Fencing Estimating Services

Send your fence plan set, spec section and site conditions. We return an LF-based takeoff with post counts, footing volumes, gate schedules and ZIP-adjusted pricing in Excel and PDF.

24–48 hours for most projectsTypical turnaround
Excel + marked-up PDFsOrganized by CSI section
ZIP-code pricingLocal material and labor
Price confirmed firstBefore any work starts
Sample estimate sheet
Division 32 — FencingSample format
Line itemQtyUnitQuantity
Chain link fence 6 ft, 9 ga1,840LF1,840 LF
Line posts 2-3/8 in. OD154EA154 EA
Terminal posts 2-7/8 in. OD26EA26 EA
Post footings 10 in. × 36 in.180EA8.7 CY
Cantilever slide gate 16 ft2EA2 EA
Total fence run and footings1,840 LF, 180 posts, 8.7 CY
Illustrative quantities. Waste factor applied as a separate line.
Terminal post footings sized

What is fencing estimating?

Fencing estimating is the linear-foot takeoff of fence runs by type, height and material, priced under CSI MasterFormat Division 32 31 00. We count posts by function, compute footing concrete by post count, and schedule gates as separate assemblies. Deliverables are Excel and PDF takeoffs with marked-up plan sets.

  • Fence runs are measured in LF; posts, gates and footings are counted in EA or CY.
  • Typical waste for chain link fabric is 5–10%, but confirm with your supplier.
  • The most costly miss is undercounting terminal, corner and pull posts and their larger footings.

Fencing estimates are won or lost on the linear-foot takeoff, not on a single blended rate. A chain link run at 6 ft with 10 ft post spacing carries roughly 10% more posts than the same run at 8 ft spacing, and every terminal, corner and pull post needs a larger footing and heavier gauge than a line post. As a fencing estimating company, we measure the fence centerline by type and height, count posts by function, compute footing concrete by post count, and schedule gates as separate assemblies. Our fence takeoff services are built in Bluebeam Revu, PlanSwift and on-screen takeoff workflows, priced with RSMeans data adjusted by ZIP code.

Deliverable
Excel estimate + marked-up PDF plans
Organized by
CSI MasterFormat section
Turnaround
24–48 hours for most projects
Pricing
ZIP-code-adjusted material and labor pricing
Software
Bluebeam Revu, PlanSwift, RSMeans data

If your scope includes ornamental aluminum picket, cedar board-on-board or vinyl fence, the same logic applies with different post spacing, rail counts and coating upcharges. We also coordinate with adjacent scopes: post footings sit inside the excavation and gravel backfill line item under Division 31 23 00, and cast-in-place concrete for footings follows Division 03 30 00. For projects that combine fence with sitework, see our Sitework Estimating Services page. When fence ties to decks, pools or garages, the takeoff is built alongside those scopes, as described on our Deck Estimating Services and Swimming Pool Estimating pages. Automated gates and access control loop into low-voltage work covered under Fire Alarm & Low Voltage Estimating.

Every fence installation estimate we produce is organized by CSI MasterFormat division — typically 32 31 00, with 32 31 13 for chain link, 32 31 19 for ornamental iron and steel fence, 32 31 26 for vinyl fence, and 32 31 29 for wood fence — and delivered in Excel and PDF with marked-up plan sets. We read the bid documents, log addenda, and issue a request for information when the elevation drawing leaves post spacing or gate hardware undefined. Turnaround is 24–48 hours for most projects, with rush available. For a full view of how fencing sits alongside other trades, see our Trade Estimating Services by CSI Division page, or Get an estimate to start.

Services

What our fence takeoff services cover

We take off Division 32 31 00 Fencing and the supporting concrete and excavation line items that fence installers routinely price separately. The takeoff is organized by fence type, height and material family, with gates and operators broken out as EA. Pricing is ZIP-code adjusted for material and labor, and every quantity traces back to a sheet and grid line.

Chain Link Fence

Fabric, top rail, tension wire, line and terminal posts, barbed wire, bracing and footings.

LF · EA · CY

Ornamental Picket

Aluminum or steel picket panels, posts, rails, finials, and powder coat or galvanized finish.

LF · EA

Wood Fence

Cedar or pressure-treated posts, rails, pickets, board-on-board, and concrete footings.

LF · EA · CY

Vinyl Privacy Fence

PVC panels, posts, rails, caps, and routed or notched assembly counts by panel width.

LF · EA

Gates and Operators

Gate frames, hinges, latches, drop rods, cantilever tracks, rollers, operators, keypads and loops.

EA · LF

Post Footings

Excavation and concrete volume per footing, sized by post type and soil conditions.

CY · EA

Coating and Finish

Galvanized, ColorBond, powder coat, and vinyl upcharges applied to fence and gate assemblies.

LF · EA

Fence Removal

Demolition and disposal of existing fence, posts, footings, and gates where replacement occurs.

LF · EA · CY

What every fencing estimating takeoff includes

  • Fence centerline measured in LF by type, height and material
  • Line, corner, pull and terminal post counts by spacing
  • Post footing excavation and concrete volume per footing
  • Chain link fabric, top rail, bottom rail and tension wire
  • Barbed wire arms, truss rods and bracing assemblies
  • Ornamental picket, rail and finial counts by panel width
  • Wood posts, rails, pickets and board configuration
  • Gate frames, hinges, latches, drop rods and closers
  • Cantilever slide gate track, rollers and operator
  • Gate operator, keypad, loop and safety edge
  • Coating upcharges: galvanized, ColorBond, powder coat, vinyl
  • Fence removal and disposal where existing fence is demolished
How we work

How our fence estimator performs the takeoff

  1. Set the fence baselineWe open the site plan and identify the fence centerline, then break it at every height transition, material change and gate opening. Each segment gets its own LF quantity so a 6 ft chain link run is never blended with a 4 ft ornamental run. We note the drawing sheet and grid line for each segment. For example, a run that steps from 6 ft to 8 ft at grid C-4 is split into two LF lines, each with its own post spacing and footing detail. This prevents a blended unit rate that hides the cost of the taller, heavier section.
  2. Count posts by functionUsing the specified post spacing, we calculate line posts and then add corner, pull and terminal posts at every direction change, gate jamb and dead end. Terminal posts are counted separately because they carry heavier gauge and larger footings. We check the structural sheet for any post schedule that overrides the typical detail. For instance, a 10 ft spacing yields 154 line posts on a 1,840 LF run, but corners and gate jambs add 26 terminal posts. We also verify that gate posts are sized for the gate leaf weight and operator thrust.
  3. Compute footing concreteWe read the footing diameter and depth from the detail, compute volume per footing in CY, and multiply by post count. A 10 in. diameter by 36 in. deep footing is 0.019 CY, so 180 posts yield 3.4 CY before waste. We apply a typical 5–10% waste factor and list it as a separate line, not buried in the unit rate. If the geotech report calls for a larger bell or deeper embedment, we adjust the volume and flag the change. We also separate excavation from concrete so you can see the labor and equipment impact.
  4. Schedule gates and operatorsGate openings are deducted from fence LF and added back as EA assemblies. We count frames, hinges, latches, closers and drop rods by gate type and width. For automated gates, we list the operator, keypad, loop and safety edge as separate EA items so the electrical scope can be coordinated. A 16 ft cantilever slide gate, for example, requires a track, rollers, a concrete pad and a 1/2 HP operator. We also note any access control interface, such as card readers or intercoms, that ties into Division 26 or 28.
  5. Apply coating and finish upchargesGalvanized, ColorBond, powder coat and vinyl coatings carry different unit costs. We tag each fence segment with its finish and apply the upcharge per LF. Where the spec calls for a color match to an adjacent building, we note it as a pricing assumption. For example, a powder coat finish on ornamental aluminum may add $2–$4 per LF over mill finish, depending on color and gloss. We also check whether the coating is required on both sides or just the exposed face, as this affects the quantity.
  6. Price with ZIP-adjusted dataMaterial and labor rates are adjusted to the project ZIP code using RSMeans data. We separate material, labor and equipment so you can see where the cost sits. The final estimate is delivered in Excel and PDF, organized by CSI MasterFormat division, with a marked-up plan set showing every measured segment. For example, a project in a high-cost labor market may see a 15% labor adjustment, while material may vary by 5%. This transparency helps you validate the numbers against your own historical costs.

What we need from you

  • Plan setSite plan, fence details and gate schedule. PDF is fine; we mark it up.
  • Spec sectionDivision 32 31 00 and any structural notes on post spacing or footing depth.
  • Site conditionsSoil report or a note on rock, caliche or frost depth that affects post hole excavation.
  • Gate listWidths, types, automation and access control requirements.
  • Finish scheduleCoating system and color for each fence type.
  • Bid dateSo we can set turnaround and flag any scope questions before you price.
Sample output

Sample fence material takeoff

This is the format you receive. Quantities are illustrative and do not represent a specific project.

Sample format — illustrative quantities
SectionLine itemQtyUnitRef.
32 31 13Chain link fence, 6 ft, 9 ga, 2 in. mesh, galvanized1,840LFC-101
32 31 13Line post, 2-3/8 in. OD, 10 ft spacing154EAC-201
32 31 13Terminal post, 2-7/8 in. OD, corner and pull26EAC-201
32 31 13Top rail, 1-5/8 in. OD, 21 ft lengths1,840LFC-201
32 31 53Cantilever slide gate, 16 ft opening, chain link infill2EAC-301
32 31 53Gate operator, slide, 1/2 HP, with keypad and loop2EAC-301
03 30 00Post footing concrete, 10 in. dia × 36 in. deep180EAC-401
31 23 00Post hole excavation, 10 in. dia × 36 in. deep180EAC-401
32 31 13Bracing assembly, truss rod, at end and corner posts26EAC-202
32 31 13Tension wire, 9 ga, bottom1,840LFC-201
32 31 13Barbed wire arm, 3-strand, at terminal posts26EAC-203
32 31 13Fence removal and disposal, existing chain link200LFC-102

Units of measure in fencing cost estimating

Fence quantities are taken off in these units. Mixing them is the most common source of a bad bid.

ItemUnitHow it's measured
Fence lineLFCenterline length by fence type, height and material
PostsEACounted by function: line, corner, pull, terminal, gate
FootingsCYPost count × footing volume, not fence length
Fabric areaSFChain link or screen fabric where spec calls for area
Steel weightLBOrnamental and chain link framework by section
AggregateTONRiprap or base at fence line where required
Equipment hoursHRRock, frost or caliche excavation per post hole

Worked example: chain link fence with double gate

This example is illustrative and does not represent a specific project. We take off a 300 LF run of 6 ft chain link fence with one 10 ft double swing gate, post spacing at 10 ft on center, and a 10 in. diameter by 36 in. deep footing for line posts and 12 in. diameter by 42 in. deep for terminal posts.

  1. Measure fence centerline – 300 LF total, including the gate opening. Deduct the 10 ft gate opening from the fence run: 300 LF – 10 LF = 290 LF of fence fabric and rails. The gate is taken off separately as an assembly.

  2. Count posts – Using 10 ft spacing, line posts = 290 LF ÷ 10 ft = 29 posts. Add terminal posts at each end and each side of the gate: 4 terminal posts. Total posts = 33. (Note: corner and pull posts would be added if the run changes direction; here it is straight.)

  3. Compute footing concrete – Line post footings: 29 × (π × (10 in./12)^2 / 4) × (36 in./12) = 29 × 0.5454 sq ft × 3 ft = 47.45 CF. Convert to CY: 47.45 ÷ 27 = 1.76 CY. Terminal post footings: 4 × (π × (12/12)^2 / 4) × (42/12) = 4 × 0.7854 × 3.5 = 10.99 CF = 0.41 CY. Total concrete = 1.76 + 0.41 = 2.17 CY. Apply 8% waste: 2.17 × 1.08 = 2.34 CY. Waste is a separate line, not buried in the unit rate.

  4. Excavation volume – Line post holes: 29 × (π × (10/12)^2 / 4) × (36/12) = 47.45 CF. Terminal holes: 4 × (π × (12/12)^2 / 4) × (42/12) = 10.99 CF. Total excavation = 58.44 CF = 2.16 CY. Add 10% for over-excavation: 2.38 CY. This is priced separately from concrete.

  5. Chain link fabric and rails – Fabric: 290 LF × 6 ft height = 1,740 SF. Top rail: 290 LF. Tension wire: 290 LF. Truss rods for terminal posts: 4 sets. Barbed wire arms: 4 (if specified).

  6. Gate assembly – One 10 ft double swing gate: frame, hinges, latch, drop rod, and two gate posts (already counted as terminal posts). Gate operator not included in this example.

  7. Apply waste factors – Fabric: typical 5% waste for chain link; 1,740 SF × 1.05 = 1,827 SF. Top rail: 5% waste; 290 LF × 1.05 = 304.5 LF. Posts: 2% waste; 33 × 1.02 = 34 posts. Concrete and excavation waste as above.

  8. Price with ZIP-adjusted rates – Material and labor rates are adjusted to the project ZIP code. The final estimate shows material, labor, and equipment separately for each line item, organized by CSI MasterFormat division.

Cost drivers

What drives fencing estimate pricing

Relative impact on a typical estimate for this trade, based on estimator judgment. Select a bar for details.

Scale: 1 = minor, 5 = major relative impact. Estimator judgment, not measured data.
Relative impact 5 / 5

Fence type

Chain link, ornamental aluminum, ornamental steel, wood, vinyl and composite carry different unit costs per LF. The material family also sets post spacing, footing size and service life. A cedar board-on-board fence uses more pickets per LF than a board-to-board fence and prices accordingly. For example, a 6 ft cedar privacy fence may require 14 pickets per LF, while a board-to-board fence uses 7. We tag each fence type separately so the material cost is transparent.

Fence type

Chain link, ornamental aluminum, ornamental steel, wood, vinyl and composite carry different unit costs per LF. The material family also sets post spacing, footing size and service life. A cedar board-on-board fence uses more pickets per LF than a board-to-board fence and prices accordingly. For example, a 6 ft cedar privacy fence may require 14 pickets per LF, while a board-to-board fence uses 7. We tag each fence type separately so the material cost is transparent.

Post spacing

Tighter spacing increases post count and footing concrete. A run at 8 ft spacing uses 20% fewer posts than the same run at 10 ft. The structural detail governs, and we follow it even when the plan shows a typical spacing. For example, a 1,000 LF run at 8 ft spacing requires 125 line posts, while at 10 ft it requires 100. We also check if the spec calls for closer spacing at corners or gates, which adds terminal posts and bracing.

Site conditions

Rock, caliche and frost change the excavation method and labor hours per post hole. We price post hole excavation as a separate line so you can see the impact. If the geotech report is missing, we note the assumption. For instance, excavating through caliche may require a rock auger and add 0.5 hours per hole, while frost depth may require deeper footings. We adjust the equipment and labor rates accordingly and flag the risk.

Gate count and type

Gates are priced as EA assemblies and often carry more cost than the fence run they interrupt. Automated gates add operator, keypad, loop and safety edge. A 16 ft cantilever slide gate needs a track, rollers and a concrete pad. For example, a manual 4 ft walk gate may cost $300–$500, while an automated 16 ft slide gate with operator can exceed $5,000. We break out each gate component so you can see the hardware and automation costs.

Coating and finish

Galvanized is the baseline. ColorBond, powder coat and vinyl add an upcharge per LF. Color matching to an adjacent building or HOA requirement can push the finish cost up further. For example, a custom powder coat color may add $3–$5 per LF over galvanized, and vinyl coating on chain link may add $2–$4 per LF. We list the finish for each segment and apply the upcharge separately so you can evaluate alternatives.

Height transitions

Every change in fence height requires a transition post and often a different footing. We break the takeoff at each transition so the post count and footing volume stay accurate. For example, a transition from 6 ft to 8 ft may require a heavier post and a deeper footing to resist the additional wind load. We count these transition posts separately and adjust the footing volume, ensuring the concrete and labor are not underestimated.

Slope and terrain

Sloped sites require stepped panels or racked chain link, which changes the post count and rail length. Racked fence follows the grade, while stepped fence uses horizontal panels with vertical drops. Each method affects the number of posts and the amount of fabric. We review the grading plan and fence details to determine the method. If the slope exceeds 3:1, we may need to add extra posts or use a different foundation, which we flag as a cost driver.

Scope gaps

Common scope gaps we catch in fence bid estimating

These are the items that most often fall out of a fencing bid. We flag them before you price.

  • Terminal posts at gates and corners need larger footings and heavier posts than line posts. The plan often shows a typical detail that does not apply. We count them separately.
  • Bracing at end, corner and pull posts — truss rods, horizontal rails or diagonal braces — is frequently omitted. It hides in the structural notes or a detail on the fence elevation sheet.
  • Concrete volume per footing is multiplied by post count, not fence length. A takeoff that uses LF for concrete will be short. We compute CY from the footing detail.
  • Gate openings are deducted from fence LF but gate assemblies are added back as EA. Missing this double-counts the fence run and undercounts the gate cost.
  • Rock, caliche or frost excavation adds labor hours per post hole. It shows up in the geotech report or a site note. We list it as a separate line with an assumed quantity if the report is missing.
  • Slope conditions requiring stepped panels or racked chain link change the post count and rail length. The grading plan shows the slope; the fence detail may not address it.
  • Privacy slats, windscreen or screen fabric added to chain link are often specified in a finish schedule, not on the fence plan. We check both.
  • Coating system upcharges — galvanized, ColorBond, powder coat or vinyl — are sometimes buried in a single unit rate. We break them out per LF.
  • Bollards, corner guards and concrete mow strips at the fence line belong to other sections but are often shown on the fence plan. We flag them for the right trade.
  • Permits, HOA submittals and utility locate costs are owner or GC costs. We exclude them explicitly so they do not inflate your fence bid.
  • Cutting and patching existing pavement, curb or landscape at the fence line is a separate scope. It hides in the civil sheets and is easy to miss.
  • Temporary fence and gate for the construction period is a Division 01 item. If the spec puts it in the fence section, we call it out.

Fence material families and takeoff impact

The material family sets post spacing, footing size, coating upcharge, and service life. These are the common families we take off.

Material familyTypical post spacingFooting size (line post)Coating/finish upcharge
Chain link, galvanized10 ft10 in. dia × 36 in. deepNone (baseline)
Chain link, vinyl-coated10 ft10 in. dia × 36 in. deepAdd per LF for color
Ornamental aluminum6–8 ft8–10 in. dia × 30–36 in. deepPowder coat or anodized
Ornamental steel6–8 ft10–12 in. dia × 36–42 in. deepPowder coat or galvanized
Wood, cedar dog-ear8 ft8–10 in. dia × 24–30 in. deepStain or natural
Wood, board-on-board8 ft8–10 in. dia × 24–30 in. deepStain or natural
Vinyl/PVC6–8 ft8–10 in. dia × 30–36 in. deepIntegral color
Composite6–8 ft8–10 in. dia × 30–36 in. deepIntegral color
Codes and standards

Codes and specs that affect a fence quantity takeoff

Model codes

Fence height, location, and pool barriers drive quantity more than any other code item. The IRC pool barrier provisions set minimum barrier height, gate swing, latch height, and self-closing/self-latching hardware, which changes gate counts, hinge and latch schedules, and post spacing at openings. The IBC governs commercial fence heights, egress gates, and screen enclosure loads. The NEC applies to gate operator circuits, disconnects, and low-voltage access control, so include conduit and conductor runs in your takeoff. NFPA 13 and fire access requirements can force removable fence panels or gates. Confirm the adopted code edition with the local building department, since amendments vary.

Industry standards

ASTM F567 covers chain link installation and sets rail, tension wire, and fabric tie practices that change linear-foot counts and accessory quantities. ASTM F1043 governs strength and coating of fence framework, so gauge and coating class must match the spec before you price posts and rails. ASTM F1184 covers industrial and commercial swing gates, including frame and hardware load ratings. ASTM F2656 and F2456 apply to crash-rated and high-security fence, where post spacing and footing size change. ACI 318 governs concrete footings and embedment. ASTM A123 and A653 cover galvanizing and zinc coating, which affect material pricing.

Specification sections

Read Division 32 31 00 (Fencing) for fence types, height, post spacing, footing details, and coatings. Division 32 31 13 (Chain Link Fencing) for fabric mesh, gauge, rails, tension wire, and ties. Division 32 31 19 (Ornamental Metal Fencing) for picket spacing and rail sections. Division 32 31 29 (Wood Fencing) for post size, rail count, and board grade. Division 32 31 53 (Fence Gates) for gate frames, hardware, and operators. Division 03 30 00 for cast-in-place footings, Division 31 23 00 for excavation and backfill, and Division 26 for operator power. These clauses set the units of measure.

Local amendments

Adopted editions differ by state and city, and fencing amendments are common. Height limits change by zoning district and front-yard versus rear-yard location. Pool barrier rules may add mesh fence, alarms, or additional gate hardware beyond the model code. Wind load requirements vary by jurisdiction and affect post spacing, footing depth, and rail sizing. Frost depth sets footing embedment, and soil conditions such as caliche or rock change excavation methods and footing cost. Before you finalize an estimate, confirm the adopted code edition and local amendments with the local building department.

Who we provide estimates for

Who uses our fencing estimate for contractors

General contractors

You need a bid-ready fence number to plug into your bid form without re-measuring the plan. We deliver the takeoff in CSI format so it drops into your estimate.

Fencing subcontractors

You price the work and need a second set of eyes on the LF, post count and footing volume. Our takeoff gives you a check against your own quantity survey.

Developers and owners

You are comparing fence bids and want to know what the scope should cost. The line-item detail shows where each bidder is high or missing scope.

Architects

You need a cost check on the fence details before the drawings are final. We flag details that drive cost, like post spacing and footing depth.

Where we provide estimates

Fencing Estimating in 20 states

Pricing is adjusted to the project ZIP code. Select a highlighted state to see the cities we cover there.

States we coverSelected
TX

Fencing Estimating in Texas

Nation's largest construction market; Sun Belt population growth, data centers, semiconductor plants, and single-family home building.

Texas estimating services
Property types

Fencing project types we estimate

The takeoff approach changes with the fence application and site constraints. These are common project types and what we adjust for each.

Commercial perimeter security

Heavy-duty chain link with barbed wire, terminal posts at corners, and automated gates. Focus on post spacing, footing size, and gate operators.

Watch for: Verify gate operator power source and access control integration. Confirm bollard protection at gate posts.

Residential subdivision privacy

Wood or vinyl privacy fence, often board-on-board. Count pickets per LF, rails, and posts. HOA requirements drive height and material.

Watch for: Check HOA submittals and color requirements. Confirm property line locations and easements.

Athletic field fencing

High chain link with bottom rail, often 10–12 ft. May include windscreen and ball stoppers. Post spacing tighter for wind loads.

Watch for: Verify footing depth for wind load. Check for special coatings or padding.

Industrial site fencing

Ornamental steel or aluminum with security topping. Often includes cantilever slide gates and crash-rated barriers.

Watch for: Confirm gate operator cycle rates and safety features. Check for concrete mow strips.

Pool and deck enclosures

Aluminum or glass pool fence with self-closing gates. Post footings may be on concrete or deck structure.

Watch for: Verify code-required barrier height and latch type. Coordinate with pool and deck scopes.

Temporary construction fence

Chain link panels on bases, often 6 ft. No footings; panels are moved. Priced by LF and gate count.

Watch for: Confirm rental vs. purchase. Check wind load requirements for bases.

Deliverables

What you receive

  • Excel workbook organized by CSI MasterFormat division with material, labor and equipment separated.
  • PDF estimate with the same line items, suitable for bid submission.
  • Marked-up plan set showing every measured fence segment, post count and gate location.
  • Gate schedule with widths, types, hardware and operator requirements.
  • Post footing calculation sheet showing volume per footing and total CY.
  • Assumption log listing any missing information, such as geotech or finish schedule.
  • Turnaround within 24–48 hours for most projects, with rush available.
Checklist

Pre-bid fencing checklist

  • Verify fence centerline length by type and height.
  • Confirm post spacing from structural details.
  • Count terminal, corner, and pull posts separately.
  • Check footing diameter and depth for each post type.
  • Calculate concrete volume per footing and total CY.
  • List gate widths, types, and hardware.
  • Confirm operator and access control requirements.
  • Check coating system and color for each fence type.
  • Review geotech report for rock, caliche, or frost.
  • Note slope conditions and required fence method.
  • Identify removal and disposal of existing fence.
  • Confirm permits, HOA, and utility locate responsibilities.
Client reviews

What clients say about Scope Precision Estimate

10 client reviews
MA
Michael AndersonGeneral Contractor

The cost estimate was detailed, accurate, and easy to understand. It helped us prepare our bid confidently and stay competitive without overlooking important costs.

AW
Andrew WilsonGeneral Contractor

Highly recommended for construction cost estimating. The quantities were accurate, the pricing was well organized, and the final report was easy to review.

MD
Matthew DavisConstruction Manager

Their construction estimate was thorough and professionally prepared. It made our budgeting process much easier and helped us identify potential cost issues early.

CM
Christopher MillerResidential Builder

We needed a quick and accurate construction cost estimate, and they delivered exactly what we needed. Great attention to detail and a very responsive team.

BT
Brian TaylorProject Estimator

Fast, accurate, and dependable estimating service. They understood the project requirements quickly and provided a detailed estimate without unnecessary delays.

RW
Robert WilliamsEstimating Manager

Professional and reliable estimating service. The detailed quantity takeoff helped us reduce pricing errors and submit our proposal on time.

FAQ

Fencing Estimating questions

How do you handle fence height transitions in the takeoff?

We break the fence run at every height change and count the transition posts separately. Each segment gets its own LF quantity, post spacing, and footing size. For example, a run that steps from 6 ft to 8 ft will have two line items for fence fabric and two for posts. This prevents blending a heavier post and deeper footing into a lower unit rate. We also note the transition detail on the marked-up plan set and flag any special fittings, such as reducing couplers or extension posts, that the height change requires.

What is the typical waste factor for chain link fabric and posts?

For chain link fabric, we apply a typical 5% waste factor. For posts, 2% is typical. Top rail and tension wire also get 5% waste. These are applied as separate lines in the estimate, not buried in the unit rate. The waste factor may increase for projects with complex geometry or many small runs. We also adjust waste for vinyl-coated fabric, which can be more susceptible to handling damage, and for posts that require custom cutting or threading on site.

Do you include gate operators and access control in the fencing estimate?

Yes, we list gate operators, keypads, loops, and safety edges as separate EA items. We also note any access control interface, such as card readers or intercoms, that ties into Division 26 or 28. This allows you to coordinate the electrical scope and see the automation cost separately from the fence run. We also verify the power source location and voltage, and we flag any need for a dedicated circuit or conduit run by the electrical contractor.

How do you price post hole excavation in rock or caliche?

We price post hole excavation as a separate line item, with equipment and labor hours adjusted for rock or caliche. If the geotech report is missing, we note the assumption and include a contingency. For example, excavating through caliche may require a rock auger and add 0.5 hours per hole. We flag this as a risk so you can verify with your installer. We also consider the need for rock coring or chipping, and we separate disposal of spoils from the excavation line.

Can you estimate ornamental aluminum fence with custom powder coat?

Yes. We tag each fence segment with its finish and apply the upcharge per LF. Custom powder coat colors may add $2–$5 per LF over mill finish, depending on color and gloss. We also check whether the coating is required on both sides or just the exposed face, as this affects the quantity and cost. We also note any special color-matching requirements, such as matching an existing fence or a specified RAL color, which may require a custom batch and affect lead times.

What is the difference between board-on-board and board-to-board wood fence in the takeoff?

Board-on-board uses more pickets per LF because each board overlaps the next, typically 14 pickets per LF for a 6 ft fence. Board-to-board uses 7 pickets per LF. This doubles the picket count and affects the material cost. We count pickets by configuration and apply the correct waste factor. We also account for the additional rails and posts required for board-on-board, which may need closer spacing to support the extra weight and wind load.

How do you handle slope conditions that require stepped or racked fence?

We review the grading plan and fence details to determine the method. Racked fence follows the grade and uses standard posts; stepped fence uses horizontal panels with vertical drops and may require additional posts. If the slope exceeds 3:1, we may need to add extra posts or use a different foundation. We flag this as a cost driver. We also check whether the fence fabric or panels need to be cut on site, which adds labor and waste.

Do you include fence removal and disposal in the estimate?

Yes, if the scope includes demolition of existing fence. We measure the LF of fence to be removed and add a line item for removal and disposal. This is separate from the new fence installation. We also note any salvage value or hazardous material handling, such as lead paint on old fence. We also consider the condition of the existing fence and whether concrete footings need to be broken out and removed, which adds cost and disposal fees.

What information do you need to estimate a cantilever slide gate?

We need the gate opening width, gate height, infill material, and operator requirements. We also need the track and roller details, concrete pad dimensions, and power source location. The gate posts must be sized for the gate leaf weight and operator thrust. We list each component as a separate line item. We also need to know the gate travel and whether it is a single or bi-parting slide, as this affects the track length and number of posts.

How do you handle privacy slats or windscreen on chain link fence?

We check the finish schedule and fence plan for privacy slats or windscreen. These are added as separate line items, priced per SF of fence area or per LF. For example, privacy slats may be priced per SF of fabric area, while windscreen may be priced per LF. We include the correct quantity and unit. We also note the color and material of the slats or windscreen, and whether they require special fasteners or grommets for attachment.

Are permits and HOA submittals included in your estimate?

No. Permits, HOA submittals, and utility locate fees are owner or GC costs. We exclude them explicitly so they do not inflate your fence bid. However, we flag them in the assumption log so you can include them in your overall project budget. We can also provide a separate line item if you want them priced. We also note any special inspection fees or engineering stamps that may be required by the jurisdiction for fence height or wind load.

What is your turnaround time for a fencing estimate?

Most fencing estimates are delivered within 24–48 hours. Rush service is available for an additional fee. The turnaround depends on the completeness of the plan set and the complexity of the fence scope. We will confirm the schedule when you send the plans and note any missing information that could delay the estimate. For projects with multiple fence types or extensive gate schedules, we may need an extra day to ensure accuracy.

Do you provide outsourced fencing estimating for general contractors?

Yes. Outsourced fencing estimating is most of what we do for GCs who carry Division 32 31 00 in their bid documents but do not keep a fence estimator on staff. You send the plan set, specs and addenda; we return an Excel and PDF estimate with quantities by linear feet, post counts by function, footing concrete, gate assemblies, installation labor and equipment rental, plus marked-up plans. We flag scope gaps and issue a request for information where the drawings are silent.

Can you produce a chain link fence estimating package with gates and barbed wire?

Yes. Chain link fence estimating starts with the centerline by height, then post spacing, terminal and pull posts, top rail, tension wire, fabric and barbed or razor wire arms. We count walk, drive and double gates as separate assemblies with hinges, latches, posts and concrete. Footings are computed per post by diameter and depth. ASTM F2453 governs welded wire fence fabric, and we note the referenced standard in the basis of estimate.

How do you handle a wood fence takeoff with stepped or racked panels?

A wood fence takeoff depends on whether panels step or rack along the slope. Stepped panels need a level run per bay, which adds posts and short rails; racked panels follow grade and change rail length and picket cuts. We scale the elevation drawing, count posts, rails and pickets per bay, and apply a typical waste factor. ICC IRC and local amendments may set height and setback limits, so confirm the adopted edition with the local building department.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning. is a Senior Estimator with more than 15 years of professional experience in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Ready to price your fencing scope?

Send your plan set and specs for an LF-based takeoff with post counts, footing volumes, and gate schedules in 24–48 hours.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.