Scope Precision EstimateContact Us

Xactimate Estimating Services

Send your plans, photos, and carrier paperwork. We return a line-by-line Xactimate estimate in Excel and PDF, organized by trade category with marked-up plan sets.

24–48 hours for most projectsTypical turnaround
Excel + marked-up PDFsOrganized by CSI section
ZIP-code pricingLocal material and labor
Price confirmed firstBefore any work starts
Sample estimate sheet
Restoration Trade Categories — Sample Line ItemsSample format
Line itemQtyUnitQuantity
Drywall 1/2 in. R&R1,840SF—
Baseboard 5-1/4 in. MDF R&R312LF312 LF
Carpet and pad R&R620SF620 SF
Asphalt shingle R&R28SQ28 SQ
Water heater 50 gal R&R1EA1 EA
Total line item units2,801 units
Illustrative quantities. Waste factor applied as a separate line.
Detach and reset included

Xactimate is the estimating and pricing format most U.S. property insurers require for a scope of loss. It organizes work into trade categories rather than CSI MasterFormat divisions, and each line item carries its own unit of measure, waste factor, and unit price. If you are a restoration contractor, adjuster, or property owner, you need an estimate that reconciles line by line with a measured takeoff, not a lump sum. We produce that estimate from your plans, photos, and carrier paperwork. Our takeoff is organized by trade category, with each line item traced to a marked-up plan set or photo. We use Bluebeam Revu, PlanSwift, and RSMeans data to measure and price, then format the output in Xactimate-compatible Excel and PDF. Turnaround is 24–48 hours for most projects, with rush available. See how this fits with our other estimating software services or our Bluebeam takeoff services.

Deliverable
Excel estimate + marked-up PDF plans
Organized by
CSI MasterFormat section
Turnaround
24–48 hours for most projects
Pricing
ZIP-code-adjusted material and labor pricing
Software
Bluebeam Revu, PlanSwift, RSMeans data

Our Xactimate estimating services are built for insurance claim estimating and property damage estimating, where the carrier's scope of loss and your measured quantities have to agree. We start with a quantity takeoff from the Xactimate sketch, plans, or photos, then assign line item pricing by trade category. For water damage estimating and fire damage estimating, that means separating demolition, drying, and rebuild so depreciation, recoverable depreciation, actual cash value, and replacement cost value are each shown on their own lines. We also price roofing estimating services scopes, from tear-off through underlayment and flashing, using the same measured square feet.

As an Xactimate estimating company, we work as your outsourced Xactimate estimating partner: you send the bid package, we return a priced estimate you can defend in a carrier review. If the scope changes, we handle the change order and log each request for information against the original takeoff. We also reconcile Xactimate trade categories to CSI divisions when a project needs it — Division 1 general requirements, Division 7 thermal and moisture protection, Division 9 finishes, Division 22 plumbing, and Division 26 electrical — so the same quantities carry into your construction estimating services workflow. Compare our PlanSwift takeoff services or RSMeans cost estimating if your project is priced outside the carrier format.

Services

What Our Xactimate Estimating Services Cover

We measure and price the restoration scope, then format it as an Xactimate estimate. The scope typically includes drywall, flooring, roofing, insulation, paint, trim, plumbing fixtures, and electrical devices. We reconcile each line item to your photos, plans, or carrier paperwork. We do not process claims or negotiate settlements. We produce the estimate.

Remove and replace drywall

Remove and replace drywall, 1/2 in. and 5/8 in., taped to Level 4

Remove and replace baseboard

Remove and replace baseboard, casing, and door/window trim

Remove and replace carpet

Remove and replace carpet, pad, and tack strip by SF

Remove and replace LVP and sheet vinyl by SF

Remove and replace LVP and sheet vinyl by SF

Remove and replace asphalt shingles

Remove and replace asphalt shingles, underlayment, and drip edge

Remove and replace roof sheathing and fascia

Remove and replace roof sheathing and fascia

Remove and replace insulation

Remove and replace insulation, blown-in attic and batt wall

Remove and replace interior and exterior paint

Remove and replace interior and exterior paint, walls and trim

What every xactimate estimating takeoff includes

  • Remove and replace drywall, 1/2 in. and 5/8 in., taped to Level 4
  • Remove and replace baseboard, casing, and door/window trim
  • Remove and replace carpet, pad, and tack strip by SF
  • Remove and replace LVP and sheet vinyl by SF
  • Remove and replace asphalt shingles, underlayment, and drip edge
  • Remove and replace roof sheathing and fascia
  • Remove and replace insulation, blown-in attic and batt wall
  • Remove and replace interior and exterior paint, walls and trim
  • Remove and replace water heater, supply lines, and shut-off valves
  • Remove and replace electrical devices, switches, outlets, and fixtures
  • Detach and reset plumbing fixtures for flooring access
  • Debris haul-off and dumpster days
How we work

How Our Xactimate Line Item Estimating Works

  1. Review carrier paperworkWe read the adjuster's scope of loss, photos, and any engineer's report to identify the affected areas. We note the cause of loss and the rooms listed. If the carrier scope is missing line items, we flag them before measuring. For example, we check for detach and reset of fixtures, temporary containment, and code upgrade items such as GFCI protection and smoke detectors. We also note any discrepancies between the carrier's measurements and our own.
  2. Measure from photos and plansUsing Bluebeam Revu and PlanSwift, we measure drywall, flooring, roofing, and insulation from the provided plans or photo sets. Where photos are the only record, we scale from known objects such as doors (typically 3 ft wide) and outlets (typically 12 in. above floor). We mark each measurement on a plan set or photo with a reference number. For roofing, we measure by squares (100 SF) and note pitch and valleys. For drywall, we measure net area after subtracting openings over 32 SF.
  3. Select Xactimate line itemsWe map each measured item to the correct Xactimate trade category and line item. For example, drywall removal and replacement is selected by thickness and finish level, and roofing is selected by shingle type and pitch. We include detach and reset where fixtures block flooring or cabinet work. We also add line items for temporary protection, debris haul-off, and equipment days. Each line item is cross-referenced to the measured quantity and the source drawing or photo.
  4. Apply waste and quantitiesWe apply typical waste factors: 10% for carpet and roofing, 5% for drywall and insulation. Quantities are rounded to the nearest whole unit. We do not inflate quantities to cover unknown conditions. For example, carpet waste accounts for seams and cuts, while roofing waste accounts for hips and valleys. We list waste as a separate line item so you can see the base quantity and the waste quantity. This transparency helps during adjuster review.
  5. Price with ZIP-adjusted dataLine item prices are adjusted by ZIP code for material and labor. We use RSMeans data as a cross-check where Xactimate pricing is not available. We do not apply overhead and profit to the entire estimate; it is applied to the correct line items per carrier guidelines. For example, O&P is typically applied to the subtotal of labor and materials, not to equipment or debris removal. We confirm the carrier's specific requirements before finalizing.
  6. Format and deliverThe final estimate is delivered in Excel and PDF, organized by trade category, with a marked-up plan set showing measured areas. We include a summary of line items and a list of exclusions. Turnaround is 24–48 hours for most projects. For rush projects, we prioritize and confirm the deadline before starting. The Excel file is formatted for easy import into Xactimate or other estimating software. We also provide a photo markup showing affected areas and measurements.

What We Need From You

  • Plans or photosFloor plans, elevations, or clear photos of affected areas. Photos should include a tape measure or known object for scale.
  • Carrier scopeThe adjuster's scope of loss, if available, so we can reconcile line by line and flag missing items.
  • Cause of lossWater, fire, wind, or hail. This drives code upgrade items such as GFCI protection and smoke detectors.
  • ZIP codeFor ZIP-adjusted material and labor pricing. Without it, we use state averages.
  • Finish scheduleFlooring type, paint colors, cabinet style, and countertop material. If unknown, we price to builder-grade standard.
  • DeadlineStandard turnaround is 24–48 hours. Rush available for an additional fee.
Sample output

Sample Xactimate Takeoff Format

This is the format we use for a typical water damage restoration estimate. Quantities are illustrative for a mid-size project.

Sample format — illustrative quantities
SectionLine itemQtyUnitRef.
09 21 16Drywall 1/2 in. remove and replace, Level 4 finish1,840SFA-101
09 30 00Carpet and pad remove and replace, including tack strip620SFF-101
09 60 00Luxury vinyl plank remove and replace, 6 mm wear layer480SFF-102
07 30 00Asphalt shingle remove and replace, 30-year architectural28SQR-101
22 40 00Water heater 50 gal remove and replace, including expansion tank1EAP-101
26 27 26Electrical device remove and replace, GFCI outlet6EAE-101
09 65 00Sheet vinyl remove and replace, 0.080 in. wear layer120SFF-103
07 21 00Blown-in attic insulation remove and replace, R-381,200SFI-101
09 90 00Interior paint, walls and ceilings, two coats3,200SFP-102
22 11 16Water supply line remove and replace, 1/2 in. copper80LFPL-101

Units of Measure in Xactimate Cost Estimating

Xactimate line items use specific units. We measure each item in its native unit and convert where the estimate requires.

ItemUnitHow it's measured
DrywallSFMeasured by room perimeter × ceiling height, minus openings over 32 SF
BaseboardLFMeasured along wall base, excluding door openings and cased openings
CarpetSFMeasured by room area plus 10% waste for seams and cuts
RoofingSQMeasured by roof plan area in squares (100 SF), plus 10% waste for hips and valleys
InsulationSFMeasured by net wall or attic area, excluding framing members
PaintSFMeasured by wall and ceiling area, including trim faces but not edges
Plumbing fixturesEACounted by type: water heater, toilet, sink, tub/shower
Electrical devicesEACounted by type: switch, outlet, GFCI, AFCI, light fixture

Worked Example: Xactimate Water Damage Estimate — Bedroom 2 Carpet and Pad

This example shows how we take off a single room for an Xactimate estimate. The dimensions are illustrative and do not represent a specific project. You can apply the same sequence to any room.

Step 1 — Measure the room. The room is 12 ft 6 in. wide by 14 ft 0 in. long. Convert to decimal feet: 12.5 ft and 14.0 ft. Area = 12.5 × 14.0 = 175.0 SF.

Step 2 — Deduct openings. There is one closet opening 6 ft 0 in. wide with a 2 ft 0 in. return. Deduct 6.0 × 2.0 = 12.0 SF. Net carpet area = 175.0 − 12.0 = 163.0 SF.

Step 3 — Convert to square yards. Carpet is often ordered by the square yard. 163.0 SF ÷ 9 = 18.11 SY. Round to 19 SY for ordering.

Step 4 — Apply waste. Typical waste for carpet is 10%. Waste = 163.0 × 0.10 = 16.3 SF. Total with waste = 163.0 + 16.3 = 179.3 SF. We show base and waste as separate lines.

Step 5 — Pad. Pad is measured at the same area as carpet: 163.0 SF with 10% waste = 179.3 SF. Pad is usually ordered in 100 SF rolls, so 2 rolls are required.

Step 6 — Tack strip. Tack strip runs along the perimeter where carpet meets the wall. Perimeter = 2 × (12.5 + 14.0) = 53.0 LF. Deduct the closet opening: 53.0 − 6.0 = 47.0 LF. Add 5% waste for cuts and corners: 47.0 × 1.05 = 49.4 LF.

Step 7 — Transitions and stair nosing. There is one 3 ft transition at the door: 3.0 LF. If stairs are present, measure treads and risers separately.

Step 8 — Detach and reset. The room has a bed and dresser that must be moved. Add detach and reset as a separate line item. If a toilet or pedestal sink is present, add detach and reset for plumbing fixtures.

Step 9 — Disposal. Old carpet and pad are hauled off. Volume = area × thickness. Carpet and pad average 0.5 in. thick. 163.0 SF × (0.5 ÷ 12) ft = 6.79 CF. Convert to cubic yards: 6.79 ÷ 27 = 0.25 CY. Round to 0.5 CY to account for bulk and handling.

Step 10 — Line items. The final Xactimate line items are:

Line itemQtyUnit
Carpet remove and replace163.0SF
Carpet waste16.3SF
Pad remove and replace163.0SF
Pad waste16.3SF
Tack strip remove and replace47.0LF
Transition strip3.0LF
Detach and reset furniture1EA
Debris haul-off0.5CY

This sequence ensures every quantity is traceable to a measurement and a waste factor. We apply the same method to drywall, roofing, and other trades.

Cost drivers

What Drives the Cost of an Xactimate Estimate for Contractors

Relative impact on a typical estimate for this trade, based on estimator judgment. Select a bar for details.

Scale: 1 = minor, 5 = major relative impact. Estimator judgment, not measured data.
Relative impact 5 / 5

Code upgrades

Older homes often trigger code items such as tamper-resistant outlets, AFCI breakers, and smoke/CO detectors. These are separate line items and must be confirmed with the local building department for the adopted code edition. For example, the IRC requires GFCI protection in wet areas, and the NEC requires AFCI protection in bedrooms. We include these items where applicable and note them as exclusions if not confirmed.

Scope complexity

A single-room water loss takes less time to measure than a whole-house fire. More rooms mean more line items and more photo review. We price by the number of line items, not by square footage alone. For example, a typical water loss might have 50–100 line items, while a fire loss can exceed 300. Complexity also increases with multiple trades and code upgrade requirements.

Photo quality

Clear photos with a scale reference reduce measuring time. Blurry or incomplete photos require assumptions and may need a site visit. We flag assumptions in the estimate. For example, if a photo lacks a tape measure, we scale from a standard door (3 ft) or outlet (12 in. above floor). Poor photo quality can add 20–30% to the estimating time and may lead to missed items.

Code upgrades

Older homes often trigger code items such as tamper-resistant outlets, AFCI breakers, and smoke/CO detectors. These are separate line items and must be confirmed with the local building department for the adopted code edition. For example, the IRC requires GFCI protection in wet areas, and the NEC requires AFCI protection in bedrooms. We include these items where applicable and note them as exclusions if not confirmed.

Material matching

Discontinued flooring, siding, or shingle profiles may require matching a larger area. We note where matching is required and price the additional quantity. For example, if carpet is discontinued, we may need to replace an entire room or adjacent areas to achieve a match. This can add 10–20% to the flooring quantity. We document the matching requirement in the estimate.

Turnaround

Standard turnaround is 24–48 hours. Rush projects are prioritized and may incur an additional fee. We confirm the deadline before starting. For rush projects, we may assign additional estimators to meet the deadline. The fee depends on the project size and the required delivery time. We do not compromise on accuracy for speed.

Number of trades

A restoration project involving multiple trades (e.g., drywall, flooring, roofing, electrical, plumbing) requires more coordination and line items. Each trade has its own unit of measure and pricing. For example, electrical devices are counted by EA, while drywall is measured by SF. More trades mean more line items and a higher estimating cost.

Equipment and containment

Drying equipment (dehumidifiers, air movers) and containment barriers are often required for water damage. These are priced by the day and can add significant cost. We include equipment days and containment setup as separate line items. For example, a typical water loss might require 5–10 air movers and 2–3 dehumidifiers for 3–5 days.

Scope gaps

Common Scope Gaps in Xactimate Insurance Estimate Reviews

These are the items most often missed in restoration estimates. We check for them on every project.

  • Detach and reset of fixtures, appliances, and toilets for flooring or cabinet work. This hides in the flooring section but is often omitted. We add it as a separate line item and verify against the carrier scope.
  • Temporary protection, containment, and negative air during demolition. These are typically in Division 01 but often left out of carrier scopes. We include them where required by the scope of work and local code.
  • Haul-off and dumpster days, especially for drywall and roofing tear-off. We calculate debris volume in cubic yards and convert to dumpster days using a 20-yard container as the baseline.
  • Permit fees, plan review, and inspection re-inspection charges. These belong in Division 01 General Requirements. We list them as exclusions if not provided by the jurisdiction.
  • Sales tax on materials where the jurisdiction applies it. We add a separate line for sales tax if you provide the rate. Without the rate, we exclude it and note the exclusion.
  • Overhead and profit applied to the correct line items, not the whole estimate. We follow carrier guidelines for O&P application, typically to labor and materials only, not equipment or debris removal.
  • Code upgrade items such as tamper-resistant outlets, GFCI protection, AFCI breakers, and smoke/CO detectors. We verify with the local building department for the adopted code edition before including them.
  • Matching of discontinued flooring, siding, or shingle profiles. We note where matching is required and price the additional quantity. This can add 10–20% to the affected area.
  • Roofing components beyond the shingles: drip edge, valley metal, pipe boots, step flashing. These are separate line items and often omitted. We measure linear feet for each component.
  • Insulation replacement after water intrusion, including vapor barrier repair. We measure net area and include vapor barrier where required by the IRC for the climate zone.
  • Paint on the back side of removed baseboard and trim. This is a separate line item and often missed. We add it when trim is removed and reinstalled.
  • Equipment days for dehumidifiers, air movers, and HEPA vacuums. We include daily rates for the drying period and note the equipment count and duration.

Xactimate Restoration Estimating: Material Systems and Line Item Selection

Material selection drives line item choice, unit of measure, and waste factor. The table below shows common options and their takeoff implications.

Material systemTypical unitWaste factor (typical)Takeoff note
Drywall, 1/2 in. vs 5/8 in.SF5%Thicker drywall may require different fasteners and finish level.
Carpet vs LVP vs sheet vinylSF or SY10% carpet, 5% LVPCarpet waste higher for seams; LVP waste for cuts and angles.
Asphalt shingle vs metal vs membraneSQ10% shingle, 5% metalShingle waste for hips and valleys; metal measured by panel length.
Batt vs blown-in vs spray foam insulationSF5% batt, 10% blown-inBlown-in measured by volume; spray foam by board feet.
MDF vs finger-jointed pine vs PVC trimLF5%PVC trim for wet areas; MDF for painted interior.
Codes and standards

Codes and Standards That Affect Xactimate Bid Estimating

Model codes

Xactimate estimates must account for code-required upgrades. The IRC and IBC govern residential and commercial construction, and the NEC covers electrical devices. The IECC sets insulation and window performance. The IPC and UPC govern plumbing fixture replacements. The NFPA 13 and NFPA 72 apply to sprinkler and alarm systems in commercial losses. Each code family has provisions that change quantities: for example, the NEC requires GFCI protection in wet areas and AFCI protection in bedrooms, which adds devices. The IRC requires smoke and CO detectors in specific locations. Always confirm the adopted code edition with the local building department, as editions vary by state and municipality.

Industry standards

Estimators reference standards that define workmanship and testing. ASTM C840 covers gypsum board application and finish levels. ASTM D4258 and D4259 cover concrete surface preparation. The NRCA Roofing Manual provides installation details for shingles and flashing. SMACNA standards apply to ductwork. GA-214 defines gypsum board finish levels. These standards affect line item selection: for example, a Level 4 finish requires a specific number of coats, which changes labor hours. The standards also define when a substrate must be replaced rather than repaired.

Specification sections

CSI MasterFormat sections tell you what the designer expects. Division 01 covers general requirements, including temporary protection and permits. Division 06 covers rough and finish carpentry, including blocking and trim. Division 07 covers thermal and moisture protection, including insulation and roofing. Division 08 covers doors and windows. Division 09 covers finishes, including drywall, flooring, and paint. Division 22 and 26 cover plumbing and electrical. Read these sections for product standards, execution, and quality assurance. They change cost by specifying material grade, installation method, and testing requirements.

Local amendments

Local jurisdictions adopt model codes with amendments. For example, some states require tamper-resistant outlets in all dwelling units, while others limit it to certain rooms. Some areas have wind-borne debris requirements for roofing and glazing. Seismic zones may require strapping and bracing. Sales tax on materials varies by state and county. Permit fees and inspection requirements differ. Because of these variations, you must confirm the adopted code edition and any amendments with the local building department before finalizing an estimate. We flag code upgrade items as exclusions when not confirmed.

Who we provide estimates for

Who Uses Outsourced Xactimate Estimating

Restoration contractors

You need a carrier-ready estimate to submit for approval. We provide line items that reconcile with your photos and measurements, reducing back-and-forth with adjusters.

Adjusters

You need a second opinion on a scope of loss or a detailed estimate for a complex claim. We measure from photos and plans and flag missing items.

Property owners

You need to understand what your insurance will cover and what it will not. We provide a line-by-line estimate with exclusions noted.

General contractors

You are bidding a restoration project and need an Xactimate-format estimate to compare with your own pricing. We deliver in Excel for easy import.

Where we provide estimates

Xactimate Estimating in 20 states

Pricing is adjusted to the project ZIP code. Select a highlighted state to see the cities we cover there.

States we coverSelected
TX

Xactimate Estimating in Texas

Nation's largest construction market; Sun Belt population growth, data centers, semiconductor plants, and single-family home building.

Texas estimating services
Property types

Xactimate Fire Damage Estimate and Other Project Types We Price

Xactimate estimates vary by loss type and property use. The takeoff method changes with the cause of loss and the building class.

Single-family water loss

Measure affected rooms; add drying equipment days and containment; check for hidden moisture in walls.

Watch for: Verify equipment quantities and days match the drying log; confirm no missed wicking in drywall.

Multi-family fire loss

Measure per unit; add smoke and water damage; include code upgrades for common areas.

Watch for: Check for shared systems; confirm unit-by-unit quantities and O&P application per carrier.

Commercial water damage

Measure large open areas; add specialty drying and temporary power; include ADA and code items.

Watch for: Confirm business interruption costs are excluded; verify equipment power requirements.

Hail damage roofing

Measure roof by squares; count penetrations, vents, and flashing; add gutter and downspout R&R.

Watch for: Check for matching shingle profiles; confirm drip edge and valley metal are included.

Wind damage siding

Measure siding by SF or squares; count corners, trim, and house wrap; add window and door wraps.

Watch for: Verify matching of discontinued siding; confirm removal of damaged sheathing is included.

Mold remediation

Measure affected areas; add containment, negative air, and HEPA vacuuming; include antimicrobial.

Watch for: Confirm clearance testing is excluded; verify containment setup and tear-down days.

Water heater replacement

Count fixtures; measure supply and drain lines; add expansion tank and pan; include permit.

Watch for: Check for code-required expansion tank; confirm venting and combustion air requirements.

Electrical device replacement

Count devices by type; measure wire runs; add GFCI, AFCI, and tamper-resistant devices.

Watch for: Confirm code edition; verify AFCI requirements in bedrooms and GFCI in wet areas.

Deliverables

What you receive

  • Xactimate-format estimate in Excel and PDF, organized by trade category.
  • Marked-up plan sets showing measured areas and line item locations.
  • Summary of line items with quantities, units, and ZIP-adjusted pricing.
  • List of exclusions and assumptions, including code upgrade items to confirm with the local building department.
  • Photo markup showing affected areas and measurements.
  • Turnaround within 24–48 hours for most projects, with rush available.
Checklist

Pre-Bid Checklist for Xactimate Takeoff Services

  • Confirm cause of loss and affected areas from carrier paperwork.
  • Verify photo scale reference (tape measure or known object).
  • Measure room dimensions and deduct openings over 32 SF.
  • Count all fixtures, devices, and equipment by type.
  • Check for detach and reset of fixtures and appliances.
  • Apply typical waste factors: 10% carpet, 5% drywall, 10% roofing.
  • Include code upgrade items: GFCI, AFCI, smoke/CO detectors.
  • Add temporary protection, containment, and negative air.
  • Calculate debris volume in cubic yards and convert to dumpster days.
  • List permit fees, sales tax, and O&P as separate lines.
  • Note any matching requirements for discontinued materials.
  • Confirm turnaround deadline and rush fee if applicable.
Client reviews

What clients say about Scope Precision Estimate

10 client reviews
MA
Michael AndersonGeneral Contractor

The cost estimate was detailed, accurate, and easy to understand. It helped us prepare our bid confidently and stay competitive without overlooking important costs.

AW
Andrew WilsonGeneral Contractor

Highly recommended for construction cost estimating. The quantities were accurate, the pricing was well organized, and the final report was easy to review.

MD
Matthew DavisConstruction Manager

Their construction estimate was thorough and professionally prepared. It made our budgeting process much easier and helped us identify potential cost issues early.

CM
Christopher MillerResidential Builder

We needed a quick and accurate construction cost estimate, and they delivered exactly what we needed. Great attention to detail and a very responsive team.

BT
Brian TaylorProject Estimator

Fast, accurate, and dependable estimating service. They understood the project requirements quickly and provided a detailed estimate without unnecessary delays.

RW
Robert WilliamsEstimating Manager

Professional and reliable estimating service. The detailed quantity takeoff helped us reduce pricing errors and submit our proposal on time.

FAQ

Xactimate Estimating questions

What file formats do you deliver for an Xactimate estimate?

We deliver in Excel and PDF, organized by trade category. The Excel file is formatted for easy import into Xactimate or other estimating software. We also provide a marked-up plan set showing measured areas and line item locations. The PDF is suitable for submission to carriers or clients. If you need a specific format, tell us before we start.

Do you need the carrier's scope of loss to prepare an estimate?

It helps but is not required. If you provide the carrier's scope, we reconcile it line by line and flag missing items. If you do not have it, we measure from your plans and photos and produce an independent estimate. We can also compare our estimate to the carrier's scope and provide a variance report.

How do you handle overhead and profit in an Xactimate estimate?

We apply overhead and profit (O&P) to the correct line items per carrier guidelines. Typically, O&P is applied to the subtotal of labor and materials, not to equipment or debris removal. We confirm the carrier's specific requirements before finalizing. If you are a contractor, we can show O&P as a separate line so you can adjust it.

What is your turnaround time for a rush Xactimate estimate?

Standard turnaround is 24–48 hours for most projects. Rush service is available for an additional fee. For rush projects, we prioritize and confirm the deadline before starting. We may assign additional estimators to meet the deadline. The fee depends on project size and required delivery time. We do not compromise on accuracy for speed.

How do you measure from photos when no plans are available?

We scale from known objects such as doors (typically 3 ft wide) and outlets (typically 12 in. above floor). We mark each measurement on the photo with a reference number. If a photo lacks a scale reference, we flag assumptions in the estimate. For complex losses, we may recommend a site visit or ask for additional photos with a tape measure.

Can you estimate mold remediation in Xactimate format?

Yes. We measure affected areas, add containment, negative air, and HEPA vacuuming, and include antimicrobial treatment. We also include clearance testing as an exclusion unless you provide the protocol. Mold remediation often requires a separate protocol from an industrial hygienist. We can follow that protocol to ensure the estimate matches the required scope.

Do you include sales tax on materials in your estimates?

Sales tax varies by jurisdiction. We add a separate line for sales tax if you provide the rate. If you do not provide it, we list it as an exclusion. Some carriers require sales tax to be included, while others handle it separately. We follow the carrier's guidelines or your instructions.

What is the difference between Xactimate and RSMeans pricing?

Xactimate pricing is based on localized data and is commonly required by insurers. RSMeans data is a national database with regional adjustments. We use RSMeans as a cross-check where Xactimate pricing is not available. The two may differ, so we note the source in the estimate. If you need a specific pricing basis, tell us before we start.

How do you handle code upgrades in an Xactimate estimate?

We identify code upgrade items such as tamper-resistant outlets, GFCI protection, AFCI breakers, and smoke/CO detectors. We include them as separate line items where applicable. Because code editions vary, we recommend confirming with the local building department. We flag unconfirmed items as exclusions so you can verify before submission.

Can you estimate a commercial restoration project?

Yes. Commercial projects often involve larger areas, multiple trades, and code requirements such as ADA and NFPA. We measure from plans and photos, apply ZIP-adjusted pricing, and organize by trade category. We also include equipment days, temporary power, and containment. We can follow a specific carrier or client format if required.

What information do you need to start an Xactimate estimate?

We need plans or clear photos of affected areas, the carrier's scope if available, cause of loss, ZIP code, finish schedule, and deadline. If you have a specific format or carrier requirement, include that. The more detail you provide, the fewer assumptions we need to make. We confirm receipt and ask follow-up questions before starting.

Do you offer revisions if the carrier changes the scope?

Yes. If the carrier changes the scope, we can revise the estimate. Revisions are billed at an hourly rate or a flat fee, depending on the extent. We keep a record of all changes so you can track the estimate history. Contact us with the revised scope and we will provide a quote for the revision.

Do you provide Xactimate takeoff services from as-built drawings?

Yes. We measure from as-built drawings, plans, or photos, then build the Xactimate sketch and quantity takeoff before pricing. Each line item shows its unit of measure, quantity, and unit price, so you can check square feet of flooring or linear feet of base against the drawing. Where as-builts disagree with the carrier's scope of loss, we flag the difference and issue a request for information rather than guessing.

Can you produce an Xactimate estimate for contractors who need it for a bid package?

Yes. Send the bid package, and we return an Xactimate-format estimate organized by trade category, with line item pricing traced to a measured takeoff. We separate demolition, drying, and rebuild, and show depreciation, recoverable depreciation, actual cash value, and replacement cost value on their own lines. If the scope changes after submission, we handle the change order and reprice only the affected line items.

How do you handle restoration estimating services when the loss involves both water and fire damage?

We split the estimate by cause of loss so each trade category is priced once. Water damage estimating covers extraction, drying equipment, and affected finishes; fire damage estimating covers soot removal, odor treatment, and replacement of burned assemblies. Both feed one Xactimate sketch and one quantity takeoff, so square feet and linear feet stay consistent across Division 9 finishes, Division 22 plumbing, and Division 26 electrical.

How does an Xactimate insurance estimate handle the deductible?

The deductible is shown as a separate line on the summary, not netted into trade lines. We price the full replacement cost value, then list depreciation, recoverable depreciation, and the deductible so the carrier and the insured can see each figure. If the loss involves water, we reference the IICRC S500 drying standard and include moisture map readings and photo documentation. You confirm the deductible amount with the policy before we finalize the estimate review.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning. is a Senior Estimator with more than 15 years of professional experience in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Guides on this topic

Send Your Plans and Photos

Email your plans, photos, and carrier paperwork for a line-by-line Xactimate estimate within 24–48 hours.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote
Call Us