Scope Precision EstimateContact Us

Insurance Restoration Contractor Estimating

Send your loss documentation, sketches, and carrier scope. We return a line-item estimate priced to Xactimate-compatible units with marked-up plans so your adjuster approves the supplement.

24–48 hours for most projectsTypical turnaround
Excel + marked-up PDFsOrganized by CSI section
ZIP-code pricingLocal material and labor
Price confirmed firstBefore any work starts
Sample estimate sheet
Division 09 — Finishes (Drywall, Flooring, Paint)Sample format
Line itemQtyUnitArea
Drywall 1/2" flood cut 24"3,200LF—
Drywall 1/2" replaced2,400SF2,400 SF
Carpet and pad removed1,800SF1,800 SF
LVP flooring replaced1,200SF1,200 SF
Paint walls primer + 2 coats6,400SF6,400 SF
Total area of finishes13,000 SF
Illustrative quantities. Waste factor applied as a separate line.
Flood cut height tracked

What is insurance restoration contractor estimating?

Insurance restoration contractor estimating prices a property loss by the line, unit, and cause of loss, organized by CSI MasterFormat division. We take off flood cut height in LF, flooring by material in SF, and drying equipment days in EA. Deliverables are Excel and PDF with marked-up plan sets and ZIP-code-adjusted pricing from RSMeans data.

  • Flood cuts are measured in LF at 24 in. or 48 in. above finished floor.
  • Typical waste factors for drywall and flooring range from 5% to 10%.
  • The most common costly miss is code upgrade triggers like GFCI protection or stair geometry.

Insurance restoration contractor estimating prices a loss the way a carrier reads it: by the line, by the unit, and by the cause of loss. When you send us a loss report, moisture readings, and your carrier's scope, we take off the drywall cut height, the flooring removed by material, the baseboard run, and the drying equipment days. We measure the flood cut at 24 in. or 48 in. above finished floor, track the water line from the moisture map, and price removal and replacement as separate line items. The result is an insurance restoration estimate for contractors organized by CSI MasterFormat division, from Division 02 existing conditions and Division 03 concrete through Division 09 finishes, Division 22 plumbing, Division 23 HVAC, and Division 26 electrical, with each line mapped to Xactimate-comparable units and ZIP-code-adjusted pricing from RSMeans data. We mark up the plan set in Bluebeam Revu and PlanSwift so you can see exactly where the flood cut lands and which rooms are affected. We also flag code upgrade triggers, such as GFCI protection or stair geometry, under Division 01 general requirements.

Deliverable
Excel estimate + marked-up PDF plans
Organized by
CSI MasterFormat section
Turnaround
24–48 hours for most projects
Pricing
ZIP-code-adjusted material and labor pricing
Software
Bluebeam Revu, PlanSwift, RSMeans data

This service pairs with Xactimate: you keep the carrier's price list, we give you the quantities and line items to support your supplement. Our insurance restoration quantity takeoff also supports Symbility price lists and unit price estimating, and we can run an Xactimate estimate review against the adjuster's scope to expose missing overhead and profit, general conditions, and debris removal. If you also handle reconstruction beyond the loss, our General Contractor Estimating and Renovation Contractor Estimating services cover the full rebuild, while Subcontractor Estimating Services cover trade-specific scopes. Most projects return in 24–48 hours, with rush available. You get Excel and PDF files, organized by division, with marked-up plan sets.

Services

What our insurance restoration quantity takeoff covers

We take off the loss scope from your documentation: moisture maps, adjuster photos, and the carrier's initial estimate. Each line is measured in the unit the carrier pays, from LF of flood cut to SF of drywall replaced to days of drying equipment. We separate removal from replacement, track cut height above finished floor, and price texture, paint sheen, and trim as distinct items. The estimate is organized by CSI MasterFormat division and cross-referenced to sheet locations.

Water Extraction & Drying

Air movers, dehumidifiers, and extraction units priced by equipment days and monitored moisture readings.

EA · DAY

Flood Cut & Drywall

Drywall removal and replacement measured at 24 in. or 48 in. cut height, including tape, bed, and texture match.

LF · SF

Flooring Removal & Replacement

Carpet, pad, LVP, tile, and hardwood taken off by material, with separate removal and replacement line items.

SF · SY

Subfloor & Joist Repair

OSB or plywood sheathing, sistered joists, and blocking measured by area and linear run.

SF · LF

Baseboard & Trim

Baseboard and shoe molding removed and replaced, including caulk and paint cut-in at corners.

LF

Insulation Replacement

Batt or blown-in insulation removed and replaced in exterior walls and rim joists, by R-value and thickness.

SF

MEP Repairs

Plumbing supply lines, DWV, water heater, electrical receptacles, GFCIs, and HVAC flex duct and register boots.

EA · LF

Roofing & Debris

Shingles, underlayment, ice and water shield, drip edge, flashing, and dumpster count for haul-off.

SF · EA

What every insurance restoration contractor estimating takeoff includes

  • Flood cut at 24 in. or 48 in. above finished floor, measured LF
  • Drywall removal and replacement with tape, bed, and texture match
  • Flooring removal and replacement by material: carpet, pad, LVP, tile, hardwood
  • Subfloor and joist repair: OSB or plywood sheathing, sistered joists, blocking
  • Baseboard and shoe molding removed and replaced, measured LF
  • Insulation removal and replacement: batt or blown-in, exterior walls and rim joists
  • Plumbing repairs: supply lines, DWV, water heater, fixtures, shut-off valves
  • Electrical repairs: receptacles, switches, GFCIs, fixtures, exhaust fans
  • HVAC: flex duct, duct board, register boots, condensate line
  • Roofing: shingles, underlayment, ice and water shield, drip edge, flashing
  • Painting: primer and two finish coats, cut-in at corners and trim, sheen match
  • Debris removal: dumpster count, haul-off, and disposal fees tracked by CY
How we work

How we take off an insurance restoration estimate for contractors

  1. Review loss documentationWe start with your moisture map, adjuster photos, and the carrier's initial scope. We identify the water line, the affected rooms, and the cut height the adjuster approved. If the documentation shows a 30 in. water line but the scope prices a 24 in. cut, we flag it before takeoff. We also note any code upgrade triggers, such as older wiring or non-compliant stair geometry.
  2. Set up the takeoffWe import your plan set or sketch into Bluebeam Revu and scale each sheet. For losses without drawings, we build a dimensioned sketch from the adjuster's measurements and photos. We set up layers for removal, replacement, and drying equipment so each scope component is measured separately. This lets us price removal and replacement as distinct line items, which carriers require.
  3. Measure flood cuts and drywallWe trace the flood cut line at 24 in. or 48 in. above finished floor and measure the LF along each wall. We then calculate SF of drywall removed by multiplying the cut height by the wall length, deducting openings. Insulation behind the cut is measured separately by SF. We track texture type and paint sheen per room, because a flat-price paint line gets cut when the bath is satin.
  4. Take off flooring, trim, and cabinetsWe measure flooring removal by material: carpet and pad, LVP, engineered hardwood, ceramic tile with thinset and backer board. Subfloor sheathing is measured by SF, including areas under cabinets. Baseboard and shoe molding are measured LF and priced as separate removal and replacement lines. Cabinetry is measured by LF of base and wall cabinets, with toe kicks, end panels, and countertops as separate items.
  5. Price mechanical, electrical, and plumbingWe count electrical devices by EA: receptacles, switches, GFCIs, fixtures, exhaust fans. Plumbing lines are measured LF from fixture to stack, with fixtures counted by EA. HVAC flex duct is measured LF from plenum to register boot, and duct board by SF. We use ZIP-code-adjusted material and labor pricing from RSMeans data, so the unit prices reflect your local market.
  6. Build the estimate and mark up plansWe assemble the estimate in Excel, organized by CSI MasterFormat division. Each line includes the quantity, unit, and a sheet reference. We mark up the plan set in Bluebeam Revu with color-coded overlays for removal, replacement, and drying equipment. The PDF and Excel files are delivered together, so you can send the marked-up plans to the adjuster with the estimate.

What we need from you

  • Loss documentationAdjuster photos, moisture map, and the carrier's initial scope. These establish the water line and approved cut height.
  • Plan set or sketchFloor plan with dimensions, or a dimensioned sketch from the adjuster. We scale from these to measure wall lengths and room areas.
  • Carrier price listThe current price list version the carrier uses, if available. This ensures our line items match their unit prices.
  • Scope notesAny agreed changes, such as upgraded flooring or texture match. These affect material and labor lines.
  • Drying logsEquipment placement and daily readings. We use these to price equipment days and monitoring visits.
  • Code upgrade triggersAny known code issues, such as older wiring or non-compliant stairs. We flag them as Division 01 general requirements.
Sample output

Sample takeoff format — illustrative quantities

This excerpt shows how we organize a water loss estimate by CSI MasterFormat division, with quantities and sheet references.

Sample format — illustrative quantities
SectionLine itemQtyUnitRef.
09 29 00Gypsum board, 1/2 in., flood cut 24 in., remove and replace2,400SFA-101
09 29 00Gypsum board, 1/2 in., tape, bed, texture match orange peel2,400SFA-101
09 65 00Resilient flooring, LVP, remove and replace1,200SFA-102
09 65 00Carpet and pad, remove and replace1,800SFA-102
09 90 00Paint, walls, primer and two coats, satin sheen6,400SFA-103
06 10 00Subfloor, OSB, 3/4 in., remove and replace600SFS-101
22 40 00Water heater, 50 gal., replace1EAP-101
23 31 00Flex duct, 6 in., replace80LFM-101
09 30 00Ceramic tile, floor, remove and replace with thinset and backer board300SFA-104
09 30 00Tile base, 4 in., remove and replace120LFA-104
08 11 13Steel door frame, remove and replace2EAA-105
08 14 16Door slab, paint grade, replace2EAA-105

Units we take off and how they are measured

Each line item is measured in the unit the carrier's price list uses. We track cut height, material type, and removal versus replacement as separate line items.

ItemUnitHow it's measured
Drywall removed and replacedSFMeasured from floor to cut height, times wall length, minus openings
Flood cutLFMeasured along the base of the wall at 24 in. or 48 in. above finished floor
Flooring removedSFRoom area by material type; carpet and pad measured separately
Subfloor replacedSFArea of sheathing removed, including under cabinets and fixtures
Baseboard removed and replacedLFMeasured along wall base, excluding door openings and closets
Insulation removed and replacedSFArea behind the flood cut on exterior walls and rim joists
Plumbing lines replacedLFMeasured from fixture to stack or main, including fittings
Fixtures replacedEACount of water heaters, toilets, tubs, sinks, disposals
Roofing removed and replacedSFSlope area measured from eave to ridge, including valleys
Electrical devices replacedEACount of receptacles, switches, GFCIs, fixtures, exhaust fans
Duct board and flex ductSF / LFDuct board by SF, flex duct by LF from plenum to register boot
Debris hauledCYDumpster count times container volume, converted to cubic yards
Drying equipmentDAYSAir movers, dehumidifiers, air scrubbers by day, per monitoring log

Worked example: Flood cut takeoff for a water-damaged bedroom

This example uses a single bedroom, 12 ft × 14 ft, with 8 ft ceilings, one 3 ft × 6 ft 8 in. door opening, and one 4 ft × 4 ft window. The water line reached 30 in. above the finished floor, so the approved cut height is 30 in. All dimensions are illustrative.

Step 1 – Measure wall perimeter

  • Wall lengths: two walls at 12 ft, two at 14 ft.
  • Total perimeter = (2 × 12) + (2 × 14) = 52 LF.
  • Deduct openings: door 3 LF, window 4 LF → net wall length = 52 − 7 = 45 LF.

Step 2 – Calculate drywall removed

  • Cut height = 30 in. = 2.5 ft.
  • Drywall SF removed = 45 LF × 2.5 ft = 112.5 SF.
  • Add 10% waste for cuts and damage = 11.25 SF → total drywall to remove = 123.75 SF. Round to 124 SF.

Step 3 – Insulation behind the cut

  • Exterior walls only: one 14 ft wall, minus window 4 LF = 10 LF.
  • Insulation SF = 10 LF × 2.5 ft = 25 SF.
  • No waste factor for batt insulation; order by the bag.

Step 4 – Baseboard removal and replacement

  • Baseboard runs along all walls except door opening: 45 LF.
  • Deduct closet door? None in this example.
  • Baseboard LF = 45 LF. Add 5% waste for cuts = 2.25 LF → 47.25 LF, round to 48 LF.

Step 5 – Paint after drywall replacement

  • Wall area to paint: same as drywall removed? No—paint entire wall surface from floor to ceiling, not just the cut.
  • Wall SF = 45 LF × 8 ft = 360 SF.
  • Deduct openings: door 3 ft × 6.67 ft = 20 SF; window 4 ft × 4 ft = 16 SF → net wall SF = 360 − 36 = 324 SF.
  • Primer and two finish coats: 324 SF × 3 coats = 972 SF of paint application.
  • Ceiling: 12 ft × 14 ft = 168 SF. Paint ceiling with two coats? Typically one coat if not damaged, but assume two coats for even coverage: 168 SF × 2 = 336 SF.
  • Total paint SF = 972 + 336 = 1,308 SF.

Step 6 – Flooring removal and replacement

  • Carpet and pad: entire room 12 ft × 14 ft = 168 SF. Add 10% waste for carpet = 16.8 SF → 184.8 SF, round to 185 SF.
  • If LVP instead: same area, but add 5% waste for cuts = 8.4 SF → 176.4 SF, round to 177 SF.

Step 7 – Drying equipment days

  • From monitoring log: 4 air movers, 1 dehumidifier, 1 air scrubber for 3 days.
  • Air mover days = 4 × 3 = 12 days.
  • Dehumidifier days = 1 × 3 = 3 days.
  • Air scrubber days = 1 × 3 = 3 days.

Step 8 – Debris removal

  • Drywall: 124 SF × 0.5 in. thick = 62 board feet? Convert to cubic yards: 124 SF × (0.5/12) ft = 5.17 CF. Insulation: 25 SF × 3.5 in. = 7.29 CF. Baseboard: 48 LF × 0.5 in. × 3 in. = 0.5 CF. Carpet and pad: 185 SF × 0.5 in. = 7.7 CF. Total volume = 20.66 CF. One 20-yard dumpster holds 540 CF, so this is a partial load. Price as one dumpster.

Step 9 – Apply unit prices

  • Use ZIP-code-adjusted RSMeans data for your area. Each line item gets a quantity and unit: drywall removal 124 SF, drywall replacement 124 SF, insulation 25 SF, baseboard 48 LF, paint 1,308 SF, carpet 185 SF, equipment days as listed, debris 1 dumpster.

Step 10 – Mark up plans

  • In Bluebeam Revu, draw a polyline at 30 in. above finished floor around the room perimeter. Color-code removal (red) and replacement (green). Attach the marked-up plan to the estimate for the adjuster.
Cost drivers

What drives insurance restoration cost estimating

Relative impact on a typical estimate for this trade, based on estimator judgment. Select a bar for details.

Scale: 1 = minor, 5 = major relative impact. Estimator judgment, not measured data.
Relative impact 5 / 5

Cut height

The single biggest driver. A 48 in. flood cut doubles the drywall SF compared to a 24 in. cut on the same wall run. It also increases insulation, baseboard, and paint quantities. We track the water line from the moisture map and price the cut height the adjuster approved.

Cut height

The single biggest driver. A 48 in. flood cut doubles the drywall SF compared to a 24 in. cut on the same wall run. It also increases insulation, baseboard, and paint quantities. We track the water line from the moisture map and price the cut height the adjuster approved.

Material type

Carpet and pad are cheaper to replace than engineered hardwood or ceramic tile. Tile adds thinset, backer board, and labor. LVP is mid-range but requires floor prep. We price each material as a separate line so the adjuster can see the difference.

Equipment days

Drying equipment is billed by the day. A typical water loss runs three to five days, but humidity and material type can extend it. We price air movers, dehumidifiers, and air scrubbers by day, based on your monitoring logs.

Code upgrades

Older homes may trigger code upgrades when walls are opened, such as adding GFCI protection or updating stair geometry. These are priced under Division 01 general requirements and require documentation. We flag them so you can request a supplement.

Debris and disposal

Debris removal is measured by dumpster count and converted to CY. A flood cut on a 2,000 SF home can generate two to four 20-yard dumpsters. Disposal fees vary by jurisdiction and material type, so we price haul-off as a separate line.

Texture and paint sheen

Matching an existing texture, such as orange peel, knockdown, or skip trowel, adds labor and material. Paint sheen varies by room: flat for ceilings, satin for kitchens and baths, semigloss for trim. We specify sheen per room and price primer plus two finish coats, not a flat-price paint line.

Cabinetry and countertops

Removal and reinstall of base and wall cabinets, toe kicks, end panels, filler strips, and countertops. We measure LF of cabinets and count countertop sections. If the cabinets are damaged, we price replacement by LF and note the door style and finish.

Roofing accessories

Drip edge, ridge vent, pipe boots, step flashing, and valley metal are separate line items. We measure LF of each and price them individually. Missing accessories are a common reason a roofing supplement gets trimmed.

Sales tax and price list version

Sales tax on materials and the current price list version the carrier is using change the unit price. We apply the correct tax rate and note the price list version in the estimate. If the carrier updates their price list mid-claim, we reprice the affected lines.

Scope gaps

Common scope gaps in insurance restoration bid estimating

Carriers trim line items that are not documented or that fall outside the approved scope. These are the gaps we catch before you submit.

  • Cut height above finished floor: pricing drywall at 24 in. when the water line reached 30 in. We measure from the moisture map and price the actual cut height, so the adjuster sees the correct SF.
  • Texture match and paint sheen: bath and kitchen walls are often satin or semigloss, not flat. We specify sheen per room and price primer plus two finish coats, not a flat-price paint line.
  • Insulation behind the flood cut: exterior walls and rim joists are frequently left out. We measure insulation SF separately from drywall SF and add it as a line item.
  • Baseboard and shoe molding: removed to make the cut and rarely priced back. We measure LF along the wall base and price removal and replacement as separate lines.
  • Subfloor under tile or hardwood: thinset, backer board, and the sheathing itself are missed when only the finish floor is priced. We measure subfloor SF including areas under cabinets.
  • Cabinetry and countertop removal and reinstall: toe kicks, end panels, filler strips, and countertop re-set or replacement. We measure LF of cabinets and count countertop sections.
  • Contents manipulation and pack-out: moving and resetting furniture, appliances, and stored items. We list this as a separate line so the carrier can approve it.
  • Permit fees, plan review, and inspection re-inspection charges: many carriers will pay when documented. We list them as Division 01 line items with the jurisdiction's fee schedule.
  • Equipment days past the initial dry standard: plus daily monitoring logs the adjuster wants to see. We price equipment by day and reference the monitoring log dates.
  • Mold remediation containment and HEPA filtration: when drying runs long and the scope shifts to Division 02. We flag it and price containment as a separate scope.
  • Roofing accessories: drip edge, ridge vent, pipe boots, step flashing, and valley metal are separate line items. We measure LF of each and price them individually.
  • Sales tax on materials and the current price list version the carrier is using: which changes the unit price. We apply the correct tax rate and note the price list version in the estimate.

Replacement materials and how carriers pay them

Carriers pay replacement cost or actual cash value depending on the policy. The material you specify changes the unit price and the depreciation calculation.

MaterialUnitTakeoff basisCarrier pay basis
Drywall, 1/2 in. regularSFArea removed plus waste; cut height × wall lengthReplacement cost (RC) if policy is RCV
Drywall, 5/8 in. Type XSFArea removed plus waste; required in garages and certain wallsRC; code upgrade may be covered
Drywall, moisture-resistantSFArea removed plus waste; used in baths and kitchensRC; verify if existing was MR
Carpet and padSFRoom area plus 10% waste; pad measured separatelyRC for carpet; pad often ACV
Luxury vinyl plank (LVP)SFRoom area plus 5% waste; include floor prepRC; check if discontinued pattern
Engineered hardwoodSFRoom area plus 7% waste; include underlaymentRC; may require full room replacement for match
Ceramic tileSFArea plus 10% waste; include thinset and backer boardRC; tile often discontinued, may need full replacement
Batt insulation, R-13SFArea behind flood cut; no waste factorRC; verify R-value required by code
Blown-in insulationSFArea behind cut; may require removal of all insulationRC; density and R-value vary
Architectural shingleSFSlope area plus 10% waste; include starter and ridgeRC; match to existing if partial repair
Ice and water shieldSFEave and valley areas; required by code in many regionsRC; may be code upgrade
OSB subfloor, 3/4 in.SFArea removed plus 5% waste; include joist repairRC; check for rot and delamination
Codes and standards

Codes and standards that affect insurance restoration takeoffs

Model codes

The International Residential Code (IRC) and International Building Code (IBC) govern reconstruction after a loss. Key provisions that change quantities include IRC R702 (wall covering), R703 (exterior covering), and R806 (roof ventilation). The IECC sets insulation R-values that may trigger upgrades when walls are opened. The NEC applies to electrical repairs, such as GFCI protection in wet areas. The IPC or UPC governs plumbing repairs. NFPA 13 applies if sprinkler systems are affected. Always confirm the adopted code edition with the local building department.

Industry standards

The IICRC S500 standard for water damage restoration defines flood cut heights and drying equipment placement. The S520 standard covers mold remediation and containment. ASTM D4258 covers surface cleaning of concrete; ASTM E96 covers vapor transmission. The Gypsum Association GA-216 provides drywall installation standards, including fastener spacing and joint treatment. SMACNA standards cover ductwork replacement. NRCA guidelines cover roofing underlayment and flashing. These standards influence labor and material quantities in your estimate.

Specification sections

An estimator must read Division 01 sections for price and payment procedures (01 20 00), unit prices (01 22 00), and change orders for supplements (01 26 00). Division 02 covers assessment (02 20 00) and hazardous material abatement (02 26 00). Division 09 sections include gypsum board (09 29 00), tiling (09 30 00), acoustical ceilings (09 51 00), resilient flooring (09 65 00), and paints (09 90 00). Each section specifies material type, thickness, finish, and installation method, which directly changes cost.

Local amendments

Local jurisdictions may adopt older editions of the IRC or IBC with amendments that affect restoration. For example, some states require specific flood cut heights or prohibit certain materials in flood zones. Coastal areas may have wind-borne debris requirements that change roofing and window specifications. Always verify the adopted code edition and any amendments with the local building department before finalizing your estimate. This ensures your supplement aligns with what the inspector will approve.

Who we provide estimates for

Who uses our insurance restoration estimator

Water and mold remediation contractors

You need to price the drying scope and the rebuild in one estimate. We give you equipment days, flood cut LF, and material replacement SF so you can submit a complete supplement to the carrier.

Fire and storm restoration contractors

You handle smoke, water, and structural damage. We take off roofing, siding, drywall, and paint by division, and flag code upgrades that trigger a supplement.

General contractors who subcontract restoration

You need a second set of eyes on the adjuster's scope. We provide a line-item takeoff you can compare against the carrier's estimate to find missing quantities.

Public adjusters and loss consultants

You represent the policyholder and need defensible quantities. Our marked-up plans and unit-price backup support your supplement request.

Where we provide estimates

Insurance Restoration Contractor Estimating in 20 states

Pricing is adjusted to the project ZIP code. Select a highlighted state to see the cities we cover there.

States we coverSelected
TX

Insurance Restoration Contractor Estimating in Texas

Nation's largest construction market; Sun Belt population growth, data centers, semiconductor plants, and single-family home building.

Texas estimating services
Property types

Insurance restoration project types and what changes in the takeoff

The loss type and building assembly determine which line items you need and how you measure them.

Water loss – single room

Flood cut at 24–48 in., drywall, insulation, baseboard, paint, flooring, drying equipment days.

Watch for: Check cut height vs. water line; verify texture and sheen match.

Water loss – multi-story

Stacked flood cuts on each floor, stairwell drywall, subfloor replacement, ceiling repairs below.

Watch for: Track water migration through floor/ceiling assemblies; check for hidden mold.

Fire loss – kitchen

Demolition, cabinet removal, countertop, appliance replacement, smoke sealing, duct cleaning.

Watch for: Smoke residue on surfaces above cut line; HVAC contamination.

Mold remediation

Containment barriers, negative air machines, HEPA vacuums, removal of porous materials.

Watch for: Clearance testing required; verify protocol with industrial hygienist.

Storm damage – roof

Shingle removal, underlayment, ice and water shield, decking, flashing, ridge vent.

Watch for: Match shingle profile and color; check for hail damage to vents and gutters.

Storm damage – siding

Remove and replace siding, house wrap, trim, caulk, paint.

Watch for: Check for matching siding profile and color; verify substrate damage.

Sewage backup

Remove and dispose of contaminated materials, disinfect, replace flooring, drywall, baseboard.

Watch for: Category 3 water requires antimicrobial treatment; check local disposal rules.

Pipe burst – commercial

Large-diameter pipe repair, ceiling tile, grid, insulation, drywall, paint, equipment days.

Watch for: Coordinate with tenant operations; after-hours work may add labor.

Deliverables

What you receive

  • Excel estimate organized by CSI MasterFormat division, with quantities, units, and ZIP-code-adjusted pricing.
  • PDF estimate with the same line items, formatted for submission to the carrier adjuster.
  • Marked-up plan set in Bluebeam Revu showing flood cut lines, removal areas, and equipment placement.
  • Line-item comparison against the carrier's initial scope, highlighting missing quantities and unit-price differences.
  • Drying equipment schedule by day, referenced to your monitoring logs.
  • Debris removal calculation by dumpster count and cubic yards.
  • Supplement-ready documentation package with sheet references for each line item.
Checklist

Pre-bid checklist for insurance restoration estimates

  • Confirm the water line and approved cut height from moisture map.
  • Verify texture match and paint sheen per room.
  • Check for insulation behind flood cut on exterior walls.
  • Measure baseboard and shoe molding removal and replacement.
  • Inspect subfloor under tile or hardwood for damage.
  • Count electrical devices and plumbing fixtures to replace.
  • Review drying logs for equipment days and monitoring visits.
  • Identify code upgrade triggers (GFCI, stair geometry, etc.).
  • Calculate debris volume and dumpster count.
  • Check roofing accessories: drip edge, ridge vent, flashing.
  • Apply correct sales tax rate and carrier price list version.
  • Document all missing items for supplement request.
Client reviews

What clients say about Scope Precision Estimate

10 client reviews
MA
Michael AndersonGeneral Contractor

The cost estimate was detailed, accurate, and easy to understand. It helped us prepare our bid confidently and stay competitive without overlooking important costs.

AW
Andrew WilsonGeneral Contractor

Highly recommended for construction cost estimating. The quantities were accurate, the pricing was well organized, and the final report was easy to review.

MD
Matthew DavisConstruction Manager

Their construction estimate was thorough and professionally prepared. It made our budgeting process much easier and helped us identify potential cost issues early.

CM
Christopher MillerResidential Builder

We needed a quick and accurate construction cost estimate, and they delivered exactly what we needed. Great attention to detail and a very responsive team.

BT
Brian TaylorProject Estimator

Fast, accurate, and dependable estimating service. They understood the project requirements quickly and provided a detailed estimate without unnecessary delays.

RW
Robert WilliamsEstimating Manager

Professional and reliable estimating service. The detailed quantity takeoff helped us reduce pricing errors and submit our proposal on time.

FAQ

Insurance Restoration Contractor Estimating questions

How do you handle the carrier's price list if it differs from RSMeans?

We use the carrier's price list version as the primary basis for unit prices when you provide it. If you do not have it, we price with ZIP-code-adjusted RSMeans data and note the source. In either case, we provide a line-item comparison so you can see where the carrier's estimate differs from our takeoff. This helps you build a supplement that addresses specific unit-price gaps.

Can you estimate a loss without a full plan set?

Yes. Many restoration projects lack updated drawings. We work from your moisture map, adjuster photos, and a dimensioned sketch. If you can provide room dimensions and wall lengths, we can build the takeoff. For complex losses, we may ask for a short video walkthrough or additional photos to verify cut heights and material types. The goal is to produce a defensible estimate from the documentation you have.

What is the turnaround time for a supplement estimate?

Most projects return in 24–48 hours. Rush service is available for an additional fee. The timeline depends on the completeness of your documentation. If we receive the moisture map, photos, and carrier scope together, we can start immediately. If we need to request missing information, it may add a day. We confirm the schedule when you send the files.

Do you price drying equipment by the day or by the job?

We price drying equipment by the day, based on your monitoring logs. Air movers, dehumidifiers, and air scrubbers are listed as separate line items with daily rates. We reference the equipment placement and daily readings from your log. If the drying period extends beyond the initial dry standard, we add those days to the estimate with a note for the adjuster.

How do you handle mold remediation if it is discovered during drying?

If mold is discovered, the scope shifts to Division 02. We price containment barriers, negative air machines, HEPA filtration, and removal of affected materials. This is typically a separate supplement. We flag the transition in the estimate and note that clearance testing may be required. You should coordinate with an industrial hygienist to confirm the protocol before we finalize the mold line items.

Can you provide a line-item comparison against the adjuster's estimate?

Yes. We offer a comparison service where we align our takeoff with the carrier's initial scope. We highlight missing quantities, different units, and unit-price differences. This is delivered as a separate spreadsheet or as a column in the estimate. It helps you identify exactly where the carrier's estimate falls short, so you can request a targeted supplement.

What if the loss involves asbestos or lead-based paint?

Asbestos and lead abatement are excluded from our standard restoration estimate. These require a licensed abatement contractor and separate testing. We can note the potential presence of hazardous materials as a Division 02 line item, but we do not price the abatement itself. You should engage a certified abatement firm and provide their estimate to the carrier as a separate scope.

How do you measure debris removal for a flood cut?

We calculate debris volume by material: drywall, insulation, flooring, and trim. We convert the volume to cubic yards and then to dumpster count. A typical 20-yard dumpster holds about 540 cubic feet. We price haul-off and disposal fees as a separate line item. If the debris is contaminated (e.g., sewage), we note that special disposal may apply.

Do you include permits and inspection fees in the estimate?

We list permit fees, plan review, and inspection charges as Division 01 line items when you provide the jurisdiction's fee schedule. Many carriers will pay these when they are documented. We do not pay the jurisdiction directly; you are responsible for pulling permits. If you do not have the fee schedule, we can note the line as 'to be determined' and you can add it later.

Can you estimate a commercial loss with a different price list?

Yes. Commercial losses often use different unit prices and labor rates. We can apply the carrier's commercial price list or use RSMeans commercial data. The takeoff units remain the same: SF, LF, EA, etc. We also account for after-hours work, tenant coordination, and special equipment if required. Provide the commercial policy details and any specific pricing instructions.

What if the carrier denies part of the supplement?

If a line item is denied, we can review the denial and provide additional documentation. This may include marked-up plans, photos, or code references. We can also re-measure quantities if the carrier disputes them. Our goal is to give you the backup you need to support your request. However, we do not negotiate with the carrier directly; that is your role or your public adjuster's.

How do you handle contents manipulation and pack-out?

Contents manipulation and pack-out are typically handled by contents specialists, not part of the building estimate. However, we can include a line item for moving and resetting furniture and appliances if it is part of your scope. We measure by room or by item count. For pack-out and storage, you should obtain a separate estimate from a contents company.

What does an insurance restoration cost estimating service include?

We produce a full quantity takeoff and line item estimating package from your loss report, moisture map, and carrier scope. That means removal and replacement quantities by CSI MasterFormat division, from Division 02 existing conditions through Division 09 finishes, Division 22 plumbing, Division 23 HVAC, and Division 26 electrical, priced with ZIP-code-adjusted RSMeans data. We also provide an Xactimate estimate review and a line-item comparison against the adjuster's estimate, so you can see where the carrier's scope differs from the actual scope of work.

How does outsourced insurance restoration estimating work?

You send the loss documentation, photos, and any carrier estimate. We take off the flood cut height, flooring by material, baseboard run, and drying equipment days, then return Excel and PDF files organized by division with marked-up plan sets in Bluebeam Revu and PlanSwift. We price in Xactimate-comparable units and can also work in Symbility. Turnaround is 24–48 hours for most projects, with rush available. You keep the carrier's price list and use our quantities to support supplements or bids.

Can you handle water damage estimating and fire damage estimating in the same takeoff?

Yes. Water damage estimating typically centers on flood cuts, drying days, and Division 09 finishes, while fire damage estimating adds smoke sealing under Division 07 thermal moisture protection, Division 08 openings, Division 10 specialties, and often Division 04 masonry or Division 05 metals. We separate the scopes by cause of loss and by division, so the carrier can see each line item. We also flag Division 31 earthwork and Division 32 exterior improvements when the loss extends outside the building envelope.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning. is a Senior Estimator with more than 15 years of professional experience in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Guides on this topic

Ready to submit a supplement that holds up?

Send your loss documentation and carrier scope, and we will return a line-item estimate with marked-up plans in 24–48 hours.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote
Call Us