Sitework and earthwork
Mass grading, structural fill, trenching and erosion control for Hillsboro sites with wet-season sequencing and drainage scope.
CY · SF · LFWe prepare detailed quantity takeoffs and cost estimates for contractors, developers and owners in Hillsboro, Oregon. Your estimate arrives in Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets and ZIP-code-adjusted pricing for Washington County.
Hillsboro pricing is driven by Washington County soil and drainage conditions, wet-season sitework windows, Portland-area semiconductor and industrial investment, suburban single-family growth, and ZIP-adjusted material and labor rates. These factors move earthwork, concrete, framing, roofing and MEP line items more than a generic state average would.
Hillsboro sits in Washington County, where the Portland-area semiconductor buildout and Willamette Valley suburban growth keep both industrial and residential work moving. The city issued 313 new privately-owned residential units in 2025, down from 594 in 2024, with 295 single-family and 18 multifamily units. That mix means most of the residential takeoff volume here is detached housing, not podium or wrap construction. You can see how that compares with other markets on our Oregon construction estimating page.
We build estimates from the plans you send, not from square-foot averages. A Hillsboro single-family takeoff typically runs through footing and stem wall concrete, slab-on-grade, floor and roof framing, exterior envelope, insulation, drywall, and MEP rough-in, each priced with ZIP-code-adjusted material and labor. Sitework packages around Hillsboro often carry extra drainage and erosion-control scope because of winter rainfall and local soils. If your project is closer to the I-5 corridor, our Salem construction estimating and Beaverton construction estimating pages cover those markets with the same format.
For bidders. You need a bid-ready number fast. We return most takeoffs in 24–48 hours, organized by CSI division, with quantities you can drop into your own pricing sheet and adjust for your crew and suppliers.
For builders. You are buying out framing, concrete, roofing and MEP. Our line items carry units and waste factors so your purchase orders match what actually gets installed, not a rounded-up allowance.
For owners. You want a budget before design is finished. We price what is drawn, flag what is missing, and separate sitework, shell and interiors so you can phase spending through Washington County permitting.
Select a bar to compare Hillsboro with the largest Oregon markets we cover.
313 new housing units in 2025 (-47.3% vs 2024).
295 single-family · 18 multifamily (6%).
Hillsboro issued 313 new privately-owned residential units in 2025, a 47% decline from 594 in 2024. Single-family units accounted for 295 of that total, or 94%, while multifamily contributed just 18 units, about 6%. Permitted value was $99M, averaging $315,000 per unit. For bidders, that means the active residential bid list is mostly detached homes and small subdivisions, not large apartment packages. Framing, foundation and roofing scopes will see more competition per project, so quantity accuracy on those divisions matters more than ever. The city ranked 11 of 25 among covered state cities by units and represented 3.3% of the 9,431 statewide units. If you also bid south of here, our Eugene construction estimating page tracks a different demand pattern.
Portland-area semiconductor investment is the main non-residential driver in this submarket, and it pulls concrete, structural steel, process piping and electrical contractors toward industrial scopes. Those projects price differently from residential work: heavier foundations, tighter tolerance specs, and MEP packages that run a much larger share of total cost. When residential permits slow, bidders who can price both sides of the market stay busier. We estimate industrial and commercial scopes with the same CSI-division structure, so your team can compare a tenant improvement against a cleanroom support building without rebuilding the format. For contractors working across the metro, our Gresham construction estimating and Medford construction estimating pages cover those nearby markets.
We price the scopes that show up most often on Washington County plans, from residential subdivisions to industrial support buildings.
Mass grading, structural fill, trenching and erosion control for Hillsboro sites with wet-season sequencing and drainage scope.
CY · SF · LFFootings, stem walls, slab-on-grade and retaining walls priced with formwork, reinforcement and local ready-mix rates.
CY · SF · TONFloor, wall and roof framing with stud counts, sheathing, hardware and typical waste factors for detached housing.
LF · SF · EAUnderlayment, flashing, siding and weather barriers detailed for Oregon rain exposure and wall assemblies.
SF · LF · SQPlumbing, HVAC and electrical rough-in quantities for residential and light commercial scopes, by fixture and device count.
EA · LF · TONFull-house takeoffs for Hillsboro single-family permits, from foundation through finishes and final grade.
SF · EA · LSTenant improvements, retail shells and office buildouts priced by CSI division with marked-up plan sets.
SF · EA · LSFoundations, structural steel and process support scopes for the semiconductor and advanced manufacturing supply chain.
TON · CY · LFYou are pricing 20 to 60 detached lots off one plan set and need per-unit quantities for concrete, framing and roofing that hold up across varied lot grades in Washington County.
You buy lumber and ready-mix on short cycles, so you need board-foot and cubic-yard takeoffs with waste factors you can hand straight to your supplier before the bid date.
Steep lots, daylight basements and engineered retaining walls change excavation and foundation scope enough that square-foot pricing misses the real cost.
Trades near the Ronler Acres and Shute Road campuses need cleanroom-adjacent MEP, process piping and equipment pad quantities separated from base building scope.
With only 18 multifamily units permitted in 2025, each project is negotiated rather than bid, so you need a defensible budget before you commit to a pro forma.
You want a division-by-division budget from schematic drawings, with missing scope flagged, so design decisions are made against numbers instead of allowances.
We estimate from plans for projects anywhere in Washington County and the surrounding Willamette Valley, and we price to the ZIP code where the work is built.
The 2025 permit mix here was 295 single-family units against 18 multifamily units, so detached housing and the sitework that supports it drive most of the takeoff volume we see.
Production plans repeated across many lots, priced per unit with footing, stem wall, slab, framing, roof and envelope quantities broken out so you can compare lot-to-lot variance.
Watch for: Lot grading, retaining walls, utility trench depth
One-off plans with irregular geometry, vaulted ceilings and mixed exterior finishes, where wall areas and roof planes must be measured rather than factored from floor area.
Watch for: Complex roof planes, window schedules, deck framing
Party-wall construction, shared utility runs and common-area finishes priced by building type, with each unit plan counted separately before assemblies are multiplied.
Watch for: Fire separation, sound ratings, shared MEP risers
Tilt-up and pre-engineered metal buildings with slab-on-grade, dock equipment, racking anchorage and office build-out separated from the shell package.
Watch for: Slab flatness, dock pits, fire protection
Tool pads, cleanroom partitions, process utilities and exhaust systems priced from equipment lists and piping drawings rather than from architectural area.
Watch for: Vibration criteria, cleanroom finishes, process piping
Office, retail and light-industrial fit-outs priced from demolition through partitions, ceilings, lighting and HVAC distribution, with landlord versus tenant scope split out.
Watch for: Demolition, sprinkler relocation, HVAC capacity
Two bids on the same drawings can differ by a wide margin here because of ground conditions, permitting sequence and how far materials travel to the site.
Hillsboro reviews building permits through the city, and Washington County coordinates some road and drainage approvals. Oregon adopts statewide building and residential codes, but the edition in force changes over time, so confirm the adopted edition and any local amendments with the building department before you lock pricing. Review timelines affect escalation on long-lead items more than they affect labor.
City of Hillsboro building department · Washington County · Oregon statewide codesMuch of the eastern Tualatin Valley sits on older alluvial and volcanic soils, and parts of the area carry expansive clay that drives over-excavation and deeper footings. A geotechnical report changes footing widths, stem wall height and drain detail. If you bid from drawings alone, carry a line for unsuitable subgrade and note it as an assumption rather than burying it in the concrete unit price.
Geotechnical report · Footing and stem wall concrete · Subgrade correctionWet-season work from October through spring adds temporary erosion control, gravel working pads, silt fence, inlet protection and dewatering. Roofing and exterior painting schedules stretch, which carries general conditions longer. Sitework packages need catch basins, storm line and footing drain quantities measured from the civil sheets, not carried as a lump sum.
Erosion control plan · Storm drainage · DewateringCrews here move between residential subdivisions, industrial campuses and Portland-metro commercial work, so trade availability tightens when large projects pull labor. Your estimate should show labor hours by trade with a stated burden and overtime assumption, so you can test the number against the crew you actually have rather than a regional average.
Labor burden · Trade hours · Overtime assumptionHillsboro's planning rules and Washington County's urban growth boundary shape lot sizes, setbacks and where you can place impervious surface. Those constraints change retaining wall lengths, driveway grades and stormwater detention volume. Estimating from the civil and landscape sheets together catches the walls and plantings that a building-only takeoff misses.
Urban growth boundary · Setbacks and lot coverage · Stormwater detentionMost structural lumber, ready-mix and finishes come from the Portland metro, but specialty items such as engineered wood, custom windows and process equipment can ship from out of state. Freight, lead time and sales tax treatment belong in the estimate. Oregon has no statewide sales tax, so confirm any local or use-tax treatment on materials with your accountant.
Freight and lead time · Ready-mix suppliers · Oregon sales tax treatmentHillsboro sits in Washington County, where wet winters, volcanic and alluvial soils, and a steady mix of residential and high-tech industrial work shape what a takeoff must capture. Here is how that plays out trade by trade.
Hillsboro's wet season means you cannot take the geotech report's bearing depth at face value. A sitework takeoff here has to carry stripping depths, unsuitable soil over-excavation, structural fill import, and perimeter drainage separate from the building scope. On the sloped west-side lots, add temporary erosion control, silt fence, and construction entrance rock as measured line items, not allowances. If the civil plan shows a storm line crossing the building pad, price the bedding, backfill, and compaction in lifts by station. We break these out under CSI 31 00 00 so your excavator's bid and your site package reconcile. See our sitework estimating services for the unit breakdown we use.
Oregon's energy code pushes wall assemblies toward continuous exterior insulation and tighter air sealing, which changes the framing takeoff more than most builders expect. We measure plates, studs at the actual on-center spacing, headers by size and span, joists, sheathing, and blocking by linear foot, then add a waste factor typical for the material. On the envelope side, house wrap, flashing at openings, and rainscreen battens need their own lines. Roof framing over a cathedral ceiling gets counted differently than a vented attic. Our framing estimating services page covers how we separate structural from finish carpentry so your framing sub's bid lines up with the plan.
The semiconductor and advanced manufacturing work around Hillsboro pulls MEP scopes toward cleanroom-grade distribution, process piping, and high-density electrical, while residential work stays closer to standard heat pump and ducted systems. Either way, an MEP takeoff has to count fixtures by type, devices by count, home runs by length, and pipe by size and material. Fire sprinkler coverage under NFPA 13 is measured by head count and branch line length. We separate mechanical, electrical, plumbing, and fire protection under their own MasterFormat divisions so a specialty contractor can price their piece without sorting through another trade's quantities. Our MEP estimating services page lists what we need to start.
Washington County footings often bear on stiff silt or weathered basalt, which pushes footing widths and stem wall heights beyond the default detail. A concrete takeoff for a Hillsboro project should measure continuous footings by linear foot at the actual width and depth, pad footings by count, slab-on-grade by square foot with thickened edges, and garage slabs separately. Add vapor barrier, rigid insulation under slab where energy code requires it, anchor bolts, and dowels into the stem wall. Rebar is taken by bar size and total length with lap and waste. Our concrete estimating services and foundation estimating services pages show how we format these quantities for a rebar supplier or a formwork crew.
Hillsboro roofs take steady winter rain and occasional wind-driven events, so underlayment and flashing details carry real cost. A roofing takeoff here starts with the actual roof plan area, then adds slope factor, starter course, ridge and hip, valley metal, drip edge, pipe boots, and step flashing at every wall intersection. Ice and water shield is measured by the eave and valley lengths the code and manufacturer require, not by a percentage guess. Ventilation — ridge vent, soffit vent, or both — is counted by linear foot. Our roofing estimating services page shows the line format we return, with waste shown separately from net area.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24 in x 12 in | 86 | CY |
| 03 20 00 | Rebar, #4 and #5, incl. lap | 4,850 | LF |
| 06 10 00 | Wall framing, 2x6 studs @ 16 in OC | 1,940 | LF |
| 06 10 00 | Headers, built-up, by size | 42 | EA |
| 07 25 00 | House wrap, walls | 3,180 | SF |
| 07 30 00 | Roof underlayment, incl. slope factor | 2,640 | SF |
| 09 21 00 | Gypsum board, 1/2 in, walls and ceilings | 4,720 | SF |
| 22 11 00 | PEX domestic water, by size | 610 | LF |
This walk-through uses illustrative dimensions for a 1,800 SF single-family slab-on-grade in Hillsboro. It shows how a takeoff moves from plan dimensions to a priced quantity with waste shown separately. Actual dimensions come from your plan set.
Step 1 — Net slab area. The conditioned footprint measures 40 ft x 45 ft = 1,800 SF. The garage is a separate 22 ft x 22 ft = 484 SF. Net slab area is 2,284 SF.
Step 2 — Slab thickness and volume. At 4 in thick, volume = 2,284 SF x (4/12) ft = 761.3 CF. Divide by 27 to get cubic yards: 761.3 / 27 = 28.2 CY.
Step 3 — Thickened edges. The perimeter of the conditioned slab is 2 x (40 + 45) = 170 LF. The garage perimeter is 2 x (22 + 22) = 88 LF. Total 258 LF. A thickened edge 12 in wide by 12 in deep adds 258 LF x 1 ft x 1 ft = 258 CF = 9.6 CY, minus the 4 in already counted in Step 2 (258 LF x 1 ft x 0.333 ft = 86 CF = 3.2 CY). Net additional edge concrete = 6.4 CY.
Step 4 — Waste. Concrete is ordered with a typical 5% waste factor for slab work. 28.2 + 6.4 = 34.6 CY net. 34.6 x 1.05 = 36.3 CY to order.
| Step | Calculation | Quantity | Unit |
|---|---|---|---|
| Net slab area | 40 x 45 + 22 x 22 | 2,284 | SF |
| Slab volume at 4 in | 2,284 x 0.333 / 27 | 28.2 | CY |
| Perimeter | 2 x (40+45) + 2 x (22+22) | 258 | LF |
| Thickened edge, additional | 258 x 1 x (1 - 0.333) / 27 | 6.4 | CY |
| Net concrete | 28.2 + 6.4 | 34.6 | CY |
| With 5% waste | 34.6 x 1.05 | 36.3 | CY |
From here, add vapor barrier at 2,284 SF plus laps, rigid insulation under the conditioned slab if the energy code requires it, rebar or mesh by area, and anchor bolts by count. Confirm the adopted code edition with the local building department before locking the assembly. If you want this run against your own plan set, send it through our concrete estimating services page.
Washington County soils and the wet season drive most of it. Over-excavation and structural fill, perimeter drainage, and temporary erosion control are real line items here, not allowances. On the building side, Oregon's energy code pushes continuous exterior insulation and tighter air sealing, which changes the framing and envelope quantities. We also separate sitework from the building package so your excavator and your GC are not pricing the same cubic yard twice.
The residential permit figures come from the U.S. Census Bureau Building Permits Survey for 2025, counting permits issued by the city of Hillsboro for new privately-owned residential units only. That means additions, alterations, and commercial permits are not in the count. The survey showed 313 total units in 2025 against 594 in 2024, with 295 single-family and 18 multifamily units. We use it as a demand signal, not as a project list.
The wet season runs roughly October through May, so weather protection, temporary heat, and dewatering show up as real costs on winter schedules. Roofing underlayment and flashing details get specified more heavily than in drier markets. Sitework bids need erosion control and stabilized construction entrances priced by length or by count. If your schedule runs through winter, those lines belong in the takeoff, not in a contingency.
Yes. The Hillsboro market runs from single-family infill and multifamily to advanced manufacturing and semiconductor support buildings. The takeoff format is the same — CSI MasterFormat divisions, quantities with units, waste shown separately — but the line items differ. Residential work leans on framing, envelope, and MEP rough-in counts. Industrial work leans on structural steel, process piping, high-density electrical, and cleanroom finishes. Tell us the project type when you send plans.
Most projects come back in 24 to 48 hours. Larger or multi-building packages take longer, and rush turnaround is available if your bid date is close. We return Excel and PDF organized by CSI MasterFormat division, plus marked-up plan sets so you can see exactly where each quantity came from. If your plans are still in progress, send what you have and we will note what is missing.
Yes. We use RSMeans data adjusted to Hillsboro ZIP codes for material and labor pricing, so the numbers reflect the local market rather than a national average. Labor rates in the Portland metro area differ from eastern Oregon, and material logistics from the Willamette Valley suppliers are part of that. If you have your own historical unit costs, we can apply those instead so the estimate matches how you actually buy work.
Send the plan set, the specification book if you have one, and any geotech or civil drawings. For a complete takeoff we need architectural, structural, and MEP sheets. If the MEP drawings are not issued yet, we can take off what is available and flag the rest as a gap. Tell us the bid date and the format you want the quantities in — Excel for pricing, PDF for review, or both.
Waste is shown as a separate line so you can see net quantity and gross quantity side by side. Concrete typically carries a 5% factor for slab work, framing lumber a higher factor depending on the member, roofing material a factor tied to the plan complexity. We do not bury waste in the unit price. That way, if your supplier ships short or your crew cuts differently, you can adjust the factor without rebuilding the whole takeoff.
Yes. We cover the Portland metro and the Willamette Valley, including Salem, Beaverton, Gresham, Eugene, Bend, and Medford. Soil conditions, jurisdiction requirements, and labor markets differ across those areas, so the takeoff reflects the specific ZIP code and the local code family. If your project is in a jurisdiction we have not listed, send the address and we will confirm coverage.
Double-counted sitework. We regularly see the same over-excavation cubic yards priced by both the site contractor and the concrete contractor, or storm drainage carried in both the site package and the plumbing package. The second most common is a missing line — usually continuous insulation or air sealing required by the energy code — that shows up later as a change order. A clean takeoff with clear scope boundaries prevents both.
Email your plan set and bid date, and we will return a division-by-division takeoff in 24 to 48 hours.