quantity. If you find discrepancies, we will review and adjust. For example, if you find a missing penetration, we will add it and reissue the takeoff. We stand behind our work and aim for continuous improvement based on client feedback.

Can you provide a thermal and moisture protection quantity takeoff only, without pricing?

Yes. We deliver a quantity takeoff in Excel with each line tagged to the sheet it came from, plus a marked-up plan set in PDF. Quantities are reported in square feet, linear feet or roof squares depending on the assembly. If you want pricing added later, we can apply RSMeans data with ZIP-code adjustment to the same takeoff without re-measuring.

How does your thermal and moisture protection estimator handle UL fire ratings and FM approvals?

We read the roof and wall assembly schedules against the spec, then confirm that the roofing membrane, insulation and cover board combination matches the listed UL fire rating and FM approval. Where the spec calls out a specific assembly number, we take off to that number and flag any substitution that would change the accessory count or fastening pattern.

Do you offer outsourced thermal and moisture protection estimating for contractors bidding several Div 07 packages at once?

Yes. We take multiple plan sets in parallel and keep each project's takeoff in its own workbook, organized by CSI MasterFormat section. That lets your estimating team compare waterproofing, insulation and roofing quantities across bids without mixing scopes. Turnaround is 24–48 hours for most projects, with rush available when bid dates overlap.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning. is a Senior Estimator with more than 15 years of professional experience in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Guides on this topic

Related services

Ready to send your Div 07 plans?

Send your plan set and specs today and get a marked-up takeoff with quantities and pricing in 24–48 hours.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote