Multifamily takeoffs
Unit-by-unit counts for apartment and condominium buildings, including repeated floor plans and common areas.
EA · SF · LFWe prepare construction estimates and quantity takeoffs for Irvine contractors, developers and owners. Plans come back in Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets, typically within 24–48 hours.
Irvine pricing is driven by Orange County labor rates, high permit and plan-check costs, multifamily-heavy scopes, podium and Type III over Type I construction, and sitework tied to graded hillside parcels. ZIP-code-adjusted material and labor pricing keeps takeoffs aligned with local market conditions rather than national averages.
Irvine sits in Orange County, where most new residential permits are multifamily rather than single-family. That mix changes what a useful estimate looks like: you need unit-by-unit takeoffs, repeated floor plans, podium decks, and MEP counts that scale across buildings, not a single-house checklist. Our takeoffs are built in Bluebeam Revu and PlanSwift, priced with RSMeans data adjusted to the project ZIP code, and delivered in Excel and PDF by CSI MasterFormat division. If you bid work across the region, see our California construction estimating overview.
We handle both private and public-facing scopes: multi-family estimating for apartment and condominium projects, commercial estimating for office, retail and hospitality, and sitework estimating for the grading, shoring and utilities that precede vertical construction. Contractors working adjacent markets in Santa Ana and Riverside use the same division-organized format. Send a plan set through our estimate request and we will confirm scope, exclusions and turnaround before starting.
For bidders. You need a defensible number before the bid date. We return division-organized quantities with waste factors, unit costs and clarifications so you can adjust markups and still see where the scope sits.
For builders. You need buyout and change-order support. We break scopes by trade, flag missing items and re-price revisions against the original takeoff so overruns are visible early.
For owners. You need budget validation before committing. We check the design against comparable unit costs and call out scope gaps, allowances and escalation assumptions that move the total.
Select a bar to compare Irvine with the largest California markets we cover.
1,746 new housing units in 2025 (-53.2% vs 2024).
368 single-family · 1,378 multifamily (79%).
Irvine issued 1,746 new privately-owned residential units in 2025, down from 3,730 in 2024, a 53% drop. Multifamily accounted for 1,378 units, or 79% of the total, against 368 single-family units. Permitted value was $465M, averaging $266,600 per unit. For bidders, that mix means most Irvine estimates are apartment and condominium scopes: repeated unit plans, Type III or podium construction, structured parking, and MEP counts that multiply per floor. Irvine ranked 5th of 25 covered state cities by units and represented 4.8% of the 36,591 covered state total. A slower year does not simplify takeoffs; it raises the cost of a missed scope gap. Review our Fremont construction estimating page for a similar multifamily-heavy market.
At $266,600 per permitted unit, Irvine projects sit well above typical single-family framing budgets, which points to concrete, steel, elevators, fire protection and full MEP systems rather than wood-frame-only work. Orange County labor rates, plan-check fees and inspection timelines all push cost upward, and hillside parcels add shoring, retaining and export. Use the state page for broader context on California construction estimating and compare nearby markets in Chula Vista or Stockton. Confirm all code editions and local amendments with the city building department before pricing.
We price the scopes that show up on Irvine multifamily, commercial and hillside residential projects, organized so your buyout packages line up with the takeoff.
Unit-by-unit counts for apartment and condominium buildings, including repeated floor plans and common areas.
EA · SF · LFCut, fill, export and shoring quantities for graded parcels and podium sites across Orange County.
CY · LF · TONFootings, mat slabs, podium decks and post-tension quantities with formwork and reinforcing.
CY · SF · TONWood and light-gauge framing counts by floor, wall type and opening, with waste factors.
LF · SF · EAPlumbing, HVAC and electrical fixture counts, riser lengths and equipment schedules per building.
EA · LF · TONLow-slope and tile roof areas, flashing, insulation and membrane quantities for multifamily roofs.
SF · LF · EATenant improvement takeoffs for office, retail and hospitality spaces, including partitions and finishes.
SF · LF · EAComparison sheets that normalize subcontractor quotes against the takeoff before award.
LS · EAIrvine permitted 1,378 multifamily units in 2025 — 79% of its residential total. You need repeated-unit takeoffs, podium and Type III over Type I assemblies, and MEP counts that multiply cleanly across floors.
Irvine's business districts carry tenant improvement and core-and-shell work. You need division-organized quantities for partitions, ceilings, HVAC distribution and electrical so a landlord or tenant budget can be checked line by line.
With 368 single-family units permitted in 2025, plan repetition drives your margins. We return per-plan quantities for framing, foundations and finishes so you can compare model-to-model and catch lumber and concrete drift early.
Grading, shoring, utilities and structural concrete precede every Irvine podium or parking structure. You need cut-and-fill quantities, rebar tonnage by bar size and formwork square footage before you commit a crew.
Irvine's 2025 permits carried about $465M in value, an average near $266,600 per unit. You need an independent check on the GC's budget before you approve a GMP or release a draw.
Early design decisions on structural system and envelope drive cost more than any finish selection. We price alternates at schematic stage so your client sees the delta while it is still cheap to change.
We price projects across Irvine and the surrounding Orange County and Inland Empire markets. If your plan set is stamped for any of these areas, the takeoff format stays the same.
Irvine's 2025 permit mix was 1,378 multifamily units against 368 single-family, so most of the vertical work here is attached housing and commercial. We estimate both, plus the site and structure packages underneath them.
Type III wood frame over a Type I concrete podium with one or two parking levels. We take off the podium slab, columns, shear walls and the wood framing above separately, then reconcile the two packages at the transfer level.
Watch for: Podium slab thickness, shear wall hold-downs, fire separation at transfer
Three- and four-story walk-ups on grade with surface parking. Repetition is the whole game: we count typical units once, verify each stack and mirror, and flag plan variants that break the repeat before pricing.
Watch for: Stair and elevator counts, roof plan breaks, unit mix changes
Core-and-shell and tenant improvement in the business districts. We quantify partitions by type, ceiling systems, HVAC distribution and electrical devices per floor so a tenant improvement allowance can be tested against real scope.
Watch for: Above-ceiling coordination, tenant vs. landlord split, restroom cores
Ground-floor retail podiums, restaurants and hotel work. Kitchen and grease duct, hood suppression and makeup air are frequent omissions, so we carry them as named line items rather than an allowance.
Watch for: Hood and grease duct, grease interceptor, makeup air, signage power
Production and custom houses on the remaining single-family lots. We take off foundation, framing, roofing and finishes by plan, and price alternates for structural floor systems and envelope assemblies when the design is still open.
Watch for: Plan variants, structural floor alternates, site retaining walls
Mass grading, shoring, wet and dry utilities, and the concrete structures that support everything above. We separate earthwork from structural concrete so a change in one does not hide inside the other.
Watch for: Shoring depth, import vs. export balance, utility tie-in points
Irvine is not a generic Southern California number. The permit mix, the geology under the podium and the plan check sequence each move the total in ways a national cost database will not capture.
Permits are issued by the city itself, and plan check comments on structural, energy and accessibility scope can add review cycles before a foundation permit is released. Build the review duration and any resubmittal fees into your schedule and general conditions, not just the permit line. Confirm the adopted code edition and current fee schedule with the Irvine building department before you finalize the budget, because the edition in force governs your detailing.
City of Irvine Building Division · California Building Standards Code · local amendmentsOrange County ground varies from alluvial soils near the creek corridors to deeper fills and older terrace deposits. A geotechnical report governs whether you use spread footings, deepened footings or a mat, and whether removal and recompaction is required. We price the foundation from the report's recommendations rather than a default detail, and carry over-excavation and backfill as separate quantities so the risk is visible.
Geotechnical report · over-excavation · recompaction · mat foundationSeismic detailing drives real cost here: hold-downs, shear wall nailing, drag struts and diaphragm continuity at podium transfers. Wood-frame over concrete requires careful load path takeoff, and any soft-story or irregular configuration adds steel. We quantify hardware by type and count rather than lumping it, because a missed hold-down schedule can swing the framing package by more than the lumber itself.
Shear walls · hold-downs · drag struts · podium transferSouthern California labor rates sit above national averages, and multifamily and commercial work often carries prevailing wage or certified payroll on public or publicly assisted projects. That changes the labor column, not the material column. We price labor with ZIP-code-adjusted rates and state clearly which scopes assume prevailing wage so you can compare bids on the same basis.
Prevailing wage · certified payroll · ZIP-adjusted labor ratesIrvine's master-planned grading means import and export balance, retaining walls and storm drain routing are often fixed by the approved plan. Post-construction water quality requirements can add treatment units and site piping. We take off drainage structures, pipe runs and wall quantities from the civil sheets and reconcile them against the architectural site plan, since the two frequently disagree.
Mass grading · retaining walls · storm drain · water quality treatmentMaterial pricing is adjusted to the project ZIP code, and delivery windows, staging limits and haul routes inside developed areas affect the general conditions line. Concrete, structural steel and MEP equipment carry longer lead times than finish materials, so escalation assumptions matter on a multi-building schedule. We show allowances and escalation as separate lines instead of burying them in unit rates.
RSMeans ZIP adjustment · lead times · escalation · staging and haul routesIrvine's mix of multifamily infill near the Spectrum and older single-family tracts in Woodbridge and Turtle Rock changes what you measure, what you waste, and what you carry in contingency. Below is how that shows up line by line.
Irvine sits on marine terraces and alluvial fans, so cut and fill rarely balance on the first pass. You measure stripping depth, over-excavation below footings, and import or export by truckload, not by the cubic yard alone. On hillside lots toward Turtle Rock and Shady Canyon, temporary shoring and benches add bid items that flat-lot bidders miss. Dust control and track-out measures are continuous on Irvine jobs, so carry them as a separate line rather than burying them in general conditions. For earthwork quantities broken out by area and phase, see our sitework estimating services.
Irvine's multifamily podium work is typically wood-frame over a concrete podium, and the transition level drives the count: hold-downs, shear nailing, and blocking at the podium deck edge. On single-family, you are measuring plates, studs at 16 inches on center, headers, and engineered lumber by member, not by board foot. Panel schedules and shear wall schedules must be read together; a shear wall shown on the plan but missing from the schedule is a common quantity hole. Our framing estimating services break out wall, floor, and roof framing separately so your lumber package can be bought in phases.
California's energy code pushes Irvine projects toward high-efficiency equipment, tight duct design, and in multifamily, individual metering or a central plant with sub-metering. A takeoff should count fixtures by type, not by plumbing sheet, and should separate domestic water, sanitary, and vent piping by diameter and material. On the mechanical side, count diffusers, registers, and exhaust points room by room; on the electrical side, count devices, panels, and feeders by schedule. Title 24 documentation requirements can add equipment and controls that do not appear on the architectural set. Our MEP estimating services reconcile all three trades against the same floor plan.
Most Irvine residential and low-rise commercial work lands on conventional spread footings, but expansive soils and undocumented fill trigger deeper embedment and sometimes post-tensioned slabs. A takeoff should separate footing concrete, stem wall, slab-on-grade, and slab reinforcing, because each carries a different waste factor and a different inspection hold point. Watch the plan note that calls for a mat or a thickened edge at garage transitions; it is easy to miss when you take the slab as one continuous area. Our foundation estimating services cover footing schedules, pier counts, and vapor barrier by square foot. Confirm the adopted code edition and any local amendment with the city building department before you lock quantities.
Irvine's dry summers and mild winters favor tile and low-slope membrane assemblies, but the real cost driver is detailing, not field area. Measure field square footage, then add separate lines for valleys, ridges, hip and ridge cap, penetration boots, and deck-to-wall flashing. On multifamily, roof drains, scuppers, and overflow scuppers should be counted individually, and balcony and deck waterproofing at the podium level should not be lumped into the roof scope. Tile waste runs higher than shingle waste on cut-up roofs; typical waste factors for tile sit above those for asphalt shingle. See roofing estimating services for assemblies by system type.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Podium slab concrete, 8 in. | 412 | CY |
| 03 30 00 | Slab-on-grade concrete, 5 in. | 1,860 | CY |
| 03 20 00 | Rebar, slab and footings | 96,400 | LB |
| 05 12 00 | Structural steel, podium framing | 38 | TON |
| 06 10 00 | Wood framing, levels 2–5 | 184,000 | BF |
| 07 21 00 | Batt insulation, exterior walls | 62,400 | SF |
| 07 92 00 | Podium deck waterproofing | 21,800 | SF |
| 09 30 00 | Tile, unit bathrooms and kitchens | 18,600 | SF |
This example sizes the exterior wall framing for one level of a wood-frame building over a podium. Dimensions are illustrative and rounded; your plan dimensions and wall schedule will differ.
Step 1 — Wall area. Take a rectangular floor plate 180 ft by 64 ft. Perimeter = 2 × (180 + 64) = 488 LF. Wall height 10 ft. Gross wall area = 488 × 10 = 4,880 SF.
Step 2 — Deduct openings. Assume 22 windows at 3 ft × 5 ft = 15 SF each, and 6 doors at 3 ft × 7 ft = 21 SF each. Openings = (22 × 15) + (6 × 21) = 330 + 126 = 456 SF. Net wall area = 4,880 − 456 = 4,424 SF.
Step 3 — Studs. At 16 in. on center, studs per LF of wall = 12 ÷ 16 = 0.75, plus one for the end = 0.8125. Stud count = 488 × 0.8125 ≈ 397 studs. Add 2 studs per opening for trimmers and 1 per opening for headers: (22 + 6) × 2 = 56 trimmers, 28 headers. Total studs ≈ 481. With 10 ft walls and 8 ft studs plus a plate, use 10 ft studs; order 481 pieces.
Step 4 — Plates. Three plates (two top, one bottom) per wall line: 488 × 3 = 1,464 LF. Add 5 percent for laps and cuts: 1,464 × 1.05 ≈ 1,537 LF.
Step 5 — Sheathing. Net wall area 4,424 SF. Add 10 percent waste for cut-up elevations: 4,424 × 1.10 ≈ 4,866 SF. At 32 SF per 4×8 sheet, that is 4,866 ÷ 32 ≈ 153 sheets.
| Step | Item | Calculation | Result |
|---|---|---|---|
| 1 | Gross wall area | 2 × (180 + 64) × 10 | 4,880 SF |
| 2 | Net wall area | 4,880 − 456 | 4,424 SF |
| 3 | Studs | 488 × 0.8125 + 84 | 481 EA |
| 4 | Plates | 488 × 3 × 1.05 | 1,537 LF |
| 5 | Sheathing | 4,424 × 1.10 ÷ 32 | 153 SH |
Carry the sheathing waste factor separately from the stud count; they move for different reasons. If the architect revises the window schedule, only Steps 2, 3, and 5 change.
The figures come from the U.S. Census Bureau's Building Permits Survey, which counts new privately-owned residential units permitted by the city itself. For 2025, Irvine issued 1,746 units, down 53 percent from 3,730 in 2024. That total splits into 368 single-family and 1,378 multifamily units, with multifamily at 79 percent of the mix. It is residential only; it does not include commercial or industrial permits.
Yes. With 1,378 of 1,746 permitted units in multifamily, most takeoffs we run here involve repeated floor plates, podium transitions, and Type III or Type V construction over concrete. Repetition means your per-unit quantities stabilize quickly, but the first level and the roof still carry one-off detailing. We separate the typical floor from the base and roof so your buyout reflects where the real cost sits.
Much of Irvine is underlain by marine terrace deposits and older alluvial fan soils, and expansive clay is common in some areas. That often means over-excavation below footings, import fill, and sometimes post-tensioned slabs. We read the geotechnical report before we price foundations, because the recommended bearing depth and the presence of undocumented fill change footing quantities directly. Confirm site-specific recommendations with the geotechnical engineer and the city building department.
We cover the full set, from Division 02 sitework and Division 03 concrete through Divisions 22, 23, and 26 for MEP and Division 31 earthwork. Deliverables come in Excel and PDF organized by CSI MasterFormat division, with marked-up plan sets so you can trace each quantity back to the sheet. If you only need one trade, we can scope to that division alone.
Most projects return in 24 to 48 hours, and rush turnaround is available when a bid date is close. Timing depends on sheet count, the number of disciplines, and whether we are working from a full permit set or a design development set. Send the architectural, structural, and MEP sheets together when you can; pricing a partial set means we have to flag assumptions instead of measuring them.
We use ZIP-code-adjusted material and labor pricing, so Irvine quantities carry Orange County rates rather than a statewide average. That matters on trades where labor is a large share of the installed cost, such as framing, drywall, and MEP rough-in. We work from RSMeans data and adjust for the specific scope, story height, and access conditions described in your plans.
Send the plan set, the specifications, the geotechnical report if you have it, and the bid form or scope sheet you are pricing against. If there is a schedule or a phasing plan, include it, because phased work changes general conditions and crane or hoist time. Tell us the bid date and whether you want a single trade or the full package.
Yes. We cover Santa Ana, Riverside, Stockton, Chula Vista, Fremont, and San Bernardino, along with the rest of California. Rates and code editions shift between jurisdictions, so we adjust pricing by ZIP code and flag anything jurisdiction-specific for you to confirm locally. If your project spans two cities, we can price each separately so you can compare.
Energy code compliance in California affects envelope, glazing, lighting, and HVAC selection, and it can add equipment and controls that do not appear on the architectural drawings. We read the Title 24 documentation when it is available and carry the specified assemblies, insulation values, and equipment efficiencies into the takeoff. Where documentation is not yet issued, we flag the affected line items as allowances so you know what is still open.
Every quantity in the spreadsheet is tied to a color-coded markup on the plan sheet, so you can see exactly where a number came from and check it against your own read. That is useful when a subcontractor challenges a quantity or when a plan revision changes one area. Markups are delivered as PDF alongside the Excel workbook.
Send your Irvine plan set and bid date, and we will return a division-by-division takeoff in 24 to 48 hours.