Sitework takeoffs
Clearing, cut and fill balanced against Lane County soil, storm and utility trenching for sloped Eugene lots.
CY · LF · TONWe prepare quantity takeoffs and estimates for Eugene contractors, developers and owners — organized by CSI MasterFormat division, with marked-up plan sets, in Excel and PDF, typically inside 24–48 hours.
Eugene pricing turns on Lane County soil and wet-season earthwork, Willamette Valley concrete and lumber supply, seismic and energy-code detailing, a multifamily-heavy permit mix, and ZIP-adjusted material and labor rates — all of which shift quantities and unit costs before you bid.
Eugene sits third among Oregon cities for new privately-owned residential units, with 850 permitted in 2025 against 1,002 in 2024 — a 15% drop. Multifamily carried 616 of those units, or 72% of the total, while single-family accounted for 234. Permitted value came to $164M, an average of $193,000 per unit. That mix matters when you price: a 60-unit wood-frame apartment building on a sloped south Eugene lot behaves nothing like a custom home off Chambers Street, and the takeoff has to reflect it.
We work from your plan set and specs, not from a square-foot guess. Takeoffs are built in Bluebeam Revu and PlanSwift, priced with RSMeans data adjusted to the project ZIP code, and delivered as Excel and PDF organized by CSI MasterFormat division with the marked-up drawings attached. If you are bidding a Lane County job against Portland or Salem numbers, start with our Oregon construction estimating overview, then send the drawings through get an estimate.
For bidders. You get division-by-division quantities with waste factors stated, so you can see where your number diverges from the competition before you submit. Marked-up plan sets show exactly what was measured.
For builders. Change-order and phase pricing tied to the same takeoff, so framing, concrete and MEP quantities stay consistent from bid through buyout. Useful when a Eugene multifamily job runs in phases.
For owners. A check on the contractor's bid and a basis for comparing alternates. You see the quantities behind the lump sum instead of accepting a single line item.
Select a bar to compare Eugene with the largest Oregon markets we cover.
850 new housing units in 2025 (-15.2% vs 2024).
234 single-family · 616 multifamily (72%).
Of the 850 new privately-owned residential units permitted in Eugene in 2025, 616 were multifamily — 72% of the total — and the city ranked 3 of 25 among the covered Oregon cities we track, about 9% of the 9,431 statewide units. For a bidder, that means your competition is mostly pricing Type III and Type V wood-frame apartment and townhome work: repetitive unit plans, shared MEP risers, and sitework spread across a single podium or slab. Repetition rewards a careful takeoff, because a small per-unit error multiplied across 60 units is the difference between a winning bid and a losing job. Compare your assumptions against our Salem construction estimating and Portland construction estimating pages, where the unit mix and labor pool differ.
Permitted value of $164M against 850 units works out to about $193,000 per unit, and with 234 single-family units in the mix, that average is pulled in two directions. Single-family permits in Eugene skew toward infill and custom work, where per-unit value runs well above the multifamily average but quantities are harder to standardize. Total units fell 15% from 1,002 in 2024 to 850 in 2025, which usually means fewer bidders per job and thinner margins — not a reason to bid loose. Price the soil, the wet-season schedule and the seismic detailing properly, and confirm which code editions the city has adopted with the local building department before you finalize.
Eugene work runs from sloped infill lots to wood-frame multifamily, and each scope has its own takeoff logic. These are the estimates we build most often here.
Clearing, cut and fill balanced against Lane County soil, storm and utility trenching for sloped Eugene lots.
CY · LF · TONFootings, stem walls, slabs and podium decks priced with formwork, rebar and pump access in mind.
CY · SF · LBSpread footings, crawlspace and slab-on-grade quantities, including moisture detailing for wet Willamette Valley winters.
CY · SF · LFFloor, wall and roof members counted from the plans, with typical waste factors applied and sheathing listed separately.
BF · LF · EASlope, valley and penetration quantities for shingle, membrane and low-slope multifamily roof systems.
SQ · LFPlumbing, HVAC and electrical rough-in counts for repetitive unit plans, plus shared risers and common-area distribution.
LF · EA · TONUnit-by-unit takeoffs for Eugene's apartment and townhome pipeline, with common areas and sitework carried separately.
UNIT · SF · CYTenant improvements, retail and light industrial shells, including division-level quantities for bid comparison.
SF · LF · EAYou are bidding Lane County schools, multifamily and tenant improvements against Salem and Portland firms. We return division-by-division quantities in 24–48 hours so you can adjust your number before the bid date, not after.
With 616 of Eugene's 850 permitted units in multifamily, your pro forma lives on cost per unit. We break out Type III and Type V wood-frame quantities by building and phase so you can compare a 60-unit podium scheme against a garden-style option.
Framing, concrete and roofing crews bidding west Eugene and Springfield work need quantities they can buy from. We mark up the plan set and state waste factors, so your lumber and rebar orders match the takeoff.
You need a cost check while the drawings are still moving. We price alternates from the same takeoff, so a siding or window change shows its cost impact without a full re-estimate.
University-area and medical office renovations often go through a CM at risk. We give you the quantities behind the lump sum so you can compare bids line by line instead of trusting a single total.
Single-family permits still account for 234 units, many on sloped or infill lots. We estimate foundation, framing and MEP separately so you can see which trade is driving your cost before you sign a fixed-price contract.
We price projects across Lane County and the Willamette Valley, from downtown infill to greenfield subdivisions. If your job is outside the city limits, the same ZIP-adjusted pricing applies.
The 2025 permit mix was 72% multifamily, so most of our Eugene volume is apartment and mixed-use work. Single-family, commercial and institutional projects round out the rest.
Three- and four-story Type III and Type V buildings over tuck-under or podium parking, common along the River Road and downtown corridors. We take off sheathing, hold-downs, floor trusses and unit-by-unit finishes from the architectural set.
Watch for: Fire-rated assemblies, shear wall hold-downs, unit turnover finishes
Cluster units and studio buildings near the university, often on tight infill lots with limited staging. Quantities are tracked per bed and per unit so you can compare a 4-bed cluster against a studio scheme.
Watch for: Per-bed MEP counts, sound transmission details, bike storage
Single-family permits totaled 234 units, many on sloped lots or tear-down sites. We estimate foundation, framing and envelope separately because those three trades usually decide whether the project pencils.
Watch for: Sloped-lot excavation, retaining walls, engineered floor systems
Ground-floor commercial under residential, common downtown and along major arterials. We separate base-building shell from tenant improvement scope so you can price the core and shell first.
Watch for: Demising walls, grease or venting rough-in, storefront glazing
Clinic and office fit-outs in the medical district and suburban office parks. MEP and partition quantities are taken off room by room, since a procedure room carries far more rough-in than a standard office.
Watch for: Med gas, specialty HVAC, lead-lined or clean-room partitions
Small-format warehouse and light manufacturing in west Eugene and the industrial corridors. Slab, tilt or pre-engineered structure and site work are estimated together because the yard and pavement often exceed the building cost.
Watch for: Slab flatness, dock equipment, fire sprinkler coverage
Eugene pricing is not Portland pricing, and it is not Salem pricing. These are the six variables that move a Lane County number the most.
Eugene and Lane County review residential and commercial permits separately, and plan review comments can add weeks before you mobilize. Oregon adopts the IBC, IRC, IECC and NEC with statewide amendments, but the adopted editions and any local overlays must be confirmed with the building department. We price to the code edition named in your drawings and flag scope that depends on an unresolved review comment.
IBC · IRC · IECC · NECMuch of Eugene sits on Willamette Valley alluvium, with plastic clays and seasonal high groundwater in the lower areas. That drives over-excavation, structural fill and sometimes deeper footings than a Portland bid assumes. On sloped south Eugene and Coburg Road lots, retaining walls and stepped foundations are common. We take off excavation, backfill and drainage separately so you can see the geotech-driven cost.
Willamette Valley alluvium · plastic clays · seasonal groundwaterWet winters compress the earthwork and exterior-finish season, and covered work or temporary heat can carry into spring. Oregon's seismic provisions affect lateral systems, hold-downs and anchorage on both wood-frame and masonry buildings. We carry weather-protection and temporary-condition line items in the general conditions and keep foundation and flatwork quantities tied to a realistic pour calendar.
OSSC seismic provisions · wet-weather protection · temporary heatEugene has a smaller union and specialty-trade pool than Portland, so mechanical, electrical and fire-protection bids can come in thin or carry travel time from the metro area. Prevailing-wage work on public projects changes the labor burden line. We use ZIP-adjusted RSMeans labor rates and note where a trade is likely to travel, because that premium shows up in the bid even when it is not itemized.
RSMeans ZIP-adjusted labor · prevailing wage · travel premiumThe city's stormwater and tree-preservation requirements can add detention, water-quality treatment and canopy protection to a site plan. Wetland and floodplain mapping along the Willamette and Amazon Creek corridors may push fill or foundation elevations. We take off site utilities, erosion control and paving from the civil set, and we price the building separately so you can see how much of the budget is site-driven.
stormwater detention · tree preservation · floodplain mappingMost lumber, concrete and steel reaches Eugene from the Willamette Valley or the Portland metro, so freight is a real line item on heavy or bulky materials. Concrete batch plants and aggregate sources are local, but specialty cladding, elevators and mechanical equipment often ship from out of state with long lead times. We state lead times and freight assumptions in the estimate so your bid reflects what actually lands on the job.
Willamette Valley suppliers · Portland metro freight · long-lead equipmentEugene's wet winters, seismic design category, and mix of student housing and infill multifamily change what you measure and how you price it. Here is how that plays out in the divisions we take off most often here.
Willamette Valley soils in the Eugene area range from silty clay to gravelly river deposits, and winter water tables sit high in the flats near the Willamette and McKenzie confluence. We take off stripping by square yard to the limits shown, then structural fill by compacted cubic yard — not loose yard — because shrinkage on silty clay typically runs 15 to 25 percent. Trench excavation for storm and sanitary is measured by linear foot with depth bands, since anything over 5 feet triggers shoring or sloping. Import and export are separate lines with haul distance stated, because disposal rates change once you leave the metro area. For a fuller breakdown, see our sitework estimating services.
Eugene's residential market is wood-framed, and the takeoff is unforgiving: plates, studs, headers, joists, sheathing, and hardware all come off the same sheets but price differently. We count studs by wall length and height with corner and opening allowances, then convert to board feet or units as your supplier prefers. Engineered lumber — LVL beams, TJI joists, PSL posts — is listed by manufacturer and depth because substitution changes the hardware schedule. Roof framing gets measured with overhang and pitch factored in, not plan area. Sheathing is taken off in sheets with a typical 5 to 10 percent waste factor. See framing estimating services for the full scope.
MEP is where Eugene bids most often go sideways, because the trades are separate and the scopes overlap. We take off plumbing fixtures by count with rough-in and trim separated, domestic water by linear foot and diameter, and DWV by fitting count and pipe length. HVAC is measured by tonnage, register count and duct run, with ERV or HRV listed separately since tight envelopes require them. Electrical is taken off by device count, homerun length, panel schedule and fixture type. Seismic bracing and permit-required special inspections get their own lines. Our MEP estimating services cover all three trades in one package.
Most Eugene residential and low-rise commercial work lands on continuous footings with stem walls, or slab-on-grade with thickened edges where soils report allows. We take off footing concrete in cubic yards by width and depth, formwork in square feet of contact area, and rebar by bar size and lap — #4 at 12 inches on center is common, but the structural sheets govern. Seismic detailing adds hold-downs, anchor bolt templates and special inspection notes that many bidders miss. Flatwork is measured separately from structural concrete because finish, joint spacing and mix design differ. Our concrete estimating services cover both scopes.
With roughly 40 inches of rain in a typical Eugene year, roof assemblies and flashing details drive callbacks. We measure roof area by slope, add for hips, valleys and penetrations, and list underlayment, ice-and-water at eaves and valleys, drip edge, and venting as separate lines. Composition shingle is the default on residential, but standing seam and TPO show up on commercial and multifamily. Wall envelope — house wrap, flashing tape, rainscreen battens — is often missing from bids even though Oregon code and good practice require it. Our roofing estimating services include envelope takeoff on request.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24" x 12" | 38.5 | CY |
| 03 10 00 | Foundation formwork, stem walls | 2,140 | SF |
| 03 20 00 | Rebar, #4 and #5, including laps | 6,850 | LB |
| 06 10 00 | Wall framing, 2x6 studs at 16" OC | 1,920 | LF |
| 06 16 00 | Wall sheathing, 7/16" OSB | 8,640 | SF |
| 07 30 00 | Roofing, composition shingle with underlayment | 4,120 | SF |
| 22 00 00 | Plumbing fixtures, rough-in and trim | 54 | EA |
| 26 00 00 | Electrical devices and fixtures | 312 | EA |
This example shows how we move from plan dimensions to a priced quantity. Dimensions are illustrative — your structural sheets govern.
Assume a rectangular building footprint of 60 feet by 40 feet, with a 6-inch slab on grade over 4 inches of compacted base. The slab is placed inside stem walls, so the pour area matches the interior footprint.
| Step | Calculation | Result |
|---|---|---|
| Plan area | 60 ft × 40 ft | 2,400 SF |
| Slab thickness | 6 in ÷ 12 | 0.50 ft |
| Net concrete volume | 2,400 SF × 0.50 ft | 1,200 CF |
| Convert to cubic yards | 1,200 CF ÷ 27 | 44.4 CY |
| Waste factor (typical 5–10%) | 44.4 CY × 1.07 | 47.5 CY |
| Base course | 2,400 SF × 0.333 ft ÷ 27 × 1.15 | 34.0 CY |
| Vapor barrier | 2,400 SF × 1.10 | 2,640 SF |
| Welded wire mesh | 2,400 SF × 1.10 ÷ 100 | 26.4 rolls (100 SF each) |
The 7 percent waste allowance covers spillage, uneven subgrade and minor over-pour at the edges. We keep base course and vapor barrier as separate lines because they are often supplied by different crews. If the geotech report calls for a capillary break or thicker base, the numbers change and we re-run them before you bid.
On a Eugene project, two local conditions matter. First, winter placement usually requires accelerated mix or heated enclosures, which we note as a separate line rather than burying in the concrete price. Second, the structural drawings may require dowels into the stem wall and a thickened slab at interior bearing lines; those are measured by linear foot and added to the rebar total. Confirm the adopted code edition and inspection requirements with the city building department before you finalize the bid.
Pricing depends on project type, square footage, and how many disciplines you want covered. We quote per project after reviewing the plan set, and we do not publish a flat rate because a 2,000-square-foot tenant improvement and a 60,000-square-foot multifamily building are not comparable. Send the drawings and we will return a fixed quote before any work starts. That quote includes marked-up plan sets so you can see exactly what we measured.
Most projects are delivered in 24 to 48 hours. Rush service is available when you have a bid date inside that window. Turnaround depends on how complete the drawings are — a full architectural and structural set with a spec book moves faster than a partial set with addenda still pending. If you send a complete package, we can usually confirm the delivery date the same day we receive it.
Yes. We include hold-downs, anchor bolts, special inspection notes, and other seismic-related items as separate lines when the structural sheets call for them. Oregon adopts the International Building Code and International Residential Code with state amendments, and the seismic design category for a given site comes from the geotechnical report and the adopted code edition. Confirm the edition with the city building department. We also flag any seismic details that appear on the drawings but are missing from your bid form.
We take off both. Eugene's permit mix leans heavily multifamily, and we cover that along with single-family, tenant improvements, light industrial, and mixed-use. The measurement methods are the same; what changes is the spec level, the trade breakdown, and the level of detail the general contractor needs for their bid form. For multifamily, we typically break out units by type so you can price per unit or per building.
Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets showing what we measured and where. That lets your estimator check quantities against the drawings without redoing the takeoff, and it makes scope review with subcontractors faster. We can also provide a summary sheet by trade if your bid form is organized that way. All quantities are traceable to the marked-up sheets.
We use ZIP-code-adjusted material and labor pricing from RSMeans data, applied to the quantities we measure. That means the labor rates and material costs reflect the Eugene market rather than a national average. We can also price against a quote you have from a local supplier if you want the estimate to match a specific buyout. Just send us the quote and we will incorporate it into the final numbers.
A complete plan set (architectural, structural, civil, MEP), the specifications, any addenda, and the bid form or scope sheet you are pricing against. If you have a geotechnical report, send it — soils affect foundation and earthwork quantities. The more complete the package, the fewer assumptions we have to flag. If something is missing, we will tell you what we assumed and list it as an exclusion so you can decide how to handle it.
Yes. We cover the surrounding Willamette Valley and other Oregon markets, including Portland, Salem, Gresham, Hillsboro, and Beaverton. If your project is elsewhere in the state, send the address and we will confirm coverage and pricing adjustments. Our Oregon construction estimating page lists the cities we serve and the trades we cover most often in each market.
The permit figures we cite come from the U.S. Census Bureau's Building Permits Survey. That survey counts new privately-owned residential units permitted by the city itself, not commercial permits and not all construction activity. It is a useful indicator of residential volume, but it is not a full picture of the Eugene construction market. We use it to understand trends, not to price individual projects.
We flag them. If a trade is missing from your bid form, or if a line item like erosion control or seismic hardware is not carried, we note it in the estimate so you can decide whether to add it or exclude it in writing. That is cheaper than discovering the gap after the contract is signed. We also provide a written list of assumptions and exclusions with every takeoff.
Email your drawings and bid date, and we will return a fixed takeoff quote — usually within one business day.