Sitework takeoff
Cut and fill, retaining walls, underdrain and erosion control for sloped Blair County lots.
CY · LF · TONScope Precision Estimate produces material and labor takeoffs for contractors, developers and owners building in Altoona and Blair County. We deliver Excel and PDF estimates by CSI MasterFormat division with marked-up plan sets, typically in 24–48 hours.
Altoona estimating is driven by hillside lot grading and retaining walls, PennDOT and municipal street-occupancy requirements, older brick and masonry building stock, mixed framing systems in renovation work, and cold-weather concrete and roofing schedules. ZIP-code-adjusted pricing matters because material and labor costs differ from Philadelphia and Pittsburgh.
Altoona sits in Blair County along the Allegheny Front, where steep lots, shale and clay soils, and freeze-thaw cycles shape what a takeoff has to capture. On a hillside house or a commercial pad on a sloping parcel, cut and fill, retaining walls, footing depth and underdrain quantities can move the estimate more than the building itself. We measure those items from the civil and architectural sheets rather than carrying an allowance.
We work from your plan sets, specifications and addenda, and return an estimate organized by CSI MasterFormat division with quantities you can check. If you bid work in the region, see our Pennsylvania construction estimating page, and for projects along the I-99 corridor toward State College, our State College construction estimating coverage applies the same format. Contractors bidding in Blair, Cambria, Bedford and Huntingdon counties can send plans through our get an estimate page and get a written scope back.
For bidders. You need quantities fast enough to price a bid and defend them later. We return division-by-division takeoffs with marked-up plan sets so you can check every line before markup and overhead go on.
For builders. You need a budget that survives the field. We break out concrete, framing, roofing and MEP by system, flag likely scope gaps, and price with ZIP-code-adjusted material and labor data for Blair County.
For owners. You need a number before you commit. We estimate renovations and new construction from concept or permit sets, show assumptions in writing, and separate hard costs from allowances you still have to buy.
Select a bar to compare Altoona with the largest Pennsylvania markets we cover.
6 new housing units in 2025 (-25% vs 2024).
6 single-family · 0 multifamily (0%).
The U.S. Census Bureau Building Permits Survey shows 6 new privately-owned residential units permitted in Altoona in 2025, down from 8 in 2024 — a 25% decline. All 6 were single-family, with no multifamily units, and permitted value was $2M, or $258,300 per unit. Altoona ranked 12th of 25 covered Pennsylvania cities by units and accounted for 0.1% of the 5,912 units permitted statewide. For bidders, that means the new-construction market is thin and competitive; renovation, infill and small commercial work carry more of the volume. Estimates on those jobs need accurate existing-conditions quantities, not just new-work takeoffs. Our residential estimating services cover both new houses and remodels.
Altoona's housing stock is older and built on graded streets, so renovation scopes often run into masonry repairs, joist replacement and service upgrades that a plan-only takeoff misses. Commercial and institutional work follows the hospital, college and Route 220/Plank Road corridors, plus light industrial and warehouse space tied to I-99 and the U.S. 22 corridor. Statewide demand described by the Census and market reporting concentrates in Philadelphia, Pittsburgh and the I-78/I-81 warehouse belt, which pulls labor and material pricing away from Blair County — one reason we price with ZIP-code-adjusted data rather than a statewide average. Contractors comparing regional pricing can review our Harrisburg construction estimating and York construction estimating pages.
We take off the trades that drive cost on Altoona-area projects, from hillside sitework to MEP rough-in, and deliver quantities by CSI MasterFormat division.
Cut and fill, retaining walls, underdrain and erosion control for sloped Blair County lots.
CY · LF · TONFootings, walls, slabs and flatwork priced for cold-weather placement and local mix designs.
CY · SF · LFSpread footings, stepped footings on grade changes, waterproofing and drain tile quantities.
CY · SF · LFFloor, wall and roof framing with sheathing and hardware, including mixed existing/new framing.
LF · SF · EASteep-slope and low-slope systems, tear-off, ice barrier and flashing for freeze-thaw exposure.
SQ · LF · EAPlumbing, HVAC and electrical rough-in counts for renovations and new commercial fit-outs.
LF · EA · TONFull-building takeoffs for retail, office, institutional and Route 220 corridor projects.
SF · LS · EAWarehouse and light industrial shells, slabs, racking pads and utility service quantities.
SF · CY · LFYou bid Altoona hillside residential and small commercial jobs where footing depth and retaining wall quantities swing the number. We return division-by-division takeoffs with marked-up plans so your bid holds up at buyout.
Concrete, framing and roofing crews working Blair County need quantities they can set crews and forms against. We break out formwork, rebar, anchor bolts and sheathing separately from the bid package scope.
You are testing infill lots and small subdivisions around Altoona where site work, utility extensions and stormwater controls drive feasibility. We price those items from the civil set before you commit to a land basis.
Your Altoona projects often involve renovations to older masonry buildings and steep-site additions. We check your drawings against a full scope and flag missing demolition, shoring and envelope items early.
You are budgeting a roof replacement, mechanical upgrade or interior fit-out on an existing Blair County property. We estimate from existing conditions and separate hard costs from allowances you still have to buy.
Public work in and around Altoona requires documented quantities and prevailing-wage-aware pricing. We organize takeoffs by CSI division so your bid form and schedule of values line up.
We take off plans for projects across Blair County and the surrounding ridge-and-valley counties, from downtown blocks to hillside parcels and outlying townships. If your site is within about an hour of Altoona, the same ZIP-code-adjusted pricing applies.
Altoona's 2025 permit mix was almost entirely single-family, with 6 new privately-owned residential units and no multifamily units reported. That said, the city's older building stock and the surrounding commercial corridors generate steady renovation, fit-out and small commercial work alongside new houses.
New houses on steep lots and infill parcels in Altoona and surrounding townships. We take off excavation, footings, foundation walls, framing, roofing and MEP from the architectural and structural sheets.
Watch for: Footing depth, retaining walls, underdrain, and rock excavation quantities.
Additions, kitchen and bath remodels, and whole-house updates in older Altoona neighborhoods. We measure selective demolition, framing modifications, insulation, drywall and finish from the permit set.
Watch for: Hidden conditions, load-bearing wall changes, and MEP relocation.
Office, retail and restaurant build-outs along the commercial corridors and downtown. We price partitions, ceilings, storefront, HVAC distribution and electrical from the architectural and MEP drawings.
Watch for: Landlord shell conditions, ADA upgrades, and hood/vent scope.
Small warehouse, shop and storage buildings serving Blair County trades and logistics. We take off slab-on-grade, pre-engineered framing, overhead doors, and site utilities from the civil and structural sets.
Watch for: Slab thickness, door clear heights, and utility trench quantities.
Schools, churches, municipal buildings and non-profit facilities in and around Altoona. We estimate from full plan sets and organize quantities by CSI division to match public bid forms.
Watch for: Prevailing wage, phased occupancy, and existing-building tie-ins.
Small apartment buildings and upper-floor residential over ground-floor commercial in the city. We break out unit-by-unit finishes, common-area MEP, and fire separation from the drawings.
Watch for: Unit mix repetition, fire-rated assemblies, and parking/site work.
Altoona's ridge-and-valley terrain, older building stock and cold winters move quantities in ways that a generic square-foot number will miss. These are the drivers we check on every Blair County takeoff.
Altoona and Blair County enforce the Pennsylvania Uniform Construction Code, which adopts the IBC and IRC with state amendments. Permit review, third-party inspections and accessibility requirements add plan-review time and can change wall, stair and egress dimensions. Confirm the adopted code edition and any local amendments with the Altoona building department before you finalize quantities.
Pennsylvania Uniform Construction Code · IBC · IRC · Altoona building departmentMuch of the Altoona area sits on shale, sandstone and clay soils left by ridge-and-valley geology. On sloping lots, footing depth, stepped footings, retaining walls and underdrain runs often exceed what a flat-site template assumes. We measure these from the structural and civil sheets rather than carrying a percentage allowance.
Shale and clay soils · stepped footings · retaining walls · underdrainAltoona winters bring freeze-thaw cycling and frost penetration that set minimum footing depths and drive insulation, vapor barrier and drainage details. Roof snow loads and ice-dam protection also affect sheathing, flashing and eave detailing. We check the drawings against typical central Pennsylvania frost-depth practice and flag where specifications are silent.
Frost depth · freeze-thaw cycling · snow load · ice dam protectionBlair County has a limited pool of skilled trades, and crews often travel from Johnstown, State College or Harrisburg. That affects productivity assumptions for concrete, framing and MEP rough-in, especially on steep sites where access is slow. We price labor from ZIP-code-adjusted data and note where travel or small-crew conditions may add cost.
Blair County trades · Johnstown · State College · HarrisburgSteep lots and clay soils make cut and fill, erosion and sedimentation controls, and stormwater management a significant part of the estimate. Driveway grades, swales, and retaining structures frequently require more material than the building footprint suggests. We take off these items from the grading and utility plans and list them separately from the building scope.
Cut and fill · erosion and sedimentation controls · stormwater management · driveway gradesAltoona is served by suppliers in Blair County and along the I-99 and Route 22 corridors, but specialty items and long-lead equipment may ship from Pittsburgh, Harrisburg or beyond. Freight, delivery windows and storage constraints on tight city lots affect material pricing. We use ZIP-code-adjusted material costs and note where lead times or access may change the number.
Blair County suppliers · I-99 corridor · Route 22 · Pittsburgh and HarrisburgAltoona's steep hillsides, residual clay soils, and cold winters change what you measure and how you price it. Here is how those conditions land in the divisions we build out for Blair County projects.
Most Altoona-area sites sit on slopes that require cut and fill balancing, and the residual clay over shale does not compact like granular fill. A takeoff that measures only building footprint excavation will miss the retaining walls, undercut, and select backfill that these lots actually need. We measure stripping by area at the specified depth, then separate rock excavation from unclassified because the unit prices are not the same. Stormwater is its own line group: seepage beds, riprap outfalls, and sediment traps sized to the local review. If your project is site-heavy, our sitework estimating services break this out by bid item rather than a lump sum.
Altoona has a deep stock of older masonry buildings, and renovation scopes often call for steel lintels, new floor framing tied into existing bearing walls, and blocking that no one drew. We measure structural steel by piece count and weight from the schedule, then flag any member called out only in a detail. Wood framing is taken off by wall area with studs at the specified spacing, plus plates, headers, and trimmers per opening. Roof framing on steep pitches takes longer to install, and we reflect that in labor rather than in quantity. Framing estimating services cover both new construction and infill work.
Altoona's housing stock is old enough that MEP scopes in renovation work often mean full replacement rather than tie-in, and the takeoff has to say which. We count plumbing fixtures by type, measure domestic water and drain, waste, and vent piping by diameter and linear foot, and separate above-grade from below-grade runs. HVAC is taken off by equipment schedule, duct by pound and linear foot, and refrigerant line sets by run. Electrical is counted by device, fixture, and panel, with feeder and branch conduit measured separately. MEP estimating services produce a division-sorted sheet you can send straight to subs.
Frost depth in this part of Pennsylvania drives footing elevation, and the hillside lots in and around Altoona push a lot of foundations into stepped or keyed footings rather than a single flat pour. We take off footing concrete by linear foot of wall times width times depth, then add the step transitions, which are easy to miss and expensive to add later. Formwork is measured by contact area, not by wall length. Flatwork is separated into interior slab on grade, exterior walks, and driveway aprons because the reinforcement and finish differ. Our concrete estimating services and foundation estimating services both start from the same marked-up plan set.
Freeze-thaw cycling and ice damming along eaves are real here, so ice barrier membrane and drip edge are not optional line items on a serious takeoff. We measure roof area by slope, not by plan footprint, and keep hips, valleys, and ridge separate because the waste factors differ. On the older commercial stock downtown, tear-off and disposal are measured by square of roof area with a separate allowance for the number of layers. Membrane, flashing, and counterflashing are taken off by linear foot. Roofing estimating services cover shingle, modified bitumen, and single-ply assemblies with the accessory list attached.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 31 23 16 | Excavation, footing and basement | 184 | CY |
| 31 23 23 | Select granular backfill, compacted | 96 | CY |
| 03 30 00 | Footing concrete, stepped | 22 | CY |
| 03 30 00 | Foundation wall concrete | 31 | CY |
| 03 11 00 | Wall formwork, contact area | 1,640 | SF |
| 05 12 00 | Steel lintels and beams | 12 | EA |
| 06 10 00 | Wall framing, 2x6 at 16 in. o.c. | 2,180 | SF |
| 07 31 13 | Asphalt shingles, 6:12 pitch | 18 | SQ |
This is the calculation we run when a foundation steps down a slope instead of sitting on one flat elevation. Dimensions are illustrative — your plan set governs.
The footing is 24 in. wide by 12 in. deep and runs in three level runs joined by two steps. Run lengths are 32 ft, 28 ft, and 24 ft. Each step drops 2 ft and adds 24 in. of extra footing length at the transition.
| Step | Calculation | Quantity |
|---|---|---|
| Level runs, volume | (32 + 28 + 24) ft × 2 ft × 1 ft | 168 CF |
| Step transitions, extra length | 2 steps × 2 ft | 4 LF |
| Step transitions, volume | 4 LF × 2 ft × 1 ft | 8 CF |
| Subtotal | 168 + 8 | 176 CF |
| Convert to cubic yards | 176 ÷ 27 | 6.52 CY |
| Waste and over-excavation, 5% | 6.52 × 1.05 | 6.85 CY |
| Order quantity | round up to whole yard | 7 CY |
Three things drive the number. First, the step transitions are real concrete and real formwork, and they are the line most often left off a footing takeoff. Second, the 5% allowance is a typical figure for footing concrete placed against earth forms; if the trench is over-excavated, that allowance is not enough and the over-excavation should be measured separately as backfill. Third, formwork is a separate quantity measured by contact area — for this footing that is the two vertical faces of each run plus the step faces, not the full perimeter of the trench.
We price the concrete and the formwork with ZIP-code-adjusted material and labor rates for the Altoona area, then deliver the result in Excel and PDF organized by CSI MasterFormat division, with the marked-up plan set attached so you can see exactly which runs and steps were measured. Turnaround on a scope this size is normally 24–48 hours.
Yes. We use ZIP-code-adjusted material and labor pricing rather than a national average, because concrete, lumber, and mechanical labor rates in Blair County do not track the same as Philadelphia or Pittsburgh. The adjustment applies to the labor hours and to material line items that move by region. You get the rate basis shown in the workbook so you can compare it against your own quotes.
The permit figures come from the U.S. Census Bureau Building Permits Survey for 2025. They count new privately-owned residential units permitted by the city itself, not total construction activity. In 2025 Altoona issued permits for 6 units, all single-family, down from 8 units in 2024 — a 25% change. Commercial, industrial, and renovation permits are not included in that count.
Send the full plan set, the specification book if there is one, and any addenda or bulletins. If you have a schedule or a bid form, include it so we can match the line structure. For renovation work, existing-condition drawings and any survey or geotech report help, especially on hillside lots where rock and slope stability affect the earthwork quantities.
We separate rock from unclassified excavation whenever the geotech report or the drawings give us a basis to do it. If there is no geotech information, we carry unclassified excavation and flag it as a risk item in the notes rather than guessing a rock percentage. That way you can decide whether to bid it firm, carry an allowance, or make it a unit-price item.
Yes, and it is a large share of the work here. Older masonry buildings mean selective demolition, lintel replacement, floor framing tied into existing bearing walls, and MEP that is usually full replacement. We measure demolition by area and by piece, and we list every assumption about existing conditions so you can price the unknowns deliberately instead of absorbing them.
Excel and PDF, organized by CSI MasterFormat division, with the marked-up plan sets included. The Excel file carries quantities, units, and the rate basis so you can adjust waste factors or swap a subcontractor quote. The PDF is the review copy. Both are sorted the same way, so a division you care about is in the same place in each.
Most projects come back in 24–48 hours. Larger or multi-building scopes take longer, and we tell you the date before we start rather than after. Rush turnaround is available when you have a hard bid date. If you need a specific division first — say the concrete and sitework so you can talk to those subs — we can release it ahead of the rest.
Yes. We cover Blair County and the surrounding region, including projects bid out of State College, Harrisburg, and York. If your project is in a nearby market, the same scope applies — the rate basis and the code references shift with the ZIP code and the local review authority, and we note that in the estimate.
Cold-weather concrete protection, temporary heat, and snow removal are carried as separate line items when the schedule puts that work in the cold months. They are not buried in a general conditions percentage. If the schedule is not set, we note the exposure so you can decide whether to carry it or make it a schedule condition in your bid.
Yes. We can sort the same quantities into packages — sitework, concrete, framing, roofing, MEP — so each sub gets only their scope. This is common on Altoona projects where you are bidding several trades and want to compare quotes line by line instead of against a single lump sum. Ask for the package split when you send the plans.
Send your plan set and we will return a division-sorted takeoff with marked-up drawings, normally within 24–48 hours.