Scope Precision EstimateContact Us

Tile & Stone Estimating

Send your architectural and finish plan sets, tile schedule, and specifications. You get back a quantity takeoff and priced estimate organized by CSI MasterFormat division, with marked-up plans, in Excel and PDF.

24–48 hours for most projectsTypical turnaround
Excel + marked-up PDFsOrganized by CSI section
ZIP-code pricingLocal material and labor
Price confirmed firstBefore any work starts
Sample estimate sheet
Division 09 — Tile & StoneSample format
Line itemQtyUnitTile
Floor tile 12x24 porcelain18,400SF18,400 SF
Shower wall tile 3x6 subway2,850SF2,850 SF
Quarry tile cove base 6 in1,240LF1,240 LF
Crack-isolation membrane16,200SF16,200 SF
Waterproofing wet areas3,400SF3,400 SF
Total tile and stone surface24,650 SF
Illustrative quantities. Waste factor applied as a separate line.
Pattern waste broken out

What is tile and stone estimating?

Tile and stone estimating is the quantity takeoff and pricing of Division 09 finishes — 09 30 00 Tiling, 09 30 13 Ceramic Tiling, 09 30 16 Quarry Tile, 09 30 19 Stone Tiling, and 09 32 00 Stone Facing — measured in SF, LF, and EA. The deliverable is an Excel and PDF takeoff with marked-up plans, priced with ZIP-code-adjusted material and labor.

  • Units are SF for field tile, LF for trim and membrane seams, EA for niches and drains.
  • Typical waste runs 10–15% for field tile, higher on diagonal or large-format layouts.
  • The most common costly miss is crack-isolation membrane and banding at changes in plane.

Tile and stone pricing starts with finished square footage, but that number alone will not buy the job. You need the takeoff converted into what a setter actually orders: cartons of field tile by format, bags of modified and unmodified thinset mortar by trowel notch, grout units by joint width and tile module, and linear feet of crack-isolation membrane, banding, and sealant at every change in plane. We take off Division 09 finishes — 09 30 00 Tiling, 09 30 13 Ceramic Tiling, 09 30 16 Quarry Tile, 09 30 19 Stone Tiling, and 09 32 00 Stone Facing — plus the substrate and waterproofing work that decides whether the tile stays down.

Deliverable
Excel estimate + marked-up PDF plans
Organized by
CSI MasterFormat section
Turnaround
24–48 hours for most projects
Pricing
ZIP-code-adjusted material and labor pricing
Software
Bluebeam Revu, PlanSwift, RSMeans data

Our tile takeoff services cover porcelain tile, ceramic, granite, limestone, mosaic tile, and glass tile, and we measure each one on the same axis so your bid is comparable. We read the finish schedule, the reflected ceiling plan, and the wall sections together, because tile backer board, tile underlayment, and tile trim quantities come from the assembly, not from the floor plan alone. Every takeoff is a material takeoff first: counts, areas, and linear foot totals you can price with your own unit price, crew size, and labor productivity assumptions. If the drawings carry a note like "tile per owner's standard," we flag it as a request for information rather than guess.

Send a plan set and we return a takeoff in Excel and PDF, organized by CSI MasterFormat division with marked-up drawings showing every measured area. We work in Bluebeam Revu, PlanSwift, and Cubit, so on-screen takeoff markup travels with the file. Pricing is ZIP-code-adjusted for material and labor using RSMeans data, so a shower surround in Dallas and one in Seattle do not carry the same number. Most projects turn in 24–48 hours; rush is available when a bid deadline is close. If your scope sits inside a larger floor package, start with our Flooring Estimating Services page, or send plans directly through Get an estimate.

Services

What our tile takeoff services cover

We measure finished tile and stone surfaces by area type, then build the setting materials, substrate prep, and wet-area assemblies from the same drawings. The takeoff follows the tile schedule and finish plans, with each area keyed back to the sheet and detail it came from so you can check the quantity against the drawing.

Field and Floor Tile

Measured in SF by size and format, with carton counts and typical waste applied per room.

SF · cartons

Wall Tile and Surrounds

Shower and tub surrounds taken off in SF by wainscot height, with bullnose and trim in LF.

SF · LF

Stone Tile and Slab

Stone tile, slab, and large-format panel in SF and slab count, including yield and freight assumptions.

SF · slabs

Quarry Tile and Cove Base

Quarry tile in SF and cove base in LF, including outside and inside corner pieces.

SF · LF

Crack Isolation and Membrane

Uncoupling and crack-isolation membrane in SF with seam LF, plus banding at edges and penetrations.

SF · LF

Waterproofing Assemblies

Liquid and sheet waterproofing in SF with preformed corners, banding, and drain collars.

SF · EA

Mortar Bed and Underlayment

Mortar bed and self-leveling underlayment in SF by thickness, with bag counts and mixing labor.

SF · bags

Setting Materials and Grout

Thinset by trowel notch, grout by joint width and tile module, and sealant in LF at changes in plane.

bags · units · LF

What every tile & stone estimating takeoff includes

  • Field and floor tile in SF by size and format
  • Wall tile and shower surrounds in SF by wainscot height
  • Stone tile, slab, and large-format panel in SF and slab count
  • Quarry tile and cove base in SF and LF
  • Bullnose, trim, and metal edge profile in LF
  • Crack-isolation and uncoupling membrane in SF with seam LF
  • Waterproofing membrane in SF with corners and banding
  • Mortar bed and self-leveling underlayment in SF by thickness
  • Thinset, grout, and sealant in bags, units, and LF
  • Backer board and cement board in SF with fasteners and tape
  • Shower niches, benches, curbs, and drains in EA and LF
  • Floor prep, grinding, patching, and substrate repair in SF and hours
Free tool

Flooring quantity calculator

Estimate material for a room. A full takeoff also covers transitions, base, underlayment, moisture mitigation and pattern layout.

Typical waste: 5–10% for straight lay, 15% or more for diagonal or herringbone patterns.

Result
24boxes
Floor area (net)432 SF
Area with waste467 SF
Square yards (carpet)51.8 SY

Need the full takeoff with pricing? Upload your plans.

How we work

How our tile estimator performs the takeoff

  1. Read the tile scheduleWe pull every tile type, size, and finish from the finish schedule and key it to the room numbers on the floor plans. A 12x24 porcelain in a corridor and a 12x24 porcelain in a shower are the same material but not the same setting method, so they stay on separate lines. We also note the specified grout joint width and any requirement for epoxy grout, because those change the material conversion and the labor rate.
  2. Measure finished surfacesEach area is measured net in SF from the finish plan: floor tile to the wall line, wall tile to the wainscot height in inches, cove base at the wall line in LF. Openings over 3 SF are deducted; door and window returns are added back where tile wraps the jamb. We record the sheet and grid line for every measurement so you can trace each quantity back to the drawing.
  3. Build the wet-area assemblyShower walls, pans, niches, benches, and curbs are traced from the details. We count preformed corners, banding LF, and the waterproofing SF separately from the tile, because these items are bought by the roll and kit, not by the tile square foot. Linear drain assemblies and their bonding flanges are counted in EA, and the sealant at every change in plane is measured in LF.
  4. Convert to setting materialsThinset bags come from coverage tables at the specified trowel notch: a 1/2 x 1/2 in notch covers less than a 1/4 x 3/8 in notch on the same SF. Grout units come from joint width and tile module, so a 3x6 subway with 1/8 in joints and a 24x48 panel with 1/16 in joints do not share a coverage rate. We show the conversion math on a separate sheet so you can adjust for your own product data.
  5. Apply waste and pattern factorsWaste is applied by format and layout, not as one blanket percentage. Straight-set large-format takes a lower factor than a 45-degree offset or herringbone, and stone with a directional vein takes more than a rectified porcelain. The factor is shown as its own line so you can change it. We also add a separate allowance for cuts at borders, niches, and door openings where breakage is higher.
  6. Price and mark up the plansMaterial and labor are priced with ZIP-code-adjusted RSMeans data, then the measured areas are highlighted on the plan set so every number can be traced. The finished file goes out in Excel and PDF, sorted by CSI section, with the marked-up drawings attached. We note the pricing basis and date so you can compare against your own quotes or a later escalation.

What we need from you

  • Finish plansFloor and reflected ceiling plans with room numbers, so tile areas can be keyed to the schedule.
  • Tile scheduleType, size, thickness, finish, and manufacturer for every tile and stone on the job.
  • Specification sectionDivision 09 30 00 and related sections, including setting materials and substrate requirements.
  • Wet-area detailsShower, tub, and niche details showing waterproofing extent and drain type.
  • Substrate drawingsStructural and architectural sheets showing what the tile goes over — slab, plywood, or backer board.
  • Bid dateThe deadline you are pricing to, so we can set standard or rush turnaround.
Sample output

Sample tile takeoff format

This is the line structure you receive, with CSI section, quantity, unit, and the sheet the quantity came from.

Sample format — illustrative quantities
SectionLine itemQtyUnitRef.
09 30 13Ceramic tile 12x24, floor, thin-set18,400SFA-201
09 30 13Ceramic tile 3x6, shower walls, thin-set2,850SFA-401
09 30 16Quarry tile cove base 6 in1,240LFA-201
09 30 19Travertine slab, lobby feature wall860SFA-301
09 05 61Crack-isolation membrane, floor16,200SFA-201
09 05 61Waterproofing membrane, wet areas3,400SFA-401
09 30 13Thinset, modified, 1/2 in notch620bagsA-201
09 30 13Grout, sanded, 1/8 in joints145unitsA-201
09 30 13Sealant, 100% silicone, changes in plane980LFA-401
09 30 13Bullnose trim, 3x12320LFA-201
09 30 13Shower niche, preformed 12x206EAA-401
09 30 13Linear drain, 36 in, with flange4EAP-101

Units of measure in a tile estimate

Tile is bought by the square foot but ordered by the carton, bag, and pail. We keep both in the takeoff so your purchase order matches the estimate.

ItemUnitHow it's measured
Finished tile surfaceSFMeasured net from the finish plan, no waste added
Substrate and membraneSFMeasured to the edge of the tile field plus required laps
Trim and edge profileLFMeasured along the exposed edge or wall line
Niches, drains, thresholdsEACounted from the plumbing and detail sheets
Thinset and groutbags / unitsConverted from SF using trowel notch and joint width
Stone slabSF or LBMeasured from the slab layout, with yield loss
Cove base and sealantLFMeasured at wall base and changes in plane, including corners

Worked takeoff: a 5 ft x 8 ft shower surround with a bench and niche

The dimensions below are illustrative. The method is the same one we use on a full plan set.

Given

  • Shower interior: 5 ft wide x 8 ft tall x 3 ft deep (back wall 5 ft, two side walls 3 ft, front wall 5 ft).
  • Tile: 3x6 in glazed ceramic, straight-set, 1/8 in joints.
  • Waterproofing: bonded sheet membrane over cement backer board.
  • Bench: 5 ft x 1.5 ft top, 5 ft x 1.5 ft face. Niche: one preformed 12x20 in unit.

Step 1 — Wall surface area (net SF)

  • Back wall: 5 ft x 8 ft = 40.0 SF
  • Left side: 3 ft x 8 ft = 24.0 SF
  • Right side: 3 ft x 8 ft = 24.0 SF
  • Front wall: 5 ft x 8 ft = 40.0 SF
  • Bench top: 5 ft x 1.5 ft = 7.5 SF
  • Bench face: 5 ft x 1.5 ft = 7.5 SF
  • Gross wall + bench = 143.0 SF
  • Deduct niche opening: 12 in x 20 in = 240 sq in ÷ 144 = 1.7 SF
  • Net tile SF = 143.0 − 1.7 = 141.3 SF

Step 2 — Waterproofing (SF)

  • Walls to 8 ft + bench + 6 in lap past the curb and 6 in beyond the shower opening on each side.
  • Walls: 40 + 24 + 24 + 40 = 128.0 SF
  • Bench: 7.5 + 7.5 = 15.0 SF
  • Lap past curb and opening: (5 ft + 5 ft) x 0.5 ft = 5.0 SF
  • Banding at corners and seams: 4 vertical corners x 8 ft = 32.0 LF; 2 horizontal seams x 3 ft = 6.0 LF; total 38.0 LF
  • Preformed corners: 4 inside + 2 outside = 6 EA
  • Niche: 1 preformed unit = 1 EA

Step 3 — Setting materials

  • Thinset coverage for 3x6 tile with a 1/4 x 3/8 in square-notch trowel: approximately 65–70 SF per 50 lb bag. Use 68 SF/bag.
  • 141.3 SF ÷ 68 SF/bag = 2.08 bags → round up to 3 bags of modified thinset.

Step 4 — Grout

  • Joint LF: for 3x6 tile, each tile has a perimeter of 18 in = 1.5 LF; two tiles share a joint, so 0.75 LF per tile.
  • Tiles per SF: 1 SF ÷ (0.25 ft x 0.5 ft) = 8 tiles/SF.
  • Joint LF = 141.3 SF x 8 tiles/SF x 0.75 LF = 847.8 LF.
  • Sanded grout at 1/8 in joints covers about 1,100 LF per 25 lb unit. 847.8 ÷ 1,100 = 0.77 units → round up to 1 unit.

Step 5 — Waste (separate line)

  • Straight-set 3x6 wall tile, typical waste 8–10%. Use 10%: 141.3 SF x 0.10 = 14.1 SF.
  • Total tile to order = 141.3 + 14.1 = 155.4 SF → order 156 SF (about 7 cartons of 22.5 SF, depending on the manufacturer).

Step 6 — Trim and sealant

  • Bullnose at the two outside vertical edges: 2 x 8 ft = 16.0 LF.
  • Sealant at changes in plane (wall-to-floor, wall-to-wall, bench-to-wall, around the niche): 4 vertical corners x 8 ft = 32.0 LF; 1 wall-to-floor joint x 5 ft = 5.0 LF; bench perimeter 5 + 1.5 + 1.5 = 8.0 LF; niche perimeter 2 x (1 + 1.67) = 5.3 LF. Total 50.3 LF.

Result: 141.3 SF net tile, 156 SF ordered, 3 bags thinset, 1 grout unit, 128 SF membrane plus 38 LF banding, 6 corners, 1 niche, 16 LF bullnose, 50.3 LF sealant. Every quantity traces to a dimension, and waste is its own line so you can change the factor without redoing the takeoff.

Cost drivers

What moves a tile cost estimating number

Relative impact on a typical estimate for this trade, based on estimator judgment. Select a bar for details.

Scale: 1 = minor, 5 = major relative impact. Estimator judgment, not measured data.
Relative impact 5 / 5

Tile format and size

A 24x48 large-format panel needs a wider trowel notch, more back-buttering, and more cuts per SF than a 12x12. Larger formats also raise waste because a broken piece cannot be reused on a short wall. The weight per SF also affects handling labor and the number of setters needed on the wall.

Tile format and size

A 24x48 large-format panel needs a wider trowel notch, more back-buttering, and more cuts per SF than a 12x12. Larger formats also raise waste because a broken piece cannot be reused on a short wall. The weight per SF also affects handling labor and the number of setters needed on the wall.

Pattern and layout

Straight-set, running bond, 45-degree, and herringbone all carry different waste and labor. A herringbone in a corridor with door openings can push waste well above a straight-set field. We read the layout from the finish plan and apply a factor by pattern, not a single job-wide percentage.

Substrate condition

Tile needs a flat, sound substrate within tolerance. Grinding, patching, and flattening are measured in SF and hours, and they are often the difference between a profitable tile package and a callback. We also check for deflection and control joints, because those can force an unbonded mortar bed or a membrane.

Wet-area assemblies

Waterproofing, preformed corners, banding, niches, benches, and linear drains are counted by the piece and the LF. They do not scale with the tile SF, so a small shower can carry a disproportionate share of the cost. We trace each assembly from the detail sheet and list the components separately.

Stone yield and freight

Natural stone is sold by the slab or bundle, and the yield from bundle to cut depends on vein direction and the layout. Imported stone adds freight and lead time that a domestic porcelain line does not. We flag imported stone as a separate line so you can see the freight and yield exposure before you bid.

Setting materials

Modified versus unmodified thinset, sanded versus unsanded grout, and epoxy grout in food-service or wet areas change both the material cost and the labor rate per SF. The specified trowel notch and joint width drive the coverage rate, so we convert from the spec, not from a default bag count.

Subfloor and underlayment

Plywood, OSB, concrete, and lightweight concrete each require different prep and bonding methods. A plywood subfloor may need an uncoupling membrane or a cement backer board, while a slab may need grinding and crack isolation. We measure the prep and membrane in SF and note the substrate type on each line.

Scope gaps

Scope gaps our stone takeoff services catch

Most tile losses come from items that are drawn but not scheduled, or scheduled but not measured. These are the ones we see most often.

  • Waste factor applied as one blanket percentage across every tile type. A 12x24 offset and a herringbone do not share a factor, and the layout is on the finish plan. We set waste by format and pattern.
  • Crack-isolation membrane over concrete and at plywood subfloor transitions. It is usually in the spec but not on the plan, so it gets missed in the takeoff. We measure it to the tile field edge plus laps.
  • Waterproofing at shower walls, niches, benches, and curbs, plus preformed corners and banding. These are detailed but rarely quantified. We count them from the wet-area details as SF, LF, and EA.
  • Mortar coverage lost to large-format trowel notches and back-buttering. The bag count is not the same as a small-tile job. We convert SF to bags using the specified notch and coverage table.
  • Grout and sealant quantities based on joint width and tile module rather than floor SF. A 3x6 subway and a 24x48 panel have very different joint LF. We calculate joint LF before converting to grout units.
  • Substrate prep — patching, grinding, and flattening to tolerance — shown on the architectural sheets but not in the tile section. We measure it in SF and hours so it is not absorbed into the tile labor rate.
  • Movement and expansion joints at perimeters, penetrations, and large field areas. They are required by the tile standard but easy to omit. We measure sealant LF at every change in plane and at the perimeter.
  • Trim, bullnose, and metal edge profiles at exposed edges and outside corners. These are drawn but not always scheduled. We take them off in LF by profile type from the reflected ceiling and floor plans.
  • Floor drains, linear drains, thresholds, and door undercuts. These are counted in EA from the plumbing and door schedules, and they carry their own setting and sealing labor.
  • Escalation and freight on imported stone and slab material, plus slab yield from bundle to cut. We flag imported stone as a separate line so you can see the freight and yield exposure before you bid.
  • Demolition and haul-off of existing tile and mortar bed, with dumpster and disposal. This is often a separate section but affects the tile schedule. We measure it in SF and add disposal as an allowance.
  • Protection of finished tile after installation and final cleaning. These are usually in the general requirements but get pushed onto the tile contractor. We list them so they are priced or explicitly excluded.

Tile and stone materials on the estimating axis

Format and setting method drive both the material order and the labor rate, so we keep them on separate takeoff lines even when the finish schedule groups them.

MaterialTypical format and thicknessSetting method and waste driverTakeoff note
Glazed ceramic3x6 to 12x24 in, 1/4 to 5/16 inThin-set over backer board; straight-set waste 8–10%Most common wall and light-duty floor tile; joint width drives grout units.
Porcelain12x24 to 24x48 in, 3/8 inModified thin-set, 1/2 in notch, back-butter; waste 10–15%Large format raises bag count and handling labor; check substrate flatness.
Natural stone — marble and travertine12x12 to 18x36 in, 3/8 to 1/2 inWhite modified thin-set; waste 12–18% with vein directionDirectional veining and slab yield must be flagged separately.
Slate and quartzite12x12 to 24x24 in, 3/8 to 1/2 inMedium-bed mortar; waste 12–18%Cleft face and thickness variation change mortar coverage.
Quarry tile6x6 in, 1/2 inCement or epoxy grout; waste 8–10%Cove base measured at the wall line in LF, not from floor SF.
Glass mosaic1x1 to 2x2 in on 12x12 in sheetsModified thin-set, 3/16 in notch; waste 10–12%Sheet layout and cut count at borders raise labor per SF.
Large-format panel24x48 to 48x110 in, 1/4 to 1/2 inModified thin-set plus back-buttering; waste 15–20%Panel weight may require two setters and a mechanical lift.
Codes and standards

Codes, standards, and specification sections that change the takeoff

Model codes

Tile work is governed indirectly by the model codes adopted in your jurisdiction. The IBC and IRC set substrate, wet-area, and shower pan requirements; the IPC or UPC governs shower drains and pan connections; the NEC covers bonding of metallic pans and equipment in wet locations; and the IECC affects exterior tile assemblies through envelope and thermal requirements. Because adopted editions vary by state and city, confirm the edition in force with the local building department before you lock quantities. A code change can add a membrane, a drain type, or a substrate layer that was not on the drawings.

Industry standards

Estimators should read the tile installation standard referenced in the specification, typically the TCNA Handbook methods and the ANSI A108 and A118 series for installation and material performance. ASTM C627 covers mortar bed and thin-set performance under load, and ASTM C920 covers elastomeric joint sealants. Substrate flatness and deflection limits come from these standards and from the structural drawings. When the spec cites a method number, that method dictates the setting bed, membrane, and joint treatment, which changes both material and labor in the takeoff.

Specification sections

The sections that move the number most are 09 30 00 Tiling with its subsections 09 30 13 Ceramic Tiling, 09 30 16 Quarry Tile, and 09 30 19 Stone Tiling, plus 09 32 00 Stone Facing. Also read 09 05 61 Common Work Results for Tile for membrane and setting material requirements, 09 06 00 Schedules for Finishes for the tile schedule, 09 21 16 Gypsum Board Assemblies for substrate, 09 24 00 Cement Plaster, 07 92 00 Joint Sealants, 03 01 30 Restoration of Concrete Substrates, and 22 42 00 Plumbing Fixtures for shower pans and drains. Each of these can add or remove a line item.

Local amendments

Adopted code editions, amendments, and local inspection practices vary widely. Some jurisdictions require specific shower pan testing, additional waterproofing at certain occupancies, or particular drain types. Seismic and wind provisions can also change substrate attachment in exterior or high-rise applications. Because these requirements are not always shown on the drawings, confirm the adopted edition and any local amendments with the local building department, and note the basis in your estimate so the number can be adjusted if the requirements differ.

Who we provide estimates for

Who uses a tile estimate for contractors

General contractors

You need a tile number you can carry in a bid without leaving money on the table. The takeoff gives you line-item quantities to compare against subcontractor quotes and to level scope between bidders.

Tile subcontractors

You are pricing a package and need the setting materials, membrane, and trim counted the way you buy them. The Excel file lets you drop in your own material pricing and labor rates without re-measuring the plans.

Developers and owners

You are checking a budget or a change order. The marked-up plans show exactly which areas were measured, so a scope change can be priced against the same baseline.

Architects

You are reviewing a contractor's quantity or preparing a cost check. The takeoff is organized by CSI section and keyed to your finish schedule, so it is easy to verify against the drawings.

Where we provide estimates

Tile & Stone Estimating in 20 states

Pricing is adjusted to the project ZIP code. Select a highlighted state to see the cities we cover there.

States we coverSelected
TX

Tile & Stone Estimating in Texas

Nation's largest construction market; Sun Belt population growth, data centers, semiconductor plants, and single-family home building.

Texas estimating services
Property types

Project types and what changes in the takeoff

The same tile schedule produces a different takeoff depending on the building type, because the wet-area density, substrate, and trim package change.

Multifamily residential

High count of repeat unit bathrooms; takeoff is per unit type then multiplied by unit count.

Watch for: Confirm unit mix and whether typical-unit drawings apply to every stack; count tubs vs. showers.

Hospitality

Back-of-house kitchens and laundry add quarry tile, epoxy grout, and heavy-duty floor prep.

Watch for: Grease-resistant setting materials and floor drains change the setting method and sealant LF.

Healthcare

More wall protection, coved base, and integral cove; joint sealant at every change in plane.

Watch for: Infection-control requirements may limit dust from grinding, adding floor prep labor.

Retail and food service

Large open floor fields with expansion joints and a high trim and threshold count.

Watch for: Expansion joint layout at perimeters and penetrations drives sealant LF and placement labor.

Commercial office core

Restroom cores and elevator lobbies; stone in lobbies, ceramic in restrooms.

Watch for: Stone slab yield and vein direction in lobbies can change the ordered SF substantially.

Education and institutional

Quarry tile in kitchens and janitor closets; heavy-duty floor prep over slab.

Watch for: Cove base at the wall line and floor drains must be counted separately from field tile.

Hospitality and spa wet areas

Steam rooms and pools add vapor management, epoxy grout, and slip-resistant finishes.

Watch for: Waterproofing and drainage assemblies are counted by the piece, not by tile SF.

Deliverables

What you receive

  • Excel takeoff organized by CSI MasterFormat division, with one line per tile type, setting material, membrane, and trim item.
  • PDF estimate with the same line structure, suitable for bid submission or internal review.
  • Marked-up plan set showing every measured area, with the sheet reference on each takeoff line.
  • Material conversion sheet showing SF to cartons, thinset bags, grout units, and sealant LF.
  • Waste and pattern factor shown as a separate line by tile type, so you can adjust it.
  • ZIP-code-adjusted material and labor pricing using RSMeans data, with the basis noted.
  • Turnaround in 24–48 hours for most projects, with rush available when a bid deadline is close.
Checklist

Pre-bid checks for a tile and stone package

  • Confirm the tile schedule matches the finish plan room by room.
  • Check the specified grout joint width against the tile size.
  • Verify substrate type and flatness tolerance on the structural sheets.
  • Confirm whether crack-isolation membrane is required over concrete.
  • Check wet-area details for waterproofing extent and drain type.
  • Count niches, benches, curbs, and linear drains from the details.
  • Verify trim, bullnose, and metal edge profiles are scheduled.
  • Check expansion and movement joint locations and sealant type.
  • Confirm demolition and haul-off scope and disposal allowance.
  • Check protection and final cleaning requirements in Division 01.
  • Confirm imported stone lead time and freight exposure.
  • Note the bid date and whether rush turnaround is needed.
Client reviews

What clients say about Scope Precision Estimate

10 client reviews
DT
Daniel ThompsonCommercial Contractor

Very impressed with the accuracy and turnaround time. Their estimate gave us a clear picture of material and labor costs before starting the project.

SH
Steven HarrisCommercial Builder

The quality of the estimate exceeded our expectations. Their detailed breakdown of labor, materials, and project costs gave us confidence in our bid.

MA
Michael AndersonGeneral Contractor

The cost estimate was detailed, accurate, and easy to understand. It helped us prepare our bid confidently and stay competitive without overlooking important costs.

AW
Andrew WilsonGeneral Contractor

Highly recommended for construction cost estimating. The quantities were accurate, the pricing was well organized, and the final report was easy to review.

MD
Matthew DavisConstruction Manager

Their construction estimate was thorough and professionally prepared. It made our budgeting process much easier and helped us identify potential cost issues early.

CM
Christopher MillerResidential Builder

We needed a quick and accurate construction cost estimate, and they delivered exactly what we needed. Great attention to detail and a very responsive team.

FAQ

Tile & Stone Estimating questions

How do you handle waste factor for different tile sizes and patterns?

We apply waste by format and layout, not as one blanket percentage. Straight-set large-format tile typically carries 8–12%, a 45-degree offset or running bond 12–15%, and herringbone or a directional stone 15–20%. The factor is shown as its own line on the takeoff, so you can change it without re-measuring. We read the layout from the finish plan and note the pattern on each line, because the same tile in a corridor and a shower can carry different waste.

What do you need from us to start a tile takeoff?

Send the finish plans with room numbers, the tile schedule, the Division 09 specification sections, wet-area details, and the structural or architectural sheets showing the substrate. If you have a bid date, include it so we can set standard or rush turnaround. Missing one of these items usually means we have to make an assumption, and we will note it on the takeoff so you can confirm. Most complete packages turn in 24–48 hours.

Do you price the setting materials, or only the tile?

We price the full assembly: field tile, trim, thinset by trowel notch, grout by joint width and tile module, crack-isolation membrane, waterproofing, backer board, fasteners, and sealant. The material conversion sheet shows how SF becomes cartons, bags, and units, so your purchase order matches the estimate. If you have your own product data or supplier pricing, you can drop it into the Excel file without redoing the takeoff.

Can you take off stone slabs and account for yield?

Yes. We measure the stone area in SF from the slab layout, then add a yield loss based on vein direction, cut sizes, and the number of pieces per slab. Slabs are counted in EA, and edge profile is measured in LF. Imported stone is flagged as a separate line so you can see freight and lead-time exposure before you bid. If the layout is not shown, we will state the assumption we used.

How do you handle waterproofing and crack-isolation membrane quantities?

We measure membrane in SF to the edge of the tile field plus required laps, and we count banding and preformed corners in LF and EA separately from the tile. Waterproofing at shower walls, niches, benches, and curbs is traced from the wet-area details. Because these items are bought by the roll and kit, they do not scale with tile SF, so a small shower can carry a disproportionate share of the cost.

What is your turnaround, and can you rush a bid?

Most projects turn in 24–48 hours. Rush is available when a bid deadline is close, and we will confirm the schedule before starting. Turnaround depends on the completeness of the package: a full finish plan set with a tile schedule moves faster than a partial set where we have to infer areas. If you send the bid date with the plans, we will set the schedule to meet it or tell you what is not possible.

Do you price labor as well as material?

Yes. Labor is priced per SF, LF, or EA using ZIP-code-adjusted RSMeans data, with production rates that reflect the tile format, pattern, and substrate. A 24x48 panel takes more labor per SF than a 12x12, and a herringbone takes more than a straight-set field. The labor rate is shown separately from material so you can substitute your own crew rates. We note the pricing basis and date on the estimate.

What file formats do you deliver?

You receive Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets showing every measured area. Each takeoff line references the sheet it came from, so you can trace a quantity back to the drawing. The Excel file is structured so you can drop in your own material pricing and labor rates. The PDF is suitable for bid submission or internal review.

How do you handle demolition and substrate prep?

Demolition and haul-off of existing tile and mortar bed are measured in SF, with a disposal allowance. Substrate prep — grinding, patching, and flattening to tolerance — is measured in SF and hours, because it is often the difference between a profitable package and a callback. We also check for deflection and control joints, since those can force an unbonded mortar bed or a membrane that was not on the drawings.

Can you take off tile for a state with different labor rates?

Yes. Pricing is ZIP-code-adjusted for material and labor, so a shower surround in one market does not carry the same number as another. We have pages for Texas estimating, California estimating, Florida estimating, New York estimating, and North Carolina estimating if you want to see how we handle regional pricing. The basis is noted on every estimate.

What if the tile schedule is incomplete or missing?

We will take off what is shown and note the assumptions where the schedule is silent, such as a default joint width or a typical waste factor. If the drawings show a tile area but no type, we will flag it so you can confirm before you bid. We can also work from a specification section alone if the schedule is not yet issued, but the takeoff will carry a note that quantities are based on the spec.

Do you include protection and final cleaning?

We list protection of finished tile and final cleaning as separate lines so they are priced or explicitly excluded. These items often sit in the general requirements but get pushed onto the tile contractor. Listing them keeps the scope clear and prevents a gap between your bid and the subcontractor's. If you want them excluded, we can mark them as not included in the total.

What does your tile estimating company need to start a takeoff?

Send the architectural and finish plans, the tile schedule, wall sections, and any addenda issued after the bid date. We also need the specification section, usually 09 30 00 Tiling or 09 60 00, so we can match the specified thinset mortar, tile backer board, and membrane. If the schedule is incomplete, we mark the missing fields as a request for information and take off what the drawings show. Plan reading starts the same day the set lands.

Can you handle outsourced stone estimating for slab and dimensional work?

Yes. We measure granite, limestone, marble, and quartz surfacing by area and by linear foot of edge profile, then convert slab layouts to a yield count so you know how many slabs to buy. For dimensional stone we take off section 09 30 19 Stone Tiling and 09 32 00 Stone Facing separately, since setting methods and mortar beds differ. Vein matching and book-match layouts are noted as a yield risk, not priced as a fixed quantity.

Do you provide stone cost estimating for a full bid package?

We provide a material takeoff you can price with your own labor rates, plus ZIP-code-adjusted material and labor pricing using RSMeans data when you want a benchmark. The deliverable is Excel and PDF, organized by CSI MasterFormat division with marked-up drawings. We do not set your unit price or crew size, but we do list the installation sequence and the areas where labor productivity typically drops, such as mosaics, herringbone, and large-format tile over a membrane.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning. is a Senior Estimator with more than 15 years of professional experience in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Guides on this topic

Send your tile and stone plans

Send your finish plans, tile schedule, and specifications through [Get an estimate](/get-estimate/) and we will return a takeoff priced by finished square foot, in Excel and PDF, in 24–48 hours.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote
Call Us