Multifamily Takeoff
Podium and wrap projects, unit-mix repetition, NFPA 13 rough-in and common-area finishes measured by floor.
SF · EA · LFWe produce line-item estimates and quantity takeoffs for Scottsdale builders — residential, multifamily and commercial — organized by CSI MasterFormat division in Excel and PDF, typically in 24–48 hours.
Scottsdale bids turn on caliche and decomposed granite excavation, Maricopa County dust-control and grading requirements, post-tension slab pricing, tile and standing-seam roofing for monsoon exposure, and City of Scottsdale design-review submittals on hillside and infill lots. Multifamily volume, not custom homes, sets the pace here.
Scottsdale sits at the northeast edge of the Phoenix metro, where the 2025 permit year ran heavily toward attached product: 2,061 new privately-owned residential units were permitted, 1,692 of them multifamily, at a permitted value of $625M. That mix shapes how bids are built. A 300-unit podium project on a former golf-course parcel and a custom home on a hillside lot in the McDowell Mountain foothills do not price the same way, and neither prices like a slab-on-grade tract house in Gilbert.
We take off from your plan set — architectural, structural, civil, MEP — and return quantities with waste factors, ZIP-code-adjusted material and labor pricing, and a marked-up plan set showing what was measured. If you are weighing a Scottsdale bid against work in Tucson or Chandler, we can keep the formats consistent so the comparison is real. Start from the Arizona construction estimating page for statewide context, or send plans through Get an estimate.
For bidders. GCs and subs chasing Scottsdale work need a takeoff they can defend line by line. We return division-coded quantities, waste factors and marked-up plans so your bid holds up in a scope review.
For builders. Builders use our takeoffs for buyout and change-order pricing. Multifamily and custom residential scopes come back sorted by trade, with unit rates you can carry into subcontractor negotiations.
For owners. Owners and developers get an independent budget check before design is frozen. We flag the divisions where Scottsdale site conditions — caliche, grading, drainage — typically move the number.
Select a bar to compare Scottsdale with the largest Arizona markets we cover.
2,061 new housing units in 2025 (+56.1% vs 2024).
369 single-family · 1,692 multifamily (82%).
Of the 2,061 residential units permitted in Scottsdale in 2025, 1,692 were multifamily — about 82% — against 369 single-family units. Total units rose 56% from 1,320 the prior year, and permitted value reached $625M, an average of $303,200 per unit. For bidders, that means the competitive field is podium and wrap multifamily, not scattered custom homes, and the estimate has to reflect it: Type III and Type V wood over concrete podium, NFPA 13 sprinkler rough-in, elevator and trash-chute coordination, and unit-mix repetition that lets you amortize formwork and rough-in across floors. Scottsdale ranks 5th of 24 covered state cities by units and accounts for 5.5% of the 37,209 units permitted statewide, so a Scottsdale loss is a meaningful share of an Arizona backlog. See how the rest of the metro stacks up on our Mesa construction estimating page.
Scottsdale lots along the McDowell and McDowell Mountain foothills carry caliche, decomposed granite and slope, so excavation, rock removal, over-excavation and retaining walls belong in the Sitework Estimating Services scope, not in a contingency line. Post-tension slab pricing is standard for the valley's expansive soils, and drainage and dust-control measures during grading are inspected by Maricopa County. On the vertical side, monsoon exposure pushes tile and standing-seam roofing specifications, and block-and-stucco exteriors with foam or batt insulation are common. Hillside and infill projects also run through City of Scottsdale design review before permit, which affects schedule rather than hard cost — but a delayed start shifts your material pricing window. Confirm the adopted code edition with the city's building department before you lock allowances.
We measure from your drawings and specifications, apply ZIP-code-adjusted pricing, and return division-coded quantities with a marked-up plan set.
Podium and wrap projects, unit-mix repetition, NFPA 13 rough-in and common-area finishes measured by floor.
SF · EA · LFCustom and production homes, including post-tension slabs, block-and-stucco exteriors and tile roofing.
SF · LF · EACaliche and decomposed granite excavation, over-excavation, retaining walls and drainage for foothill lots.
CY · SF · LFFoundations, post-tension slabs, podium decks and hardscape, with formwork and reinforcing separated.
CY · SF · TONWood and light-gauge framing by member size and spacing, with sheathing, hardware and waste factors.
LF · SF · EAMechanical, electrical and plumbing rough-in by fixture and device count for multifamily and commercial scopes.
EA · LF · TONTile, standing-seam and low-slope membrane systems detailed for monsoon exposure and valley heat.
SF · SQ · LFRetail, office and hospitality shells and fit-outs, including design-review-driven scope adjustments.
SF · EA · LSGCs bidding podium multifamily and custom hillside homes in Scottsdale need division-coded quantities they can defend in a scope review. We return marked-up plans and waste factors for each trade.
Scottsdale concrete, framing and MEP subs use our takeoffs to price labor against ZIP-adjusted local rates. Unit counts and lineal footage come back in the format your foreman already uses.
Developers evaluating infill parcels near Old Town or the Airpark need an independent budget before land close. We flag the divisions where caliche, grading and drainage move the number.
Architects on Scottsdale custom residential and mixed-use work use our takeoffs for cost checks at design milestones. Quantities are traceable to the sheet and detail you drew.
Owners comparing bids on a Scottsdale multifamily or office renovation get a neutral quantity baseline. We separate scope gaps from real price differences between contractors.
Scottsdale builders pricing additions, ADUs and whole-home remodels use our takeoffs for buyout and change orders. We measure existing conditions from your as-built or scan.
We take off Scottsdale projects across Maricopa County, from infill lots near Old Town to hillside parcels in the McDowell Mountain foothills. Plans from nearby East Valley cities are priced on the same format.
The 2025 permit mix in Scottsdale ran 82% multifamily, with 1,692 attached units against 369 single-family. That split drives what we measure most: podium and wrap apartments, then custom hillside homes.
Wood-framed apartments over concrete podium, typically Type III or V construction. We take off per-unit quantities for framing, MEP rough-in, drywall and finishes, plus the podium slab and site retaining walls.
Watch for: Podium waterproofing, unit-turn finishes, balcony railings
Custom residences on sloped lots in the McDowell Mountain foothills. Quantities follow stepped footings, retaining walls, structural steel and long retaining runs that tract plans never show.
Watch for: Stepped footings, caisson depth, haul-off quantities
Whole-home remodels and additions in established Scottsdale neighborhoods. We measure selective demolition, structural modifications and upgraded finishes from as-built plans or a laser scan.
Watch for: Demo tonnage, temporary shoring, match-existing finishes
Ground-floor retail under residential, plus restaurant and office fit-outs near Old Town. Takeoffs split shell-and-core from tenant improvements so each budget line is priced separately.
Watch for: Grease interceptors, hoods, storefront glazing
Resort renovations, casitas and amenity buildings. We measure guest-room prototypes, exterior hardscape and pool decks, then extend unit counts across the building footprint.
Watch for: Pool shells, shade structures, FF&E blockouts
Warehouse, flex and light-industrial buildings in the Scottsdale Airpark area. Slab thickness, tilt-up panels, dock equipment and racking loads are measured from the structural set.
Watch for: Slab flatness, tilt panel reveals, dock levelers
Scottsdale pricing moves on soil, slope and the city's own plan-review sequence. These are the six drivers we check on every takeoff before the number goes out.
Scottsdale reviews residential and commercial permits through its own development services process, and hillside or environmentally sensitive parcels can trigger additional submittals. Review timelines affect general conditions and escalation, so we carry a line for extended permit duration. Confirm the adopted code edition and any local amendments with the city building department before you lock the schedule.
City of Scottsdale · Maricopa County · IBC · IECCMuch of north Scottsdale sits on caliche and cemented alluvium that refuses a standard trench. We measure over-excavation, replacement import and rock removal separately from structural fill, because those lines can swing the earthwork division by a wide margin. A geotechnical report is the input we ask for first on any hillside or foothills parcel.
Geotechnical report · Caliche · Over-excavation · Import fillSummer heat limits concrete placement windows and drives cooling cost on occupied renovations. Monsoon storms in July through September put a premium on roof drainage, scuppers and site retention, and dust control is a standing line item on graded parcels. We carry temporary cooling, dust palliative and stormwater BMPs as separate quantities.
Monsoon season · Dust palliative · SWPPP · Roof drainageScottsdale competes for the same East Valley trades as Mesa, Chandler and Gilbert, and the Phoenix metro's semiconductor and data-center work pulls crews away from residential. Our pricing is ZIP-code-adjusted so the labor component reflects the local market rather than a national average. On fast-track multifamily, we note where trade availability, not material, sets the bid.
RSMeans data · ZIP-code adjustment · East Valley trades · Phoenix metroHillside lots in the McDowell Mountain foothills need retaining walls, stepped pads and engineered drainage that flat-lot tract plans do not carry. We measure wall face area, footing volume and drainage runs from the civil set, and we separate them from the building structure. On infill lots near Old Town, the constraint is often offsite drainage and right-of-way improvements instead.
Retaining walls · Civil set · Right-of-way · DrainageMost Scottsdale projects draw concrete, masonry and framing material from Phoenix metro suppliers, so haul distance is short but delivery windows in summer start before dawn. Arizona transaction privilege tax treatment differs between a contractor as prime and material purchased directly by an owner, which changes the taxable base. We flag the tax assumption on the summary page so your bid carries it consistently.
Arizona TPT · Phoenix metro suppliers · Delivery windows · Taxable baseScottsdale's mix of hillside custom homes, mid-rise multifamily and tenant improvements means the same plan set produces very different quantities depending on the trade. These are the line items and adjustments we watch most closely when we build an estimate here.
Caliche layers in north Scottsdale and the McDowell foothills often require ripping and re-compaction before footings can be placed, and that shows up as extra hours in 31 23 16 trenching and 31 23 23 backfill. On sloped lots, cut and fill is rarely balanced, so we price import or export of fill by the cubic yard rather than assuming on-site balance. Dust control, SWPPP measures and temporary stabilization are separate line items in 31 10 00. For hillside pads, retaining walls in 31 32 19 are measured by face area, not linear feet, because stepped footings change the concrete volume. Our sitework takeoffs follow the same sequence used on Phoenix-metro work.
Wood framing dominates Scottsdale's single-family and low-rise work, but mid-rise multifamily in the city's core uses steel or concrete podium construction. In 06 10 00 we take off studs by linear foot, plates by piece, and sheathing by sheet with a waste factor, and we call out engineered lumber separately because I-joist and LVL pricing moves independently of dimensional lumber. Simpson-style connectors are counted per the schedules, not estimated by allowance. For steel, 05 12 00 is measured by weight from the member list, and we flag any delegated-design items so you know whether the fabricator or the erector owns them.
Tile and foam roofing are common on Scottsdale homes, and both are measured by square (100 square feet) with ridge, hip and valley trim by linear foot. Underlayment in 07 31 13 is a separate line because tile roofs are often re-felted without replacing tile. On commercial and multifamily, 07 54 00 single-ply is measured by area with perimeter and penetration allowances. Stucco in 09 24 00 is measured by wall area minus openings, and we track control joints by linear foot. Monsoon-driven rain and UV exposure mean flashing details at parapets and scuppers deserve their own lines rather than a percentage add.
Post-tensioned slabs are standard on expansive soils across the Salt River Valley, so 03 30 00 quantities must separate slab-on-grade from thickened edges and interior beams. We measure PT cable by linear foot and anchorages by count. Caliche excavation under footings is a common scope gap: the structural drawings show the footing, but the geotech report is what tells you how much over-excavation to price. Flatwork in 03 30 00 for driveways and walks is often a separate bid package on Scottsdale custom homes, and we keep it separate so the numbers stay comparable between bidders.
Scottsdale's summer design temperatures push HVAC equipment sizing and ductwork insulation above what plans from milder climates show, so 23 31 13 duct quantities and R-values need to match the mechanical schedule, not a generic allowance. In multifamily, we take off fixtures by unit type and stack them, because a 200-unit building with six plan types is a different labor picture than a single-family home. Electrical 26 05 19 feeders and 26 27 26 devices are counted per unit and per common area separately. Plumbing 22 11 16 distribution is measured by fixture count and developed length. MEP scopes are where we see the most bid-leveling problems.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Post-tensioned slab, 8 in. | 18,400 | SF |
| 03 30 00 | Thickened edges and beams | 1,240 | LF |
| 05 12 00 | Structural steel, podium framing | 86 | TON |
| 06 10 00 | Wood studs, 2x6 @ 16 in. OC | 9,800 | LF |
| 07 54 00 | TPO roof membrane, 60 mil | 18,900 | SF |
| 09 24 00 | Stucco, 3-coat, exterior | 14,200 | SF |
| 23 31 13 | Rectangular duct, galvanized | 3,600 | LB |
| 26 27 26 | Duplex receptacles, dwelling units | 412 | EA |
This example shows how we build a concrete quantity for a typical multifamily floor in Scottsdale. The dimensions are illustrative and do not come from a specific project. We start with the slab area from the structural plan, then apply thickness, waste and the PT tendon allowance separately so the concrete and the post-tensioning can be bid by different subcontractors.
Assume a rectangular floor plate 120 feet by 160 feet with an 8-inch post-tensioned slab, a 6-inch thickening at the perimeter, and a 4 percent waste factor on concrete. The slab area is 120 x 160 = 19,200 square feet. At 8 inches thick, the volume is 19,200 x (8/12) = 12,800 cubic feet. Dividing by 27 gives 474.07 cubic yards. Adding 4 percent waste gives 474.07 x 1.04 = 493.03 cubic yards.
| Step | Calculation | Result |
|---|---|---|
| Slab area | 120 ft x 160 ft | 19,200 SF |
| Slab volume | 19,200 x (8/12) | 12,800 CF |
| Volume in CY | 12,800 / 27 | 474.07 CY |
| Waste at 4% | 474.07 x 1.04 | 493.03 CY |
| Perimeter thickening | 2 x (120 + 160) = 560 LF | 560 LF |
| Thickening volume | 560 x (6/12) x 1.5 ft width | 420 CF |
| Thickening in CY | 420 / 27 | 15.56 CY |
| Total concrete | 493.03 + 15.56 | 508.59 CY |
Post-tensioning is taken off separately. Tendons are measured by linear foot along the slab, and anchorages by count at each stressing end. On a floor this size, the tendon layout usually runs in two directions, so we measure both directions and add for the dead-end and live-end anchorages shown on the shop drawings. We do not bundle PT into the concrete price because the two scopes are almost always awarded to different subcontractors. For a full building, this same process repeats per floor, and we stack the floors by typical and non-typical levels so the concrete and PT quantities stay separated in the final estimate. If you want this level of detail on your Scottsdale project, send the structural set and we will build the takeoff.
Pricing depends on project type, square footage and how many trades you want covered. We do not publish a flat rate because a tenant improvement and a mid-rise multifamily building take very different amounts of time. Send the plan set and the scope you want priced, and we will quote the fee before we start. Most projects are returned in 24–48 hours, with rush turnaround available when your bid date is close.
Most projects are delivered in 24–48 hours. Larger multifamily, industrial or full MEP packages can take longer, and we will tell you the expected date when we quote the fee. Rush turnaround is available for active bid dates. Deliverables come as Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets so you can trace every quantity back to the drawing.
We use Bluebeam Revu for plan review and markup, PlanSwift for quantity takeoff, and RSMeans data for cost reference. Material and labor pricing is adjusted by ZIP code so the numbers reflect the Scottsdale and Phoenix-metro market rather than a national average. When you have your own historical pricing, we can apply it instead of the RSMeans default.
Yes. We cover single-family custom homes, multifamily buildings, tenant improvements, retail, light industrial and sitework. Scottsdale's permit mix leans heavily toward multifamily, so we see a lot of podium and wrap construction, but we also price hillside custom homes in the northern part of the city. The takeoff format is the same either way: CSI divisions, measured quantities and clear units.
The permit figures on this page come from the U.S. Census Bureau Building Permits Survey for 2025. That survey counts new privately-owned residential units permitted by the city itself, not commercial permits and not additions or remodels. In 2025 Scottsdale issued 2,061 residential units, up 56 percent from 1,320 in 2024, with 1,692 of those units multifamily. The survey is a useful demand signal, but it is not a construction cost index.
Yes. Hillside work adds retaining walls, stepped footings, drilled piers and sometimes caissons, and those items need to be measured from the structural and geotech drawings rather than estimated by allowance. We separate sitework, foundation and structural quantities so you can see how much of the cost is driven by the slope. If the geotech report calls for over-excavation, we price it as its own line.
Send the architectural, structural, civil and MEP drawings, plus any specifications, schedules and the geotech report if you have it. If you have a bid date, tell us that up front so we can sequence the work. For tenant improvements, the landlord's shell drawings and the tenant's plans both matter, because the split of scope between them is where most gaps appear.
Yes. Along with Scottsdale, we cover Mesa, Chandler, Glendale, Gilbert, Tempe and Tucson. Soil conditions, labor rates and permitting differ across the metro, so a takeoff priced for one city does not automatically transfer to another. If your project spans multiple jurisdictions, tell us and we will note where the assumptions change.
Material and labor pricing is adjusted by ZIP code, and we flag sales tax as a separate consideration rather than burying it in the unit price. Arizona's transaction privilege tax works differently from a conventional sales tax, and rates vary by city, so you should confirm the current rate with your accountant or the Arizona Department of Revenue. We keep tax out of the bare cost and let you apply it at the bid level.
Yes, with the understanding that early sets produce allowances for undefined scope. We will mark which quantities are measured from the drawings and which are allowances, so you know where the risk sits. As the design develops, we can update the estimate and convert allowances to measured quantities. That staged approach is common on multifamily and commercial work in Scottsdale, where the permit set often follows the pricing set.
Send your plan set and bid date, and we will return a CSI-organized takeoff in Excel and PDF, usually within 24–48 hours.