Residential takeoffs
Full plan takeoffs for Centennial custom and semi-custom homes, base plan plus options, by division.
SF · EA · LFCentennial issued 194 new privately-owned residential permits in 2025, all single-family, at an average value of $275,900 per unit. We produce division-organized quantity takeoffs and estimates for builders working Arapahoe County's infill lots and Front Range subdivisions.
Centennial's 2025 permit mix is 100% single-family — 194 units, zero multifamily — so estimates skew toward custom and semi-custom homes. Key cost drivers include expansive clay soils along the Front Range, wind and hail exposure driving roofing and exterior specs, Denver-metro labor rates, and Arapahoe County permitting and inspection sequencing.
Centennial sits in Arapahoe County, south of Denver and north of the Castle Rock corridor, where most of the 2025 residential work was single-family infill and small subdivision platting rather than large multifamily pods. That matters at bid time: with no multifamily units permitted by the city in 2025, your competition is other single-family builders, and the estimate has to hold up house by house instead of averaging over a 200-unit podium. We build takeoffs at that granularity — each plan, each elevation, each option.
We price with ZIP-code-adjusted material and labor data and deliver Excel and PDF files organized by CSI MasterFormat division, with marked-up plan sets you can hand to a superintendent. Most projects turn in 24–48 hours, with rush available. If you are bidding Front Range work outside Centennial, our Colorado construction estimating team covers the whole corridor, including Arvada and Westminster.
For bidders. You need a number you can defend line by line. We return division-coded quantities with waste factors stated, so you can adjust framing, concrete and roofing assumptions before the bid date instead of after.
For builders. Production builders in Arapahoe County run the same plan across multiple lots. We take off the base plan plus options, so your purchase orders and change orders start from a consistent quantity baseline.
For owners. If you are building one custom home in Centennial, you still want a check against the contractor's bid. We provide an independent takeoff you can compare scope against, item by item, before you sign.
Select a bar to compare Centennial with the largest Colorado markets we cover.
194 new housing units in 2025 (+646.2% vs 2024).
194 single-family · 0 multifamily (0%).
The city issued 194 new privately-owned residential units in 2025, up from 26 in 2024 — a 646% increase — and every one was single-family. Permitted value was $54M, averaging $275,900 per unit. For bidders, that means the pipeline is detached homes, not apartment pods, so your estimate needs full exterior envelopes, individual utility services and per-house sitework rather than shared systems. Centennial ranked 16th of 21 covered Colorado cities by units and accounted for 1.1% of the 16,921 units permitted statewide. If you also bid north-metro work, our Boulder and Longmont pages follow the same format.
At roughly $275,900 average permitted value per unit, the cost is concentrated in the structure and envelope, not in shared infrastructure. Expect excavation and foundation to carry real weight because Front Range soils include expansive clay that often drives over-excavation, moisture conditioning or pier systems; confirm geotechnical recommendations before you price. Roofing and exterior finishes are bid against hail and wind exposure, which pushes toward Class 4 impact-rated shingles and heavier underlayment. MEP is per-house — individual taps, meters and panels. See our foundation and roofing takeoff pages for how we structure those divisions.
We take off the divisions that drive cost on Arapahoe County single-family and light commercial work, and we price them with ZIP-adjusted data.
Full plan takeoffs for Centennial custom and semi-custom homes, base plan plus options, by division.
SF · EA · LFCut and fill, over-excavation and import for expansive Front Range clay on tight infill lots.
CY · SFFootings, stem walls, slab-on-grade and pier systems, with formwork and reinforcement itemized.
CY · SF · TONWall, floor and roof framing counts with plate and waste factors stated for stick-built homes.
LF · EA · BFClass 4 impact-rated shingle, underlayment, flashing and siding quantities for hail-exposed roofs.
SQ · SF · LFPer-house plumbing, HVAC and electrical takeoffs, including individual service taps and panels.
LF · EA · TONTenant improvements and small commercial buildings along the Arapahoe Road and I-25 corridors.
SF · EAScope-gap checks against subcontractor bids before you submit, with marked-up plan sets returned.
LS · EACentennial permitted 194 single-family units in 2025 and no multifamily, so builders here run the same plan across multiple lots. We take off base plans plus options for consistent purchase orders.
Infill lots in Arapahoe County often mean one-off plans with walkout basements and varied elevations. We build each takeoff from that specific plan, not a template.
You are bidding against other Front Range builders on house-by-house scopes. We return division-coded quantities with stated waste factors so you can adjust before bid day.
Concrete, framing and roofing crews working Centennial subdivisions need quantities tied to each lot. We mark up the plan set so your foreman can verify before you mobilize.
Small subdivision platting south of Denver requires per-lot sitework and utility quantities. We estimate those scopes so your lot budgets hold before you sell.
If you are building one custom home in Centennial, an independent takeoff lets you compare a contractor's bid scope line by line before you sign.
We cover Centennial and the surrounding Arapahoe County corridor, from the Denver Tech Center edge south toward Castle Rock. If your project sits in one of these areas, send the plans and we will price it with local ZIP-code-adjusted data.
Centennial's 2025 permit mix was entirely single-family, 194 units with zero multifamily, so our work here leans toward detached homes, infill lots and the small commercial and institutional buildings that serve those neighborhoods.
The core of Centennial permitting. We take off framing, concrete flatwork, roofing and finishes per plan and elevation, with option packages priced separately so your base bid stays clean.
Watch for: Elevation changes, optional basements, garage extensions
Tear-down and infill lots in established Centennial neighborhoods often carry walkout basements, retaining walls and tighter staging. We estimate the sitework and foundation scope that production templates miss.
Watch for: Retaining walls, walkout excavation, utility relocations
Small attached projects appear on infill parcels even when the city's multifamily permit count is zero. We separate party-wall, fire-rated assembly and shared utility quantities from the unit takeoff.
Watch for: Party walls, fire separation, shared utility trenches
Centennial's commercial corridors along Arapahoe Road and near the tech center support tenant improvements. We estimate demising walls, storefront, MEP rough-in and ceiling scope by division.
Watch for: Demising walls, storefront, above-ceiling MEP coordination
Service and flex buildings in the south metro need slab, tilt or masonry wall, and racking-ready electrical quantities. We take those off separately from office build-out areas.
Watch for: Slab flatness, dock equipment, panel capacity
Institutional work in the Cherry Creek and Littleton school corridors follows public bid forms. We organize quantities by CSI division so your bid form lines map directly to our takeoff.
Watch for: Prevailing wage, bid alternates, phasing around school calendar
Centennial sits at the south end of the Denver metro, where soil, climate and permitting each move the number. These are the six factors we check on every takeoff here.
Centennial issues its own residential permits, and Arapahoe County handles some unincorporated parcels nearby. Plan review comments on energy code and structural sheets can add a revision cycle before you break ground, so carry a allowance for resubmittal time in your schedule. Confirm the adopted IBC, IRC and IECC editions with the city building department before you finalize specs.
City of Centennial Building Division · Arapahoe County · IECC · IRCFront Range soils along the south metro include expansive clay and bentonite pockets, and some lots carry undocumented fill from earlier grading. Geotechnical reports often call for over-excavation, moisture conditioning or drilled piers instead of standard spread footings. Those decisions change concrete volume, rebar and backfill quantities, so we price the foundation from the soils report rather than a default detail.
Expansive clay · Drilled piers · Over-excavation · Geotechnical reportHail is the dominant roofing risk on the Colorado Front Range, and it drives shingle class, underlayment and sometimes impact-rated windows. Snow load and freeze-thaw cycles affect roof framing, exterior concrete and drainage details. We state the roofing system assumed in the takeoff so you can compare bids on the same assembly instead of guessing.
Class 4 shingles · Snow load · Freeze-thaw · Ice and water shieldThe Denver to Colorado Springs corridor keeps framing, concrete and MEP crews busy, and labor rates in Centennial track the metro rather than rural Colorado. Bid days that land in a busy season can come back higher than the same scope in winter. We price with ZIP-code-adjusted labor so your number reflects the local market, not a state average.
Front Range labor · ZIP-adjusted rates · Framing crews · MEP tradesCentennial lots range from flat prairie to sloped parcels backing to open space, and drainage requirements change the earthwork quantity fast. Grading, swales, retaining walls and utility trenching are often the largest swing item between two similar houses. We take off sitework separately so you can see what the lot, not the plan, is costing you.
Grading · Swales · Retaining walls · Utility trenchingMost Centennial material comes through Denver metro suppliers, so delivery is short but yard space on infill lots is tight. Truss lead times, concrete scheduling and staging constraints can add handling cost that a plan-only takeoff misses. Colorado has no statewide sales tax, and local taxes vary by jurisdiction, so confirm the applicable rate with your supplier or the city finance office.
Denver metro suppliers · Truss lead times · Local sales tax · StagingCentennial sits in Arapahoe County on the Front Range, where expansive clay soils, a short but intense construction season, and hail exposure shape what you actually quantify. Each trade below carries line items that a generic national takeoff will miss.
Centennial's rolling terrain and clay subgrade mean you cannot price a simple cut-and-fill from a site plan alone. A real takeoff measures stripping depth, topsoil stockpile volume, and over-excavation below footings in cubic yards, then adds import or export by truckload. Storm drainage runs to curb inlets and detention, so you quantify trench length, bedding stone by ton, and PVC or RCP pipe by linear foot with fittings. If the civil drawings show a sanitary tap to a district main, count the tap, the wy e, and the manhole separately. For a complete site package, see our sitework estimating services.
Centennial's single-family work is largely wood frame over a basement or crawl space. A framing takeoff counts plates, studs, headers, and joists by piece, then converts to board feet for lumber pricing; sheathing is by sheet with a typical 5–10% cut waste. Roof framing must account for the wind and snow loads in the adopted code, which can drive closer rafter spacing or heavier trusses than a national template assumes. Wall and roof sheathing, housewrap, and flashing are separate line items. Our framing estimating services cover the full shell, and roofing estimating services handle the steep-slope and low-slope assemblies.
Mechanical, electrical, and plumbing takeoffs in Centennial homes are driven by fixture and outlet counts, not by square foot. Count lavatories, water closets, hose bibs, and floor drains; count panel, branch circuits, receptacles, switches, and light fixtures by type. HVAC is by ton of cooling and by linear foot of duct, with registers and thermostats as each. Insulation goes in by square foot of wall, ceiling, and rim area with the R-value the energy code requires. Drywall is by sheet with a typical 10–15% waste. Our MEP estimating services and residential estimating services cover these divisions.
Arapahoe County's expansive soils drive the foundation scope more than the building size does. You quantify continuous footings and stem walls by linear foot, slab-on-grade by square foot with a typical 5–10% waste, and pier or caisson counts where a geotechnical report calls for drilled elements. Rebar is priced by pound or by bar length with lap and dowel waste; vapor barrier and rigid insulation go in by square foot with overlap. Flatwork is separate: driveways, walks, and patios in square feet with control joints by linear foot. Our concrete estimating services and foundation estimating services break these out by division.
Hail is the defining exterior cost in Centennial. You quantify roof area in squares (100 square feet) from the plan dimensions plus overhangs and pitch factor, then add ridge, hip, valley, and starter by linear foot. Underlayment, ice-and-water at valleys and eaves, and class 4 impact-rated shingles are separate lines because the insurance and resale math depends on them. Wall cladding, WRB, and flashing are measured by square foot of wall area, not floor area. Gutters and downspouts are by linear foot. Confirm the adopted code edition and any local amendment with the building department before you lock the assembly.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24" x 12" | 38.4 | CY |
| 03 20 00 | Rebar, footing and stem wall | 4,850 | LB |
| 06 10 00 | Wall framing, 2x6 studs | 1,240 | PCS |
| 06 16 00 | Wall sheathing, 7/16" OSB | 96 | SHT |
| 07 30 00 | Roof shingles, class 4 impact | 34.2 | SQ |
| 07 27 00 | Housewrap, wall area | 4,320 | SF |
| 09 29 00 | Drywall, 1/2" interior | 218 | SHT |
| 22 10 00 | PEX water piping | 1,150 | LF |
This example prices a slab-on-grade for a 2,400 square foot single-family home in Centennial. The dimensions are illustrative and do not represent a specific address. We assume a 4-inch slab with a 12-inch thickened edge, 6x6-W1.4xW1.4 welded wire mesh, and a 10-mil vapor barrier. Waste factors are typical for residential flatwork.
| Step | Calculation | Quantity | Unit |
|---|---|---|---|
| Slab area | 40 ft x 60 ft | 2,400 | SF |
| Slab volume | 2,400 SF x (4 in / 12) | 800 | CF |
| Edge volume | 160 LF x (12 in / 12) x (12 in / 12) | 160 | CF |
| Total volume | 800 + 160 | 960 | CF |
| Convert to CY | 960 / 27 | 35.6 | CY |
| Waste at 7% | 35.6 x 1.07 | 38.1 | CY |
| Vapor barrier | 2,400 x 1.10 | 2,640 | SF |
| Mesh | 2,400 / 100 x 1.10 | 26.4 | rolls |
Concrete is ordered by the cubic yard, so the 38.1 CY figure is what goes on the purchase order. The 7% waste covers spillage, uneven subgrade, and the thickened edge not being perfectly uniform. Vapor barrier carries 10% for laps and cuts. Mesh is priced by roll covering 100 SF, with 10% for side and end laps.
Two Centennial-specific adjustments matter here. First, expansive clay subgrade often requires over-excavation and structural fill below the slab; that is a separate line item measured in cubic yards of import and is not included in the 38.1 CY above. Second, the slab must be isolated from the foundation stem wall where the soils report calls for it, which adds isolation joint material by linear foot. Confirm the geotechnical recommendations and the adopted code edition with the local building department before you finalize quantities. For a full flatwork package, our concrete estimating services cover slab, footing, and flatwork divisions together.
Most residential and light commercial takeoffs are returned in 24–48 hours from the time we receive a complete plan set. Larger or multi-building projects may take longer, and we will tell you the schedule before we start. Rush turnaround is available when you have a bid date inside that window. Send the architectural, structural, civil, and MEP drawings together so we can price the full scope instead of issuing a partial takeoff.
We deliver Excel workbooks and PDF reports organized by CSI MasterFormat division, with marked-up plan sets showing what was measured. The Excel file lets you adjust quantities, add your own pricing, and roll up to a bid form. The PDF is useful for review and for attaching to a proposal. If your estimating team uses a specific template, tell us at kickoff and we will match the column structure.
Yes. We use ZIP-code-adjusted material and labor pricing, so the rates reflect the Denver metro market rather than a national average. That matters for concrete, framing labor, and roofing, where the local market moves independently of the national index. We also use RSMeans data as a baseline and adjust for the specific scope, access, and site conditions shown on your drawings.
We work in Bluebeam Revu for plan review and markup, PlanSwift for quantity takeoff, and RSMeans data for pricing. That combination lets us measure directly from the PDF, tag each line item to a drawing location, and produce a priced estimate without re-keying quantities. You receive the marked-up set so you can see exactly where each number came from.
The permit figures come from the U.S. Census Bureau Building Permits Survey for 2025, counting permits issued by the city itself for new privately-owned residential units only. That means the 194 units and $54M permitted value cover single-family and multifamily housing starts, not commercial or industrial permits. The survey is a useful demand indicator, but it is not a complete measure of construction activity in Centennial.
The city issued 194 new privately-owned residential units in 2025, up from 26 in 2024, a 646% increase. All 194 units were single-family; multifamily was zero. The permitted value was $54M, or about $275,900 per unit. Among the covered Colorado cities, Centennial ranked 16 of 21 by units and accounted for 1.1% of the state total of 16,921 units. The jump reflects a small base in 2024 more than a sustained trend, so treat one year as a signal, not a forecast.
Yes. We cover the Front Range and the rest of Colorado, including Arvada, Westminster, Pueblo, Boulder, Greeley, and Longmont. If your project is in one of those cities, the takeoff still uses ZIP-code-adjusted pricing for that location. You can start from our Colorado construction estimating page or send plans directly through the estimate request form.
Send the complete plan set: architectural, structural, civil, and MEP drawings, plus the geotechnical report if one exists and any specifications or addenda. If the drawings are issued for bid, include the bid form and the date. If something is missing, we will tell you what we can price and what we will carry as an allowance so the gaps are visible rather than buried.
Expansive clay is common along the Front Range, so we read the geotechnical report before pricing foundations. If the report calls for over-excavation, structural fill, or a specific pier depth, those become separate line items measured in cubic yards or by count. If no report is provided, we note the assumption and recommend you confirm the foundation design with a local geotechnical engineer. The adopted code edition and any local amendment should be confirmed with the building department.
Yes. Centennial's recent permit activity is almost entirely single-family, but the city also has commercial and light industrial work along the corridors. We estimate both, using the same division-by-division approach. Residential takeoffs emphasize framing, flatwork, and finishes; commercial takeoffs add structural steel, storefront, and larger MEP systems. Tell us the project type at kickoff so we apply the right waste factors and labor assumptions.
Send your plan set and bid date, and we will return a division-by-division takeoff in 24–48 hours.