Residential takeoffs
Custom and production homes on stepped lots, with framing, envelope and finish quantities separated by floor level.
SF · LF · EAHappy Valley issued 350 new residential permits in 2025, half of them multifamily. We produce material and labor takeoffs for builders and bidders working Clackamas County hillside lots, with pricing adjusted to local ZIP codes.
Happy Valley pricing turns on hillside excavation and retaining walls, Clackamas County slope and drainage review, wet-season earthwork, multifamily repetition across 174 permitted units in 2025, and ZIP-adjusted material and labor rates for the 97086 and 97015 area. Each drives separate line items in a takeoff.
Happy Valley sits on the Clackamas County hillsides south of Portland, where lots step up in elevation and every foundation package carries excavation, shoring and retaining wall quantities that flatland subdivisions do not. Permit volume more than doubled last year, from 165 units in 2024 to 350 in 2025, so subcontractors bidding here are pricing against more competition than the market has seen recently. We build takeoffs for that environment: quantity surveys from your plan set, priced with ZIP-code-adjusted material and labor, organized by CSI MasterFormat division and returned in Excel and PDF with marked-up drawings.
Most of our Happy Valley work is residential and light commercial — single-family custom homes, townhome and apartment shells, and the sitework, concrete and framing packages that go with them. If you bid public or private work across the metro, the Oregon construction estimating page covers how we handle state-wide pricing, and our Wilsonville and Newberg pages cover adjacent markets with similar soil and slope conditions.
For bidders. You get a division-by-division takeoff you can drop into your bid form, with waste factors and unit costs stated so you can adjust them to your own crew productivity before you submit.
For builders. We quantify from the permit set or construction drawings, flag scope gaps between architectural, structural and civil sheets, and return marked-up plans so your superintendent can see where each quantity came from.
For owners. You get a cost baseline before you commit to a guaranteed maximum price, with quantities separated from pricing so changes in scope can be re-priced quickly during design development.
Select a bar to compare Happy Valley with the largest Oregon markets we cover.
350 new housing units in 2025 (+112.1% vs 2024).
176 single-family · 174 multifamily (50%).
Happy Valley issued 350 new privately-owned residential units in 2025, up 112% from 165 in 2024, according to the U.S. Census Bureau Building Permits Survey. Multifamily accounted for 174 of those units, 50% of the total, and permitted value reached $99M, an average of $283,600 per unit. That mix matters to bidders: half the volume is repetitive apartment and townhome construction where framing, MEP rough-in and drywall quantities repeat floor to floor, and half is single-family work where each plan is priced on its own. The city ranks 9th of 25 covered Oregon cities by units and represents 3.7% of the 9,431 units permitted statewide. When volume moves that fast, subcontractor pricing drifts between bids, so a takeoff tied to current ZIP-adjusted rates keeps your number defensible. See how we handle the rest of the state on the Oregon estimating page.
Happy Valley's terrain is the cost driver that separates it from flat Portland-area suburbs. Lots on the slopes above the Clackamas River corridor typically need cut and fill, engineered retaining walls, and footing designs that step with grade, which pushes concrete, rebar and excavation quantities well beyond what a similar square footage would carry on level ground. Winter and spring rainfall saturates the silty clay soils common in the area, so erosion control, temporary drainage and import/export decisions carry real money. Multifamily projects on the flatter parcels near the Sunnyside Road and 172nd Avenue corridors see less of this, but still face stormwater detention and utility extension scope. We price these packages through sitework, foundation and concrete takeoffs so the dirt and structure numbers are not buried in a lump sum.
We produce quantity takeoffs and priced estimates for the project types that dominate Happy Valley's permit activity, from hillside single-family homes to repeated multifamily floors.
Custom and production homes on stepped lots, with framing, envelope and finish quantities separated by floor level.
SF · LF · EATownhome and apartment shells where 174 permitted units in 2025 reward repeating a priced unit type accurately.
SF · UNITCut and fill, retaining walls, erosion control and utility trenching for sloped Clackamas County parcels.
CY · LF · TONStepped footings, stem walls, slab-on-grade and rebar schedules priced from structural sheets.
CY · SF · LBFloor, wall and roof framing with sheathing, hardware and typical waste factors applied line by line.
BF · SF · EAPlumbing, HVAC and electrical rough-in quantities for repeated multifamily floors and single-family plans.
LF · EA · TONSlope-adjusted roof areas, underlayment, flashing and ventilation for steep hillside roof designs.
SQ · LF · EATenant improvements and small commercial shells along the Sunnyside Road and 82nd Avenue corridors.
SF · LF · EAHappy Valley’s 2025 permit count hit 350 units, more than double 2024, so you are bidding against more contractors. We give you a complete division-by-division takeoff to sharpen your bid.
With 174 multifamily units permitted, framing, concrete, and MEP scopes are competitive. We provide unit-level quantities and waste factors so you can adjust to your crew’s productivity and win the right jobs.
Half of last year’s 350 units were multifamily, and average permitted value was $283,600 per unit. We give you a cost baseline early, so you can compare pro formas before committing to land or GMP.
Your Happy Valley designs must address hillside grading and retaining walls. We mark up your plan set and flag scope gaps between architectural, structural, and civil sheets before bid day.
If you are building a custom home or light commercial building in Happy Valley, we separate quantities from pricing so you can re-price changes quickly during design development without re-bidding the whole job.
Happy Valley’s older homes often need foundation and drainage upgrades due to slope. We quantify demolition, excavation, and replacement costs so your renovation budget reflects the hillside conditions.
We estimate projects throughout Happy Valley and the surrounding Clackamas County communities. Our takeoffs account for local soil, slope, and jurisdictional requirements.
Happy Valley’s 2025 permit data shows a balanced mix of single-family and multifamily units. We estimate all common residential and light commercial property types in the area.
With 176 single-family units permitted in 2025, custom homes on sloped lots are common. We quantify excavation, retaining walls, and stepped foundations from your architectural and structural plans.
Watch for: Watch for retaining wall quantities and soil compaction.
Townhome developments often appear on infill sites in Happy Valley. We take off shared walls, fire separations, and unit-level MEP rough-in to help you bid per-unit costs accurately.
Watch for: Watch for fire-rated assembly and party wall details.
Multifamily made up half of last year’s permitted units. We estimate full building shells, including structural concrete, framing, and MEP systems, using RSMeans data adjusted for Happy Valley ZIP codes.
Watch for: Watch for parking structure and elevator scope gaps.
Happy Valley Town Center and Sunnyside have retail and office spaces. We take off tenant improvements, storefronts, and rooftop HVAC units, and organize by CSI MasterFormat divisions.
Watch for: Watch for ADA and egress compliance items.
Homeowners in Happy Valley often add accessory dwelling units or expand existing homes. We quantify tie-ins to existing foundations, rooflines, and utility connections to avoid change orders.
Watch for: Watch for structural tie-in and utility capacity.
Hillside development requires significant sitework. We estimate clearing, grading, retaining walls, storm drainage, and utility trenching, with quantities from your civil plans.
Watch for: Watch for erosion control and stormwater management.
Several local conditions affect pricing in Happy Valley. We adjust our takeoffs to reflect these factors so your bid matches the actual cost of building here.
Happy Valley enforces the Oregon Structural Specialty Code, which adopts the IBC with state amendments. Hillside grading and retaining walls often trigger geotechnical review and additional inspections. Confirm the adopted code edition and local amendments with the city building department before you finalize your permit set, because plan review comments can add engineering and resubmittal costs.
Oregon Structural Specialty Code · Clackamas County · city building departmentMuch of Happy Valley sits on sloping ground with clay and loam soils. Foundations frequently require over-excavation, engineered fill, or deep footings to reach bearing strata. We quantify excavation, backfill, and retaining wall volumes from your geotechnical report and structural plans, because these items can swing foundation costs significantly on hillside lots.
geotechnical report · engineered fill · retaining wallsHappy Valley gets about 40 inches of rain annually, mostly from October through May. Wet winters affect excavation, concrete pours, and roofing schedules. We include dewatering, temporary erosion control, and weather-protection allowances in our estimates, and we note where winter conditions could delay your critical path.
erosion control · dewatering · winter conditionsThe Portland metro construction labor market is competitive, with ongoing semiconductor and infrastructure projects drawing trades. We use ZIP-code-adjusted RSMeans labor rates for Happy Valley, but you should verify current crew availability and wage rates with your subcontractors, especially for concrete, framing, and MEP scopes where demand is highest.
RSMeans data · Portland metro · semiconductor projectsSteep driveways and limited staging areas on Happy Valley hillsides can increase excavation and material handling costs. Stormwater management requirements often dictate on-site detention and water quality facilities. We take off drainage structures, piping, and biofiltration swales from your civil plans, and we flag where access constraints may require smaller equipment or phased work.
stormwater management · detention facilities · biofiltration swalesMost materials reach Happy Valley from Portland-area suppliers, but specialty items like engineered wood and custom windows may have longer lead times. Oregon has no sales tax, which simplifies material pricing, but freight and fuel surcharges still apply. We include current material costs from RSMeans and note any items that may require early procurement to meet your schedule.
RSMeans data · Oregon no sales tax · freight surchargesHappy Valley's mix of steep hillside subdivisions and flat infill lots changes what you measure and how you price it, so the takeoff has to follow the site, not a template.
Much of Happy Valley sits on sloping ground east of the Willamette Valley floor, so cut and fill quantities drive the earthwork line more than lot size does. We take off stripping by area, then balance cut against fill in cubic yards and price the excess as haul-off, since export on a sloped lot is rarely zero. Trenching for storm lines, retaining wall backfill, and erosion control blanket are separate items. Winter silt-fence and inlet protection quantities matter here because rain between October and May will mobilize exposed soil. If your project is mostly dirt work, start with our sitework estimating services.
Happy Valley residential plans are typically wood frame, and we take off wall, floor, and roof framing by linear feet and piece count from the plan dimensions, then apply a waste factor. Typical waste for dimensional lumber runs 5 to 10 percent, higher on complex roof geometry with hips and valleys. Engineered lumber — LVL beams, PSL posts, I-joists — is scheduled separately because suppliers quote those by piece and lead time. Sheathing is measured by sheet count with openings deducted. Our framing estimating services cover both stick-framed subdivisions and small commercial wood-frame buildings along the Sunnyside Road corridor.
MEP takeoffs on Happy Valley projects follow fixture and device counts from the plans, not square footage. We count plumbing fixtures, water closets, lavatories, hose bibbs, and floor drains, then measure DWV and supply piping by diameter and linear feet. Electrical takeoff counts devices, fixtures, panels, and homeruns, with conduit and wire measured separately. For HVAC, we take off equipment by tonnage and count registers, flex runs, and thermostats. On multifamily work, riser diagrams and unit counts drive the quantities. Our MEP estimating services handle both single-family and multi-family scopes.
Foundations in this area typically bear on native soil or engineered fill, and the geotechnical report governs footing width and depth, so we take off footings from the foundation plan and note where the report calls for over-excavation. Slab-on-grade is measured by area with thickened edges at garage doors and interior bearing lines. Driveway and sidewalk flatwork are separate from structural concrete and are often the largest cubic-yard item on a single-family lot. We break out formwork, reinforcing, vapor barrier, and anchor bolts by CSI section so nothing hides in a lump sum. See our foundation estimating services and concrete estimating services for line-item detail.
Roof pitch and complexity drive both material and labor on Happy Valley homes, and steep-slope roofs need more squares of underlayment, more ridge and hip cap, and more labor per square. We measure roof area from the plan or elevation, add for overhangs, and convert to squares. Typical waste for asphalt shingles is 10 percent on simple gables and higher on cut-up roofs. Flashing at sidewalls, valleys, and penetrations is taken off by linear feet. Ventilation — ridge vent, soffit vent, or O'Hagin-style vents — is itemized. Our roofing estimating services cover shingle, tile, and metal systems.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 31 23 16 | Excavation, footing and basement | 185 | CY |
| 31 23 23 | Structural fill, on-site | 95 | CY |
| 03 30 00 | Footing concrete, 24 in x 12 in | 42 | CY |
| 03 30 00 | Slab-on-grade, 4 in, 2,400 sf | 30 | CY |
| 06 10 00 | Wall framing, 2x6, 16 in OC | 1,850 | LF |
| 06 10 00 | Floor framing, I-joists | 2,400 | SF |
| 07 30 00 | Asphalt shingles, 6:12 pitch | 32 | SQ |
| 22 11 16 | Domestic water piping, PEX | 310 | LF |
This example sizes a continuous spread footing for a two-story wood-frame house on a sloped lot. The dimensions are illustrative; your geotechnical report and stamped foundation plan govern the actual width and depth.
Assume a rectangular footprint 40 ft by 30 ft with a continuous perimeter footing 24 in wide by 12 in deep, plus one interior bearing line 30 ft long. The perimeter is 2 x (40 + 30) = 140 linear feet. Add the interior line: 140 + 30 = 170 linear feet of footing.
Convert width and depth to feet: 24 in = 2.0 ft, 12 in = 1.0 ft. Cross-section area is 2.0 x 1.0 = 2.0 square feet. Volume is 170 LF x 2.0 SF = 340 cubic feet. Divide by 27 to get cubic yards: 340 / 27 = 12.59 CY.
Add waste and spillage. Typical waste for footing concrete runs 5 to 10 percent. At 7 percent: 12.59 x 1.07 = 13.47 CY, round to 13.5 CY. Ordering 14 CY covers a small overpour.
Now check the slab separately. A 40 x 30 footprint is 1,200 square feet. At 4 in thick (0.333 ft), volume is 1,200 x 0.333 = 400 cubic feet, or 400 / 27 = 14.81 CY. Add 8 percent for uneven subgrade and edge thickening: 14.81 x 1.08 = 16.0 CY.
| Step | Calculation | Result |
|---|---|---|
| Perimeter footing length | 2 x (40 + 30) + 30 | 170 LF |
| Cross-section area | 2.0 ft x 1.0 ft | 2.0 SF |
| Footing volume | 170 x 2.0 / 27 | 12.59 CY |
| Footing with 7% waste | 12.59 x 1.07 | 13.5 CY |
| Slab area | 40 x 30 | 1,200 SF |
| Slab volume at 4 in | 1,200 x 0.333 / 27 | 14.81 CY |
| Slab with 8% waste | 14.81 x 1.08 | 16.0 CY |
On a sloped Happy Valley lot, the same footing may step down the hillside, which adds vertical formwork and changes the concrete volume at each step. We take off each step separately rather than averaging the depth. If you want this level of detail on your plans, send them through our get an estimate page.
We use ZIP-code-adjusted material and labor pricing from RSMeans data, so the rates reflect the Portland metro market rather than a national average. Concrete, lumber, and specialty trades are priced by line item with the unit of measure shown, so you can see exactly what drives the number. If your supplier or subcontractor has a firm quote, we can plug that in and show the variance against the database rate.
Most projects return in 24 to 48 hours, and rush service is available if your bid deadline is tighter. Turnaround depends on how complete the plan set is. A full architectural, structural, and civil set with a geotechnical report moves fastest. If you send only a floor plan, we will note the assumptions we made for foundation, roof, and MEP so you can confirm them before you bid.
Deliverables come in Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets showing what we measured. The Excel workbook carries quantities, units, waste factors, and unit pricing on separate columns so you can adjust any line. The PDF markup lets your superintendent or foreman see the takeoff against the drawing.
Yes. Happy Valley permitted 176 single-family and 174 multi-family units in 2025, so the market runs close to even between the two. Single-family takeoffs focus on footing, framing, roofing, and MEP per house. Multi-family takeoffs add unit-count multipliers, common-area scope, riser diagrams, and sitework shared across buildings. We price each building type separately so you can compare.
The permit figures come from the U.S. Census Bureau Building Permits Survey for 2025. The survey counts new privately-owned residential units permitted by the city itself. It does not include commercial permits, additions, or alterations. In 2025 Happy Valley permitted 350 residential units, up from 165 in 2024, with a total permitted value of $99 million.
Yes. We take off stripping, cut, fill, export, and structural fill separately, using the grading plan and the geotechnical report. On sloped lots the balance between cut and fill is the biggest cost driver, so we show both quantities and flag the export volume. Retaining walls, drainage, and erosion control are itemized as separate scopes. Our sitework estimating services cover the full dirt package.
We apply waste by material, not as one blanket percentage. Typical waste for dimensional lumber runs 5 to 10 percent, asphalt shingles 10 percent or more on cut-up roofs, and concrete 5 to 10 percent depending on placement method. Each waste factor appears on its own line in the Excel deliverable so you can see the assumption and change it if your crew's history differs.
Yes. We cover the Portland metro and the Willamette Valley, including Forest Grove, Newberg, and Wilsonville. Soil conditions, jurisdiction, and labor rates shift across the region, so we adjust the pricing basis by ZIP code for each project. If your work spans several cities, we can deliver a single workbook with the location noted per project.
Send the architectural, structural, and civil plan sets, plus the geotechnical report if you have it. A specification book or scope narrative helps for finishes and MEP. If you have a bid form or a subcontractor scope sheet, include it so we can align the takeoff to your bid structure. Plans go to our get an estimate page and we confirm scope before starting.
Yes. The city has commercial and light industrial projects along the Sunnyside Road and 172nd Avenue corridors, plus tenant improvements. Commercial takeoffs follow CSI MasterFormat divisions with separate line items for structure, envelope, interiors, and MEP. Industrial work adds process piping, equipment pads, and specialty electrical. Both are priced with the same ZIP-adjusted basis as residential.
Send your plan set and we will return a division-organized takeoff in Excel and PDF, typically within 24 to 48 hours.