Scope Precision EstimateContact Us

Senior Living & Assisted Care Estimating

Send your assisted living, memory care, or CCRC plan set and specs. You get back a CSI-organized quantity takeoff and estimate in Excel and PDF, typically within 24–48 hours.

24–48 hours for most projectsTypical turnaround
Excel + marked-up PDFsOrganized by CSI section
ZIP-code pricingLocal material and labor
Price confirmed firstBefore any work starts
Sample estimate sheet
Division 09 — Finishes & Division 10 — SpecialtiesSample format
Line itemQtyUnitQuantity
Resident room door & hardware set184EA184 EA
Corridor handrail at 42 in. AFF1,260LF1,260 LF
Type B bathroom grab bar set184EA184 EA
2x2 acoustical ceiling tile42,800SF42,800 SF
Memory care delayed egress device12EA12 EA
Total measured quantity44,440 units
Illustrative quantities. Waste factor applied as a separate line.
Blocking included

What is senior living and assisted care estimating?

Senior living estimating is a CSI MasterFormat takeoff of resident-room wet walls, rated corridor assemblies, commercial kitchen, nurse call, and site work. We measure concrete in CY, partitions in LF, devices in EA, and price with ZIP-code-adjusted material and labor. Deliverables are Excel and PDF with marked-up plan sets.

  • Concrete measured in CY; partitions in LF; devices in EA.
  • Typical waste factors: 5–10% for concrete, 10% for tile.
  • Most costly miss: nurse call rough-in and delayed egress hardware.

Senior living estimating is not a generic commercial shell takeoff. The cost sits in repeated resident-room wet walls, Type B and ADA bathroom rough-in, 1-hour corridor assemblies, nurse call pathways, and a commercial kitchen that has to serve three meals a day. We take off those systems by assembly and by room type, then price them with ZIP-code-adjusted material and labor.

Deliverable
Excel estimate + marked-up PDF plans
Organized by
CSI MasterFormat section
Turnaround
24–48 hours for most projects
Pricing
ZIP-code-adjusted material and labor pricing
Software
Bluebeam Revu, PlanSwift, RSMeans data

You need this when you are validating a development budget before land close, bidding a hard bid against three other GCs, or checking a subcontractor's numbers before you sign a GMP. The takeoff is organized by CSI MasterFormat division — Division 03 concrete through Division 28 electronic safety and security — with marked-up plan sets so you can see exactly which sheet each quantity came from. Formats are Excel and PDF, and most projects return in 24–48 hours with rush available.

If your project mixes uses, the same method applies to the residential and retail portions; see our mixed-use development estimating page. Projects with a hospital-grade skilled nursing wing should be priced against healthcare & hospital estimating standards. For a single-building assisted living or memory care job, this page is the right scope.

We also account for the details that separate senior living from standard multifamily: delayed egress hardware at memory care perimeter doors, wander management and access control rough-in, resident lift blocking in ceilings, and commercial kitchen grease duct and make-up air. Each of these is measured by device count or linear foot, not carried as a lump sum. If your project includes a therapy gym, we take off the equipment anchors and floor finishes from the therapy plan. For projects in states with specific licensing review, such as Texas or California, we note the local plan review submittal items that affect scope.

Services

What the senior housing takeoff covers by division

We measure the building from the foundation up and the site from the property line in. Each resident room type is counted once, then multiplied by the unit mix on the architectural plans. Corridor and demising assemblies are measured by linear foot of wall, not by gross floor area, because rated and acoustical assemblies drive the cost.

Concrete & Structure

Slab-on-grade, elevated decks, footings, and load-bearing CMU walls measured by pour strip and assembly.

CY · SF · LF

Resident Room Finishes

Type B bathroom wet wall rough-in, finishes, and accessories per room type and ADA unit.

EA · SF · LF

Rated Corridor Assemblies

1-hour corridor partitions, handrails, wall protection, and corner guards at required heights.

LF · EA

Commercial Kitchen

Hood, grease duct, make-up air, and food service equipment connections for three-meal service.

EA · LF · LB

Nurse Call & Low-Voltage

Nurse call, emergency call, wander management, and access control rough-in and devices.

EA · LF

Fire Protection & Alarm

Wet-pipe sprinkler distribution with quick-response heads and addressable fire alarm with corridor notification.

EA · LF

Elevators & Lifts

Elevator and LULA lift for multi-story assisted living and memory care, including shaft and pit work.

EA

Site & Parking

Site grading, paving, parking, and utilities measured by area and linear foot.

CY · SF · LF

What every senior living & assisted care estimating takeoff includes

  • Slab-on-grade and elevated deck concrete, CY by pour strip
  • Load-bearing CMU and rated cold-formed stud partitions, LF by assembly
  • Resident room Type B bathroom wet wall rough-in and finish
  • Corridor handrail, wall protection, and corner guard at 42 in. and 36 in.
  • Acoustical ceiling grid and tile with seismic bracing where required
  • Resident room door, frame, and hardware sets including delayed egress
  • Wet-pipe sprinkler distribution with quick-response heads at unit spacing
  • Domestic water, sanitary, and vent rough-in for units, kitchen, and laundry
  • Commercial kitchen hood, grease duct, and food service equipment connections
  • Nurse call and emergency call rough-in and device at rooms and bathrooms
  • Addressable fire alarm with corridor notification and sprinkler monitoring
  • Elevator and LULA lift for multi-story assisted living and memory care
How we work

How a senior living estimator runs an on-screen takeoff

  1. Set the unit mixWe start with the unit plan and count each room type — studio, one-bedroom, two-bedroom, memory care — against the unit mix table. Every repeated assembly is priced once and multiplied, so a 96-unit building is measured as 96 wet walls, not as gross square footage. This is where a missed room type becomes a six-figure error.
  2. Measure wet walls by roomFor each bathroom we measure the wet wall length, fixture count, and pipe run back to the nearest riser. Type B and ADA units get separate counts because grab bar blocking, offset drains, and clearances change the rough-in and the finish. We mark each fixture on the plumbing sheet so the count is auditable.
  3. Take off rated and acoustical wallsCorridor and demising partitions are measured by linear foot and tagged by assembly — 1-hour, 2-hour, or STC-rated. We note head-of-wall joint treatment and blocking for handrail and wall protection, because those items sit in Division 05 and Division 10 but are triggered by the wall assembly.
  4. Price kitchen, laundry, and nurse callThe commercial kitchen is taken off from the food service plan: hood length, grease duct, make-up air, equipment connections, and the grease interceptor. Nurse call and emergency call are measured as device counts plus pathway length, coordinated with the corridor ceiling height and the electrical panel schedule.
  5. Apply ZIP-adjusted pricingQuantities go into RSMeans data adjusted for the project ZIP code, with separate material and labor rates. Waste factors are shown as their own line so you can see the difference between net and gross. The estimate lands in Excel and PDF, organized by CSI division, with marked-up plan sets.
  6. Review and flag gapsBefore delivery, we run a consistency check between the drawings and the specifications. We flag missing details such as incomplete hardware schedules, unspecified wall ratings, or low-voltage sheets that show devices without pathways. These flags are listed in a written summary so you can request clarifications before bid.

What to send us

  • Architectural setFloor plans, unit plans, reflected ceiling plans, and door and finish schedules. The unit plan is the single most important sheet for resident room counts.
  • Structural setFoundation and framing plans with member sizes. Needed for concrete CY and steel TON, including the elevator and mechanical shaft walls.
  • MEP setPlumbing, mechanical, electrical, and fire protection plans. Nurse call and low-voltage drawings are needed for Division 27 and 28 device counts.
  • SpecificationsProject manual with CSI section numbers. Assembly ratings, hardware functions, and finish schedules are usually only in the specs.
  • Unit mix tableThe schedule of unit types and counts. If it is not on the drawings, send it separately so we price the right mix.
  • Site and civilGrading, utility, and parking plans if you want site scope included. Otherwise we price the building footprint only.
Sample output

Sample takeoff format — illustrative quantities

This is the line-item format you receive, organized by CSI MasterFormat division with a sheet reference for every quantity.

Sample format — illustrative quantities
SectionLine itemQtyUnitRef.
03 30 00Slab-on-grade concrete, 5 in. thick1,850CYS-101
05 12 00Structural steel, elevator and mechanical shaft framing42TONS-301
09 51 00Acoustical ceiling tile, 2x2, corridor and common areas42,800SFA-401
10 28 00Toilet accessories, Type B resident bathroom184EAA-601
11 41 00Food service equipment connection, kitchen hood6EAFS-101
14 20 00Elevator, 3-stop, 2,500 lb capacity2EAA-201
21 13 13Wet-pipe sprinkler head, quick response1,240EAFP-101
22 11 16Domestic water piping, Type L copper, 3/4 in.3,600LFP-101
23 31 00HVAC duct, galvanized, 24x12 in.1,480LFM-201
26 05 19Conductors, THHN, branch circuit18,500LFE-301
27 15 00Communications horizontal cabling, Cat 622,400LFT-101
28 31 00Fire alarm addressable device, corridor notification96EAFA-101

Units of measure in an assisted living bid takeoff

Every line carries a unit that a subcontractor can price without re-measuring. Derived units like CY and TON come from the dimensions named in the line item.

ItemUnitHow it's measured
Resident room wet wall rough-inEACounted per room type from the unit plan, then multiplied by unit mix
1-hour corridor partitionLFMeasured along the corridor centerline, full height floor to deck
Type B bathroom grab bar setEACounted per bathroom, three bars at tub, shower, and water closet
2x2 acoustical ceiling tileSFMeasured room by room, deducting only openings over 10 SF
Wet-pipe sprinkler headEACounted at spacing shown on the fire protection plan, by hazard class
Supply and return ductLFMeasured by size and gauge from the mechanical plan, excluding flex
Slab-on-grade concreteCYArea times thickness from the structural plan, divided by 27
Structural steelTONMember weight from the framing plan, plus connection allowance
Resident room door and hardwareEACounted per opening schedule, hardware set by function type
Nurse call stationEACounted per device location on the low-voltage plan

Worked example: takeoff of a typical resident bathroom wet wall

This walkthrough shows how we measure one repeated element — a Type B resident bathroom wet wall — and turn it into priced quantities. All dimensions are illustrative and do not come from a specific project. Use it to see the level of detail you get in the final estimate.

Step 1 — Count the rooms. From the unit plan, we identify the bathroom type. Suppose the unit mix shows 96 units, and 72 have a private Type B bathroom. That gives 72 wet walls to measure. The remaining 24 units share bathrooms or are memory care with different fixtures, so they are counted separately.

Step 2 — Measure the wet wall length. For each private bathroom, the wet wall runs the width of the room. Using an illustrative 8 ft width, the total linear feet of wet wall is 72 rooms × 8 ft = 576 LF.

Step 3 — Rough-in plumbing. Each bathroom has one water closet, one lavatory, and one tub/shower. From the plumbing plan, we measure pipe runs from each fixture back to the nearest riser. Assume an average of 18 LF of domestic water (hot and cold) and 12 LF of sanitary and vent per room. That yields:

  • Domestic water: 72 × 18 = 1,296 LF
  • Sanitary and vent: 72 × 12 = 864 LF

Step 4 — Fixture count. Fixtures are counted by type: 72 water closets, 72 lavatories, 72 tub/shower units. We also count the trim and rough-in valves separately because they are different CSI sections.

Step 5 — Blocking and backing. The wet wall needs blocking for grab bars at the tub, shower, and water closet. From the accessibility details, we count three grab bar locations per bathroom, each requiring 6 LF of blocking. That is 72 × 3 × 6 = 1,296 LF of blocking. This is a separate line, not included in the drywall square footage.

Step 6 — Wall finishes. The wet wall is typically tiled at the tub surround and painted elsewhere. We measure the tile area per room: 5 ft high × 8 ft wide = 40 SF per bathroom, times 72 = 2,880 SF of tile. The remaining wall area is drywall and paint.

Step 7 — Waste factor. Waste is applied as a separate step, not baked into the net quantity. For tile, a typical waste factor is 10% for straight lay and 15% for diagonal. Using 10%, the tile order quantity becomes 2,880 SF × 1.10 = 3,168 SF. Pipe waste is lower, typically 2–5% for copper and PEX.

Step 8 — Price and output. Each quantity is priced with ZIP-code-adjusted material and labor rates. The result is a line-item estimate showing net quantity, waste, and gross quantity, with a reference to the sheet where the measurement was taken. This same method is applied to every repeated room type on the project.

Cost drivers

What drives the senior living construction cost estimate

Relative impact on a typical estimate for this trade, based on estimator judgment. Select a bar for details.

Scale: 1 = minor, 5 = major relative impact. Estimator judgment, not measured data.
Relative impact 5 / 5

Unit mix and wet walls

Every additional bathroom is a wet wall, a vent stack, a drain, a fan, and a set of grab bars. A building with 70 percent private bathrooms costs more per bed than one with shared bathrooms, even at the same gross square footage. We price the mix you show on the unit plan, not an average.

Unit mix and wet walls

Every additional bathroom is a wet wall, a vent stack, a drain, a fan, and a set of grab bars. A building with 70 percent private bathrooms costs more per bed than one with shared bathrooms, even at the same gross square footage. We price the mix you show on the unit plan, not an average.

Rated corridor assemblies

Corridors in assisted living and memory care are typically 1-hour rated with smoke partitions at the unit entry. The assembly, head-of-wall joint, and door hardware all change with the rating. We tag each corridor wall by assembly so the drywall and door subcontractors price the correct system.

Acoustical separation

Demising walls between resident rooms carry an STC rating, which usually means a staggered or double-stud assembly with insulation and resilient channel. That is more material and more labor than a standard partition. We measure it by linear foot and note the assembly on the wall schedule.

Commercial kitchen and laundry

The kitchen hood, grease duct, make-up air unit, and grease interceptor are specialty scopes with long lead times and few bidders. Laundry rooms add gas, venting, and floor drains. We take these off from the food service and plumbing plans so they are not buried in a Division 22 or 23 allowance.

Nurse call and low-voltage

Nurse call, emergency call, access control, and wander management are Division 27 and 28 scopes that are often shown only as a single line on the electrical plan. We count devices and pathway from the low-voltage drawings, and flag where the design is not yet complete.

Elevators and lifts

Multi-story assisted living needs elevators sized for stretchers and residents with mobility devices. Shaft construction, pit, and machine room requirements drive structural and Division 14 cost. We take off the elevator package from the conveyance drawings and the shaft from the structural set.

Site and parking

Senior living projects often require more parking than the zoning minimum, plus drop-off canopies and accessible routes. We measure curb, asphalt, striping, and canopy footings from the civil plans, and note where the parking count exceeds the code minimum so you can see the cost of that decision.

Therapy and wellness spaces

Physical therapy rooms, fitness areas, and therapy pools add equipment anchors, specialized flooring, and higher electrical loads. We take off the equipment connections and floor finishes from the therapy plan, and flag any pool mechanical scope that is not on the plumbing drawings.

Scope gaps

Common scope gaps in a senior living bid package

These are the items that most often fall between subcontractors on senior living projects. Each one is a real line in our takeoff.

  • Handrail blocking and backing in stud walls is missed when only the handrail is counted. It hides in the wall type details, not the finish schedule. We add blocking by linear foot of corridor handrail.
  • Type B bathroom grab bar blocking at the tub, shower, and water closet is often left to the drywall contractor with no quantity. We count it per bathroom from the accessibility details.
  • Bathroom exhaust fan and duct riser coordination is missed when the mechanical plan shows the fan but not the corridor ceiling path. We measure the duct run from the fan to the riser.
  • Nurse call device rough-in and low-voltage pathway in resident room walls is often shown as a note on the electrical plan. We count devices and pathway from the low-voltage sheets and flag incomplete design.
  • Delayed egress hardware and door position switches at memory care perimeter doors are missed when the hardware schedule lists only standard functions. We check the door schedule against the egress narrative.
  • Commercial kitchen grease interceptor and hood suppression connection are missed when the kitchen is priced from the food service plan alone. We pick them up from the plumbing and fire protection sheets.
  • Memory care secure courtyard gate and fence hardware is missed when site work is priced without the security scope. We measure gates, fence, and access control from the site and security plans.
  • Resident lift and ceiling track blocking is missed when only the lift equipment is counted. We add blocking and structural reinforcement by linear foot from the equipment layout.
  • Fire-rated shaft wall at elevator and mechanical chases is often omitted when the structural set shows the shaft but not the rated enclosure. We measure the shaft wall by square foot and tag the assembly.
  • Wet wall plumbing vent through roof flashing and roof penetration coordination is missed when the plumbing plan stops at the ceiling. We count roof penetrations and flashings from the architectural roof plan.
  • Unit entry door closers and smoke gasketing are missed when the hardware schedule lists only the lockset. We add closers and gasketing per door from the life safety plan.

Material and assembly choices that move the estimate

These are the assemblies we measure most often on senior living projects. Each choice changes the quantity, the unit cost, or both.

Assembly / materialTypical applicationWhat it changes in the takeoff
CMU with brick veneerExterior wall, load-bearing and non-load-bearingAdds mortar, reinforcement, and brick ties; requires separate flashing and weep holes.
Cold-formed steel stud with fiber cementExterior wall, non-load-bearingAdds sheathing, WRB, and continuous insulation; stud gauge changes with height.
1-hour rated corridor partitionCorridor and demising wallsRequires specific stud, drywall, and joint treatment; head-of-wall detail adds material.
STC-rated demising wallBetween resident roomsStaggered or double stud with insulation and resilient channel; more labor and material.
TPO or EPDM roofingLow-slope roof over resident wingsAdds insulation, cover board, and flashing; roof penetrations from vents and hoods.
Standing seam metal roofEntry canopy or pitched roof areasAdds clips, underlayment, and trim; snow guards may be required in some climates.
Resident room door and hardwareUnit entry and bathroom doorsHardware function changes with rating and accessibility; closers and gasketing add cost.
Corridor handrail and wall protectionCorridor walls at 42 in. and 36 in.Requires blocking in stud walls; wall protection adds corner guards and bumper rails.
Wet-pipe sprinkler with quick-response headsThroughout buildingHead count changes with hazard class and ceiling height; concealed heads cost more.
Nurse call and emergency callResident rooms and bathroomsDevice count and pathway length; rough-in must coordinate with electrical and low-voltage.
Codes and standards

Codes and standards that affect the takeoff

Model codes

Senior living buildings are typically classified under the International Building Code (IBC) as Group I-1 or I-2 occupancies, depending on the level of care and whether residents are incapable of self-preservation. That classification drives the number of exits, corridor width, travel distance, and the required fire-resistance rating of corridor and demising walls. The International Residential Code (IRC) may apply to independent living cottages. The IECC sets envelope insulation and glazing values that change wall and roof assemblies. The NEC and IPC or UPC govern electrical and plumbing rough-in. NFPA 13 governs sprinkler design and head spacing. Confirm the adopted edition with the local building department.

Industry standards

Estimators rely on ACI 318 for concrete, ASTM standards for materials and test methods, and SMACNA for duct construction. The Gypsum Association publishes GA-600, which lists fire and sound ratings for wall assemblies; that document tells you the exact stud, insulation, and drywall layers behind a 1-hour or STC-rated wall. NRCA guidelines inform roofing takeoff for flashing and insulation. These standards do not change the code requirement, but they define what the assembly actually contains, which is what you price.

Specification sections

You must read the project manual, not just the drawings. Division 03 concrete specs give mix designs and reinforcement details that affect CY and TON. Division 08 door and hardware specs list functions, finishes, and electrified hardware that change the unit cost. Division 09 finishes specs define tile, paint, and acoustical ceiling types. Division 10 specialties specs cover toilet accessories, signage, and wall protection. Division 11 equipment specs list food service and therapy equipment connections. Division 21, 22, 23, 26, 27, and 28 specs define sprinkler, plumbing, HVAC, electrical, and low-voltage scopes. Each section can add or remove line items from the takeoff.

Local amendments

Adopted code editions vary by state and jurisdiction; some are on the 2018 IBC, others on 2021 or 2024. Local amendments can change sprinkler requirements, corridor ratings, or accessibility details. For example, some states require sprinklers in all assisted living buildings regardless of size, while others allow an exception for small facilities. Seismic design categories affect bracing for ceilings and mechanical systems. Always confirm the adopted edition and any amendments with the local building department before finalizing your bid.

Who we provide estimates for

Who uses an assisted living estimate for contractors

General contractors

You need a second set of eyes on a hard bid or a GMP. We return a division-by-division takeoff you can compare against your own, so you can see which subcontractor is light on wet walls or corridor handrail before you sign.

Senior living developers

You are testing a pro forma before land close or a construction loan. A unit-mix-based estimate tells you whether the project pencils at the rent you can charge, and which scope to value-engineer first.

Specialty subcontractors

Drywall, plumbing, and electrical bidders on assisted living projects need quantities by assembly and by room type. We give you the linear feet and device counts you can price directly, with the sheet reference.

Architects and owners

You want a cost check at design development before the drawings are complete. We flag the gaps in the documents so you can close them before the bid, rather than through change orders.

Where we provide estimates

Senior Living & Assisted Care Estimating in 20 states

Pricing is adjusted to the project ZIP code. Select a highlighted state to see the cities we cover there.

States we coverSelected
TX

Senior Living & Assisted Care Estimating in Texas

Nation's largest construction market; Sun Belt population growth, data centers, semiconductor plants, and single-family home building.

Texas estimating services
Property types

Senior living project types and what changes in the takeoff

The takeoff method is the same, but the unit mix, code occupancy, and systems shift the quantities. Here is what changes by project type.

Assisted living (AL)

Higher ratio of private bathrooms; more corridor handrail and nurse call devices per unit.

Watch for: Confirm whether bathrooms are private or shared; shared units reduce wet wall count but add common area.

Memory care (MC)

Secure perimeter doors, delayed egress hardware, and wander management devices add to Division 08 and 28.

Watch for: Check door hardware schedule for delayed egress functions and door position switches.

Skilled nursing facility (SNF)

More medical gas, nurse call, and 24/7 backup power; larger commercial kitchen and laundry.

Watch for: Verify medical gas rough-in and emergency power scope; these are often design-build.

Independent living (IL)

More like multifamily: full kitchens, washers/dryers in units, fewer nurse call devices.

Watch for: Watch for full kitchen rough-in and venting; these add plumbing and electrical load.

CCRC (continuing care retirement community)

Mix of all levels of care on one campus; separate buildings or wings with different systems.

Watch for: Confirm which buildings are in your scope; site utilities and central plant may be shared.

Memory care addition/renovation

Tie-in to existing fire alarm, nurse call, and sprinkler systems; selective demolition.

Watch for: Verify existing system capacity and compatibility; patch and repair scope is often missed.

Deliverables

What you receive

  • Excel workbook organized by CSI MasterFormat division, with quantities, units, and unit costs on separate columns.
  • PDF estimate with the same line items, formatted for review and markup.
  • Marked-up plan sets showing where each quantity was measured, sheet by sheet.
  • Waste factors shown as separate lines so you can see net versus gross quantities.
  • ZIP-code-adjusted material and labor pricing using RSMeans data.
  • A written list of scope gaps and design items that need confirmation before bid.
  • Turnaround in 24–48 hours for most projects, with rush available.
Checklist

Pre-bid checklist for senior living estimates

  • Confirm unit mix and count each room type from the unit plan.
  • Verify bathroom types: private, shared, Type B, or ADA.
  • Check corridor and demising wall ratings on the life safety plan.
  • Count handrail and wall protection linear feet, including blocking.
  • Review door hardware schedule for delayed egress and access control.
  • Measure wet wall rough-in from plumbing riser diagrams.
  • Count nurse call and emergency call devices from low-voltage sheets.
  • Verify commercial kitchen hood, grease duct, and make-up air scope.
  • Check elevator and lift shaft dimensions against structural plans.
  • Confirm sprinkler head spacing and hazard classification.
  • Review site plan for parking count, canopies, and accessible routes.
  • List any design gaps or missing details for clarification before bid.
Client reviews

What clients say about Scope Precision Estimate

10 client reviews
DT
Daniel ThompsonCommercial Contractor

Very impressed with the accuracy and turnaround time. Their estimate gave us a clear picture of material and labor costs before starting the project.

SH
Steven HarrisCommercial Builder

The quality of the estimate exceeded our expectations. Their detailed breakdown of labor, materials, and project costs gave us confidence in our bid.

MA
Michael AndersonGeneral Contractor

The cost estimate was detailed, accurate, and easy to understand. It helped us prepare our bid confidently and stay competitive without overlooking important costs.

AW
Andrew WilsonGeneral Contractor

Highly recommended for construction cost estimating. The quantities were accurate, the pricing was well organized, and the final report was easy to review.

MD
Matthew DavisConstruction Manager

Their construction estimate was thorough and professionally prepared. It made our budgeting process much easier and helped us identify potential cost issues early.

CM
Christopher MillerResidential Builder

We needed a quick and accurate construction cost estimate, and they delivered exactly what we needed. Great attention to detail and a very responsive team.

FAQ

Senior Living & Assisted Care Estimating questions

What information do you need to start a senior living estimate?

Send the architectural, structural, and MEP plan sets, plus the project manual and unit mix table. The unit plan is critical because we count each room type and multiply by the mix. If you have a site plan, include it for site scope. Low-voltage and food service drawings are needed for Division 27, 28, and 11. If any of these are missing, we can still start and flag the gaps.

How do you handle repeated resident room types in the takeoff?

We measure one room of each type in detail, then multiply by the count from the unit mix. That means we count wet walls, fixtures, doors, and devices once per room type, not once per building. This method keeps the takeoff accurate and easy to audit. If the unit mix changes during design, we can adjust the multiplier without re-measuring every room.

Do you include the commercial kitchen and laundry in the estimate?

Yes. We take off the kitchen from the food service plan: hood length, grease duct, make-up air, equipment connections, and the grease interceptor. Laundry rooms add gas, venting, and floor drains. These are specialty scopes with long lead times, so we list them separately. If the food service plan is not available, we flag the kitchen as a design gap and exclude it until drawings are issued.

How do you price nurse call and low-voltage systems?

We count devices and measure pathway length from the low-voltage drawings. Nurse call stations, emergency call pulls, and wander management devices are counted per location. Pathway is measured as linear feet of conduit or cable tray. If the low-voltage design is shown only as a note, we flag it and exclude the scope until drawings are provided. This prevents a large allowance from being buried in the electrical bid.

What waste factors do you use for senior living materials?

Waste factors vary by material. For tile, we typically use 10% for straight lay and 15% for diagonal. For drywall, 10–15% depending on the complexity. For pipe, 2–5% for copper and PEX, and 5–10% for PVC. Concrete waste is usually 5%. We show waste as a separate line so you can see net versus gross quantities. These are typical ranges; your project conditions may require different factors.

Can you estimate a memory care unit with delayed egress and secure courtyard?

Yes. Memory care adds specific scope: delayed egress hardware at perimeter doors, door position switches, access control, and secure courtyard fencing and gates. We check the door schedule against the egress narrative and count these devices separately. We also measure the courtyard fence and gate hardware from the site and security plans. These items are often missed when the project is priced as standard assisted living.

How do you handle accessibility requirements in the takeoff?

We measure Type B and ADA bathrooms separately because they require different blocking, fixture offsets, and clearances. We count grab bar blocking at the tub, shower, and water closet from the accessibility details. We also check corridor widths and turning radii against the plans. Accessibility scope is not a lump sum; it is measured by fixture and by linear foot of blocking.

What is your turnaround for a senior living estimate?

Most projects return in 24–48 hours. Larger or more complex projects, such as a CCRC with multiple buildings, may take longer. Rush service is available if you have a bid deadline. We confirm the schedule when you send the plans. The deliverable includes an Excel workbook, a PDF estimate, and marked-up plan sets.

Do you provide quantities only, or do you also price them?

We provide both. Each line item includes the quantity, unit, and a unit cost for material and labor. Pricing is adjusted for the project ZIP code using RSMeans data. You can use the quantities alone if you have your own pricing, or use our pricing as a check. Waste is shown separately so you can apply your own factors if you prefer.

How do you handle site work and utilities?

If you send civil and site plans, we measure site utilities, storm drainage, paving, curb, striping, and canopies. We take off site scope to the property line. If site plans are not available, we price the building footprint only and note the exclusion. For senior living, parking count and drop-off canopies are often significant, so we measure them from the site plan.

What if the drawings are incomplete or at design development?

We can still produce an estimate. We measure what is shown and flag the gaps in a written summary. Common gaps include incomplete hardware schedules, unspecified wall ratings, and low-voltage sheets without pathways. The estimate will carry allowances for missing scope, clearly labeled. This helps you close the gaps before bid rather than through change orders.

Can you estimate a renovation or addition to an existing senior living building?

Yes. Renovations add selective demolition, tie-ins to existing fire alarm, sprinkler, and nurse call systems, and patch and repair scope. We measure demolition by area and system, and we note where existing capacity must be verified. If as-built drawings are available, send them; if not, we flag the unknowns. Renovation estimates typically carry more contingency for field conditions.

What does an outsourced senior living estimating company need to price a full bid package?

Send the complete bid package: architectural, structural, MEP, and civil sheets, plus the spec book and any addenda issued to date. We also need the finishes schedule, door and hardware schedule, and the kitchen equipment plan. If the drawings are at design development, we flag assumptions and list RFIs rather than guess. We return quantities and pricing in Excel and PDF, organized by CSI MasterFormat division, so your bid leveling against subcontractor quotes is straightforward.

How does a senior living estimator handle a nursing home estimating scope with full commercial kitchen and laundry?

We take off the kitchen by equipment schedule and rough-in: grease duct, make-up air, hood suppression tied to Division 21 fire suppression, floor drains, and quarry tile. Laundry is measured by washer and dryer count, gas and vent rough-in, and floor sinks. Both areas carry Division 22 plumbing and Division 23 HVAC line items that a standard multifamily takeoff would miss. We price them from the spec book, not as allowances, unless the drawings show allowances.

Do you include memory care estimating items like delayed egress and secure courtyards?

Yes. Memory care adds delayed egress hardware at perimeter doors, access control and wander management rough-in under Division 28, and secure courtyard fencing and gates under Division 32 exterior improvements. We measure these by device count and linear foot. We also check the courtyard grade for ADA compliance and ANSI A117.1 clearances at door thresholds. Confirm the adopted code edition and licensing rules with the local building department before you rely on any hardware count.

What does a senior living bid estimating package include?

You get quantities by CSI MasterFormat division with marked-up plan sets showing which sheet each line came from, plus a separate summary for alternates and unit prices. Division 05 metals, Division 06 wood plastics composites, Division 07 thermal moisture, Division 08 openings, Division 12 furnishings, Division 14 conveying equipment, Division 26 electrical, Division 27 communications and Division 31 earthwork are all carried as separate lines, not lump sums. We flag any addendum you sent so the bid reflects the current documents.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning. is a Senior Estimator with more than 15 years of professional experience in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Guides on this topic

Send your senior living plans for a takeoff

Send your assisted living, memory care, or CCRC plan set and specs, and we will return a CSI-organized quantity takeoff and estimate in Excel and PDF, typically within 24–48 hours.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote
Call Us