Sitework takeoff
Cut and fill, overexcavation for expansive clay, utility trenching and paving quantities for Northglenn lots and industrial pads.
CY · LF · TONWe prepare quantity takeoffs and cost estimates for Northglenn contractors, developers and owners. Deliverables come as Excel and PDF, organized by CSI MasterFormat division with marked-up plan sets, typically in 24–48 hours.
Northglenn numbers turn on several local drivers: expansive clay soils along the Front Range, IBC and IRC editions adopted by Adams and Weld County jurisdictions, IECC thermal requirements for roof and wall assemblies, ZIP-code-adjusted material and labor pricing, and Denver-metro subcontractor pricing that shifts with the corridor's permit volume.
Northglenn sits in Adams and Weld counties along the I-25 corridor between Denver and Brighton. Work here splits between infill residential, small commercial tenant improvements, and industrial and warehouse space near the interstate. Because the city issued no new privately-owned residential permits in 2025 after 146 in 2024, much of the current bid volume is remodel, repair and commercial work rather than new subdivision construction. That mix changes how you estimate: renovation takeoffs carry selective demolition, temporary protection and unforeseen condition allowances that new-build templates do not.
We build estimates from the plan set you send, using Bluebeam Revu for markup, PlanSwift for quantity takeoff, and RSMeans data with ZIP-code adjustment for Northglenn pricing. Every estimate is organized by CSI MasterFormat division so your bid form, your subcontractor scopes and your buyout all key off the same numbers. If you are comparing this market to the rest of the corridor, start with our Colorado construction estimating overview, then look at what we produce for Brighton and Commerce City work.
For bidders. You need unit-price backup fast. We return Division 1 through 33 quantities with waste factors, so you can plug your own labor rates and still hit the bid date.
For builders. You are pricing a remodel or tenant improvement with partial existing conditions. We flag scope gaps, allowances and demolition line items you will need before you sign a subcontract.
For owners. You want a budget before design is complete. We estimate from schematic plans and mark what is not yet defined, so your contingency reflects real unknowns.
Select a bar to compare Northglenn with the largest Colorado markets we cover.
0 new housing units in 2025 (-100% vs 2024).
0 single-family · 0 multifamily (0%).
Northglenn recorded zero new privately-owned residential units in 2025, down from 146 in 2024, a 100% drop, and ranks 21st of 21 covered Colorado cities by units. Statewide, 16,921 units were permitted. For you as a bidder, that means fewer new-construction residential packages are being advertised inside the city and more of the work is renovation, addition, tenant finish and commercial. Price accordingly: carry demolition, dust control, disposal and existing-condition allowances. If you are set up for new residential shells, look at the wider Front Range corridor; our Parker and Windsor pages cover markets with active single-family and multifamily volume.
The Denver–Colorado Springs–Fort Collins corridor keeps residential and commercial expansion steady, and Northglenn's position on I-25 puts it in the path of industrial and warehouse demand. Material and labor pricing here is Denver-metro pricing, adjusted by ZIP code, not a statewide average. Expect concrete and earthwork to move with fuel and haul costs, and MEP packages to move with mechanical and electrical subcontractor backlogs. Because the city's own permit volume was flat in 2025, general contractors working Northglenn are often bidding against firms from Englewood and Littleton, which means your estimate has to be tight on both quantity and scope.
We produce takeoffs and estimates for the project types that actually get built and renovated in Northglenn and the surrounding Adams and Weld County corridor.
Cut and fill, overexcavation for expansive clay, utility trenching and paving quantities for Northglenn lots and industrial pads.
CY · LF · TONFootings, slab-on-grade, stem walls and flatwork, with formwork and reinforcement broken out for Colorado mixes and cure schedules.
CY · SF · LBSpread footings, pier and grade beam, and post-tension slabs priced against the soil report and the adopted IRC or IBC edition.
CY · LF · EAFloor, wall and roof framing with stud, plate, joist and sheathing counts, plus waste factors for the plan's layout and roof geometry.
BF · LF · EAShingle, TPO and membrane systems with insulation, flashing and ice-barrier quantities for IECC thermal and snow-load requirements.
SQ · LF · SFPlumbing, HVAC and electrical rough and finish counts for tenant improvements, remodels and small commercial buildings.
LF · EA · TONAdditions, basement finishes and custom homes, with allowances for existing conditions and selective demolition.
SF · LF · EATenant finish, retail, office and light industrial packages, organized by CSI MasterFormat division for bid and buyout.
SF · EA · LSYou bid tenant improvements and small commercial in Northglenn, where existing conditions and selective demolition drive cost. We return Division 1–33 quantities with waste factors so your buyout matches the bid form.
You need unit-price backup for concrete, framing or roofing packages in Adams and Weld counties. We price from your scope with ZIP-adjusted RSMeans data, so your numbers hold against other bidders.
You are weighing infill residential or warehouse near I-25. We estimate from schematic plans, flag undefined scope, and let you compare land cost against hard cost before you commit.
You need a cost check during design development. We mark up your plan set in Bluebeam Revu and return quantities by CSI division, so your spec sections and estimate line up.
You are budgeting a remodel or repair after a quiet permit year. We estimate from existing drawings and list allowances for unforeseen conditions, so your contingency reflects real unknowns.
You handle tenant turnover and capital repairs across Northglenn commercial space. We price unit-rate scopes for flooring, ceilings, paint and MEP so you can approve work orders quickly.
We estimate projects across Northglenn and the surrounding Adams and Weld county corridor. If your project sits near a city line, send the address and we price to the correct jurisdiction.
With no new privately-owned residential permits issued in 2025 after 146 in 2024, the current bid mix leans toward remodel, repair and commercial work. We price the property types that actually trade in this market.
Northglenn's older housing stock means kitchen and bath remodels, room additions and structural repairs. We take off selective demolition, temporary protection and finish allowances from your existing plans.
Watch for: Existing framing, asbestos and lead paint, match existing finishes
Retail, office and service space along the I-25 corridor changes hands often. We estimate demising walls, storefront, HVAC distribution and restroom cores from your lease outline and permit set.
Watch for: Landlord vs. tenant scope, ADA upgrades, sprinkler modifications
Warehouse and light industrial space near the interstate needs slab, racking, dock equipment and power. We price Division 3 concrete, Division 5 metals and Division 26 electrical from your site plan.
Watch for: Slab flatness, dock levelers, power capacity, fire access
Older apartment and townhome properties in Northglenn see unit-turn and capital repairs. We estimate by unit type, so you can compare per-door cost across buildings and phasing.
Watch for: Unit mix, plumbing riser condition, common area scope
Food service and retail fit-outs carry grease, hood, and health department requirements. We take off kitchen equipment rough-in, exhaust, and finish schedules from your equipment plan.
Watch for: Grease interceptor, hood suppression, health department review
Schools, churches and municipal buildings in the Northglenn area need phased occupied-building work. We estimate temporary partitions, off-hours labor and security provisions from your phasing plan.
Watch for: Occupied building phasing, prevailing wage, security clearances
Northglenn sits across Adams and Weld counties, so the same plan can carry different fees, inspections and soil conditions. These are the drivers we adjust for before we send a number.
Northglenn enforces the adopted IBC and IRC editions along with local amendments, and projects in Adams County may see different review timelines than Weld County. We build permit fee and plan review allowances into Division 1 based on the jurisdiction you name. Confirm the adopted code edition and any local amendments with the Northglenn building department before you finalize your bid.
IBC · IRC · Northglenn building department · Adams County · Weld CountyFront Range soils often include expansive clay and undocumented fill from earlier grading. That changes footing depth, piering and slab underlayment quantities. We carry a geotechnical report allowance when one is not provided, and we flag where a soils investigation should be completed before foundation pricing is final.
Expansive clay · undocumented fill · geotechnical report · pieringNorthglenn sees freeze-thaw cycles, heavy spring snow and hail. Roofing systems, exterior sealants and freeze protection on piping all carry cost implications. We price roof cover board, ice barrier and freeze-protected domestic water lines where the design calls for them, and we note hail-rated roofing where specified.
Freeze-thaw · hail · ice barrier · freeze protectionThe Denver metro corridor keeps concrete, framing and MEP trades busy, so labor rates and availability shift by season. We use ZIP-code-adjusted RSMeans labor rates for Northglenn and note where trade escalation may apply. If your schedule is tight, we can carry an overtime or shift differential allowance.
RSMeans data · ZIP-code adjustment · trade escalation · overtime allowanceFlat lots and clay soils make storm drainage and grading a real cost item. We take off detention, swales, area drains and utility trenching from your civil plans, and we flag where a drainage study or grading permit may be required. Confirm local drainage criteria with the city or county engineer.
Detention · swales · area drains · grading permitNorthglenn's location off I-25 gives good access to Denver-area suppliers, but delivery windows and storage on tight infill sites add cost. We include crane, pump and hoisting allowances where the site plan shows limited laydown. Sales tax treatment on materials can vary by project type; confirm with your accountant.
I-25 access · crane allowance · pump rental · sales taxNorthglenn sits in Adams and Weld counties on the north metro fringe, where expansive clay soils, freeze-thaw cycles, and Front Range wind loads change what you quantify. Here is how those conditions land in the divisions we price most.
Northglenn's clay soils and flat-to-rolling lots mean over-excavation and import are common line items, not afterthoughts. We quantify stripping by depth and area, then structural fill in compacted cubic yards, and we separate on-site borrow from imported granular fill because the haul cost differs. For a typical pad, expect to carry over-excavation beneath footings plus a moisture-conditioning allowance. Storm drainage ties into the regional system, so we take off trench lengths, pipe diameters, and inlet structures from the civil sheets. If your project includes site utilities, our sitework estimating services break out each bid item so you can see where the dirt money actually goes.
Wood framing dominates Northglenn's residential and light commercial work. We take off wall framing by linear feet of plate and count studs at the specified spacing, then add headers, trimmers, and blocking as separate items. Floor and roof systems are quantified by square feet of sheathing plus joist or truss counts, with hangers and connectors listed individually. Wind uplift on roof sheathing affects nailing schedules and clip counts, so we read the structural sheets rather than assuming a default. If you bid framing packages, our framing estimating services produce a takeoff you can hand straight to a lumber yard for a quote.
MEP scope in Northglenn follows the adopted energy and mechanical codes, which affect equipment sizing and duct insulation. We count plumbing fixtures and take off piping by diameter and linear feet, with fittings as a percentage you can adjust. HVAC gets quantified by tonnage, register and diffuser counts, and ductwork by pound or linear foot depending on how your sub prices it. Electrical is taken off by device count, fixture count, and feeder and branch circuit lengths. Our MEP estimating services organize all three trades by CSI division so nothing hides in a combined allowance.
Expansive soils drive the foundation scope here. We take off continuous footings, stem walls, and slab-on-grade separately, in cubic yards, and we track rebar by bar size and lap length rather than a blanket pounds-per-cubic-yard factor. For post-tensioned slabs, we quantify tendons by linear feet and anchorages by count. Flatwork gets its own line: sidewalks, driveways, and aprons in square feet with thickness noted, because a 4-inch walk and a 6-inch apron are different costs. Our concrete estimating services and foundation estimating services both start from the same marked-up plan set, so quantities reconcile between the two scopes.
Hail and wind drive roof specification along the Front Range, so we quantify underlayment, ice-and-water membrane at valleys and eaves, and Class 4 impact-rated shingles by square, with ridge, hip, and starter courses as separate linear-foot items. On commercial roofs, we take off insulation by thickness and R-value, cover board, and membrane by square, plus flashing at penetrations and curbs. Air barrier and insulation in Division 07 overlap with the energy code scope, so we note where a line belongs to avoid double-counting. Our roofing estimating services cover both steep-slope and low-slope assemblies.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24"x12" continuous | 18.5 | CY |
| 03 20 00 | Rebar, #4 footing bars with laps | 4,120 | LF |
| 06 10 00 | Wall framing, 2x6 at 16" o.c. | 3,240 | LF |
| 06 10 00 | Wall studs, 8' precut | 486 | EA |
| 06 16 00 | Roof sheathing, 7/16" OSB | 2,860 | SF |
| 07 30 00 | Asphalt shingles, Class 4 | 31.8 | SQ |
| 07 30 00 | Ice-and-water membrane at eaves | 196 | LF |
| 22 11 00 | PEX water piping, 1/2" and 3/4" | 740 | LF |
Dimensions below are illustrative. Say you are pricing a 1,800-square-foot ranch on a rectangular lot with a perimeter footing 24 inches wide by 12 inches deep, plus two interior bearing lines. You measure the footing centerline from the foundation plan and add for the garage return.
| Step | Calculation | Result |
|---|---|---|
| Perimeter footing length | 60 + 40 + 60 + 40 ft | 200 LF |
| Interior bearing footings | 2 lines x 40 ft | 80 LF |
| Total footing length | 200 + 80 | 280 LF |
| Cross-section area | 2.0 ft x 1.0 ft | 2.0 SF |
| Net concrete volume | 280 LF x 2.0 SF ÷ 27 | 20.7 CY |
| Waste factor (typical 5%) | 20.7 x 1.05 | 21.8 CY |
So the footing line carries about 21.8 cubic yards before you add any slab or stem wall. Keep the waste factor separate from the net quantity so a reviewer can see both. If the geotechnical report calls for over-excavation and a granular base, that is a Division 31 line, not part of this footing volume, and mixing the two is one of the most common errors we catch on Northglenn bids. Rebar for the same footing runs roughly 4,120 linear feet of #4 bar once you account for laps and dowels, which you should take off by bar length rather than a generic pounds-per-yard figure. Confirm the adopted code edition and inspection requirements with the local building department before you lock the number.
Yes. Northglenn straddles both counties, and we price work on either side of the line. County review and inspection can differ, so tell us which jurisdiction your permit is under when you send plans. We also cover nearby Front Range cities including Commerce City, Brighton, and Englewood. If your project is in one of those, our Colorado construction estimating services page lists the cities we handle and the formats we return.
The permit figures come from the U.S. Census Bureau's Building Permits Survey, and they count new privately-owned residential units only. That means additions, remodels, and commercial permits are not included. For 2025, the survey recorded 0 new privately-owned residential units in Northglenn, down from 146 in 2024. Treat that as a residential-only measure, not a total construction volume for the city.
Most projects come back in 24 to 48 hours. Rush turnaround is available if your bid date is close. Deliverables are Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets so you can trace every quantity back to the sheet it came from. Send the plans and we will confirm the schedule before we start.
Yes. We use ZIP-code-adjusted material and labor pricing with RSMeans data as the base, reviewed in Bluebeam Revu and PlanSwift. That matters here because Front Range labor rates and haul distances differ from the national average. If you have recent supplier quotes or a subcontractor bid you want us to match, include them and we will reconcile the takeoff against your numbers.
Yes. Post-tensioned slabs are common in this soil. We quantify tendons by linear feet, anchorages and stressing pockets by count, and edge forms separately from the slab area. We also separate the concrete volume for footings, stem walls, and slab so your ready-mix order and your finishing labor are priced against the right quantities. If the structural sheets call out a specific tendon profile, we take it off as drawn.
We take off shingles by square, then list underlayment, ice-and-water membrane at eaves and valleys, starter courses, ridge and hip, and ventilation as separate line items. Class 4 impact-rated products change the material cost but not the quantity, so the takeoff stays comparable if you switch products. For low-slope commercial roofs, we take off insulation by thickness and R-value, cover board, and membrane by square, with flashing at every penetration and curb.
Send the architectural, structural, civil, and MEP sheets, plus the geotechnical report if you have one. A spec book or scope narrative helps us assign line items to the right division. If you only have a partial set, tell us which scopes you want priced and we will note the exclusions. You can start through our get an estimate page and we will confirm what is missing before we begin.
Yes. Northglenn's residential permit volume was flat in 2025, but the north metro corridor still carries commercial and multi-family work. We take off both, and our commercial estimating services and multi-family estimating services pages describe the divisions we cover. Multi-family takeoffs get unit-type counts so you can compare a one-bedroom stack against a two-bedroom stack without re-measuring the whole building.
Yes. We can return the takeoff as one combined workbook or split it by trade so each subcontractor gets only their scope. That helps on Northglenn jobs where the framing, concrete, and roofing packages go to different bidders. Marked-up plan sets accompany the workbook, so a reviewer can see exactly which sheets produced each quantity. Tell us your preferred split when you send the plans.
We keep material, labor, tax, and freight as separate columns where the pricing basis allows it, so you can adjust the rate without rebuilding the takeoff. Colorado sales tax treatment can vary by jurisdiction and by whether the buyer is a contractor or an owner, so confirm the applicable rate with your accountant or the local authority. Freight matters on imported fill and on long-lead items, so we flag those lines.
Send your plans and we will return a division-organized takeoff in 24 to 48 hours.