Earthwork and sitework
Over-excavation, structural fill, moisture conditioning and utility runs for El Paso County clay and caliche sites.
CY · LF · TONWe produce quantity takeoffs and construction estimates for Colorado Springs contractors, developers and owners — Excel and PDF bid packages organized by CSI MasterFormat division, with marked-up plan sets, returned in 24–48 hours for most projects.
Colorado Springs pricing turns on expansive clay soils and caliche that drive deep foundations and over-excavation, hail-rated roofing assemblies, wind and snow loads along the Front Range, steep sites near the foothills, and ZIP-code-adjusted material and labor rates that shift between El Paso County submarkets.
Colorado Springs sits in El Paso County at the foot of Pikes Peak, where the building stock splits cleanly between infill commercial along the north and east corridors and residential subdivision work pushing outward toward Falcon, Fountain and Monument. That split matters at bid time: a tenant improvement on Academy Boulevard and a 60-lot subdivision in Banning Lewis Ranch carry completely different scope structures, and your estimate has to reflect which one you are pricing. We build both, organized by CSI MasterFormat division so your bid form, buyout sheet and schedule of values can all pull from the same file.
El Paso County issues the permits for most work inside the city limits, and plan review comments there tend to focus on soils reports, drainage and roof assemblies. If your takeoff does not carry the over-excavation and structural fill quantities those reviews assume, you will find the gap in the field. Our Colorado construction estimating work covers the whole Front Range corridor, and we price with ZIP-code-adjusted RSMeans data rather than a single state average. Send drawings through the estimate request page and we will confirm scope, format and delivery date before starting.
For bidders. Hard-bid and design-assist takeoffs with quantities you can hand to suppliers. We mark up the plan set so every line item traces back to a sheet, detail or schedule, which shortens your internal review before the bid goes out.
For builders. Buyout and change-order support. When a soils report adds structural fill or a roof assembly changes after hail review, we re-price the affected divisions only, so you are not rebuilding the whole estimate to see the delta.
For owners. Budget-level estimates for feasibility and proforma work, plus reconciliation against contractor bids. Division-level detail lets you compare proposals line by line instead of accepting a single lump sum.
Colorado Springs is the second-largest city in Colorado and part of the Front Range growth corridor running Denver–Colorado Springs–Fort Collins, with steady residential and commercial expansion. Permit counts for the city are issued by a county or regional office, so there is no clean city-level Census figure to quote, and we do not invent one. What you can act on is the mix: subdivision platting and multifamily work on the north and east edges, medical and office tenant improvements along the I-25 corridor, and institutional work around the university and downtown. Each of those bid types has a different competition profile, so your markup decision should follow the project type, not a headline growth number. For comparison pricing in adjacent markets, see our Denver construction estimating and Fort Collins construction estimating pages.
Expansive clay and caliche are common across El Paso County, and geotechnical reports routinely call for over-excavation, structural fill, moisture conditioning and drilled pier or caisson foundations instead of shallow spread footings. That single report can move earthwork and concrete quantities by an order of magnitude, so we price from the soils recommendation, not from a generic square-foot allowance. Roofing is the other local swing item: hail-rated assemblies, Class 4 shingles and higher underlayment specs change the per-square cost, and the assembly must be confirmed against the locally adopted code edition with the building department. On the structural side, snow and wind exposure near the foothills affects framing and connection detailing. We cover these scopes through Foundation Estimating Services and Roofing Estimating Services.
Every package is organized by CSI MasterFormat division, priced with ZIP-code-adjusted material and labor rates, and delivered as Excel plus PDF with a marked-up plan set.
Over-excavation, structural fill, moisture conditioning and utility runs for El Paso County clay and caliche sites.
CY · LF · TONDrilled piers, caissons, grade beams and slab-on-grade quantities priced from the geotechnical recommendation.
CY · LF · EAFootings, stem walls, slab thicknesses and flatwork with formwork and reinforcement broken out separately.
CY · SF · TONWall, floor and roof framing with snow and wind loading allowances for foothills and plains exposures.
LF · EA · BFHail-rated assemblies, underlayment and flashing quantities for steep-slope and low-slope Colorado Springs roofs.
SQ · LF · EAMechanical, electrical and plumbing rough-in and fixture counts for tenant improvements and new commercial shells.
LF · EA · TONSingle-family, townhome and apartment takeoffs for the north and east subdivision corridors.
SF · EA · LFShell, core-and-shell and fit-out estimates for retail, medical, office and light industrial projects.
SF · EA · TONYou need every line tied to a sheet before bid day. We mark up the plan set and organize by CSI division so your buyout and schedule of values pull from one file.
Concrete, framing, roofing and MEP trades on Front Range projects need quantities they can hand to suppliers. We deliver takeoffs by division, so you price only what you install.
Repeat plans in Banning Lewis Ranch and Fountain require consistent waste factors and option pricing. We build the master takeoff once and re-price options per lot.
El Paso County land costs and soils conditions drive early budgets. Division-level estimates let you compare proformas against contractor bids without a lump-sum guess.
When three bids arrive in different formats, a common scope structure exposes the gaps. We reconcile proposals line by line so you see what each contractor included.
Tenant improvements and capital repairs along Academy Boulevard need fast, defensible numbers. We price from existing conditions and mark up the drawings for review.
We estimate projects across El Paso County and the surrounding Front Range communities, from central infill to new subdivision work at the edges.
The permit mix here runs from single-family subdivisions to retail and light industrial, and each property type carries its own scope structure.
Production and semi-custom homes in Banning Lewis Ranch, Falcon and Fountain. We take off per-plan quantities, then apply lot-specific adjustments for walkout basements, stem walls and driveway lengths.
Watch for: Per-lot soils reports, over-excavation, and roof pitch changes.
Apartment and townhome projects along the Powers Corridor and in Briargate. Shared walls, unit mix and common-area MEP drive the estimate, so we separate building shell from unit interiors.
Watch for: Unit mix repetition, fire-rated assemblies, and common-area HVAC.
Tenant improvements and ground-up retail on Academy Boulevard and Northgate. Grease interceptors, hood systems and storefront glazing are common scope items that need separate line items.
Watch for: Grease ducts, hood curbs, and storefront structural backing.
Medical office and professional buildings in Briargate and near Memorial Hospital. These projects carry dense MEP, imaging equipment rough-ins and specialty gas systems that change the division split.
Watch for: Medical gas, equipment rough-in, and after-hours phasing.
Distribution and flex space near the airport and Powers Boulevard. Slab thickness, column spacing and dock equipment set the structural quantities; office build-out is priced separately.
Watch for: Slab flatness, dock pits, and fire-sprinkler coverage.
Schools, churches and municipal buildings across El Paso County. Prevailing wage, phased occupancy and long-lead equipment often apply, so we carry separate allowances and escalation lines.
Watch for: Prevailing wage, phased turnover, and long-lead switchgear.
Pricing here is not a Denver number with a discount. Soils, elevation, code review and logistics each move the estimate in ways you can trace.
El Paso County issues most permits inside the city, and plan review comments often focus on soils, drainage and roof assemblies. Confirm the adopted code edition with the local building department before you lock divisions. Energy code requirements for roof insulation and glazing affect the envelope takeoff, and commercial projects may trigger fire-sprinkler review under NFPA 13.
El Paso County · IBC · IECC · NFPA 13Much of the region sits on expansive clay and bentonite, and the Front Range foothills add sloping sites. Geotechnical reports commonly call for over-excavation, structural fill or drilled piers, which add cubic-yard quantities and import costs. If your takeoff does not carry those volumes, the foundation bid will come in low and the change order will follow.
Expansive clay · Bentonite · Geotechnical report · Drilled piersHail and wind drive roof assembly selection more than snow here. Class 4 impact-rated shingles, ice-and-water shield at eaves and higher wind-uplift fastening schedules are typical. Design temperatures near 0°F and 90°F set heating and cooling loads, and freeze protection on piping is a real line item, not a footnote.
Class 4 shingles · Ice-and-water shield · Wind uplift · Freeze protectionThe Front Range corridor keeps crews busy from Denver to Fort Collins, and that tightens pricing on MEP and specialty trades. Labor rates for Colorado Springs sit below Denver but above many rural markets, so ZIP-code-adjusted pricing matters. Crew size, overtime and per-diem assumptions should be stated in the estimate, not buried in a lump sum.
RSMeans data · ZIP-code adjustment · MEP trades · OvertimeGrading, retaining walls and storm drainage are significant on sloped lots and in new subdivisions. Drainage studies may require detention ponds, swales or engineered outfalls, and those quantities come from the civil sheets, not the architectural set. Erosion control and temporary stabilization are separate line items that reviewers look for.
Detention ponds · Retaining walls · Swales · Erosion controlMost materials arrive from Denver or Pueblo, so freight and lead times affect the estimate. Concrete and aggregate are locally available, but specialty items like structural steel and switchgear carry longer leads. Colorado does not tax most construction materials at the local level, but confirm current rules with your accountant before you finalize sales-tax lines.
Freight · Structural steel · Switchgear · Sales taxColorado Springs sits on the Front Range, where expansive soils, a short frost season, and high-wind exposures change what you measure and what you carry. These five trades absorb most of that risk in a takeoff.
On the east side of the city, bentonite-heavy soils and shallow groundwater push you toward over-excavation, moisture conditioning, and engineered fill rather than simple cut-and-fill. A takeoff here has to separate unsuitable on-site material from import, because haul-off and import are priced in cubic yards but measured from the same cut. Measure stripping by area, then cut and fill by volume with a shrink or swell factor applied, and carry a separate line for scarifying and recompacting subgrade. For projects in the foothills, add rock excavation as a unit-rate line rather than a lump sum, since the quantity is unknown until you expose it. Our sitework estimating services break these lines out by CSI division so you can see the import volume before you bid.
Wind exposure on the Palmer Divide and along the eastern plains affects both sheathing nailing and roof framing, so framing takeoffs here need to reflect the sheathing schedule rather than a generic wall count. Measure wall plates by linear feet using the actual plan dimensions, then add for corners, openings, and top plates at intersecting walls. Roof framing on complex hips and valleys in newer subdivisions produces significant waste, so convert rafter and truss counts from the roof plan, not from a rule of thumb. Carry blocking, backing, and shear panel edge nailing as separate lines. Framing estimating services can return studs, plates, sheathing, and hardware by floor so your lumber package is bid-ready.
At 6,000 feet, gas-fired equipment and combustion air requirements differ from sea-level designs, and that shows up in the mechanical takeoff as larger flues, different venting material, and sometimes a different equipment schedule. Plumbing takeoffs need to reflect the local frost depth for water service and irrigation lines. Electrical takeoffs should carry the service size from the load calculation, not a default, because all-electric designs are increasingly common in new subdivisions. Measure fixtures by count, pipe by linear feet by size and material, and ductwork by pounds or by square feet of sheet metal. MEP estimating services can return these quantities by system so your mechanical, electrical, and plumbing bids are comparable.
Frost depth in the Colorado Springs area drives footing elevation, and on sloped lots that means stepped footings and stem walls that vary in height along the same run. In a takeoff, measure continuous footings by linear feet and then convert to cubic yards using the actual section, not an average, because stepped footings lose concrete at every step. Basement and garage slabs sit on capillary break and vapor retarder, so carry those by square feet under 03 30 00. For post-tensioned residential slabs, the tendon layout and anchor pockets are separate line items that are easy to omit. Foundation estimating services can carry the reinforcing and formwork quantities alongside the concrete volume so your buyout matches the takeoff.
Hail is a real design driver on the Front Range, and the roof covering you specify changes the takeoff. Class 4 impact-rated shingles, concrete tile, and standing-seam metal each have different waste factors and different underlayment requirements. Measure roof area from the plan plus slope factor, then add for ridge, hip, valley, and eave trim by linear feet. On steep-slope roofs above 8:12, carry additional labor and staging. Don't forget ice barrier at eaves and in valleys, and drip edge by perimeter. Roofing estimating services can separate tear-off, sheathing repair, underlayment, and covering so you can price alternates without redoing the takeoff.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24" x 12" continuous | 148 | CY |
| 03 20 00 | Footing rebar, #4 continuous | 4,860 | LF |
| 03 30 00 | Basement slab concrete, 4" | 96 | CY |
| 03 30 00 | Garage slab concrete, 4" with fiber | 18 | CY |
| 06 10 00 | 2x6 exterior wall studs, 16" o.c. | 2,340 | LF |
| 06 10 00 | Wall sheathing, 7/16" OSB | 4,180 | SF |
| 09 30 00 | Roof covering, Class 4 impact shingles | 42 | SQ |
| 22 11 00 | Water service, 1" type K copper | 86 | LF |
This example uses illustrative dimensions for a slab-on-grade house with a full basement. The footing runs 148 linear feet around the perimeter, and because the lot slopes, the footing steps in two places. The engineer's section is 24 inches wide by 12 inches deep, but the stepped sections add depth at the low side. We will calculate the concrete volume and then apply a waste factor.
Step 1: Convert the footing section to square feet. 24 in ÷ 12 = 2.0 ft wide; 12 in ÷ 12 = 1.0 ft deep. Section area = 2.0 × 1.0 = 2.00 SF.
Step 2: Calculate the base volume. 148 LF × 2.00 SF = 296 CF. Convert to cubic yards: 296 ÷ 27 = 10.96 CY. Round to 11.0 CY.
Step 3: Add the stepped sections. Two steps add 8 LF of footing at an average additional depth of 1.5 ft. Additional volume = 8 LF × 2.0 ft wide × 1.5 ft deep = 24 CF = 0.89 CY.
Step 4: Add waste. Footings typically carry 5% waste for over-excavation and spillage. (11.0 + 0.89) × 1.05 = 12.48 CY. Round up to 12.5 CY.
Step 5: Check against rebar. The footing uses four #4 bars continuous. 148 LF × 4 = 592 LF, plus 10% for laps and waste = 651 LF. The stepped sections add 8 LF × 4 = 32 LF, plus 10% = 35 LF. Total rebar = 686 LF.
| Step | Calculation | Quantity | Unit |
|---|---|---|---|
| Section area | 2.0 ft × 1.0 ft | 2.00 | SF |
| Base volume | 148 LF × 2.00 SF ÷ 27 | 10.96 | CY |
| Stepped volume | 8 LF × 2.0 ft × 1.5 ft ÷ 27 | 0.89 | CY |
| With 5% waste | (10.96 + 0.89) × 1.05 | 12.48 | CY |
| Rebar, base | 148 LF × 4 bars × 1.10 | 651 | LF |
| Rebar, steps | 8 LF × 4 bars × 1.10 | 35 | LF |
These quantities feed the concrete and reinforcing lines under CSI 03 30 00 and 03 20 00. For a full footing and foundation takeoff, our foundation estimating services return formwork, waterproofing, and drainage board on the same sheet. If your project is in the foothills, add a rock excavation unit rate before you bid.
The U.S. Census Bureau Building Permits Survey collects new privately-owned residential unit counts. For Colorado Springs, permits are issued by the Pikes Peak Regional Building Department rather than a city office, so the Census reports the data at the county or regional level. No city-level figure is published. When you see permit counts referenced for this market, confirm whether they cover El Paso County or the regional department's full jurisdiction before you use them for absorption or pipeline analysis.
Expansive clay and bentonite are common on the east side of the city, and those soils drive over-excavation, moisture conditioning, and engineered fill. In the foothills, you hit rock and sloping grades that require stepped footings and rock excavation. A takeoff should separate unsuitable on-site material from import and carry rock as a unit rate. Confirm the geotechnical report's recommendations with the local building department before you price the foundation.
Hail and high wind on the Front Range push most new roofs toward Class 4 impact-rated shingles or metal. Those assemblies have different waste factors than standard three-tab, and steep-slope roofs above 8:12 add labor and staging. Your takeoff should measure roof area from the plan with a slope factor, then add ridge, hip, valley, and eave trim by linear feet. Carry ice barrier at eaves and in valleys separately. Confirm the adopted code edition for wind and impact requirements with the local building department.
Yes. Residential takeoffs cover single-family, townhome, and multi-family plans, including slab-on-grade, basement, and crawlspace foundations. Commercial takeoffs cover tenant improvements, retail, light industrial, and institutional projects, organized by CSI MasterFormat division. We use RSMeans data adjusted by ZIP code for material and labor pricing, and we return Excel and PDF files with marked-up plan sets. Turnaround is 24–48 hours for most projects, with rush available.
Send the architectural, structural, civil, and MEP plan sets in PDF, along with any specifications, geotechnical report, and addenda. If you have a preferred unit price or labor rate, include it. We will confirm the scope, note any missing sheets, and return the takeoff organized by CSI division with quantities, units, and a marked-up plan set. For a firm quote, use our get an estimate page.
We use RSMeans data adjusted by ZIP code for the Colorado Springs area, then apply your labor rates if you provide them. That matters because Front Range labor availability varies by trade, and a rate that works in Denver may not cover the Springs. We show material and labor separately so you can see where the cost sits. If you are bidding a project in a nearby city, we can adjust the ZIP code and labor factors.
Yes. We cover Denver, Aurora, Fort Collins, Lakewood, and other Front Range markets. Each city page explains the local conditions that change a takeoff, from soils to code editions. If your project spans multiple jurisdictions, tell us which one governs the permit. We will adjust the pricing basis and note any code differences that affect quantities, such as wind exposure or frost depth.
Most takeoffs are returned in 24–48 hours. Larger or more complex projects may take longer, and rush service is available. The schedule starts when we have a complete set of plans and a clear scope. If sheets are missing or the scope is ambiguous, we will tell you before we start so the clock does not run on incomplete information. You receive Excel and PDF files with the takeoff by CSI division and marked-up plan sets.
Both. Every line includes a quantity and unit, and we can add unit prices for material and labor based on RSMeans data adjusted for the ZIP code. That lets you compare bids or build a budget without doing the pricing yourself. If you already have rates, send them and we will apply them. The takeoff is structured so you can sort by division, trade, or phase.
We can isolate a single trade, such as concrete, framing, roofing, or MEP. That is useful when you are bidding a subcontract scope and do not need the full building. Send the relevant sheets and tell us the trade. We will return the quantities, units, and notes for that scope, organized under the correct CSI division. For a multi-trade package, we can combine them on one sheet.
Send your plans and specs and we will return a division-organized takeoff with quantities, units, and marked-up plan sets, typically within 24–48 hours.