Sitework and utilities
Clearing, grading, storm drainage and sanitary sewer quantities for flat Pitt County sites with high groundwater and shallow utility depths.
CY · LF · TONScope Precision Estimate prepares CSI MasterFormat takeoffs and estimates for Greenville, NC contractors, developers and owners — residential subdivisions, commercial fit-outs and industrial work across Pitt County.
Pitt County's flat, sandy loam and high water table drive foundation and sitework quantities; Greenville's medical, university and industrial base mixes commercial and multifamily scopes; and ZIP-code-adjusted pricing separates Greenville from Raleigh and Charlotte rates. Storm drainage, dewatering and wind-rated assemblies recur on nearly every takeoff.
Greenville sits in Pitt County, where the coastal plain's high water table and sandy soils change how you price foundations, sitework and storm drainage. A slab on grade with a thickened edge is common, but you still carry vapor barrier, gravel and often a dewatering allowance. On the commercial side, East Carolina University and the medical district keep a steady flow of renovation and fit-out work that never matches a new-build template.
We build takeoffs in Bluebeam Revu and PlanSwift, apply RSMeans data adjusted by ZIP code for Greenville material and labor, and deliver Excel and PDF files organized by CSI MasterFormat division with marked-up plan sets. Most projects return in 24–48 hours, with rush available. If you bid across the region, our North Carolina construction estimating page covers how we handle the state's different markets, and you can see the same approach for High Point and Jacksonville.
For bidders. You need quantities you can defend line by line before bid day. We mark up the plan set, list each CSI division, and separate material from labor so you can adjust crew rates or supplier quotes without rebuilding the takeoff.
For builders. You are buying out trades and tracking change orders. We give you a division-by-division Excel file with waste factors, unit costs and quantities formatted for your purchasing and scheduling workflow.
For owners. You are comparing contractor proposals or checking a budget before design is complete. We provide a scope-level estimate with assumptions and exclusions stated, so gaps between bids are visible before you sign.
Select a bar to compare Greenville with the largest North Carolina markets we cover.
855 new housing units in 2025 (+1.4% vs 2024).
678 single-family · 177 multifamily (21%).
Greenville issued permits for 855 new privately-owned residential units in 2025, up about 1% from 843 in 2024, according to the U.S. Census Bureau Building Permits Survey. Single-family units accounted for 678 of those, with 177 multifamily units — about 21% of the total. The permitted value was $111M, averaging $130,300 per unit. For bidders, that mix means two different workflows: repetitive single-family takeoffs where framing, roofing and foundation quantities repeat lot to lot, and multifamily buildings where you need unit-mix matrices and per-building summaries. Our residential estimating services and multi-family estimating services handle both, and the state page shows how Greenville ranks against other North Carolina markets we cover.
Greenville's 855 units were 4.3% of the 19,955 units permitted across the 17 North Carolina cities we cover, ranking 8th by unit count. That places Greenville behind the Piedmont corridor's largest markets but ahead of many smaller cities, which matches what you see locally: steady subdivision work rather than the data-center and EV plant volume driving Charlotte and Raleigh. For your bids, the practical effect is that subcontractor coverage can be thinner on specialty scopes, so estimates should carry clear allowances for items like fire protection and mechanical equipment. Confirm adopted code editions with the City of Greenville and Pitt County building departments before pricing to a specific code year.
Greenville's coastal-plain soils, medical and university construction, and steady subdivision pipeline shape the scopes we take off most often.
Clearing, grading, storm drainage and sanitary sewer quantities for flat Pitt County sites with high groundwater and shallow utility depths.
CY · LF · TONSlab-on-grade, thickened edges, footings and rebar takeoffs priced for Greenville's sandy soils and vapor-barrier requirements.
CY · SF · LBWall, floor and roof framing with stud, plate, joist and sheathing counts sized for wind-rated assemblies common in eastern North Carolina.
LF · EA · BFShingle, membrane and metal roofing quantities with underlayment, flashing and insulation line items for coastal-plain weather exposure.
SQ · LF · SFMechanical, electrical and plumbing scopes for medical, university and commercial fit-outs where equipment allowances drive the budget.
EA · LF · TONDemolition, partitions, ceilings, finishes and casework takeoffs for ECU-area and medical-district renovations with phased occupancy.
SF · LF · EASlab, steel, dock equipment and process-support scopes for Pitt County distribution and light-industrial projects.
SF · TON · EAUnit-mix matrices and per-building summaries for apartment and townhome projects, with repeatable quantities across identical units.
EA · SF · LFRenovation and fit-out packages around East Carolina University and Vidant Medical Center rarely match new-build templates. We separate demolition, infection-control partitions, and phased MEP tie-ins so your bid reflects occupied-building conditions.
With 678 single-family units permitted in 2025, you are pricing repetitive plans across Winterville, Bethel and Grimesland. We build one model takeoff, then adjust per-lot sitework, driveways and utility runs.
The 177 multifamily units permitted here in 2025 follow the ECU academic calendar. We phase foundations, framing and MEP by building so your buyout matches your draw schedule.
Greenville's retail corridors and Pitt County industrial parks bring tilt-up, masonry and metal building packages. We quantify each trade separately so you can bid only your division without carrying another's scope.
You need a defensible number before design is complete. We flag assumptions, exclusions and escalation so your capital plan survives value-engineering and bid-day comparison.
We return quantities by CSI division with marked-up plan sets, so you can see which assemblies drive cost and adjust details before the 90 percent submission.
We take off work across Pitt County and the surrounding coastal plain, from the ECU campus edge to the smaller towns along the Tar River.
The 2025 permit mix here was 855 new privately-owned residential units, 678 single-family and 177 multifamily, with $111M in permitted value. That mix drives the property types we price most often.
Typical Greenville subdivision homes run slab on grade with brick or vinyl veneer. We take off per-plan quantities, then adjust sitework, driveways and utility trenches per lot so your model stays accurate across phases.
Watch for: Vapor barrier, gravel base, and lot-specific grading and drainage quantities.
Three- and four-story wood-frame apartments near ECU repeat unit plans but vary in elevation and MEP riser layout. We separate building-by-building quantities so your buyout matches your construction sequence.
Watch for: Fire-rated assemblies, sprinkler coverage, and elevator and stair core quantities.
ECU and medical district projects involve phased demolition, temporary partitions and MEP tie-ins to occupied systems. We quantify selective demolition and infection-control measures as separate line items.
Watch for: Phasing, temporary utilities, and above-ceiling MEP coordination.
Greenville's commercial corridors support tenant fit-outs that arrive as incomplete permit sets. We price from the shell drawings and note assumptions for storefront, grease interceptor and hood work.
Watch for: Storefront glazing, grease interceptors, and hood and makeup air.
Pitt County industrial park buildings are typically pre-engineered metal or tilt-up with minimal finishes. We take off foundations, slab, steel erection and site utilities as separate CSI divisions.
Watch for: Slab thickness, anchor bolt templates, and dock equipment allowances.
Greenville has a steady stream of church additions, private school buildings and nonprofit facilities. These often use volunteer labor, so we separate material from labor and show both.
Watch for: Volunteer-labor exclusions, specialty finishes, and audio-visual rough-in.
Pitt County sits on the coastal plain, where flat terrain, sandy soils and a high water table shape both sitework and foundation costs. The items below are the ones that move a Greenville estimate most.
Greenville and Pitt County enforce the North Carolina State Building Code, with local amendments and floodplain rules along the Tar River. Confirm the adopted edition and any local amendments with the city or county building department before you finalize your permit and inspection budget. Plan review timelines and trade permit sequencing can shift your start date, so carry them as a line item rather than an assumption.
North Carolina State Building Code · Pitt County building department · City of Greenville inspectionsSandy coastal-plain soils drain quickly but offer limited bearing capacity, so many Greenville homes use slab on grade with thickened edges or pier-and-beam. A high seasonal water table can require under-slab drainage, gravel, and a heavier vapor barrier. If a geotechnical report calls for deep foundations, that cost lands in the first division and changes your entire bid structure.
Sandy soils · high water table · slab on grade · pier and beamGreenville sees hurricane-season wind and rain, plus occasional winter ice. Wind-borne debris and uplift requirements can raise roof sheathing, fastener and connection costs. Floodplain proximity adds elevation, flood vents and moisture-resistant assemblies. Roofing and envelope takeoffs should carry these items explicitly rather than as a percentage allowance.
Hurricane season · wind uplift · floodplain · moisture-resistant assembliesPitt County's trades are stretched by ECU construction and regional growth, so labor rates and crew availability vary by season. We apply ZIP-code-adjusted RSMeans labor, but you should confirm current rates with your subs. On phased or occupied-building work, add premium time for after-hours and infection-control supervision, because those hours are not in a standard labor table.
RSMeans ZIP adjustment · trade availability · premium time · phased occupancyFlat terrain means storm drainage relies on swales, culverts and retention rather than gravity to a distant outfall. Clearing, grubbing, topsoil stripping and borrow fill quantities can swing widely between adjacent lots. For anything larger than a single lot, pair a [sitework takeoff](/sitework-estimating-services/) with a [foundation takeoff](/foundation-estimating-services/) so cut-fill and bearing decisions stay linked.
Storm drainage · retention ponds · borrow fill · cut and fillGreenville is roughly 85 miles from Raleigh, so most material deliveries are regional truck hauls rather than local pickup. Concrete, masonry and steel pricing follows the eastern North Carolina market, and fuel surcharges apply. If your project is in a small Pitt County town, add delivery time and small-load premiums to your material quotes.
Raleigh material market · truck haul · fuel surcharge · small-load premiumGreenville's mix of residential subdivisions, medical and university work, and light industrial projects changes what you count and how you price it. Here is how local conditions show up, trade by trade.
Pitt County's flat, poorly drained soils mean mass grading quantities and undercut volumes are the first thing we check on a Greenville set. We count cut and fill by grid, then add undercut where the geotech report calls for it. Storm drainage is a large line on most local jobs: pipe by diameter and length, structures by type and depth, and riprap or flared end sections. Because the water table sits high in places, we carry dewatering and stone stabilization as separate lines rather than burying them in the earthwork unit price. For a full site package, see our sitework estimating services.
Greenville framing is mostly wood frame, even on mid-rise residential, so we take off plates, studs, headers and sheathing by wall run and opening, then convert to board feet and sheets. We separate treated bottom plates and sill sealer from the untreated count. Roof framing is counted by rafter or truss length with overhang, and we note where a hip or valley changes the piece count. Wind bracing and continuous load path hardware are line items, not allowances. Our framing estimating services page shows the level of detail we return on a typical wall and roof takeoff.
Greenville's humid summers and mild winters shape HVAC sizing, and we take off equipment by tonnage and CFM rather than by square foot rule of thumb. Ductwork is measured by linear foot and pound of metal, with fittings counted individually. Plumbing is counted by fixture and by pipe run in linear feet, including vent stacks and cleanouts. Electrical is counted by device, fixture, panel and home run. On medical and lab work around the ECU Health campus, we add med gas, specialized exhaust and emergency power as separate scopes. MEP estimating services explains how we structure those divisions.
On Greenville residential work, slab-on-grade with turned-down edges is common, and we take off concrete by cubic yard using the actual thickened-edge section, not a flat 4-inch assumption. Rebar is counted by bar size and length, with lap and chair allowances stated separately. On commercial and institutional jobs around the medical district and East Carolina University, we see more spread footings and pier systems, and we measure formwork by contact area rather than by volume. Concrete estimating services covers the full division, and foundation estimating services handles the below-grade scope in detail.
Roofing in eastern North Carolina has to handle heat, humidity and occasional wind-driven rain, so underlayment and flashing details matter as much as shingle squares. We measure roof area by slope, add typical waste for hips and valleys, and count ridge, hip, valley and starter separately. On commercial roofs we take off insulation by thickness and R-value, cover board, and membrane by square with fastening pattern noted. Wall envelope items like house wrap, flashing tape and sealant are counted by linear foot and roll. Roofing estimating services covers shingle, metal and low-slope systems.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Slab-on-grade concrete, 4 in. | 38.5 | CY |
| 03 20 00 | Rebar, #4, slab and edge | 2,140 | LF |
| 06 10 00 | 2x4 studs, 8 ft, walls | 412 | EA |
| 06 10 00 | 2x6 studs, 9 ft, exterior walls | 286 | EA |
| 06 16 00 | OSB wall sheathing, 7/16 in. | 3,240 | SF |
| 07 30 00 | Architectural shingles | 31.2 | SQ |
| 09 29 00 | 1/2 in. gypsum board, walls | 6,880 | SF |
| 15 00 00 | Plumbing rough-in, fixtures | 14 | EA |
This example uses illustrative dimensions for a one-story house on a slab in Pitt County. The goal is to show how a takeoff moves from plan dimensions to a priced quantity, including waste and thickened edges. Verify actual dimensions against your plan set before ordering.
Step 1 — Main slab area. The house footprint measures 52 ft by 34 ft. Area = 52 × 34 = 1,768 SF. At 4 in. thick, volume = 1,768 × (4 ÷ 12) = 589.3 CF. Convert to cubic yards: 589.3 ÷ 27 = 21.83 CY.
Step 2 — Thickened edge. The perimeter is 2 × (52 + 34) = 172 LF. The edge is 12 in. wide and 12 in. deep, so the extra volume beyond the 4 in. slab is 8 in. deep by 12 in. wide: 172 × 1.0 × 0.667 = 114.7 CF = 4.25 CY.
Step 3 — Interior footings. Three interior bearing lines total 96 LF, each 16 in. wide and 12 in. deep. Volume = 96 × 1.333 × 1.0 = 128.0 CF = 4.74 CY.
Step 4 — Waste and rounding. Typical waste for slab concrete is 5–10%. Using 7%: (21.83 + 4.25 + 4.74) × 1.07 = 30.82 × 1.07 = 32.98 CY, rounded to 33 CY.
| Step | Calculation | Quantity | Unit |
|---|---|---|---|
| Main slab | 52 × 34 × 0.333 | 21.83 | CY |
| Thickened edge | 172 × 1.0 × 0.667 ÷ 27 | 4.25 | CY |
| Interior footings | 96 × 1.333 × 1.0 ÷ 27 | 4.74 | CY |
| Subtotal | — | 30.82 | CY |
| With 7% waste | 30.82 × 1.07 | 32.98 | CY |
We price this concrete using ZIP-code-adjusted material and labor rates for the Greenville area, and we show the waste line separately so you can see what is base quantity and what is allowance. If the geotech report calls for a thicker slab or a vapor barrier under the entire area, those become separate lines in the estimate. For a full residential takeoff in this format, see our residential estimating services page.
Eastern North Carolina's humidity and storm risk show up in several places. HVAC equipment is often sized with extra dehumidification capacity, roofing underlayment and flashing details are specified more heavily, and exterior finishes need to handle wind-driven rain. We carry those items explicitly rather than as allowances, so you can see the cost impact before you bid.
Much of Pitt County has flat terrain and seasonally high water tables, with some areas of shrink-swell clay. That means undercut, select fill, and dewatering are common line items on sitework and foundation scopes. We read the geotech report and reflect its recommendations directly in the takeoff rather than applying a generic allowance.
Yes. We take off single-family and multifamily residential, as well as commercial, institutional and light industrial work. The units and level of detail differ, but the output is the same: quantities organized by CSI MasterFormat division, with marked-up plan sets so you can trace every number back to the drawing.
Most projects are returned in 24–48 hours. Larger or more complex jobs may take longer, and rush service is available if you have a bid deadline. We confirm the schedule when you send the plans.
Send the plan set, specifications, and any geotech or civil drawings you have. If there are addenda or a specific bid form, include those too. We will confirm the scope and turnaround, then return the takeoff in Excel and PDF with marked-up plans.
Yes. We organize the takeoff by CSI MasterFormat division, so you can pull the concrete, framing, roofing or MEP sections separately. Many general contractors use our output to send scoped packages to subs, which reduces the back-and-forth on what is included.
The permit figures come from the U.S. Census Bureau Building Permits Survey for 2025. They count new privately-owned residential units permitted by the City of Greenville, and they do not include commercial or non-residential permits. We use them to understand the volume and mix of residential construction in the area.
Yes. We cover the surrounding region, including nearby cities like High Point, Concord, Asheville, Gastonia, Jacksonville and Chapel Hill. Our pricing is adjusted by ZIP code, so material and labor rates reflect the specific location of your project.
We use Bluebeam Revu for plan markup, PlanSwift for quantity takeoff, and RSMeans data for pricing. That combination lets us produce consistent, traceable quantities and apply current material and labor costs for the Greenville area.
We apply typical waste factors by material and show them as separate lines in the estimate. For example, concrete might carry 5–10% waste, framing lumber 5–10%, and roofing 10–15% depending on roof complexity. You can see the base quantity and the waste allowance, so you can adjust if your supplier or crew experience differs.
Send your plan set and specifications, and we will return a division-by-division takeoff in 24–48 hours.