Sitework takeoff
Clearing, grubbing, cut and fill, and utility trench quantities for sloped Rogue Valley lots and I-5 corridor haul pricing.
CY · LF · TONGrants Pass residential permits jumped from 94 units in 2024 to 195 units in 2025, with 70 percent of that in multifamily. We produce CSI-formatted, ZIP-adjusted estimates for builders and bidders working in Josephine County.
Grants Pass pricing turns on Josephine County labor availability, I-5 corridor haul distances for aggregate and concrete, wet-season earthwork windows, Rogue River Valley drainage and rock, and a multifamily-heavy permit mix — 137 of 195 permitted units in 2025 — that shifts takeoff emphasis toward repeated unit types and shared sitework.
Grants Pass sits in Josephine County, where the building department reviews plans under the Oregon Structural Specialty Code and the adopted residential code. That matters to your takeoff because plan review comments on egress, fire separation and energy compliance can change wall assemblies and window schedules after you have already priced them. We build estimates so those changes are easy to trace back to a line item.
We work from your plan set in Bluebeam Revu and PlanSwift, price material and labor with RSMeans data adjusted to the local ZIP code, and deliver Excel and PDF files organized by CSI MasterFormat division with marked-up plan sets. That structure lets a general contractor hand the Division 03 pages to a concrete sub and the Division 05 pages to a steel supplier without reformatting anything. If you are comparing this market to the rest of the state, start with our Oregon construction estimating overview, or look at how we handle Tigard and Lake Oswego where the permit mix is different.
For bidders. You need a bid that survives plan review and still wins. We quantify from the drawings, flag scope gaps and deliver a division-by-division takeoff you can mark up before submission.
For builders. You need buying quantities and labor hours, not a lump sum. We break out concrete, framing, roofing and MEP so your purchase orders and crew loading match the estimate.
For owners. You need a budget before design is finished. We price what is drawn, list what is missing, and show the assumptions so you can carry a contingency you understand.
Select a bar to compare Grants Pass with the largest Oregon markets we cover.
195 new housing units in 2025 (+107.4% vs 2024).
58 single-family · 137 multifamily (70%).
Grants Pass issued 195 new privately-owned residential units in 2025, up from 94 in 2024 — about a 107 percent increase. Multifamily accounted for 137 of those units, or 70 percent of the total, while single-family was 58 units. Permitted value was $42M, an average of $217,800 per unit. For a bidder, that mix means your multifamily takeoff has to handle repeated unit types with a shared sitework and utility package, and your single-family pricing still has to stand on its own. The city ranked 16 of 25 among covered Oregon cities by units and took 2.1 percent of the 9,431 covered state total, so local labor and material demand is real but not so large that every sub is booked. Check how this compares with Keizer and Oregon City before you set your overhead.
Average permitted value per unit of $217,800 is a valuation figure, not a construction cost, but it is useful as a sanity check on your own budget. If your per-unit number comes in far below it for a similar product type, you are probably missing sitework, utility connections, or the fire-rated assemblies that multifamily plans in this market tend to require. Josephine County's wet winters compress the earthwork and foundation schedule, and rock encountered during excavation is a common change-order source, so carry a stated allowance rather than a guess. We price sitework and foundations as separate divisions so you can see that exposure clearly. Our sitework estimating services and foundation estimating services pages show the line items we typically include.
We price the divisions that carry the most risk in Josephine County work, from dirt to roof, and deliver them in a format your subs can use.
Clearing, grubbing, cut and fill, and utility trench quantities for sloped Rogue Valley lots and I-5 corridor haul pricing.
CY · LF · TONFootings, stem walls, slab-on-grade and rebar priced with an excavation rock allowance common to Josephine County.
CY · SF · LBFormwork, reinforcing, flatwork and pump or chute placement for multifamily podiums and single-family foundations.
CY · SF · LFWall, floor and roof framing with stud, plate, joist and sheathing counts broken out by floor and building type.
LF · EA · BFUnderlayment, flashing, vents and steep-slope labor for the pitched roofs typical of Grants Pass residential work.
SQ · LF · EAMechanical, electrical and plumbing quantities coordinated across repeated multifamily unit plans and shared risers.
EA · LF · TONUnit-mix takeoffs with common area, site and utility scope separated so your per-unit cost is defensible.
UNIT · SF · EACustom and production home budgets priced from plan sets, with allowances listed rather than buried in a lump sum.
SF · EA · LSYou are bidding Josephine County jobs against local crews and need a division-by-division takeoff you can mark up before submission, not a lump sum.
Footing and slab quantities on Grants Pass hillside lots swing with slope and bearing conditions, so we break out formwork, rebar and concrete separately for your bid.
You need board feet by size and grade, plus sheathing and hardware counts, to price a package before lumber yards quote you on the same plans.
With 137 of the 195 residential units permitted in 2025 in multifamily buildings, unit-mix pricing and repeated floor plans drive your pro forma more than any single trade.
You want a cost check while drawings are still editable, so we flag missing assemblies and note where a schedule or detail is too thin to price.
You are budgeting a remodel, addition or roof replacement in Grants Pass and need scope broken out by trade so you can compare contractor bids on equal footing.
We price work across Grants Pass and the surrounding Josephine County communities, plus the larger southern Oregon market along the I-5 corridor. If your project sits outside these areas, send the address and we will confirm coverage.
The permit mix here is heavily multifamily, but single-family and commercial work still moves through the same plan review queue. We price each type with the divisions and units that fit it.
With 137 multifamily units permitted in 2025, apartment and townhome projects dominate. We price repeated unit plans once, then extend by building and floor so your per-unit cost is clear.
Watch for: Unit-mix changes, corridor lengths, and fire-rated assemblies.
The 58 single-family units permitted in 2025 include infill lots and hillside builds. We quantify foundation, framing, roofing and MEP from the plan set and flag where slope or access changes the labor.
Watch for: Slope excavation, retaining walls, and driveway profiles.
Kitchen and bath remodels, room additions and garage conversions are common in older Grants Pass neighborhoods. We price new work separately from demolition and patch-back so you can see the true cost of tying into existing construction.
Watch for: Selective demolition, matching finishes, and hidden framing.
Retail, office and clinic build-outs along the main corridors need division-by-division pricing for landlord and tenant scopes. We separate base-building work from tenant improvements so the lease exhibit is easy to read.
Watch for: Demising walls, HVAC zoning, and ADA upgrades.
Shops, warehouses and storage buildings in the Grants Pass area often use pre-engineered metal buildings. We price slab, erection, insulation and MEP separately because those scopes are frequently bid by different trades.
Watch for: Slab thickness, anchor bolt layout, and crane access.
Re-roofs and siding replacements are steady work in a wet-climate market. We measure roof area by slope and pitch, count penetrations and flashing, and price tear-off and disposal as separate line items.
Watch for: Deck condition, underlayment spec, and disposal fees.
Grants Pass sits in a wet, seismic zone with hillside lots and a plan review process that follows the Oregon Structural Specialty Code. These are the factors that move numbers on a local estimate.
Josephine County and the City of Grants Pass review plans under the Oregon Structural Specialty Code and the adopted residential code, with energy provisions that affect wall and window specs. Confirm the adopted edition with the local building department before you finalize assemblies. Plan review comments on egress, fire separation and energy compliance can change quantities after you have priced them, so we keep a revision trail back to the line item.
Oregon Structural Specialty Code · Josephine County building department · City of Grants PassMuch of Grants Pass is built on sloping ground and residual soils, so foundation design often includes stepped footings, retaining walls and deeper piers than a flat-lot estimate assumes. We price excavation, backfill, formwork and reinforcement separately, and we flag where a geotechnical report or a hillside-specific detail is missing from the plan set. If your project needs a dedicated foundation takeoff, our foundation estimating services cover that scope.
Stepped footings · Retaining walls · Geotechnical reportGrants Pass gets wet winters and sits in a seismic zone, so roofing underlayment, drainage detailing and lateral-force hardware carry real cost. Wildfire risk in the surrounding wildland-urban interface can also drive roof class, vent screening and siding choices. We price those items as separate lines so you can see the premium rather than burying it in a generic assembly.
Seismic Zone · Wildland-urban interface · Wet-winter detailingSouthern Oregon has a smaller specialty trade pool than the Portland metro, and crews travel from Medford and Roseburg for some scopes. That travel and mobilization shows up in labor rates and minimum crew charges, especially for MEP and fire protection. We use ZIP-code-adjusted labor pricing so your estimate reflects the local market rather than a statewide average.
Medford · Roseburg · ZIP-code-adjusted laborHillside lots, seasonal creeks and high winter water tables make sitework and drainage a variable cost in Grants Pass. We quantify clearing, cut and fill, storm line, and erosion control separately, and we look for retaining structures that may be shown on the civil sheets but omitted from the architectural set. Our sitework estimating services cover that division when your project needs it.
Cut and fill · Storm drainage · Erosion controlMost building materials reach Grants Pass by truck from the Willamette Valley or from California, so freight and lead times affect pricing on steel, trusses and specialty finishes. We note long-lead items and price them with a reasonable allowance rather than a placeholder. Oregon's statewide building code also sets energy and ventilation requirements that can change material specs mid-bid.
Freight from Willamette Valley · Long-lead steel · Oregon energy codeJosephine County's mix of infill multifamily and hillside single-family work changes what a takeoff has to capture before pricing starts.
Grants Pass sits in the Rogue River valley, and much of the undeveloped ground on the outskirts is decomposed granite or clay-heavy soil that does not drain quickly. A sitework takeoff here has to separate topsoil strip from unsuitable excavation, because rock and wet clay are priced differently. Line items typically include clearing per acre, topsoil stockpile per cubic yard, structural fill per cubic yard, and rock excavation per cubic yard, plus erosion control measured by linear foot of silt fence and each inlet protection device. Winter work in Josephine County means short daylight and wet ground, so dewatering and temporary gravel access are real costs, not allowances. Our sitework estimating services break these out by area so you can see which bid item carries the risk.
Wood framing dominates residential construction in this part of Oregon, and the takeoff is driven by wall length, plate height, and opening counts rather than gross floor area alone. We count studs by spacing and wall type, headers by size and span, floor and roof sheathing by sheet, and engineered lumber by piece with a cut list. Hip and valley roof geometry on hillside lots adds waste, so we price roof sheathing and fascia from the actual plan geometry instead of a square-foot multiplier. Our framing estimating services and residential estimating services both deliver these quantities in a spreadsheet you can hand to a lumber yard for a quote.
Multifamily work in Grants Pass triggers more MEP scope than a single house: shared water service, separate gas meters, common-area lighting, and often a fire sprinkler system under NFPA 13 or 13R depending on construction type and height. A takeoff has to count fixtures each, piping by diameter and linear foot, ductwork by pound and linear foot, and devices each. We do not guess at the adopted plumbing or mechanical code edition; confirm it with the Josephine County or city building department before you price. Our MEP estimating services and multi-family estimating services organize these divisions so nothing falls between the trades.
A large share of the 2025 permits in Grants Pass were multifamily units, and those projects usually land on mat or continuous footings rather than basements. The takeoff needs footing length by width and depth, stem wall height above and below grade, slab area by thickness, and a separate line for vapor barrier and rigid insulation under slab. Typical waste factors run a few percent on ready-mix ordered by the cubic yard, but forming lumber and rebar are usually counted with more. Mix design matters: freeze-thaw exposure drives air entrainment, and the adopted code edition should be confirmed with the city building department. See our foundation estimating services and concrete estimating services for how we structure those divisions.
Rogue Valley winters bring rain on wind, and summer sun is hard on asphalt shingles, so roofing bids here often compare architectural shingle against standing seam metal. The takeoff measures roof area by slope and plane, then adds ridge, hip, valley, eave, and rake lengths separately, plus underlayment by square and ice-and-water membrane by linear foot at valleys and eaves. Penetrations, pipe boots, and vents are counted each. Flashing at sidewalls and chimneys is a common omission, so we list it explicitly. Our roofing estimating services produce a division 07 sheet you can compare line by line against a subcontractor's proposal.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24 in x 12 in | 38.5 | CY |
| 03 30 00 | Slab on grade, 4 in thick | 6,420 | SF |
| 04 20 00 | CMU stem wall, 8 in | 410 | SF |
| 05 12 00 | Structural steel lintels | 1,240 | LB |
| 06 10 00 | 2x6 wall framing, 16 in OC | 9,860 | LF |
| 06 16 00 | Roof sheathing, 7/16 in OSB | 3,180 | SF |
| 07 30 00 | Architectural shingles | 34.5 | SQ |
| 09 29 00 | Gypsum board, 1/2 in | 14,200 | SF |
This example shows how we convert plan dimensions into an orderable concrete quantity. The dimensions are illustrative and are not taken from a specific project.
Assume a duplex on a level lot with a continuous footing 24 inches wide by 12 inches deep, running 210 linear feet around the perimeter and under one interior bearing wall. Ready-mix is ordered by the cubic yard, so the calculation is width times depth times length, converted from inches to feet.
| Step | Calculation | Result |
|---|---|---|
| Footing cross-section | 24 in ÷ 12 = 2.0 ft; 12 in ÷ 12 = 1.0 ft | 2.0 SF |
| Net volume | 2.0 SF × 210 LF | 420 CF |
| Convert to cubic yards | 420 CF ÷ 27 | 15.56 CY |
| Waste and spillage, typical 5% | 15.56 × 1.05 | 16.34 CY |
| Order quantity | Round up to full yard | 17 CY |
The waste factor is the part most bidders get wrong. A 5 percent allowance is typical for a simple continuous footing poured directly from the truck, but it climbs when the truck cannot reach the form, when there are steps or drops, or when the pour is split across two days. On hillside lots common around Grants Pass, pump charges and a longer chute run can push the practical waste higher, and that cost belongs in the concrete division, not in general conditions.
Rebar is counted separately. A typical continuous footing carries two or three continuous bars plus dowels at a spacing set by the structural drawings, so we measure bar length by diameter, add lap splices at a typical 40 bar diameters, and convert to pounds using the standard weight per foot for that bar size.
Forming is measured by contact area, not by footing volume. The same 210 linear feet of footing with 12 inches of form height on both sides gives 420 square feet of form contact area, which is what a formwork crew prices. If the footing is poured against earth on one side, that side is deducted.
When you send plans, include the foundation plan, structural notes, and the geotechnical report if one exists. Soil bearing and the presence of rock or expansive clay change footing width, and therefore change the concrete quantity. Our foundation estimating services deliver this breakdown by division with the arithmetic shown, so you can adjust a single input and see the effect on the order.
The figures come from the U.S. Census Bureau Building Permits Survey for 2025, which counts permits issued by the city itself for new privately-owned residential units only. That means additions, remodels, commercial buildings, and accessory structures are not in the count. For Grants Pass, the survey reported 195 total residential units in 2025 against 94 in 2024, with 58 single-family and 137 multifamily units. Use these numbers as a demand signal, not as a measure of total construction volume in Josephine County.
It means multifamily permitting in Grants Pass roughly doubled between 2024 and 2025, with 137 of the 195 units in multifamily buildings. More concurrent projects in a small market can tighten concrete, framing, and drywall crews, and subcontractors may carry more work in their backlog. When you bid in a period like that, verify that your subcontractor quotes state how long they are holding the number and what escalation they assume. We price material and labor with ZIP-code-adjusted data so the estimate reflects the local market rather than a national average.
It helps, but it is not always available at bid time. If there is no report, we estimate from the footing sizes shown on the structural drawings and flag the assumptions in writing, particularly allowable bearing pressure and whether rock excavation is likely. Decomposed granite and clay soils are common in the area, and both can change footing width or depth. If the report arrives later, we can revise the foundation quantities quickly. Tell us at the start if the report exists so we price from real data.
We do not build the schedule, but we do price the items that winter drives. On sitework, that means dewatering, temporary gravel access, and erosion control measured by linear foot and each. On concrete, it means cold-weather protection and possibly accelerated mix designs. On roofing, it means a realistic number of weather days and temporary dry-in. If your bid assumes a summer start and the project slips to November, those costs do not disappear. We list them as separate line items so you can decide whether to carry them.
We deliver Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets showing what we measured. Most projects turn around in 24 to 48 hours, and rush service is available when a bid date is close. We work in Bluebeam Revu and PlanSwift and price with RSMeans data adjusted to the local ZIP code. If you need the quantities in a specific spreadsheet template your office already uses, send it with the plans and we will match the column structure.
Yes. Multifamily buildings in Oregon often require sprinklers under NFPA 13 or 13R, and the applicable standard depends on construction type, height, and whether the building is treated as residential occupancy. We count heads each, pipe by diameter and linear foot, and riser components each, then separate the design-build portion from the sprinkler rough-in so the scope is clear. Confirm the adopted fire code edition and any local amendments with the building department before you finalize the bid.
Yes. We estimate work throughout Josephine County and the surrounding region, including rural parcels where well, septic, and longer utility runs change the sitework scope. Rural projects often carry more excavation, more trenching, and more restoration than a city lot, and those items need to be measured rather than allowed. We also cover projects in nearby cities across the state, including Medford-area work and communities along the I-5 corridor.
Send the architectural and structural plan sets, the civil or site plan, the specification book if one exists, and any addenda issued to date. If you have a geotechnical report, a survey, or a previous estimate you want matched, include those too. Tell us the bid date, the delivery format you want, and whether you are pricing as a general contractor or a single trade. With that package we can usually confirm scope and turnaround the same day.
Oregon has no statewide sales tax, so material pricing does not carry a sales tax line the way it would in Washington or California. That does not mean there are no fees. Plan review, system development charges, and permit fees are project costs, and they vary by jurisdiction and by the scope of work. We typically exclude permit fees from the construction estimate and list them separately so you can add the actual amounts once the jurisdiction issues them. Confirm current fee schedules with the city or county.
Yes. Subcontractors often only need their own division, and a focused takeoff is faster and cheaper than a full-building estimate. Common requests are concrete, framing, roofing, and MEP. Send the plans and tell us which division you bid, and we will return quantities in that division with the same level of detail, including waste factors and a clear list of what we assumed. If you later need the adjacent divisions, we can extend the same model rather than starting over.
Send your plans, bid date, and the divisions you need priced, and we will confirm scope and turnaround the same day.