Sitework takeoff
Clearing, grading, cut/fill balance and storm drainage for Sandhills sandy soils and clay pockets.
CY · LF · TONFayetteville permitted 1,047 new privately-owned residential units in 2025, up 99% from 525 in 2024. We produce CSI MasterFormat takeoffs and estimates for contractors, builders and owners working Cumberland County and the surrounding Sandhills.
Fayetteville pricing turns on sandy Sandhills soils that drive deeper footings and pier foundations, a 67% multifamily share of 2025 permits that concentrates cost in MEP and unit-mix repetition, wind-borne debris detailing on the coastal side of the fall line, and ZIP-code-adjusted labor rates that differ from Raleigh and Charlotte.
Fayetteville sits at the edge of the Sandhills, where the soil profile changes fast between sandy ridges and clay pockets. That variability shows up directly in your earthwork and foundation numbers: trench depths, backfill import, and whether a slab-on-grade or a pier-and-beam system carries the load. We build estimates around the geotech report and the actual bearing conditions, not a regional average.
Fayetteville permitted 1,047 new privately-owned residential units in 2025, up 99% from 525 in 2024, and 706 of those units were multifamily. That mix concentrates cost in repeated unit layouts, corridor MEP rough-in, fire-rated assemblies and stair or elevator cores, while single-family work scatters cost across lot-specific sitework and foundations. The $140M in permitted value works out to about $133,900 per unit, a figure that reflects the multifamily share and the smaller average unit size those projects carry.
Our takeoffs are organized by CSI MasterFormat division, priced with ZIP-code-adjusted material and labor, and delivered in Excel and PDF with marked-up plan sets. Most projects turn around in 24–48 hours, with rush available. Whether you are bidding a multifamily podium on the west side or a subdivision of single-family homes, the estimate reflects Cumberland County labor and the supply chain you actually buy from. Start with an estimate request or review our North Carolina construction estimating services.
For bidders. You need a defensible number by the bid date. We deliver division-level quantities with marked-up plans so you can see exactly where the concrete, framing and MEP dollars sit before you sign the proposal.
For builders. You are pricing the same plan across multiple lots. We break out per-unit costs by building type so you can compare a slab-on-grade duplex against a pier-foundation walk-up without rebuilding the estimate each time.
For owners. You want a budget before design is finished. We provide order-of-magnitude and schematic-level estimates tied to square-foot and unit-count drivers, with clear assumptions you can hand back to the architect.
Select a bar to compare Fayetteville with the largest North Carolina markets we cover.
1,047 new housing units in 2025 (+99.4% vs 2024).
341 single-family · 706 multifamily (67%).
Of the 1,047 new privately-owned residential units permitted by Fayetteville in 2025, 706 were multifamily — 67% of the total. Single-family accounted for 341 units. That mix matters at bid time: multifamily work concentrates cost in repeated unit layouts, corridor MEP rough-in, fire-rated assemblies and elevator or stair cores, while single-family scatters cost across lot-specific sitework and foundations. The $140M in permitted value works out to about $133,900 per unit, a figure that reflects the multifamily share and the smaller average unit size those projects carry. For a bidder, the practical takeaway is that your estimating hours should follow the unit count, not the building count. Our multi-family estimating services are built around that unit-mix logic, and our residential estimating services handle the single-family side.
Units permitted rose from 525 in 2024 to 1,047 in 2025 — a 99% increase. Fayetteville ranked 6th of 17 covered North Carolina cities by units and accounted for 5.2% of the 19,955 units permitted across those cities. Volume like that strains estimating capacity before it strains field crews. If your team is pricing three subdivisions and two apartment buildings at once, the bottleneck is quantity takeoff, not markup. That is where a commercial estimating services partner or a framing estimating services takeoff pays for itself. Nearby metros such as Durham and Cary are pulling from the same subcontractor pool, so labor assumptions need to be local, not borrowed from the Triangle.
We cover the divisions that carry the most cost in Cumberland County work, from dirt to trim.
Clearing, grading, cut/fill balance and storm drainage for Sandhills sandy soils and clay pockets.
CY · LF · TONPier, grade-beam and slab-on-grade quantities driven by bearing capacity and frost-depth assumptions.
CY · SF · LFFootings, stem walls, slab thickness, rebar schedules and formwork for multifamily podiums and walk-ups.
CY · SF · TONWall, floor and roof framing counts by member size, plus sheathing, hardware and waste factors.
BF · SF · EAArchitectural shingle, TPO and metal roof areas with underlayment, flashing and wind-uplift detailing.
SQ · LF · EAPlumbing, HVAC and electrical rough-in counts by unit type, including corridor and common-area distribution.
LF · EA · TONPer-plan and per-lot pricing for single-family homes, including sitework and utility tie-ins.
SF · EA · LSUnit-mix models, common-area breakdowns and division-level budgets for apartment and townhome projects.
SF · EA · LSYou are bidding multifamily and single-family work across Cumberland County. We give you division-level quantities with marked-up plans so you can confirm scope before the bid date and defend your number.
You need takeoffs for the trades you self-perform, from concrete to MEP. We break out quantities by CSI division so you can price your scope without carrying another trade's risk.
You are comparing land positions and unit mixes. We model per-unit costs by building type so you can test a duplex against a walk-up before you commit to a site plan.
You need a cost check during design. We provide schematic-level estimates tied to square-foot and unit-count drivers, with assumptions you can carry back into the drawings.
You are budgeting a renovation or an addition on an existing building. We estimate from the existing conditions and the scope you can actually see, not a new-construction average.
You handle repairs and unit turns across a portfolio. We price repeatable scopes like flooring, drywall, and fixture replacements so you can set a per-unit budget that holds.
We estimate projects throughout Cumberland County and the surrounding region, from downtown infill to subdivision work on the outskirts. If your project is within about an hour of Fayetteville, we can price it.
Fayetteville's 2025 permit mix was 67% multifamily, with 706 units in multifamily buildings and 341 single-family units. We estimate both, along with the commercial and institutional work that supports them.
Three- and four-story wood-framed buildings with surface parking. Cost concentrates in repeated unit layouts, corridor MEP rough-in, and fire-rated assemblies between units and along egress paths.
Watch for: Fire-rated wall and floor-ceiling assemblies, corridor HVAC, and stair pressurization if required.
Production homes on scattered lots across Cumberland County. Per-unit cost varies with lot grading, foundation type, and whether utilities are extended or already stubbed to the lot.
Watch for: Lot-specific earthwork, utility trenching, and whether the geotech calls for pier foundations.
Wood-framed units over a concrete podium, often with retail or parking at grade. The podium and transfer structures drive the concrete and structural steel quantities.
Watch for: Podium slab thickness, transfer beams, and fire separation between uses.
Strip centers, standalone retail, and small office buildings along the major corridors. Shell and core estimates turn on the structural system, storefront glazing, and rooftop mechanical screening.
Watch for: Storefront systems, roof screening, and tenant improvement allowances.
Distribution and light manufacturing buildings near the interstate and industrial parks. Tilt-up or pre-engineered metal buildings with slab-on-grade and minimal interior finishes.
Watch for: Slab flatness and thickness, dock equipment, and sprinkler density.
Clinics, schools, and similar facilities that carry higher MEP and life-safety loads. Estimates need to account for code-driven egress, sprinkler, and HVAC requirements.
Watch for: Sprinkler coverage, emergency power, and medical gas if applicable.
Fayetteville sits on the Sandhills, where the ground, the weather, and the local labor market all move your numbers. These are the drivers we build into every estimate.
Fayetteville and Cumberland County enforce the North Carolina State Building Code, which adopts the IBC and IRC with state amendments. Permit fees and review times vary by project type and jurisdiction, so confirm the adopted edition and local amendments with the Fayetteville-Cumberland County building department. We build permit line items from the current fee schedule and note any special inspections the geotech or structural drawings require.
North Carolina State Building Code · IBC · IRC · Fayetteville-Cumberland County building departmentThe Sandhills transition from sandy ridges to clay pockets over short distances. Sandy soils drain well but can require deeper footings for bearing, while clay pockets hold water and expand when wet. Foundation type, backfill import, and dewatering all change with the geotech report. We price from the report's bearing capacity and groundwater recommendations, not a regional default.
Geotech report · bearing capacity · clay pockets · pier foundationsFayetteville sees hot, humid summers and occasional hurricane remnants that bring heavy rain and wind. Roof assemblies need proper ventilation and hurricane straps where the wind speed map requires them. Site drainage must handle intense storms, and exterior finishes need to resist moisture. We include these details when the drawings call for them and flag them when they are missing.
Wind speed map · hurricane straps · roof ventilation · site drainageCumberland County labor rates are lower than Raleigh or Charlotte, but the pool of skilled trades is smaller. Multifamily and military-related construction keep crews busy, and labor availability can tighten during peak periods. We price with ZIP-code-adjusted labor rates and note where crew size or overtime may affect the schedule.
Cumberland County labor rates · skilled trades · ZIP-code adjustmentFayetteville's terrain rolls, and many sites need cut and fill to balance earthwork. Drainage and stormwater management requirements, including buffers and retention, affect the site plan and the cost. Utility extensions, road frontage improvements, and lot grading all vary by parcel. We estimate sitework from the civil drawings and note any assumptions about soil export or import.
Cut and fill · stormwater management · utility extensions · lot gradingFayetteville is within a day's haul of major material suppliers in the Piedmont and on the coast. Concrete, lumber, and drywall are generally available, but specialty items like elevator components or custom glazing can have longer lead times. We price materials with ZIP-code-adjusted costs and flag long-lead items that could affect the schedule.
ZIP-code-adjusted material pricing · long-lead items · supplier networkFayetteville's mix of infill multifamily, single-family subdivisions and Fort Bragg-area commercial work changes what you measure and how you price it. These are the trades where local conditions move the numbers most.
Sandhills soils drain fast but erode just as fast, so a takeoff here has to carry more than cut and fill. Measure clearing by acre, then strip topsoil by cubic yard using the actual depth shown on the geotech, not a default 6 inches. Silt fence and inlet protection are usually linear feet and each, and on sloped lots the sediment basin volume is a separate line. Underdrain and stone are common where the water table sits high near creek bottoms. If your scope includes mass grading, a dedicated sitework takeoff separates that work from the building pad so you can see which bid is actually low.
Wood framing dominates the residential and low-rise work around Fayetteville. Take off wall studs by linear foot of wall per height, then convert to pieces with the plate count included; headers, trimmers and jack studs are separate line items. Floor and roof sheathing is square feet with a waste factor, and roof trusses are usually priced per truss plus a set and crane line. Hurricane and high-wind detailing along the coast-influenced portions of the state adds clips, straps and additional nailing, which shows up as hardware counts. Framing estimating that stops at board feet will understate the labor on complex roof geometry.
MEP is where Fayetteville bids drift most, because plan sets often show fixture and equipment locations without schedules. Count plumbing fixtures each, then measure domestic water and DWV in linear feet by pipe size, with fittings counted separately on smaller jobs. For HVAC, take off tonnage by unit, then ductwork by pound or linear foot depending on whether it is flex or sheet metal, plus registers and thermostats each. Electrical is devices, fixtures, panels and feeders, with home-run wire measured by the foot. A full MEP estimating pass ties these to the equipment schedule so nothing is priced from a symbol alone.
Most Fayetteville residential work is slab-on-grade or crawlspace, with stem walls and interior footings measured in linear feet and cubic yards. On multifamily podium and wrap buildings, you are pricing pile caps, grade beams and post-tensioned slabs, and the PT tendon layout drives both concrete volume and the reinforcing schedule. Watch the vapor barrier and capillary break under slabs — they are frequently left off a subcontractor's scope and then added back as a change. Concrete estimating for this market should show formwork in square feet of contact area, not just yards of concrete, because form cost is what separates the bids.
Architectural shingle is the default on Fayetteville houses, so the takeoff is squares of shingle, squares of underlayment, linear feet of ridge and hip, and linear feet of drip edge, valley metal and flashing. On commercial low-slope work you are measuring TPO or modified bitumen in squares plus insulation thickness, cover board, and tapered crickets at drains. Ventilation — ridge vent, soffit vent or off-ridge vents — is counted in linear feet or each, and it is a classic omission when a roofer bids from the plan without reading the energy notes. Roofing takeoffs here should also carry a line for decking replacement, because you cannot see rot from a plan.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Slab on grade, 5 in. reinforced | 412 | CY |
| 03 30 00 | Vapor barrier under slab | 18400 | SF |
| 05 12 00 | Structural steel columns and beams | 9.4 | TON |
| 06 10 00 | Wall framing, 2x4 and 2x6 studs | 2140 | LF |
| 06 16 00 | Roof and floor sheathing | 19600 | SF |
| 07 30 00 | Architectural shingle roofing | 78 | SQ |
| 09 29 00 | Gypsum board, walls and ceilings | 42800 | SF |
| 22 00 00 | Plumbing fixtures and rough-in | 126 | EA |
The dimensions below are illustrative. Confirm the actual slab thickness, reinforcing and vapor barrier detail on the structural and architectural sheets before you price anything.
Assume a duplex with a 60 ft by 34 ft footprint and a 4 in. slab inside a 12 in. by 24 in. perimeter footing. We price the slab and the footing separately because they carry different waste and different labor.
| Step | Calculation | Quantity | Unit |
|---|---|---|---|
| Slab area | 60 ft × 34 ft | 2,040 | SF |
| Slab volume | 2,040 SF × (4 in. ÷ 12) | 680 | CF |
| Slab volume | 680 CF ÷ 27 | 25.2 | CY |
| Slab with 5% waste | 25.2 CY × 1.05 | 26.5 | CY |
| Footing perimeter | 2 × (60 ft + 34 ft) | 188 | LF |
| Footing volume | 188 LF × 1 ft × 2 ft | 376 | CF |
| Footing volume | 376 CF ÷ 27 | 13.9 | CY |
| Footing with 8% waste | 13.9 CY × 1.08 | 15.0 | CY |
Slab waste runs lower than footing waste because the slab is placed in large, controlled pours, while the footing has more short returns, cleanup and spillage. Typical ranges are 5 to 10 percent for slab and 8 to 12 percent for footings, and you should set the number from your own pour history rather than a default.
Reinforcing is next. If the slab carries 6x6-W2.9xW2.9 welded wire mesh, that is 2,040 SF plus 10 percent lap and waste, about 2,244 SF, which converts to rolls or sheets depending on what your supplier stocks. Footing steel is taken from the detail: say four continuous #5 bars in the footing, that is 188 LF × 4 = 752 LF, plus dowels at the stem wall counted each. Add a line for the vapor barrier at 2,040 SF plus 10 percent lap.
Finally, separate the finish and curing lines. A trowel finish, cure and seal, and saw-cut control joints at roughly 12 ft on center are all real cost, and they are frequently missing from a bare cubic-yard quote. When you send plans through a concrete takeoff, those lines should come back on the same sheet as the yardage so you can compare bids line for line.
The figures come from the U.S. Census Bureau Building Permits Survey, which counts permits issued by the city itself for new privately-owned residential units only. That means commercial, industrial and renovation permits are not in the total, and neither are units permitted in unincorporated Cumberland County. The 2025 count of 1,047 units, split 341 single-family and 706 multifamily, reflects only what the city issued. Use it as a demand signal, not as a measure of total construction volume in the market.
With 706 of 1,047 permitted units in multifamily, a large share of local work is three- and four-story wood-frame buildings over podium or slab. Those plans carry rated floor and ceiling assemblies, shaft walls, firestopping at penetrations, and more MEP rough-in per square foot than a single-family house. You also get repeat unit types, so a takeoff organized by unit plan and then multiplied by count is faster and less error-prone than measuring every floor. Multi-family estimating should always show the unit mix and the count per type.
The Sandhills soils common in this part of North Carolina are generally well-draining sands and sandy loams, which is good for bearing but poor for cut-slope stability and erosion control. Footings often bear on competent sand at a shallower depth than you would see on Piedmont clay, but you still need the geotechnical report to set bearing and to decide between spread footings and deeper systems. Expansive clay appears in pockets, so never assume a standard detail applies across a whole site. Have the geotech reviewed before you finalize foundation quantities.
Yes. We price with ZIP-code-adjusted material and labor data rather than a national average, so the rates reflect what contractors and suppliers are actually charging in the Fayetteville area. That matters most on labor-heavy scopes like framing, drywall and MEP rough-in, where a national rate can be off by a wide margin. We build the estimate in Bluebeam Revu and PlanSwift and price with RSMeans data, then deliver Excel and PDF organized by CSI MasterFormat division with marked-up plan sets.
Most projects come back in 24 to 48 hours, and rush turnaround is available when you have a bid date closing. The clock starts when we have a complete set: architectural, structural, civil, MEP and the specifications. If you send only a floor plan, we can still give you a partial takeoff, but the number will carry more allowance lines. Send the full set with any addenda and we can usually hold the standard turnaround without a rush charge.
Send the plan set and specifications in PDF, the project address or ZIP code so we can set local pricing, and the bid date. Tell us the scope you want priced — full building or a single trade — and whether you want alternates separated. If there is a site plan, include it, because grading, utilities and erosion control are frequently bid as a separate package. We return Excel and PDF by CSI division with marked-up drawings so you can see exactly what was measured.
Yes. Plenty of Fayetteville subcontractors only want their own scope priced, and that is often the better use of a takeoff. We regularly produce standalone sitework, concrete, framing, roofing and MEP estimates, each with its own quantity sheet and waste assumptions. The advantage is that a trade-specific takeoff can show more detail than a full-building estimate, including formwork, hardware, fittings and hangers that get buried in a lump-sum number. Tell us the trade and the bid date and we will scope it accordingly.
We apply waste by material and by installation method, not one blanket percentage. Typical ranges are 5 to 10 percent for slab concrete, 8 to 12 percent for footings, 5 to 10 percent for framing lumber, and 10 to 15 percent for roofing shingles and underlayment, depending on roof geometry. Tile, drywall and flooring run higher on cut-up layouts. The waste line should be visible in the estimate so you can adjust it to match your own field history instead of accepting a number you cannot defend.
It does. The area sees hot, humid summers and occasional hurricane and tropical-storm impacts, so roof fastening schedules, roof-to-wall connections and exterior envelope details carry more hardware than a mild-climate plan. Wind-borne debris and uplift requirements vary by jurisdiction and by the adopted code edition, so confirm the current edition and any local amendments with the Fayetteville building department before you finalize. On the interior side, humidity drives the need for proper vapor control, which is a real line item under the slab and in the wall assembly.
Yes. We work across North Carolina, including Greensboro, Durham, Winston-Salem, Cary, Wilmington and High Point, as well as the smaller towns in between. Pricing adjusts by ZIP code, so a takeoff for a Fayetteville project and one for a Wilmington project use different labor and material rates even when the drawings are identical. If your project sits in Cumberland County or a neighboring county, send the address and we will set the pricing to that location.
Send your plan set and bid date, and we will return a division-organized takeoff with marked-up drawings in 24 to 48 hours.